This is a Request for Quotation (RFQ) issued by the U.S. Army Corps of Engineers New England District for security fencing installation at the Fox Point Hurricane Barrier in Providence, Rhode Island. The project involves demolishing and removing existing metal railings and chain-link fence, and installing approximately 122 linear feet of 8-foot-high vinyl-coated chain-link fence, a 30-inch-wide pedestrian gate, and barbed wire. The contract is a firm-fixed-price job with a 240-day performance period from the notice to proceed, and work must be completed Monday through Friday between 7:00 AM and 5:00 PM.

Key requirements include core-drilling fence posts into a steel-reinforced concrete structure, using specific materials like 9 GA galvanized wire with black vinyl coating, DQ-40 pipe with black vinyl coating for posts and rails, and a pad-lockable pedestrian gate. The contractor must provide a one-year warranty on materials and workmanship, submit detailed pre-construction documentation including an Accident Prevention Plan, and comply with U.S. Army Corps of Engineers safety and occupational health requirements. The solicitation is not a small business set-aside, and the estimated contract value is between $25,000 and $100,000.

View the file

Other files

File Type Posted
Amendment W912WJ25QA100-0001.pdf PDF
Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

1 33

W912WJ25QA100 12 SEP 2025

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD CONCORD, MA 01742-2751 UNITED

STATES

JENNIFER SAMELA 978 318-8324

22 SEP 2025

SEE SCHEDULE

Section A - Solicitation/Contract Form

Security Fencing Installation, Fox Point Hurricane Barrier, Providence, Rhode Island

W912WJ25QA100

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

VENDORS SUBMITTING A QUOTE IN RESPONSE TO A SOLICITATION ARE RESPONSIBLE FOR

ADHERING TO ALL INSTRUCTIONS AND TERMS AND CONDITIONS INCLUDED IN THE

SOLICITATION. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE

INFORMATION:

1. This is a Request for Quotations (RFQ) in accordance with Federal Acquisition Regulation (FAR) Part 13.

2. Potential vendors are notified that the basis on which award will be made is price alone.

3. All responsible sources may submit a quote which, if timely received, must be considered by the Agency.

4. The Government may request that a vendor respond to a Quote Verification after the solicitation closes, but prior to award. The vendor shall respond in sufficient detail to all questions or statements no later than the response date and time listed in the correspondence. Failure to do so may result in quotes being deemed non-responsive and removed from consideration. The Government is under no obligation to provide extensions for responses.

QUESTIONS REGARDING SOLICITATIONS:

1. Questions regarding the solicitation shall be directed to the Contract Specialist:

a. Name: Jennifer M. Samela

b. Phone: 978-318-8324

c. Email: Jennifer.M.Samela@usace.army.mil

2. Technical Points of Contact shall not provide responses to interested vendors.

3. Please direct questions to the Contract Specialist. Any information received at the site visit which conflicts with this solicitation should be brought to the attention of the Contract Specialist. The solicitation and resulting contract shall be the governing document in all cases.

QUOTE SUBMISSION:

1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments.

2. The Government is under no obligation to consider any quote received after the solicitation closing date or time.

BID SCHEDULES:

1. If a Bid Schedule is included in the solicitation, vendors shall complete the bid schedule in its entirety (all tasks, all years).

2. Vendors shall enter $0.00 on Bid Schedules in which items are Not Separately Priced. Blank entries will not be considered and will result in quotes being deemed non-responsive.

3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive.

SITE VISITS:

1. SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27 or 2.236-27 ALT I FOR

ADDITIONAL INFORMATION.

2. If date(s)/time(s) for site visits are included in the solicitation, then interested vendors will be permitted to visit the site during those dates/times. No other dates/times will be permitted for site visits.

3. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit.

4. No site visits will be permitted AFTER a solicitation closes.

BONDING:

1. In accordance with FAR 28.101-1(c), the Contractor will NOT be required to provide a Bid Guarantee.

2. In accordance with FAR 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

3. In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above, but not exceeding $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

4. Prior to award, the Government may request that the Contractor provide a Letter of Bond Ability issued by a Surety that is listed on US Treasury Circular 570 (https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html).

Letter of Bond Ability shall be issued to the Contractor and shall state that the Contractor is pre-qualified for bonding, include the single and aggregate bond limits that the bond company will support, and provide contact information of the bond agent or attorney-in-fact.

Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name and contact information:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.

gov) to submit a quote. Registered is considered when a SAM registration is marked "Active".

3. In accordance with FAR Clause 52.204-8(d), Representations and Certifications are to be completed in www.sam.gov.

NOTE: SAM.gov registration takes approximately 3 weeks (Unique Entity Identified (UEI) 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor's responsibility to track SAM.gov registration and follow-up with required tasks.

4. Provide business Unique Entity Identifier (UEI): _______________________________

5. Provide business CAGE code: __________________________________

6. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

Item Supplies/Service Quantity Unit Unit Price Amount

Security Fence Installation, Fox Point Hurricane Barrier, Providence, RI

Contractor shall furnish all labor, materials, and equipment necessary to demolish and remove existing railings, fence, and posts and install new chain link fence, pedestrian gate, and barbed wire at Fox Point Hurricane Barrier, Providence, RI in accordance with the Statement of Work.

Product Service Code: Y1QA Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

REPLACE CHAIN LINK SECURITY FENCING

FOX POINT HURRICANE BARRIER

PROVIDENCE, RHODE ISLAND

STATEMENT OF WORK

I. General

1. Scope - Contractor shall demolish and remove existing metal railings and chain-link fence and posts from a concrete structure and install new vinyl coated chain link fence, one new pedestrian gate and barbed wire as shown on the figures. The new fence includes approximately 122 linear feet of 8-foot-high vinyl coated chain link fence complete with posts cored-drilled into steel reinforced concrete, braces, 30-inch-wide pedestrian gate, barbed wire and all other appurtenances required for a complete and functional new fence enclosure. Contractor shall furnish all materials, equipment, labor and services to complete work in accordance with this statement of work. Work includes proper disposal or recycling of all debris generated. Attached Figures 1-7 show required work.

2. Location - The work site is located in Providence RI 02905, adjacent to the intersection of Bridge and Tockwotton Streets. The fence location is on the east abutment of the concrete hurricane barrier structure accessed from a public sidewalk over stone rip rap. The Contractor is responsible for all means and methods for access to and from the work site.

3. Site Visit - A scheduled site visit will be listed in the solicitation. Interested vendors should attend the site visit to confirm understanding of the scope, inspect field conditions, and assess access to the site. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements. After Notice to Proceed, contact the Technical Point of Contact (TPOC) with questions and coordination, Andrew Cattano 978-318-8329 or Andrew.M.Cattano@usace.army.mil

4. Schedule - The Contractor shall commence work within 21 days after Notice to Proceed, prosecute work diligently, and complete all work no later than 240 days from notice to proceed. The project area will be open to the Contractor Monday through Friday, 7:00 AM to 5:00 PM. All work must be done during these hours unless additional hours are approved by the TPOC. No work shall be done on weekends or Government holidays.

All Pre-Construction submittals shall be submitted within 21 days of Notice to Proceed. The Government reserves up to 21 days for review and acceptance on each submittal/ resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of Pre-Construction submittals.

5. SAFETY REQUIREMENTS

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385- 1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-%20FINAL.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines.

The AHA shall be reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-%20FINAL.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.

b. The SSHO must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program.

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

f. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC immediately.

6. Preconstruction Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination. The purpose of the conference is to discuss the contract requirements in terms of safety, quality, submittals, communications, access to the site, inspections, and payments.

7. Permits - There are no permits required to complete this work. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

8. Security - The contractor will comply with all established security policies at the Fox Point Hurricane Barrier. Potential periods of heightened security may affect access to work areas. During periods of heightened security, the Government reserves the right, at any time, to close any property and reschedule work. The Contractor shall be given at least 24-hour notice of any such closure.

9. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. All invoices shall be coordinated with Andrew.M.Cattano@usace.army.mil. For jobs greater than thirty (30) days, the Contractor may request progress payment.

Mailing address:

US Army Corps of Engineers

Cape Cod Canal Field Office

PO Box 1555

Buzzards Bay, MA 02532

Attn: Andrew Cattano

10. Warranty - Contractor shall provide a materials and workmanship warranty for a period of one year from date of installation. Material warranty shall include all fence components, gate, and accessories. The fence installer is responsible for correction of defective workmanship or failure of materials during the warranty period.

II. Technical Requirements:

Part 1 General:

1. Requests for Information:

After Notice to Proceed, questions and requests for information should be directed to the TPOC Andrew Cattano at 978-318-8329 or Andrew.M.

Cattano@usace.army.mil.

2. Submittals - The submittals identified below shall be prepared and submitted to the TPOC for review and accepted by the Government. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government within 14 days of the Government's response, unless additional time is granted by the Government in writing. Although the Government reviews submissions, the Contractor's work shall be completed using proper internal controls and review procedures.

a. Preconstruction Submittals: Submitted within 21 days of Notice to Proceed. Submittals must be accepted prior to the commencement of any field work.

Accident Prevention Plan (ENG Form 6293)

Activity Hazard Analysis

Site Safety and Health Officer Designation Letter (ENG Form 6282)

CPR and First aid Certification

Proposed Schedule for completing the work.

Proposed vinyl coated fence materials and layout drawings of post locations. Include description of proposed fence fabric, pipe posts, pipe rails, bracing, barbed wire, hangers and hardware. Include detail drawings of new pedestrian gate and cantilevered section of fence.

Proposed concrete grout to secure new fence posts and fill railing holes after demolition.

b. Other submittals

As-built drawing of the installed fence.

3. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping and keep the work areas, including any storage areas, free from the accumulation of waste materials. Upon completing work, the Contractor shall remove all tools, equipment, and materials that are not the property of the Government and shall clean up the job site to the satisfaction of the Government. Debris, rubbish, and all waste materials resulting from the work under this contract shall be disposed of by the Contractor at his expense off Government property. Segregate and maximize recycling of all waste generated.

4. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site. Contractors means and methods shall prevent any release of debris or any contaminants onto land or the adjacent waterway. Contractor staff shall utilize strict collection of demolition debris and removal from the site. Water, air and land resources shall not be adversely impacted during the course of the work.

Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met. Contractor shall immediately notify the TPOC of any spill or any release of contaminants to land or the waterway.

5. Sustainability - EPA Designated: Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

6. Government Resources - The contractor is responsible for providing all resources to complete this project. The Government will not provide any resources on this project. The Contractor may have a portable toilet delivered and placed in the staging area.

7. Damage to other Property - The Contractor shall Dig Safe the work area prior to mobilization. Contractor is responsible to restore any and all Government, City or Utility owned structure, cables, sidewalks, curbing or roads if impacted during contract work. Contractor is responsible for injury to any person as a result of contract work. Any items that are damaged or altered during construction shall be restored to their pre-construction condition at the contractor's expense and verified as such by the Government TPOC.

8. Omissions - Although work is not specifically shown or specified, the contract shall include miscellaneous items, appurtenances, and materials obviously necessary for a sound, secure and complete fence installation. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail.

9. Quality Assurance - The Contractor is responsible for quality control of the work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times during the term of the contract.

10. Staging Area for Contractor Use -The figures attached show available staging area and parking for Contractor personnel. The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material at the site and will not be responsible for damage to the Contractor's equipment or materials.

Part 2 Products:

The Contractor shall provide sufficient information on proposed materials and time to allow the Government to evaluate the products for adherence to specifications. Substitute materials will be evaluated in terms of quality, features, performance and expected service life. Substitute products must be accepted by the Government prior to installation. All products shall be new and unused. All materials shall be approved by the Technical Point of Contact prior to installation.

1. Industrial Grade Security Fence with Barbed Wire:

a. Approximate total length: 122 linear feet of black vinyl coated security fence 8' above concrete surface.

b. Fabric: 96" 9 GA. galvanized wire with black vinyl coating, 2" mesh, twisted selvage on top and knuckled selvage on bottom.

c. Pipe: High Yield/Tensile Strength Pipe DQ-40 galvanized pipe, black vinyl coating.

d. Top and Bottom Rails: 1 5/8" O.D. DQ-40 Pipe, black vinyl coating

e. Line Posts: 2-1/2" O.D. DQ-40 Pipe, black vinyl coating

f. Terminal Posts: 4" O.D. DQ-40 Pipe, black vinyl coating

g. Bracing on Terminal posts - 1-5/8" O.D. DQ-40 Pipe and 3/8" truss rod & truss rod tightener, black vinyl coating.

h. Maximum Post spacing: 8'

i. Barbed Wire: (3) strands of 12 1/2 gauge 4-point class III high-tensile galvanized steel barbed wire on 45-degree pressed steel arms with black vinyl coating.

j. Fittings: Regular brace band & carriage bolt, die-cast aluminum rail-end, line rail clamp, die-cast aluminum dome cap, 3/16" X 3/4" tension bar, regular tension band & carriage bolt.

k. Tie Wire: 9 gage steel with black vinyl coating

2. Pedestrian Swing Gate, With Barbed Wire:

a. Size: 30" wide

b. Frame: 1-5/8" Galvanized DQ-40 PIPE with black vinyl coating.

c. Welded Frame with vertical and horizontal brace members.

d. Fabric: 96"- 9 gauge galvanized with black vinyl coating, 2" Mesh, twisted selvage on top and knuckled selvage on bottom. The chain link fabric shall be attached to the gate uprights with tension bars and tension bands, and tie wires attaching the fabric at all horizontal and vertical rail connections.

e. Gate latch: Pad Locking Drop Fork

f. Gate Posts: 4" O.D. DQ-40 PIPE, full weight pipe, 9.10 lbs. per foot with black vinyl coating, 16' long, embedded 24" into concrete.

3. Grout:

a. Non-Shrinking, flowable, 8,000 psi minimum. Grout shall be applied in accordance with manufacturers recommendations.

Part 3 Execution:

General

1. All onsite work shall be coordinated with the TPOC prior to start of mobilization. Contractor shall confirm Dig Safe has marked known utilities.

Verify that all required submittals are approved, and new materials are onsite prior to commencing any demolition work. Contractor shall determine a plan for access to the east abutment and staging area that does not impact traffic on the public roads and keeps the sidewalk open. Contractor shall provide, erect, and maintain all necessary fencing, signs, and barriers to perform work in a safe manner that protects both workers and the public from hazards.

2. Although work is not specifically shown or specified, contract shall include miscellaneous items, appurtenances, devices, and materials obviously necessary for a sound, secure and complete installation. The Government will supply a pad lock for the new pedestrian gate.

3. Contractor shall verify that actual site conditions are consistent with the conditions depicted within this statement of work and figures.

Discrepancies, omissions, and errors shall be reported to the Government prior to the start of construction.

Demolition

4. Contractor shall demolish, remove, and properly dispose or recycle the existing chain link security fence, pedestrian gate, and 2" metal railings.

Existing posts of the fence and railings shall be cut flush with the concrete surface of the structure. The existing fence to be removed has 6 posts and existing railing to be removed has 18 posts. All post holes shall be filled with grout flush with the concrete surface. During all phases of work, the means and methods shall prevent any spillage of materials from falling into the river.

Fence Installation:

5. The Contractor shall mark the proposed location of each new post hole consistent with the approved submittal drawing. Contractor shall coordinate with the TPOC for an inspection of the proposed fence layout. New posts shall be core-drilled into the steel reinforced concrete structure with appropriate equipment and experienced workers. The diameter of holes shall be 1/2" greater than the post diameter. Line posts shall be 2 1/2 inch O.

D. embedded to 18-inch depth. Terminal posts shall be 4-inch O.D. embedded to 24-inch depth. Allow sufficient time for grout to cure prior to installation of fence fabric and gates. Fence line shall be installed straight and true with a professional appearance. The fence shall not have gaps or openings that allow persons to gain entry past the fence. Any abrasions to the black vinyl coating during erection shall be coated with repair material as recommended by the fence manufacturer. The fence shall be installed by experienced fence installers employed by a company specializing in fence installations.

6. The new fence top and bottom rails shall be securely fastened. The installed fabric shall be stretched taut and securely fastened to posts and rails and installed flush to the concrete surface. Posts set on maximum 8-foot center spacing. 9 gage steel wire ties spaced 15" on center for line posts & 24" on center for rails. Terminal posts braced and trussed to the nearest line post with 1 5/8" O.D. DQ-40 Pipe and 3/8" truss rod & truss rod tightener. End, corner, pull and gate posts shall be braced and trussed. The horizontal brace rail and diagonal truss rod shall be installed in accordance with ASTM F567. Install regular brace band and carriage bolts, die-cast aluminum rail-ends, line rail clamps, die-cast aluminum dome caps, 3/16" X 3 /4" tension bars, regular tension band & carriage bolts. Carriage bolts used for fittings shall be installed with the head on the secure side of the fence.

All bolts shall be peened over to prevent removal of the nut.

7. The entire new fence perimeter shall have 3 strands of 12 1/2 gauge 4-point class III high-tensile galvanized steel barbed wire installed on 45-degree pressed steel arms. Barbed wire shall be pulled taut and fastened to each post or arm with tie wires or metal tie clips.

8. Install new single leaf pedestrian swing gate (30-inches wide by 8-feet high). Installation of swing gate and gateposts shall be in compliance with ASTM F567. Direction of swing shall swing inwards towards the south. Gates shall be plumb in the closed position having a bottom ground clearance of 2". Hinge and latch offset opening space from the gate frame to the post shall be no greater than 3 in. in the closed position. Swing gate shall have heavy duty hinges and a functional mechanism to receive a heavy-duty pad lock for security. Gate posts shall be 4" O.D., 16' long, core-drilled into concrete 24" deep.

9. Install a fence section above the pedestrian gate with barbed wire installed to deter trespassing.

Closeout Procedures

10. All debris generated from the project shall be removed and properly disposed or recycled by the Contractor. Contractor shall clean up and properly dispose of debris off-site in accordance with Federal, State and Local ordinances and regulations. Contractor shall leave the entire site of the work in a neat and orderly condition. Segregate and maximize recycling of all waste generated. Debris shall be removed and transported in such a manner that prevents damage to local roads and spillage.

11. Contractor shall coordinate with the TPOC for the following at the completion of the project:

a. A final inspection walkthrough of the project to ensure the work is completed in accordance with the Statement of Work.

b. Restore site area to pre-construction condition.

c. Provide "As-Built" Drawing.

d. Complete Final Payment Forms and Certifications.

Requirements Security Fencing Installation, Fox Point Hurricane Barrier, Providence, Rhode Island

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: All work shall be completed in accordance with the Statement of Work

DoDAAC: 961503 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

FOXPOINT HURRICANE BARRIER, 700 ALLENS AVE

PROVIDENCE, RI 02905

UNITED STATES

Section F - Deliveries or Performance

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 240 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: 961503 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

FOXPOINT HURRICANE BARRIER, 700 ALLENS

AVE

PROVIDENCE, RI 02905

UNITED STATES

Andrew Cattano Email: andrew.m.cattano@usace.army.mil Telephone: 978-318-8329

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

Section H - Special Contract Requirements

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

WAGE DETERMINATION:

The Wage Determination for this project can be found at:

https://sam.gov/wage-determination/RI20250001/9

Wage Determination No.: RI20250001

Modification No.: 9

Date: 5 September 2025

Section I - Contract Clauses

UAI 5152.249-9000 Basis for Settlement of Proposals

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using total cost basis, the following principles will be applied to determine allowable equipment costs.

(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).

(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

(End of Clause)

52.003-4015 MAGNITUDE OF CONSTRUCTION

The estimated cost of the work is between $25,000 and $100,000

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

May 2014

52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Pledges of Assets (DEVIATION 2020-O0016) Feb 2021 Deviation 2020-O0016 Apr 2020 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.232-23 Assignment of Claims. May 2014 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984 52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-21 Specifications and Drawings for Construction. Feb 1997

52.236-26 Preconstruction Conference. Feb 1995 52.242-14 Suspension of Work. Apr 1984 52.243-5 Changes and Changed Conditions. Apr 1984 52.246-21 Warranty of Construction. Mar 1994 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984 52.249-10 Default (Fixed-Price Construction). Apr 1984

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.

(DEVIATION 2024-O0013 REVISION 1)

May 2024 Deviation 2024-O0013 May 2024

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.

Sep 2014

252.225-7048 Export-Controlled Items. Jun 2013 252.227-7033 Rights in Shop Drawings. Apr 1966 252.232-7004 DoD Progress Payment Rates (DEVIATION 2020-O0010) Oct 2014 Deviation 2020-O0010 Mar 2020 252.232-7010 Levies on Contract Payments. Dec 2006 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024

FAR Clauses Incorporated by Full Text

52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to 21 proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . The time 240 days after Notice to Proceed stated for completion shall include final cleanup of the premises.

(End of clause)

52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (DEVIATION 2025-O0003 and 2025-O0004)

(Jan 2025) Deviation 2025-O0004 (Mar 2025)

Terms and Conditions-Simplified Acquisitions (Other Than Commercial Products and Commercial Services) (MAR 2025) (DEVIATION 2025- O0003 )and 2025-O0004

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (section 743 of Division E, Title VII, of (Jan 2017) the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec (Section 1634 of Pub. L. 115-91).2023)

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Section 889(Nov 2021) (a)(1)(A) of Pub. L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (Section 102 of Division R of Pub. L. 117-328), unless the agency grants (Jun 2023) an exception - see paragraph (b) of 52.204-27.

(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition. (Pub. L. 115-390, title II).(Dec 2023)

(vi) 52.222-3, Convict Labor (E.O.11755).(Jun 2003)

(vii) [Reserved]

(viii) [Reserved]

(ix) 52.225-13, Restrictions on Certain Foreign Purchases ( ) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Feb 2021 Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (31 U.S.C. 3903 and 10 U.S.C. 3801).(Mar 2023)

(xi) 52.233-3, Protest After Award (31 U.S.C. 3553).(Aug 1996)

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (Pub. L. 108-77 and 108-78 (19 U.S.C. 3805 note)).(Oct 2004)

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments .(Apr 1984)

(ii) 52.232-8, Discounts for Prompt Payment .(Feb 2002)

(iii) 52.232-11, Extras .(Apr 1984)

(iv) 52.232-25, Prompt Payment (Jan 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations .(Jun 2013)

(vi) 52.233-1, Disputes .(May 2014)

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services .(Jan 2025)

(viii) 52.253-1, Computer Generated Forms .(Jan 1991)

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the (Nov 2023) Coast Guard, or applicable elements of the intelligence community-see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to (Jun 2020) contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (E.O. 13126) (Applies to contracts for supplies exceeding the (Jan 2025) micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (41 (Jun 2020) U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR (Jun 2020) 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (29 U.S.C. 793) (Applies to contracts over the threshold specified in (Jun 2020) FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in (Jun 2020) FAR 22.1303(a) on the date of award of this contract).

(viii) 52.222-41, Service Contract Labor Standards (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the (Aug 2018) Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(ix)

(A) 52.222-50, Combating Trafficking in Persons (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).(Nov 2021)

(B) Alternate I (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: (Mar 2015) Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(x) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Applies when 52.222-6 or 52.222-41 are in the (Jan 2022) contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, ))).et seq.

(xi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and (Jan 2022) performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xii) 52.223-5, Pollution Prevention and Right-to-Know Information (42 U.S.C. 11001-11050 and 13101-13109) (Applies to services (May 2024) performed on Federal facilities).

(xiii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (42 U.S.C. 7671, ) (May 2024) et seq.

(Applies to contracts for products as prescribed at FAR 23.109(d)(1)).

(xiv) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (42 U.S.C. 7671, ) (May 2024) et seq.

(Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xv) 52.223-20, Aerosols (42 U.S.C. 7671, ) (Applies to contracts for products that may contain high global warming potential (May 2024) et seq.

hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvi) 52.223-21, Foams (42 U.S.C. 7671, ) (Applies to contracts for products that may contain high global warming potential (May 2024) et seq.

hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

(xvii) 52.223-23, Sustainable Products and Services (MAR 2025) (DEVIATION 2025-O0004)) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C.