Solid Waste Bathroom Renovation - Invitation to Bid Summary

This is an Invitation to Bid (ITB) issued by the City of Fayetteville, North Carolina for construction services related to the Solid Waste Building Bathroom Renovation project (ITB No. COF1517016). The project scope includes construction of a new women's locker room, renovation of the existing men's locker room, renovation of the break room area, and all associated architectural, structural, mechanical, electrical, plumbing, and life safety modifications within the existing building footprint at 455 Grove Street, Fayetteville, NC 28301. The ITB was issued July 31, 2026, with a mandatory pre-bid conference and site walk-through scheduled for August 12, 2026 at 2:00 p.m. (attendance required in person or bids will be deemed non-responsive). The written question deadline is August 18, 2026 by 5:00 p.m., with the City's response posted August 20, 2026. Bids are due September 3, 2026 by 2:00 p.m., followed by evaluation, anticipated award by September 14, 2026, contract execution by September 24, 2026, and Notice to Proceed by October 1, 2026. The estimated contract duration is 180 calendar days from the effective date of Notice to Proceed.

The contract is funded solely from the City of Fayetteville General Fund/Local Funds with no federal funding involved; therefore, Davis-Bacon prevailing wage and federal Buy American provisions do not apply. Award will be made to the lowest responsive, responsible bidder meeting all technical and responsibility criteria. Bidders must submit a 5% bid bond, proof of valid North Carolina General Contractor License, non-collusion and debarment certifications, three project references, financial condition certification, pending litigation disclosure, subcontractor lists, and acknowledgment of all addenda. Post-award requirements include submission of 100% performance and payment bonds, certificates of insurance meeting specified minimum limits ($1,000,000 general liability per occurrence, $2,000,000 aggregate, $1,000,000 auto liability, statutory workers' compensation), E-Verify compliance certification, and NC Secretary of State registration if applicable. The contract includes a liquidated damages clause of $1,000 per calendar day for delays beyond substantial completion, 5% retainage on progress payments until 50% completion (reduced to 2.5% thereafter), and a one-year workmanship warranty from final completion. All work must comply with the 2018 North Carolina Building Code, ADA accessibility standards, OSHA requirements, and applicable City standards. The facility will remain occupied and operational during construction, requiring coordination with City departments and minimal disruption to daily operations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF FAYETTEVILLE, NC | ITB No. COF1517016 | SOLID WASTE BATHROOM RENOVATION

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 1 of 43

CITY OF FAYETTEVILLE, NORTH CAROLINA

INVITATION TO BID – CONSTRUCTION

Solid Waste Bathroom Renovation

ITB No. COF1517016

DATE ISSUED: July 31, 2026

BIDS DUE: SEPTEMBER 3, 2026

FUNDING SOURCE: Local ISSUED BY: City of Fayetteville, North Carolina

PRIMARY CONTACT: Kimberly Toon, Assistant Chief Financial Officer-Procurement KimberlyToon@fayettevillenc.gov

(910) 433-1942

OFFERORS ARE NOT REQUIRED TO RETURN THIS FORM.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 2 of 43

A MESSAGE FROM THE CITY OF FAYETTEVILLE CITY MANAGER, DR. DOUGLAS J. HEWETT, ICMA-CM

The City of Fayetteville is fully committed to providing Small Local Business Enterprises (SLBEs) and small businesses an equal opportunity to participate in all aspects of City contracting, including but not limited to participation in the procurement of contracts relating to construction, professional services, equipment, supplies, and improvements to facilities throughout the City.

It is the policy of the City to prohibit discrimination against any person or business in pursuit of these opportunities on the basis of race, sex, color, religion, national origin, age, or disability, and to conduct its contracting and purchasing programs so as to prevent such discrimination. The City is committed to following all applicable federal, state, and local laws as they relate to procurement practices.

Small Business Participation Commitment The City will actively seek and identify qualified small businesses, including SLBEs, and offer them the opportunity to participate in the procurement of contracts for all City purchasing and service contracts as well as construction and repair contracts. The City aspires to spend 40% of its eligible contract dollars with small local suppliers and contractors.

Small Business Enterprise Program The City’s Charter has been amended by the General Assembly (H.B. 198) to establish a small business enterprise program to promote the development of small local businesses. The City is authorized to establish bid and proposal specifications that include measures to enhance participation by small business enterprises located in Cumberland and Hoke Counties, including:

• Arranging solicitations, specifications, and contract requirements to facilitate small business participation

• Providing technical assistance and capacity building programs

• Carrying out information and communication programs on contracting procedures and opportunities

• Implementing outreach programs to identify and engage qualified small businesses

• Offering supportive services to help small businesses compete effectively

• Ensuring prompt payment to subcontractors

• Simplifying bonding and insurance requirements where appropriate

Federal and State-Funded Projects — Important Notice In accordance with state directive following the U.S. Department of Transportation’s October 3, 2025 Interim Final Rule to 49 CFR Part 26:

For Federally-Funded Contracts:

• No DBE goals may be established for federally-funded contracts until further guidance is provided by the state

• All existing DBE certifications are in suspended status pending Unified Certification Program

(UCP) reevaluation under new individualized disadvantage standards

• Firms are not required to submit DBE participation commitments at this time

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 4 of 43

TABLE OF CONTENTS

Small Business Participation Commitment Small Business Enterprise Program Federal and State-Funded Projects — Important Notice

For Federally-Funded Contracts:

For State-Funded Contracts:

Equal Opportunity for All

TABLE OF CONTENTS

NOTICE TO BIDDERS

SECTION 1: INTRODUCTION & GENERAL INSTRUCTIONS

1.1 Intent of Invitation to Bid

1.2 Background

1.3 ITB Schedule

1.4 Pre-Bid Meeting (MANDATORY)

1.5 Vendor Registration

SECTION 2: BID SUBMISSION REQUIREMENTS

2.1 Submission of Bids

2.2 Bid Contents

2.3 Request for Clarification

2.4 Addenda

2.5 Withdrawal of Bids

2.6 Public Records

2.7 Insurance Requirements

2.8 Contractor Licensing

2.9 Conflict of Interest

2.10 City’s Reserved Rights

SECTION 3: EVALUATION OF BIDS

3.1 Award Standard — Lowest Responsive, Responsible Bidder

3.2 Responsiveness and Responsibility Criteria

3.3 Evaluation Process

3.4 Confidentiality During Evaluation

SECTION 4: AGREEMENT & GENERAL CONDITIONS

4.1 Contract Term

4.2 Contract Execution

4.3 Availability of Funds

4.4 Non-Discrimination / Equal Opportunity

4.5 E-Verify Compliance

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 5 of 43

4.6 NC Secretary of State Registration

4.7 Collusive Bidding

4.8 General Indemnity

4.9 ADA Compliance and Accessibility Requirements

4.10 Assignment and Subcontracting

4.11 Termination

4.12 Dispute Resolution

4.13 Notification of Legal Issues

SECTION 5: NC CONSTRUCTION PROCUREMENT TERMS AND CONDITIONS

5.1 Formal Bidding Requirements — G.S. 143-128 and 143-129

5.2 Performance Bond and Payment Bond — G.S. 44A-26 and 44A-27

5.3 Bid Security / Bid Bond

5.4 Retainage — G.S. 22C-1 and G.S. 143-134.1

5.5 Prompt Payment — G.S. Chapter 22C (NC Prompt Pay Act)

5.6 Change Orders and Modifications

5.7 Substantial Completion and Final Completion

5.8 Liquidated Damages

5.9 Construction Safety — OSHA and NC OSH

5.10 Lien Waivers and Releases — G.S. Chapter 44A

5.11 Sales Tax Exemption — G.S. 105-164.14(b)

5.12 Materials, Testing, and Inspections

5.13 Environmental Compliance

5.14 Contractor’s License Compliance — G.S. 87-1

5.15 Warranty

5.16 NC General Statutes Reference

SECTION 6: SUBCONTRACTOR REQUIREMENTS AND FLOW-DOWN TERMS

6.1 Subcontractor Identification and Approval

6.2 Subcontractor Changes — Immediate Reporting Requirement

6.3 Flow-Down Terms and Conditions

6.4 Sub-Tier Subcontractors

SECTION 7: SCOPE OF WORK

7.1 Overview

7.2 Detailed Requirements

7.3 Performance Standards

7.4 Project Timeline and Phasing

7.5 City Responsibilities

7.6 Deliverables

SECTION 8: RESPONDENT INFORMATION SHEET

SECTION 9: BID RESPONSE FORM

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 6 of 43

ATTACHMENT A: BID SCHEDULE / FINANCIAL PROPOSAL

ATTACHMENT B: REFERENCES FORM (CONSTRUCTION)

ATTACHMENT C: CERTIFICATION OF FINANCIAL CONDITION

ATTACHMENT D: LOCATION OF WORKERS UTILIZED BY VENDOR

ATTACHMENT E: NON-COLLUSION CERTIFICATION

ATTACHMENT F: DEBARMENT, SUSPENSION & RESPONSIBILITY CERTIFICATION

ATTACHMENT G: PENDING LITIGATION & LEGAL PROCEEDINGS DISCLOSURE

ATTACHMENT H: SUBCONTRACTOR LIST AND CHANGE NOTIFICATION FORM

SUBCONTRACTOR CHANGE NOTIFICATION FORM

ATTACHMENT J: BID BOND / PERFORMANCE BOND / PAYMENT BOND

BID BOND

PERFORMANCE BOND — G.S. 44A-26

PAYMENT BOND — G.S. 44A-27

ATTACHMENT K: DRAFT CITY OF FAYETTEVILLE GENERAL CONSTRUCTION CONTRACT

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 7 of 43

NOTICE TO BIDDERS

Pursuant to N.C.G.S. 143-129, sealed bids will be received by the City of Fayetteville, until SEPTEMBER 3, 2026, at City Hall, 433 Hay Street, Fayetteville, North Carolina, at which time they will be publicly opened and read aloud for the following:

SOLID WASTE BATHROOM RENOVATION — Project No. COF1517016

Bids may be mailed to the City Purchasing Office, Attn: Kimberly Toon, Assistant Chief Financial Officer-Procurement, 433 Hay Street, Fayetteville, NC 28301, or may be delivered in person or by express mail to the same address. The City of Fayetteville will not be responsible for picking up bids at the post office. Bids arriving after the hour designated for opening shall not be considered.

Plans, specifications, and bid documents may be obtained in the Purchasing Office of the City of Fayetteville, 2nd floor, City Hall, 433 Hay Street, between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, or by email request to KimberlyToon@fayettevillenc.gov. Bid Documents are also posted at: https://www.fayettevillenc.gov/City-Departments/Finance/Purchasing/Bid-Opportunities.

The advertisement for this Invitation to Bid was published at least seven (7) full days before the bid opening date in a newspaper of general circulation and/or electronically in accordance with G.S. 143- 129(b).

THIS PROJECT IS FUNDED SOLELY WITH CITY OF FAYETTEVILLE GENERAL FUND / LOCAL

FUNDS. No federal funding is involved. Federal terms and conditions — including Davis-Bacon prevailing wage requirements and federal Buy American provisions — do not apply to this contract.

Questions regarding this bid must be submitted in writing by e-mail to, Kimberly Toon, Assistant Chief Financial Officer-Procurement, at COFBiddingQuestions@fayettevillenc.gov no later than 5:00 p.m. on the deadline stated in the ITB Schedule. Bidders are expressly prohibited from contacting any City of Fayetteville official or employee except through the designated channel above.

The City reserves the right to reject any or all bids and to waive all informalities or irregularities, taking into consideration quality, performance, and the time specified in the bids for the performance of the contract, and to award the contract to the lowest responsive and responsible bidder whose bid conforms to all material requirements of the Invitation to Bid.

City of Fayetteville Kimberly Toon, CLGPO,CLGFO — Assistant Chief Financial Officer-Procurement

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 8 of 43

SECTION 1: INTRODUCTION & GENERAL INSTRUCTIONS

1.1 Intent of Invitation to Bid

The purpose and intent of this Invitation to Bid (ITB) is to solicit competitive sealed bids from qualified, licensed general contractors to The purpose and intent of this Invitation to Bid (ITB) is to solicit competitive sealed bids from qualified, licensed general contractors to renovate the existing Solid Waste Building to improve employee support facilities and optimize the use of the existing interior space. The project consists of the construction of a new women's locker room, renovation of the existing men's locker room, and renovation of the remaining break room area. The scope of work includes all necessary architectural, structural, mechanical, electrical, plumbing, and life safety modifications required to support the renovated spaces, including associated finishes, fixtures, equipment, and code-compliant improvements.

All work shall be completed within the existing building footprint unless otherwise identified during design development. The resulting contract is expected to provide a fully renovated, code-compliant facility that enhances employee amenities, improves the functionality of the existing interior spaces, and supports the operational needs of the Solid Waste Department.

The following documents constitute this ITB:

• This document (base ITB and all sections)

• Section 5: NC Construction Procurement Terms and Conditions

• Section 6: Subcontractor Requirements and Flow-Down Terms

• Section 7: Scope of Work

• Section 8: Respondent Information Sheet

• Section 9: Bid Response Form

• All required Attachments (A through L)

1.2 Background

The purpose of this project is to renovate the existing Solid Waste Building, located at 455 Grove Street, Fayetteville, NC 28301, to improve employee support facilities and optimize the use of the existing interior space. The renovations are intended to provide updated locker room facilities, enhance the employee break room, and improve the overall functionality of the building while maintaining operations within the existing structure.

The project site is located at the existing Solid Waste Building. The work will be performed entirely within the existing building footprint unless otherwise identified during the design development process. Renovations include the construction of a new women's locker room, renovation of the existing men's locker room, and renovation of the remaining break room area, along with all associated architectural, structural, mechanical, electrical, plumbing, and life safety improvements required to support the renovated spaces.

This project is a capital improvement initiative intended to modernize employee support areas and ensure compliance with current building codes and accessibility requirements. There are no known prior contracts for this specific scope of work unless otherwise identified by the Owner.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 9 of 43

1.3 ITB Schedule

Action / Event Responsibility Date / Time

Mandatory Pre-Bid Conference / Site Walk-Through

City & Bidders August 12, 2026 at 2:00

Deadline for Written Questions Bidders August 18, 2026 by 5:00 pm

City Response to Questions / Addendum Posted

City of Fayetteville August 20, 2026

Bid Submission Deadline Bidders August 27, 2026 by 2:00 pm

Public Bid Opening City of Fayetteville August 27, 2026 by 2:00 pm

Evaluation / Responsibility Review City of Fayetteville September 4, 2026

Anticipated Award / Council Approval

City of Fayetteville September 14, 2026

Contract Execution City of Fayetteville September 24, 2026

Notice to Proceed City of Fayetteville October 1, 2026

All dates are subject to change. Any modifications will be communicated via addendum.

1.4 Pre-Bid Meeting (MANDATORY)

Attendance at the Pre-Bid Meeting and Site Walk-Through is MANDATORY, in person only. The meeting will be held at the project site at 455 Grove Street, Fayetteville, NC 28301 in the main meeting room, on the date listed in the ITB Schedule above. Contractors who fail to attend will be deemed non-responsive and their bids will not be accepted. Late arrivals will not be permitted to sign in, participate in the site visit, or have their bid considered.

Any information shared during the meeting must be confirmed by written addendum to constitute part of the official ITB.

1.5 Vendor Registration

All vendors wishing to do business with the City of Fayetteville must register through the City’s Vendor Portal at Doing Business with the City | City of Fayetteville, N.C. . A completed W-9 must be submitted with registration. Contractors must hold a valid NC General Contractor’s License (G.S. 143-128(a1)) at the time of bid submission.

https://www.fayettevillenc.gov/City-Departments/Finance/Purchasing/Doing-Business-with-the-City

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 10 of 43

SECTION 2: BID SUBMISSION REQUIREMENTS

2.1 Submission of Bids

Bids must be submitted in a sealed package clearly marked:

" ITB No. COF1517016 – Solid Waste Bathroom Renovation "

Each bidder must provide:

• One signed hard copy of the complete bid delivered either in person or by mail by the bid date and deadline.

Paper/mail submissions:

City of Fayetteville – Purchasing Office Attn: Kimberly Toon, Assistant Chief Financial Officer-Procurement 433 Hay Street, Fayetteville, NC 28301

IMPORTANT: Late bids, regardless of cause, will not be accepted or considered. G.S. 143- 129(b) requires that bids be sealed; opening a sealed bid prior to the time set for opening constitutes a Class 1 misdemeanor.

2.2 Bid Contents

The bidder’s complete bid submission shall include the following items in the order listed. Failure to include any required item may result in the bid being deemed non-responsive.

Required Bid Documents:

• Completed Bid Response Form (Section 10) — fully executed by authorized representative, total bid amount in figures and words

• Bid Bond (Attachment J) — 5% of total bid amount

• List of Subcontractors (Attachment I) — all first-tier subcontractors and major suppliers

• NC General Contractor License — copy of current valid license

• Non-Collusion Certification (Attachment F)

• Debarment, Suspension & Responsibility Certification (Attachment G)

• Certification of Financial Condition (Attachment D)

• Qualifications / References (Attachment B) — three construction project references

• Pending Litigation Disclosure (Attachment H)

• Location of Workers (Attachment E)

• Acknowledged Addenda — all addenda issued prior to bid due date

Post-Award Required Documents (within 10 days of award):

• Performance Bond & Payment Bond (Attachment J) — 100% each

• Certificate(s) of Insurance (required levels specified in Section 2.7)

• Executed Contract — Draft Construction Contract provided as Attachment K

• E-Verify Compliance Certification

• NC Secretary of State Registration (if required)

2.3 Request for Clarification

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 11 of 43

All questions must be submitted in writing to Kimberly Toon, Assistant Chief Financial Officer- Procurement at COFBiddingQuestions @fayettevillenc.gov by the deadline in the ITB Schedule.

Responses will be issued as written addenda posted to the City’s procurement website. Oral responses are not authoritative. (G.S. 143-129(b).)

2.4 Addenda

The City may issue written addenda to modify or clarify any part of this ITB. All addenda will be posted on the City’s procurement website. It is the Bidder’s responsibility to check for addenda. Bids must acknowledge receipt of all addenda issued.

2.5 Withdrawal of Bids

Bids may be withdrawn in writing prior to the bid opening. Withdrawal after the deadline is permitted only if the price was based on a substantial material or clerical error, in accordance with N.C.G.S. 143-129.1.

2.6 Public Records

All materials submitted become public records subject to the North Carolina Public Records Law (G.S.

Chapter 132) upon contract award, except for information properly designated as a trade secret under G.S. 66-152 or otherwise exempt under G.S. 132-1.2.

2.7 Insurance Requirements

The awarded contractor shall not commence work until all required insurance is in place. The following minimum coverages are required; specific limits are shown as fill-in fields because they may be adjusted based on project size, scope, and risk. Insurance requirements are subject to revision by the City’s Risk Manager on a project-specific basis.

Coverage Type Minimum Limits (Fill In Per Project Risk)

Commercial General Liability (ISO

#CG 00 01)

$1,000,000.00 per occurrence / $2,000,000.00 aggregate

Automobile Liability (ISO #CA 00 01)

$1,000,000.00 combined single limit per accident

Workers’ Compensation & Employers’ Liability

Statutory NC limits; Employers’ Liability $500,000 /

Owner’s & Contractor’s Protective Liability (ISO #CG 00 09)

$2,000,000 per occurrence / 5,000,000 aggregate

Builder’s Risk / Installation Floater (if applicable)

Contractor shall provide Builder’s Risk insurance covering the value of the work in place and materials on site, written for the full replacement value of the project scope. Coverage is required only for the work being performed, not for the replacement value of the existing building.

Umbrella / Excess Liability (if required)

$5,000,000 per occurrence / $10,000,000 aggregate

All insurers must be licensed in North Carolina and rated A-VII or better by A.M. Best. The City of Fayetteville must be named as Additional Insured on CGL, Auto, and Umbrella policies. Certificates must include 30 days’ prior written notice of cancellation to the City Purchasing Office. All subcontractors must carry equivalent minimum coverages.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 12 of 43

2.8 Contractor Licensing

Pursuant to N.C.G.S. 87-1 and G.S. 143-128(a1), any contractor submitting a bid for construction work must hold a valid General Contractor’s License issued by the NC Licensing Board for General Contractors, with a classification and license limitation appropriate for this project. Proof of license must be included with the bid.

2.9 Conflict of Interest

Bidders must disclose any relationship between their firm and any City of Fayetteville employee, official, or Council member. Undisclosed conflicts may result in disqualification. See also G.S. 14-234.

2.10 City’s Reserved Rights

The City of Fayetteville expressly reserves the right to:

• Reject any or all bids in whole or in part, for any reason or for no reason, without liability to any Bidder (G.S. 143-129(b))

• Waive minor informalities or technicalities that do not affect price, time, or a material requirement

• Cancel or withdraw this ITB at any time prior to contract execution, with no obligation to any Bidder

• Re-advertise if fewer than three responsive bids are received or no bid is in the best interest of the City

• Conduct site visits or inspections of a Bidder’s facilities or operations prior to or during the contract term

No bid shall be binding on the City until a formal written contract is fully executed by both parties.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 13 of 43

SECTION 3: EVALUATION OF BIDS

3.1 Award Standard — Lowest Responsive, Responsible Bidder

Pursuant to N.C.G.S. 143-128 and 143-129, construction contracts shall be awarded to the lowest responsive, responsible bidder. The criteria below are pass/fail responsibility factors. Award goes to the lowest-priced responsive bidder who satisfies all responsibility criteria.

3.2 Responsiveness and Responsibility Criteria

Criterion Pass/Fail

Technical Approach & Understanding of Construction Scope ☐ Pass ☐ Fail

Qualifications, Experience & Construction References ☐ Pass ☐ Fail

Project Team & Key Personnel ☐ Pass ☐ Fail

Proposed Project Schedule / CPM ☐ Pass ☐ Fail

Cost / Price Proposal (Base Bid + Alternates) Lowest = Award

TOTAL

Note: The City reserves the right to adjust weighting through written addendum prior to the bid due date.

3.3 Evaluation Process

• All bids received by the deadline will be logged and time-stamped.

• An evaluation committee will review bids against the published criteria.

• All responsive bidders shall furnish the following within five (5) business days of written request:

(a) Certification of Financial Condition (Attachment D); (b) three (3) completed project references of similar scope (Attachment B); (c) proof of valid NC General Contractor’s License; (d) evidence of ability to obtain required bonds; and (e) evidence of required insurance coverage.

• A recommendation will be prepared for approval by the City Manager and/or City Council as required by the Local Government Budget and Fiscal Control Act (G.S. Chapter 159).

• Award will be posted to the City’s procurement website.

3.4 Confidentiality During Evaluation

While this ITB is under evaluation, Bidders are prohibited from communicating with any City employee, official, or Council member regarding bid content or evaluation outcomes. Violations may result in disqualification.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 14 of 43

SECTION 4: AGREEMENT & GENERAL CONDITIONS

4.1 Contract Term

Any contract resulting from this ITB shall commence upon issuance of the Notice to Proceed and continue until Final Completion and acceptance. Estimated contract duration: 180 calendar days.

4.2 Contract Execution

No contract shall be deemed awarded until a formal written agreement is executed by both parties (G.S.

160A-16). Contracts at the formal bidding threshold require a pre-audit certification by the Finance Officer pursuant to G.S. 159-28 before execution.

4.3 Availability of Funds

This contract is contingent upon appropriation of funds by the Fayetteville City Council per the Local Government Budget and Fiscal Control Act (G.S. Chapter 159). If funds are not appropriated, the City may terminate without penalty.

4.4 Non-Discrimination / Equal Opportunity

The Contractor shall not discriminate against any individual and shall comply with all applicable Federal and State requirements concerning fair employment, including Title VII of the Civil Rights Act of 1964, the Americans with Disabilities Act (ADA), the Age Discrimination in Employment Act, and Executive Order 24 (2017). The City is an equal opportunity employer and requires the same of its contractors.

4.5 E-Verify Compliance

As required by G.S. 64-26, the awarded contractor certifies that it and each of its subcontractors complies with Article 2 of Chapter 64 of the NC General Statutes, including the E-Verify requirement for employers with more than 25 employees in North Carolina.

4.6 NC Secretary of State Registration

Prior to entering into a contract with the City, the awarded Bidder must be registered to do business in North Carolina with the NC Secretary of State if required by G.S. 55-15-01 (corporations) or G.S. 57D-7- 01 (LLCs). Evidence of registration must be provided within 10 business days of award notification.

Register at https://www.sosnc.gov.

4.7 Collusive Bidding

The Bidder’s signature on the Bid Response Form constitutes a guarantee that prices were arrived at independently, without collusion with other bidders, in compliance with G.S. 143-54. Violation may constitute a criminal offense under G.S. 75-2 (NC antitrust statutes).

4.8 General Indemnity

The Contractor shall defend, indemnify, and hold harmless the City of Fayetteville, its officers, employees, and agents from any claims, losses, damages, or liabilities arising from the Contractor’s performance or failure to perform under this contract, including claims arising from the acts or omissions of subcontractors.

4.9 ADA Compliance and Accessibility Requirements

All construction work performed under this contract must comply with applicable federal and North Carolina accessibility requirements, including but not limited to:

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 15 of 43

• Title II of the Americans with Disabilities Act (ADA), 42 U.S.C. §12131 et seq.: Applies to all public entities. All new construction and alterations must be readily accessible to and usable by individuals with disabilities.

• 2010 ADA Standards for Accessible Design: Applies to all new construction and alterations to places of public accommodation and commercial facilities. The Contractor shall design and construct all elements in conformance with these Standards.

• North Carolina Building Code, Chapter 11 — Accessibility (2018): Based on ICC/ANSI A117.1-2017. All construction shall comply with Chapter 11 of the North Carolina Building Code, including requirements for accessible routes, entrances, parking, toilet facilities, and other elements as applicable to the project type.

• G.S. 143-136 and G.S. 143-138 — NC State Building Code Authority (Chapter 11 Accessibility): North Carolina law requires that all buildings and facilities used by the public and constructed with public funds be designed and constructed to be accessible to and usable by physically handicapped persons. Contractor shall ensure compliance with these provisions throughout the project.

• Public Rights-of-Way Accessibility Guidelines (PROWAG): For any construction affecting public sidewalks, crosswalks, curb ramps, or other pedestrian infrastructure, the Contractor shall comply with PROWAG and NCDOT design standards for accessible pedestrian facilities.

• Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. §794): If this project receives or is associated with federal financial assistance, Section 504 requires that no qualified person with a disability shall be excluded from or denied the benefits of participation.

• Temporary Accessible Routes During Construction: The Contractor shall maintain accessible routes for pedestrians during construction. Temporary routes must comply with ADA and PROWAG requirements, including minimum 60” clear width, firm and stable surfaces, and appropriate signage. Closure of accessible routes requires prior written approval from the City.

• Path of Travel Obligations (ADA Alterations): When alterations are made to a primary function area, the Contractor shall ensure that the path of travel to the altered area (including restrooms, telephones, and drinking fountains serving the altered area) is made accessible to the extent required by ADA and NC Building Code, unless the cost is disproportionate (exceeding 20% of the alteration cost).

• G.S. 168A-1 et seq. — NC Persons with Disabilities Protection Act: The Contractor and all subcontractors shall comply with the NC Persons with Disabilities Protection Act prohibiting discrimination against persons with disabilities in employment and public services.

The Contractor shall immediately notify the City in writing if any proposed design, construction method, or site condition would create an accessibility barrier or would result in non-compliance with the above requirements. Failure to comply with applicable accessibility requirements shall be grounds for rejection of work and may require removal and replacement at Contractor’s expense.

4.10 Assignment and Subcontracting

The awarded Contractor shall not assign, transfer, or subcontract any portion of this agreement without prior written consent of the City. Any change to the approved subcontractor list MUST be immediately reported to the City Purchasing Manager in writing BEFORE the substitute or new subcontractor begins work. See Section 6.

4.11 Termination

4.11.1 Termination for Cause: The City may terminate for cause upon written notice specifying the cause and effective date. The Contractor shall have ten (10) days to cure.

4.11.2 Termination for Convenience: The City may terminate for convenience upon 30 days’ written notice. The Contractor shall be compensated for work properly performed to the termination date, including reasonable demobilization costs.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 16 of 43

4.12 Dispute Resolution

The parties agree to resolve disputes informally and in good faith. Claims by the Contractor shall be submitted in writing to the City’s Contract Manager within 21 days of the event giving rise to the claim.

All disputes are governed by the laws of North Carolina; venue is Cumberland County.

4.13 Notification of Legal Issues

The awarded Contractor must promptly notify the City in writing of any legal actions, investigations, bankruptcy filings, or regulatory sanctions that may affect performance. Failure to provide timely notification may result in contract termination.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 17 of 43

SECTION 5: NC CONSTRUCTION PROCUREMENT TERMS AND

CONDITIONS

This Section sets forth the North Carolina statutory and regulatory requirements governing all construction contracts with the City of Fayetteville. All provisions are mandatory and non-negotiable. Applicable statutes include N.C.G.S. Chapters 143, 44A, 22C, 87, and 159.

5.1 Formal Bidding Requirements — G.S. 143-128 and 143-129

All construction contracts with a cost exceeding $500,000 are subject to formal bidding requirements.

The City shall publicly advertise all such projects; bids must be submitted in sealed form and opened publicly. Separate prime bids shall be taken for General Construction, Plumbing, HVAC, and Electrical when applicable, unless a single-prime method is specified in the ITB. Separate trade specifications shall be prepared for each subdivision of the work actually performed — general construction; heating, ventilation, and air conditioning with a cooling load of 15 tons or more; plumbing and gas fittings; and electrical — for the construction, reconstruction, alteration, or repair of a building regardless of project cost, as required by G.S. 143-128 (as amended by S.L. 2026-9).

5.2 Performance Bond and Payment Bond — G.S. 44A-26 and 44A-27 The successful bidder shall furnish, within ten (10) calendar days of contract award, the following bonds from a surety authorized in NC with an A.M. Best rating of A-VII or better:

• Performance Bond: 100% of the contract price, conditioned upon faithful performance of the contract

• Payment Bond: 100% of the contract price, conditioned upon prompt payment for all labor, materials, and equipment (G.S. 44A-27)

Failure to furnish required bonds within the specified time shall be cause for rejection of the bid and forfeiture of the bid security.

5.3 Bid Security / Bid Bond

Each bid shall be accompanied by a bid bond or certified check in the amount of five percent (5%) of the total bid amount, payable to the City of Fayetteville. Bid security will be returned to unsuccessful bidders after contract execution.

5.4 Retainage — G.S. 22C-1 and G.S. 143-134.1

• No retainage may be withheld on a project with total project costs of less than one hundred fifty thousand dollars ($150,000) (G.S. 143-134.1, as amended by S.L. 2026-9). On a project at or above that threshold, five percent (5%) retainage may be withheld from each progress payment until the contract is fifty percent (50%) complete.

• After 50% completion, retainage may be reduced to 2.5% at the City’s discretion if progress is satisfactory.

• Upon Substantial Completion, total retainage held shall not exceed two hundred fifty percent (250%) of the value of the work remaining to be completed, with the balance released in accordance with G.S. 143-134.1 upon Final Completion and acceptance, subject to all required lien waivers and closeout documents.

• Per G.S. 22C-3, the prime contractor shall not withhold retainage from subcontractors in excess of the percentage withheld from the prime by the City.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 18 of 43

5.5 Prompt Payment — G.S. Chapter 22C (NC Prompt Pay Act)

The City shall make progress payments within 30 days of a properly submitted pay application. The prime contractor shall pay each subcontractor within seven (7) days of receipt of payment from the City for work performed by that subcontractor. Interest at one percent (1%) per month applies to late payments per G.S. 22C-5 and G.S. 143-134.1.

5.6 Change Orders and Modifications

No change shall be authorized except by a written Change Order executed by both parties. Changes shall be priced by: (a) lump sum; (b) unit prices; or (c) cost-plus with a maximum markup of 15% for overhead and profit on the contractor’s own work, and 10% on subcontractor costs. Claims for additional cost must be submitted in writing within 21 days.

5.7 Substantial Completion and Final Completion

5.7.1 Substantial Completion: The stage when the work is sufficiently complete so the City can occupy and utilize it for its intended use. Contractor shall notify the City in writing; City will conduct inspection within 14 days.

5.7.2 Final Completion: Occurs when all punch list items are complete and the City issues a written Certificate of Final Completion. Final payment and retainage release are conditioned upon Final Completion.

5.8 Liquidated Damages

Time is of the essence. Liquidated damages of $1,000.00 per calendar day shall apply for each day beyond the Substantial Completion date. These damages represent agreed compensation for delay, not a penalty. (See also Special Provisions table in the Bid Proposal Package.)

5.9 Construction Safety — OSHA and NC OSH

The Contractor shall comply with all applicable OSHA Construction Industry Standards (29 CFR Part 1926), the NC OSH Act (G.S. Chapter 95, Article 16), and all NC Department of Labor rules. The Contractor shall designate a qualified Safety Representative on-site at all times during construction activities.

5.10 Lien Waivers and Releases — G.S. Chapter 44A

Conditional lien waivers from all first-tier subcontractors and suppliers shall accompany each pay application. Unconditional lien waivers shall be provided before the next pay application is approved.

Prior to Final Payment, unconditional lien waivers from all parties who could file a claim shall be required.

5.11 Sales Tax Exemption — G.S. 105-164.14(b)

Bid prices shall EXCLUDE North Carolina sales and use tax on materials that become a permanent part of this project. These materials are tax-exempt pursuant to G.S. 105-164.14(b). Equipment rental, consumables, and temporary materials remain taxable and shall be included in bid pricing.

5.12 Materials, Testing, and Inspections

All materials and equipment shall conform to project specifications and applicable standards. Contractor shall provide 48 hours’ advance notice before covering work requiring inspection. Costs of required testing and re-testing due to failures are the Contractor’s responsibility.

5.13 Environmental Compliance

• NC Sedimentation and Pollution Control Act (G.S. Chapter 113A, Article 4) — erosion control plan required prior to land disturbance

• NPDES Construction General Permit (NCG01) — for disturbance of one acre or more

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 19 of 43

• NC Air Quality regulations (15A NCAC 02D) for dust and emissions control

• Hazardous materials handling per applicable federal and state regulations

• Asbestos and lead paint regulations (OSHA 29 CFR §1926.1101; EPA 40 CFR Part 745) for pre-

1978 structures

5.14 Contractor’s License Compliance — G.S. 87-1

The Contractor and all subcontractors performing licensed work shall maintain valid NC licenses (General Contractor, Electrical, Plumbing/HVAC, etc.) throughout the contract. Any lapse in required licensing shall be grounds for contract termination.

5.15 Warranty

Contractor warrants all work to be free from defects in workmanship and materials for one (1) year from Final Completion. Manufacturer warranties of greater duration shall be assigned to the City at Final Completion.

5.16 NC General Statutes Reference

Statute Subject

G.S. 22C-1 et seq. NC Prompt Pay Act — Construction Contracts

G.S. 44A, Article 3 Payment and Performance Bonds (NC Little Miller Act)

G.S. 64-26 E-Verify Requirements

G.S. 87-1 et seq. General Contractor Licensing

G.S. 105-164.14(b) Sales Tax Exemption for Permanent Construction Materials

G.S. 113A, Article 4 Sedimentation Pollution Control Act

G.S. 143-54 Non-Collusion / Antitrust

G.S. 143-129 Formal Bidding — Construction

G.S. 143-129.1 Bid Withdrawal for Clerical or Material Error

G.S. 143-134.1 Retainage — Construction Contracts

G.S. 143-136 / 143-138 NC State Building Code Authority (incl. Ch. 11 Accessibility)

G.S. 159 Local Government Budget and Fiscal Control Act

G.S. 160A Cities and Towns — Contracts and Purchasing

G.S. 168A-1 et seq. NC Persons with Disabilities Protection Act

ADA, 42 U.S.C. §12131

et seq.

Americans with Disabilities Act — Title II

2018 NC Building Code, Chapter 11

Accessibility Standards (ICC/ANSI A117.1-2017)

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 20 of 43

SECTION 6: SUBCONTRACTOR REQUIREMENTS AND FLOW-DOWN

TERMS

CRITICAL: ALL subcontractor changes MUST be immediately reported in writing to Kimberly Toon, Assistant Chief Financial Officer-Procurement, at Kimberlytoon@fayettevillenc.gov, PRIOR to the substitute or new subcontractor beginning any work. Unauthorized substitutions may result in non-payment and/or contract termination.

6.1 Subcontractor Identification and Approval

All Bidders shall submit a complete list of anticipated first-tier subcontractors using Attachment I. Approval of the subcontractor list is a condition precedent to contract execution.

• The City reserves the right to approve or reject any proposed subcontractor based on qualifications, licensing, debarment status, or other factors

• The prime contractor remains solely responsible for the performance of all subcontractors regardless of City review

6.2 Subcontractor Changes — Immediate Reporting Requirement

ANY change to the approved Subcontractor List — including additions, deletions, substitutions, or changes in scope — MUST be reported IMMEDIATELY and in writing to:

Kimberly Toon, CLGPO,CLGFO — Assistant Chief Financial Officer-Procurement Kimberlytoon@fayettevillenc.gov | (910) 433-1942

433 Hay Street, Fayetteville, NC 28301

Written notification must be submitted BEFORE the substitute or new subcontractor commences any work. The notification must include: name and license numbers of the outgoing and incoming subcontractor, reason for change, and scope affected. The City will respond within five (5) business days. Use the Subcontractor Change Notification Form in Attachment I.

6.3 Flow-Down Terms and Conditions

The prime contractor shall incorporate all of the following terms into every subcontract on this project.

These terms are mandatory and non-negotiable. The City of Fayetteville is an intended third-party beneficiary of all subcontracts.

• Legal Compliance: G.S. 143-128 et seq., G.S. 44A-25 et seq., G.S. Chapter 22C, G.S. Chapter 87, G.S. 64-26, OSHA 29 CFR Part 1926, ADA Title II, NC Building Code Chapter 11

• Non-Discrimination: Title VII, ADA, Age Discrimination in Employment Act, NC Persons with Disabilities Protection Act

• E-Verify: Certification of compliance with Article 2, Chapter 64, NC General Statutes

• Safety: Written safety plan, qualified safety representative, immediate incident reporting

• Insurance: Minimum coverages as specified in Section 2.7, City and prime named as Additional

Insured

• Prompt Payment: Payment within 7 days of receipt per G.S. 22C-3; retainage not to exceed prime’s retainage percentage

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 21 of 43

• ADA / Accessibility: Full compliance with ADA, NC Building Code Chapter 11 (G.S. 143-136 and G.S. 143-138), and G.S. 168A-6 for all work performed

• Indemnification: Indemnify prime contractor and City from claims arising from subcontractor’s work

• Access to Records: City audit rights; minimum 5-year record retention

• One-Year Warranty: On all workmanship and materials from Final Completion

• Governing Law: North Carolina; Venue: Cumberland County

6.4 Sub-Tier Subcontractors

The prime contractor shall require each first-tier subcontractor to incorporate these same flow-down terms into all sub-tier subcontracts. The prime contractor remains responsible for compliance at all tiers.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 22 of 43

SECTION 7: SCOPE OF WORK & TECHNICAL SPECS

7.1 Overview

The City is seeking competitive sealed bids from qualified, licensed general contractors to renovate the existing Solid Waste Building to improve employee support facilities and optimize the existing interior space. The project includes construction of a new women's locker room, renovation of the existing men's locker room and break room, and all associated architectural, structural, mechanical, electrical, plumbing, and life safety improvements. The Contractor shall provide all labor, materials, equipment, supervision, and permits necessary to complete the work in accordance with the contract documents and applicable codes. The objective of this project is to provide modern, functional, and code-compliant employee support facilities for the City's Solid Waste Department.

7.2 Detailed Requirements

• All Work shall comply with the latest adopted editions of the North Carolina State Building Code, including all applicable building, accessibility, electrical, mechanical, plumbing, fire, and energy conservation codes, as well as all applicable City of Fayetteville standards, ordinances, and requirements. The Contractor shall obtain all required permits, licenses, inspections, and ap-provals necessary for completion of the Work.

• Materials and installations shall be new, first-quality, commercial-grade, and suitable for the in-tended occupancy within an active municipal facility. Interior wall construction shall consist of metal stud framing with gypsum board assemblies finished to a minimum Level 4 finish prior to paint application unless otherwise specified or approved by the City. Gypsum board installed in restrooms, shower rooms, locker rooms, or other wet areas shall be Moisture-Resistant Gypsum Board (MRGB) and finished in accordance with the Room Finish Schedule. Paint systems shall consist of low-VOC commercial-grade interior coatings. Flooring materials shall be durable, commercial-grade products appropriate for their intended use and installed in strict accordance with the manufacturer's written recommendations and the Contract Documents. All materials shall be installed in a neat and workmanlike manner by qualified personnel and shall comply with applicable building codes, manufacturer requirements, recognized industry standards, and the Contract Documents.

• Doors, frames, and hardware shall comply with all applicable life safety, accessibility, and egress requirements, including the Americans with Disabilities Act (ADA), the North Carolina Accessi-bility Code, and applicable fire rating requirements. Mechanical modifications shall maintain proper ventilation, indoor air quality, temperature control, and occupant comfort within the reno-vated areas. Electrical work shall include code-compliant lighting, receptacles, switches, branch circuits, and power distribution sufficient to support the intended occupancy. All Information Technology (IT) and data cabling shall comply with current industry standards, manufacturer re-quirements, and City IT standards and shall be coordinated with the City's Information Technol-ogy Department.

• Fire protection systems shall remain operational unless a temporary shutdown has been approved by the City and the Authority Having Jurisdiction (AHJ). All modifications to fire alarm and fire sprinkler systems shall be performed by properly licensed contractors and coordinated with the applicable AHJ. The Contractor shall provide advance notice of any required system shutdowns and shall minimize the duration of any interruption to life safety systems. Any penetrations

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 23 of 43 through fire-rated walls, floors, or ceilings shall be properly sealed using approved firestopping systems in accordance with applicable codes and manufacturer requirements.

• Protection of existing facilities shall be the responsibility of the Contractor. The Contractor shall protect existing finishes, furnishings, equipment, utilities, and adjacent occupied areas from dust, debris, vibration, water intrusion, and damage throughout construction. Temporary dust parti-tions, floor protection, and other protective measures shall be provided as necessary to maintain a clean and safe environment. Any damage to existing facilities caused by the Contractor or its subcontractors shall be repaired or replaced at no additional cost to the City.

7.3 Performance Standards

The Contractor shall perform all work in a professional and workmanlike manner in accordance with the contract documents, approved plans and specifications, applicable federal, state, and local laws, building codes, and industry standards. All materials shall be new unless otherwise specified and installed in accordance with the manufacturer's recommendations.

The Contractor shall maintain a safe and clean work site, minimize disruptions to City operations, protect existing facilities from damage, and promptly correct any deficiencies identified by the City. All work shall be completed within the contract time and meet all required inspections and acceptance criteria before final project completion.

Quality Standards All materials and workmanship shall be new, code-compliant, and installed in accordance with manufacturer recommendations and City standards. Finished spaces shall present a clean, professional appearance free from visible defects or damage. All building systems shall be properly coordinated, rated penetrations shall be firestopped as required, and the Contractor shall maintain a clean and orderly project site throughout construction.

Testing and Commissioning Requirements All electrical, mechanical, IT/data, fire alarm, and fire sprinkler systems associated with the renovation shall be tested and verified operational prior to final acceptance. The Contractor shall ensure all systems meet applicable code and industry standards, including verification of compliant egress and exit signage.

Any deficiencies identified during testing or inspection shall be corrected by the Contractor at no additional cost to the City.

Inspection Requirements The Contractor shall obtain and coordinate all required permits and inspections associated with the work and ensure compliance with all applicable North Carolina Building Code requirements and City of Fayetteville standards. Required inspections shall include all applicable building, electrical, mechanical, fire sprinkler, and life safety inspections. The Contractor shall notify the City prior to major inspections, and final acceptance shall be contingent upon successful completion of inspections, resolution of punch list items, and submission of all required closeout documentation, test reports, warranties, and as-built drawings where applicable.

Warranty Requirements The Contractor shall provide a minimum one (1) year warranty on all workmanship and installed materials beginning on the date of final acceptance, unless longer manufacturer warranties apply. Any defects or deficiencies identified during the warranty period shall be corrected promptly by the Contractor at no additional cost to the City.

City of Fayetteville, NC | 433 Hay Street, Fayetteville, NC 28301 | (910) 433-1942 Page 24 of 43

7.4 Project Timeline and Phasing

The Contractor shall provide a project schedule within ten (10) calendar days of Notice to Proceed and complete the work within the timeframe established in the contract. The schedule shall include key milestones for demolition, framing and rough-in inspections, drywall and ceiling installation, MEP and IT/data installations, and final inspections and punch list completion. The Contractor shall coordinate disruptive activities with the City to minimize impacts to ongoing operations and promptly notify the City of any anticipated delays along with a proposed recovery plan. The Contractor shall achieve Substantial Completion and Final Completion within the time periods established in Section 4.1, calculated from the effective date of the Notice to Proceed.

7.5 City Responsibilities

The City of Fayetteville shall provide the Contractor…