Sources Sought Response Form.pdf

PDF 281 KB Posted

Attached to
C-130J NP-2000 Propeller Maintenance & Storage Stand
Solicitation number
W50S7L23P0003
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-20 NGB 2023

Sample Sources Sought Response Form

NAICS Code: 336413

Interested firms please respond with this information form and the following requested information. Please complete all sections of the document.

1. Company Information.

Company Name:

Company Address as registered in System for Award Management (SAM):

CAGE Code:

DUNS Number:

Socio‐economic status for the listed NAICS code ‐ please check all that apply:

( ) Large business ( ) Small business

( ) Small disadvantaged business ( ) 8(a) program participant

( ) HUB Zone business ( ) Woman‐Owned business

( ) Service‐Disabled Veteran‐Owned Small Business (SDVOSB)

By responding to the Sources Sought Notice, I confirm that my firm is registered in the System for Award Management (SAM) https://www.sam.gov/ with the socio‐economic status identified above and the NAICS code specified in the sources sought notice; or that my firm qualifies and registration under the applicable NAICS code is in process.

Certification:

I understand that incomplete answers in sections or my failure to provide required documentation or failure to sign this certification may remove my firm from the Government’s determination of whether to solicit the referenced project on a set-aside basis in accordance with Part 19 of the Federal Acquisition Regulation.

Name:

Title:

Signature:

http://www.sam.gov/

for
January 2023
Where to Find Tools
PCF Folder Structure
SECTION I. Pre‐Award
SECTION II. Award
Scope
A. Requirements Development
Pre-Requirements Package Initiation Documentation
Should the procurement be considered “Construction”?
DFARS 222.402-70(d)
The following documents are filed PCF:
References:
Acquisition Plan (AP)
Construction Source Selection Considering Technical Capability, Past Performance and Price
The following documents are filed PCF:
References:
Usable Formats:
Acquisition Strategy Document and Briefing Slides
Biddability, Constructability, Operability and Environmental Review (BCOE)
The following documents are filed in PCF:
References:
Link:
Contract Requirements Package (CRP) Checklist
The following documents are filed PCF:
Reference(s):
Usable Format(s):
Comments:
Independent Government Estimate (IGE)
The following documents are filed in PCF:
Reference(s):
Sample(s):
CERTIFICATION OF INDEPENDENT GOVERNMENT ESTIMATE
OR
Justification and Approval (J&A) for Other Than Full and Open Competition
The following documents are filed in PCF:
Reference(s):
Sample(s):
Justification Approval to Provide Government Furnished Property / Facilities and / or Contractor Acquired Property
The following documents are filed in PCF:
Reference(s):
Justification for an Exception to Fair Opportunity
The following documents are filed in PCF:
Reference(s):
Sample(s):
Market Research Documentation
The following documents are filed in PCF:
References:
Sample:
Useable Format(s):
Sample Sources Sought Response Form
Sample Sources Sought Notice
Sole Source Justification
The following documents are filed in PCF:
Reference(s):
Format(s):
Statement of Work
Construction is not a performance-based service, therefore a PWS does not apply.
The following documents are filed in PCF:
Acquisition Milestone Sheet
The following documents are filed in PCF:
Antiterrorism / Operations Security (AT / OPSEC) Cover Sheet
The following documents are filed PCF:
Reference(s):
Drawings / Technical Data / Technical Data Package (TDP)
The following documents are filed PCF:
Reference(s):
Military Specifications and Standards
The following documents are filed PCF:
Reference(s):
Miscellaneous Correspondence / Documents / Memoranda - Requirement Package
The following documents are filed in PCF:
Purchase Request / MIPR / Funding Document
The following documents are filed in PCF:
References:
Request for Services Contract Approval
The following documents are filed in PCF:
Reference(s):
B. Solicitation
Pre-Solicitation Notices / Synopsis (and Amendments) / Exemption / Responses
The following documents are filed in PCF:
References:
Samples:
Legal Review(s) - Solicitation
The following documents are filed in PCF:
Reference(s):
Small Business Coordination Record (DD Form 2579)
Determination to Solicit Unrestricted - Sample
Solicitation Review(s)
Peer Review / Solicitation Review Board (SRB) Documentation
Solicitation Review Board Clearance
Solicitation Review Board Comments and Recommendations
D&F: Authority to Use Contractors in Source Selection
D&F: Full and Open Competition after Exclusion of Sources
D&F: Inclusion and Evaluation of an Option
D&F: Letter Contract / Undefinitized Contract Action (UCA)
D&F: Liquidated Damages
MATOC BASIC CONTRACT SAMPLE
Determination for Standard / Commercial / Noncommercial Warranty
HCA Waiver of Submission of Cost / Price Data
Waiver of Synopsis
Authority to Advertise
Miscellaneous Correspondence / Documents / Memoranda - Pre-Award
Pre-Solicitation / Pre-Proposal Conference / Site-Visit Documentation / Attendance List / Minutes
Pre-proposal Conference Minutes Sample (post to SAM.gov as PDF)
Solicitation
Solicitation Amendment(s)
Solicitation Distribution Checklist
C. EVALUATION
8(a) Concern Award Notice - Offer / Acceptance Letter(s)
SAMPLE SSEB CHAIRPERSON APPOINTMENT LETTER
SAMPLE SSEB APPOINTMENT LETTER
Conduct, and Nondisclosure Agreements)
Lowest Price Technically Acceptable (LPTA) Selection Criteria
Record of Weighted Guidelines Application (DD Form 1547)
Source Selection Plan (SSP)
Certificate of Current Cost or Pricing Data
Certificate of Current Cost or Pricing Data
Late Submissions of Bids / Offers
Late Bid
Sample Late Proposal letter (Sanitized notice written by NGB/JA)
Litigations (Claims / Disputes / Protests) - Pre-Award
No Bid / Offer Replies
Offeror Initial: Quote(s) / Bid(s) / Proposal(s) / Submittal(s)
File Checklist for Unsuccessful Proposals
Offeror Successful: Quote(s) / Bid(s) / Proposal(s) / Submittal(s)
Abstract of Offers (SF1409) / Summary of Bids
Invitation For Bid (IFB) Opening Checklist
RFP COMPLIANCE CHECKLIST AND OFFEROR EVALUATION PREPARATION CHECKLIST
Competitive Range Determination
Mistakes in Quote(s) / Bid(s) / Proposal(s) / Submittal(s) and Disposition
Verification of Bid/Proposal Request
Non-Responsive Offerors
Noncompliant Single Project Letter
Letter to Rejected Bidder
Pre-Award Survey Documentation
Price / Post Negotiation Memorandum (PNM) - Business Clearance Memorandum (BCM)
Small Business Participation Plan Evaluation
Source Selection Evaluation Notes
SSEB Evaluation Worksheet
Debriefing Documentation - Pre-Award
Determination of Contractor Responsibility / Non-Responsibility / Pre-Award Survey (Proposal Receipt / Prior to Award)
Source Selection Consensus Document
Addendum to SSEB Report
OFFEROR NO. 1 - ABC Construction, Inc.
Offeror No. 1 – ABC Construction
OFFEROR NO. 2 – XYZ, LLC

Review(s) of Subcontracting Plan

Agreement (OTA) Reviews
Contract Specialist / Contracting Officer Pre-Review Checklist
Legal Review(s) - Contract
Peer Review / Contract Review Board (CRB) Documentation
Contract Review Board Clearance
Contract Review Board Comments and Recommendations
Announcement of Award
Multiple Award Announcement
Notice of Award
Notice to Proceed / Contract Receipt
ACKNOWLEDGMENT
Synopsis of Award / Exemption from Synopsizing
Unsuccessful Offeror(s') Notification
E.CONTRACT / ORDER AGREEMENT / GRANT / MODIFICATION / OTA
Contract / Letter Contract
CONSTRUCTION COST ESTIMATE BREAKDOWN
F. POST AWARD DOCUMENTS
Contracting Officer Award Review Certification
D&F: Exercise of an Option
Miscellaneous Correspondence / Documents / Memoranda - Post-Award
Notice to Contractor of Intent to Exercise Option
Novation / Change-of-Name Agreements
Post-Award Conference Minutes
Debriefing Documentation - Post-Award
Sample Postaward Debriefing Letter
Contractor Claim / Certifications
Sample Contracting Officer’s Final Decision
Litigations (Claims / Disputes / Protests) - Post-Award
Legal Review(s) - Post-Award
Administration
General Information
Apprentice Certificates
SAMPLE
Insurance Certificates
Labor Standards Interviews (SF 1445)
List of Subcontractors
Completed / Superseded Progress Schedule(s)
Construction Photographs
REMEMBER: “A Picture is Worth a Thousand Words”
Contract Progress Reports
SAMPLE
Contract Progress Schedule
Government Progress Reports
Performance Evaluation
Weekly Payrolls
Labor Investigation Correspondence
Declining Balance Sheet
Payment and Performance Bonds / Checklist
Checklist: Consent of Surety
Progress Payment Package
Statement and Acknowledgment (SF 1413)
Contractor Quality Control Documentation
Contractor's Safety Program / Minutes of Preconstruction Safety Conference
Inspection Reports
Notice of Final Inspection
Site Superintendent / Safety / Quality Control Appointment Letters
Delinquent Performance Notifications
Incoming Correspondence / Documents / Memoranda
Miscellaneous Correspondence / Documents / Memoranda – Construction
REQUEST FOR INFORMATION (RFIs) SUMMARY SHEET
Outgoing Correspondence / Documents / Memoranda
Request for Additional Classification and Rate (SF 1444)
Pre-Construction Meetings
Sample Post-Award Conference Minutes/Agenda
Progress Meetings
ISSUES TRACKING LOG
Drawings
Materials Submittals
Specifications / Submittals
(Contract / Order / Agreement / Grant / OTA)
Site Visit Documentation
Within Scope Determination
Sample Within Scope Determination
Liquidated Damages Data
Sample Liquidated Damages Assessment Letter
Pre-Final Payment / Final Acceptance
Value Engineering Change Proposals (VECP)
Administrative Contracting Officer (ACO) Delegation
Cure Notices
Show Cause Notices
Termination Notice / Documentation
J. CLOSEOUT DOCUMENTATION
Contract Closeout Checklist (DD Form 1597)
Instruction for Request for Warranty Work-Construction Contracts Form
Miscellaneous Contract Closeout Documentation
Release of Claims
Transfer and Acceptance of DoD Real Property (DD Form 1354)

File details come from the government source that posted it. Updated .