SOW 20-0B5 Approved 3Mar20_Redacted.pdf
PDF 24 KB Posted
- Attached to
- Advantest Workstation Upgrade
- Solicitation number
- HQ072720QRH02
- Issued by
-
Defense Microelectronics Activity
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA Advantest 20-0B5 3Mar20_Redacted.pdf | ||
| Combined Synopsis and Solicitation 20-0B5_3Mar20.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
DMEA 20-0B5
11 February 2020
1.0 SCOPE:
1.1 TITLE: Advantest Workstation Acquisition
1.2 APPLICABILITY: DMEA Advantest Workstations
1.3 BACKGROUND: MEBA recently completed Radio Frequency (RF) testing for using a test system other than Advantest. Upgrading the Advantest workstations is required in order to efficiently conduct
RF testing on the Advantest system in the future for projects such as for the . DMEA requires replacement of the existing workstation system controller hardware for three (3) V93000 test systems manufactured by Advantest. The current workstations have an older operating system that no longer complies with security policies and data back-up strategies. One (1) of the three (3) V93000 Test Systems will require a hardware upgrade in order to be compatible with the new workstation.
1.4 PURPOSE: The contractor shall provide three (3) new workstations for V93000 test systems, manufactured by
Advantest. The contractor shall provide and install one (1) new PCI Express upgrade for the V93000-L test system.
2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES: None
2.5 GOVERNMENT FURNISHED FACILITIES/ACCESS:
Facility/Access Date
DMEA Facility, 4234 54th St., McClellan, CA 95652-2100 As scheduled under the contract
3.0 REQUIREMENTS:
3.1 GENERAL REQUIREMENTS:
3.2 PROGRAM MANAGEMENT: None
3.3 TASK REQUIREMENTS: The contractor shall ship to DMEA three (3) new Advantest workstations that will be used as system controllers for the following Advantest V93000 test systems: one (1) V93000-L, L-Class, model number E8000S and two (2) V93000-A, A-Class, model number E8000Y. The contractor shall provide and install one (1) new PCI Express upgrade, which includes a new active control board and all related fiber optics cables, for the V93000-L, L-Class, model number E8000S test system onsite at DMEA.
The workstations shall meet the following hardware and software requirements:
3.3.1 HARDWARE:
ONLINE HP Z4G4 workstation system controller
Intel Xeon W-2145 3.7 2666MHz 11 8C CPU
Memory Configuration:
- 64GB (2X32GB) DDR4 2666 DIMM ECC Registered Memory
- Two (2) HP Z Turbo Drive M.2 1TB SSD
NVIDIA Quadro p400 2 GB (3) mDP GFX graphics adapter (3 monitor display support)
HP i350 T2 PCIe Dual Port Gigabit NIC
9.5 mm slim Blue-Ray writer
USB keyboard and mouse
3.3.2 SOFTWARE: The contractor shall provide the workstations with the SmarTest 7.5 software installed. Before shipping the three (3) new workstations, the contractor shall install an individual local license onto each workstation.
The serial numbers of the licenses shall match the existing licenses currently installed and in use at DMEA.
3.3.3 INSTALLATION: DMEA will install workstations with no on-site assistance from contractor. The contractor shall come on-site at DMEA to perform installation of the PCI Express upgrade for the V93000-L, L-Class test system.
3.3.4 LOCATION: The contractor shall deliver the service/materials to DMEA at the location listed in paragraph
2.5.
3.3.5 SECURITY: The contractor shall provide advance notification prior to conducting any onsite service. A forty-eight (48) hour minimum notice during normal business hours shall be given. All contractor work at DMEA shall be performed by US citizens unless an exception is granted, in writing, by DMEA; after hours and/or weekend work may be required for excepted personnel. Prior to being allowed entry, contractor personnel shall provide proof of citizenship in accordance with the DMEA visitor approval process in effect at the time the visit is requested. During periods of exceptionally heightened security, additional advance notice background investigations of contractor personnel may be required prior to gaining entry into DMEA.
4.0 POINTS OF CONTACT:
File details come from the government source that posted it. Updated .