Solicitation Package 47PJ0023R0067.pdf

PDF 3 MB Posted

Attached to
Cafeteria Floor Repair, Bismarck, ND
Solicitation number
47PJ0023R0067
Issued by

View the file

Other files

File Type Posted
Universal Scope Requirements v3_8 2022 08 01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

�������
����$%&''(�$)*+,+-.-+)/0�12340�5�67.48��99999999999999999999999:� �(��;<3�6=433>3/-��99999999999999999999999999999999999::� �?��@)/A-4B,-+)/�$,)C3�)D�E)4F��999999999999999999999999� �G��E.=3�H3-34>+/.-+)/��9999999999999999999999999999:� �&I��;<3�$)*+,+-.-+)/��99999999999999999999999999999999999:� �'?��J3C43A3/-.-+)/A�5�@34-+K,.-+)/A��9999999999999999999999999� �I&�

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

47PJ0023R0067

GSA PBS NORTH DAKOTA FIELD OFFICE 8PMPN

657 2ND AVE N RM 244

Fargo, ND 58102 USA

As detailed in the Construction Scope of Work dated 4/25/2023, the contractor will fix heaving concrete floors in the basement of the William Guy Federal Building.

8PMPN

GSA PBS NORTH DAKOTA FIELD OFFICE 8PMPN

657 2ND AVE N RM 244

Fargo, ND 58102 USA

EQ8PSMMN-23-0037

8PMPN

Laura Funk 701-566-6114

23-084

5/5/2023

5/19/2023

4:00 PM (CST)

2 70

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f) vinyl tile to match existing for final floor finish.

The area square footage is approximately 16 SF (4 x 4 See reinforced concrete and two layers of vinyl tile and carpet locations and been repaired in the past by chipping a placed 12 OC and pinned to the existing slab. Finish with

Deliverable concrete floors in the basement of the William Guy Federal

Place of Performance: 220 E ROSSER AVE BISMARCK, ND 58501-3869 is posing to be a tripping hazard for building occupancy.

Picture Below). The concrete floor is made up of 4

Building. Over the years the flooring has cracked in certain

PoP: 05/25/2023 - 07/31/2023 vinyl tile to match existing for final floor finish.

The GSA is initiating a project to fix heaving of the

Contract Type: Firm Fixed Price replaced with pour in place concrete. Reinforcement shall be compound. The concrete is beginning to heave once again and

The area square footage is approximately 16 SF (4 x 4 See concrete floors in the basement of the William Guy Federal

Place of Performance: 220 E ROSSER AVE BISMARCK, ND 58501-3869 placed 12 OC and pinned to the existing slab. Finish with squares. The 4 concrete flooring shall be cut out and

Abatement is posing to be a tripping hazard for building occupancy.

LS

portion of the concrete out and filled with leveling

The GSA is initiating a project to fix heaving of the

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

PoP: 05/25/2023 - 07/31/2023 replaced with pour in place concrete. Reinforcement shall be compound. The concrete is beginning to heave once again and

Deliverable

Contract Type: Firm Fixed Price locations and been repaired in the past by chipping a

LS

reinforced concrete and two layers of vinyl tile and carpet

Floor Repairs

Picture Below). The concrete floor is made up of 4 squares. The 4 concrete flooring shall be cut out and portion of the concrete out and filled with leveling

PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS

Building. Over the years the flooring has cracked in certain

4 70

Sol. Reference No. 47PJ0023R0067

Simplified Acquisition Construction Contract for: Cafeteria Floor Repair located at 220 E Rosser Ave, Bismarck, North Dakota.

The Agreement

Table of Contents

I. Project Information I.A. Project Summary I.B. The Contract I.C. Period of Performance I.D. Work Conditions/Site Requirements I.E. Authorized Representatives I.F. Contract Liquidated Damages Rate I.G. Buy American Exceptions I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments

II. Prices II.A. Basis of Pricing II.B. Contract Price Form

III. Terms and Conditions III.A. Commencement, Prosecution, and Completion of Work III.B. Contractor Responsibilities III.C. Material and Workmanship III.D. Project Schedule III.E. Interpretation of Specifications and Drawings III.F. Submittals III.G. Government’s Right to Stop Work for Non-Compliance III.H. Other Contracts III.I. Use and Possession Prior to Substantial Completion III.J. Finality of Contract Modifications III.K. Liquidated Damages III.L. Insurance Requirements [CO Instruction: See FAR 28.306(b) and edit amounts if needed III.M. Administrative Matters III.N. Bonds III.O. Requirements for GSA Information Systems

IV. Contract Clauses IV.A. Clauses Incorporated in Full Text

(1) (FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEPT 2013)

(2) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 08)

(3) FAR 52.225-9 Buy American—Construction Materials (OCT 2022)

(The Agreement) Last Revised 03/2023

(4) FAR 52.228-13 Alternative Payment Protections (July 2000)

(5) GSAR 552.204-9 Personal Identity Verification Requirements (JUL 2021)

(6) GSAR 552.252-6 Authorized Deviations in Clauses (NOV 2021)(Deviation FAR 52.252-6)

(7) FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)

(8) FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

(NOV 2021)(DEVIATION APR 2020)

(9) FAR 52.228-11, Pledges of Assets (FEB 2021) (DEVIATION APR 2020)

(10) Additional clauses

IV.B. Clauses Incorporated by Reference

I. Project Information

I.A. Project Summary

The GSA is initiating a project to fix heaving of the concrete floors in the basement of the William Guy Federal Building. The concrete is beginning to heave and pose a tripping hazard for building occupants.

I.B. The Contract

(1) The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract.

(2) The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract.

I.C. Period of Performance

(1) Commencement. The Contractor shall commence performance of the Work within 10 days of contract award.

(2) Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 80 calendar days from issuance of contract award.

(3) Contract Completion. The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 10 calendar days of Substantial Completion.

I.D. Work Conditions/Site Requirements

Work is located inside of the William Guy Federal Building in Bismarck, North Dakota.

I.E. Authorized Representatives

(1) This Contract is between the United States of America, acting by and through the Administrator of General Services (GSA), and the Contractor (the Parties). References in this Contract to "the Owner" or "the Government" shall be understood to refer to GSA. The following individual is designated as the only authorized GSA representative under this Contract, unless other warranted contracting officers are designated in writing:

Authorized Representative Information:

Contracting Officer’s Information

Name: Laura Funk

Telephone: (701) 566-6114

Email: laura.funk@gsa.gov

(2) For the applicable authorities and limitations see Section IV of this Agreement, GSAR 552.236-70.

I.F. Contract Liquidated Damages Rate

In accordance with GSAR 552.211-12, Liquidated Damages – Construction, in Section IV of this Agreement, liquidated damages shall be calculated at the rate of $0 per calendar day.

I.G. Buy American Exceptions

For the applicable Buy American clause and any exceptions, see Section IV of this Agreement.

I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments

The following documents are incorporated by reference into this Contract.

(1) Construction Scope of Work dated 4/25/2023

(2) Wage Determination ND20230012 dated 1/13/ 2023

(Remainder of Page Intentionally Blank)

Construction Scope of Work)

CONSTRUCTION SCOPE OF WORK

U.S. GENERAL SERVICES ADMINISTRATION, ROCKY MOUNTAIN REGION 8

Date: 4/25/2023 Revision: N/A

Section 1: Project Title 037 Cafeteria Floor Repair

Section 2: Project Location, Building Name, & Building Number William Guy Federal Building 220 East Rosser Ave, Bismarck ND, 58501 Building Number: ND0037ZZ Section 3: Contact List

Contracting Officer (CO) Name: Laura Funk Email: laura.funk@gsa.gov Address: 657 2nd Ave North Fargo, ND 58102 Phone (O): 701 566-6114 Project Manager Name: Jesse Johnson Email: jesse.johnson@gsa.gov Address: 220 East Rosser Ave Bismarck, ND 58501 Phone (O): 701-557-9649 Phone (C): 701-202-9036 Property Manager Name: James Langlois Email: james.langlois@gsa.gov Address: 220 East Rosser Ave Bismarck, ND 58501 Phone (O): 701 566-6115

(Construction Scope of Work)

Section 4: Project Background & Project Description The GSA is initiating a project to fix heaving of the concrete floors in the basement of the William Guy Federal Building. Over the years the flooring has cracked in certain locations and been repaired in the past by chipping a portion of the concrete out and filled with leveling compound. The concrete is beginning to heave once again and is posing to be a tripping hazard for building occupancy.

The area square footage is approximately 16 SF (4’ x 4’ See Picture Below). The concrete floor is made up of 4” reinforced concrete and two layers of vinyl tile and carpet squares. The 4” concrete flooring shall be cut out and replaced with pour in place concrete.

Reinforcement shall be placed 12” OC and pinned to the existing slab. Finish with vinyl tile to match existing for final floor finish.

Section 5: Project Objectives The contractor shall provide labor, materials, equipment, and supervision necessary to perform:

1) The contractor shall use water while saw cutting concrete to cut down on air borne debris.

2) The contractor shall use reinforcing bar similar to what is removed.

3) The government will provide new flooring for the repairs and the contractor shall provide the installation.

4) Concrete shall have a smooth finish to help with the application of the finished floor materials.

5) Filler may be used where needed to achieve proper floor finish elevation.

6) All finish work for each area is explained above as noted.

7) All LOUD work such as saw cutting grinding and jackhammering will need to be done before 7:00am or after 5:00pm for loud noise will be prohibited during work hours.

8) The following information is provided for bidding purposes only. The contractor is advised to conduct a site visit and field-verify the exact information required for use in completing the work and submitting an offer.

9) No asbestos or lead containing materials shall be used.

10) The contractor is responsible for the protection of all existing building property surfaces from damage due to work performed under this contract. Damages to existing surfaces caused by the performance of this contract shall be repaired as to match the existing surface finish at no additional cost to the Government.

11) The contractor shall take all necessary precautions to prevent any dust or debris from filtering into other parts of the building including but not limited to mechanical systems. Should dust or debris filter into other parts of the building the contractor shall take immediate steps to clean the area (no equipment or supplies will be furnished by GSA).

12) At the completion of the project, the project area shall be cleaned to building standards as determined by the GSA Property Manager. Should the contractor fail to clean the project limits in a timely manner, GSA will contract for said cleaning and the cost will be deducted from the contract. Ensure that all penetrations are sealed with fire rated approved material as required by the International Building Code.

13) The CO has the right to reject any unsatisfactory or unsuitable material or workmanship.

14) The contractor shall provide and utilize all Personal Protective Equipment required when working on the system when energized.

15) The contractor shall provide all equipment associated with the entire project, operate in a safe manner and adhere to all

OSHA and GSA standards.

16) Fire sprinkler heads and smoke detectors shall be properly isolated, clean and free of debris, paint or dust. Contractor shall be responsible for the cleaning of smoke detectors in the project area that become dirty (internally and externally). Contractor shall be responsible for cleaning any fire sprinkler head in the project area that becomes dirty from dust or other debris.

17) ACM exists in the black mastic layer between the concrete and the first layer of vinyl tile in areas AB&C only. See below for requirements.

Abatement – All vinyl tile shall be abated in areas A, B and C.

a) The contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site to include but not limited to:

1) U.S. Environmental Protection Agency (EPA) national Emission Standards for Hazardous Air Pollutants (NESHAP) 40 CFR 61 Subpart M

2) EPA Asbestos Hazard Emergency Response Act (AHERA) 40CFR 763

3) 29 CFR 1910.1001, Occupational Safety and Health Administration (OSHA), Asbestos in General

Industry

4) 29 CFR 1910.134, OSHA Respiratory Protection Standard

5) 29 CFR 1926.1101, OSHA, Asbestos in Construction Standard

6) North Dakota Administrative Code Chapter 33-15-13 Emission Standards for Hazardous Air Pollutants

7) North Dakota Century Code Chapter 23-25 Air Pollution Control

b) The contractor is responsible for providing medical records of personnel as required by the applicable federal state and local regulations, and shall hold the government harmless for failure to comply with any applicable safety or health regulations on the part of himself, his employees, or contractors.

c) Contractor shall coordinate project schedule with the third-party consultant responsible for clearance air monitoring and project surveillance. This consultant will be under separate contract to the Government.

d) The contractor shall be responsible for obtaining all necessary local, state, and federal permits and licenses and payment of related fees.

e) The contractor shall be a firm of established reputation (or if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which maintains a regular force of workmen skilled in asbestos abatement, and shall have performed this work on previous projects. All workers shall be certified as and if required by North Dakota Department of Environmental Quality. Contractor shall submit all permits and forms as required by the NDDEQ.

f) Abatement Work Practices and Control Requirements:

1) All asbestos disturbing and asbestos abatement activities shall follow all applicable OSHA, NDDEQ and EPA requirements for removal of ACM based on the specific type of work being performed.

2) Project to occur during off hours. Contractor shall coordination abatement activities with the GSA Building

Manager.

3) The air handling system in the work area shall be shut-down and isolated to prevent the distribution of asbestos fibers into other areas. The Contractor shall be responsible to confirm the air handling system is off.

4) Negative air machine (NAM) exhaust shall be exhausted to the exterior of the building.

5) No variances or alternative procedures from OSHA, EPA, or NDDEQ shall be allowed unless approved by

GSA prior to the commencement of abatement activities. Written agency approval of any variance or alternative work procedures shall be provided to GSA.

g) Abatement Specific Pre-Abatement Submittals Prior to the commencement of asbestos abatement actions the Contractor shall provide the following documentation to GSA for review and approval.

1) A written method of procedure (MOP) describing types, quantities and locations of asbestos to be removed;

specific controls and work methods to be utilized; phasing; disposal, etc.

2) Copy of 10-day notification and/or permit to the appropriate authorities (e.g. EPA, CDPHE, local fire department, etc.). If notification and/or permit are not required the Contractor shall state why.

h) Asbestos- Containing Waste Material Disposal Requirements:

1) Asbestos-containing waste material shall be properly packaged, labeled, manifested, and transported.

2) Asbestos waste handling, bagging, and labeling shall meet all applicable regulatory requirements including but not limited to 29 CFR 1926.1101(k)(8)(i), 29 CFR 1926.1101(l)(2), and 40 CFR 61.150(a).

3) Transportation and disposal of friable asbestos-containing waste material shall be conducted in accordance with all applicable requirements including but limited to NDAC 33-15-13 Subsection 11, 40 CFR 61.150, and 49 CFR Parts 171 & 172.

i) Asbestos Abatement Specific Completion Submittals Upon completion of abatement activities, the Contractor shall provide the following documentation in a closure report:

1) A brief written statement by the GAC on their company letterhead describing the dates, location, and quantities of asbestos containing material abated, controls and work methods that were used, waste bagging and handling, and name and address of disposal facility.

2) Copy of 10-day notification and/or permit to the appropriate authorities (e.g. EPA, CDPHE, local fire department, etc.). If notification and/or permit are not required the abatement contractor shall state why.

3) Copies of the firm’s state asbestos firm licenses.

4) Copies of current certification and/or licenses for all asbestos supervisors and workers working onsite.

5) OSHA-required respirator fit testing and medical clearance documentation for each person entering the regulated area.

6) Copies of personal air monitoring data or supporting Negative Exposure Assessment (NEA).

7) Legible copies of all daily logs.

8) Legible copies of the final signed waste manifests or other shipping documentation.

j) Coordinate project activities with GSA Property Manager. Contractor shall take care to prevent unwanted activation of the fire alarm system (dust control or similar). Coordinate project activities with GSA Property Manager.

Section 6: Proposal Pricing & Site Walk

1) Pre-proposal Site Visit Meeting:

a) The site visit shall consist of a meeting to review construction requirements followed by a walk-thru of the project site. The meeting shall be attended by the contractor and GSA project personnel, and appropriate sub-contractors. Contact the Project Manager to schedule a site visit.

b) Review existing conditions of the project area including any field verification.

Review the solicitation/evaluation requirements

2) Cost Proposal Requirements:

a) When submitting a proposal, provide a cost breakdown for each task into the following categories: Materials, equipment, labor hours, subcontractor's quotes, overhead, profit, and bond broken down into shell, tenant improvement (TI) (by tenant), Building- Specific Amortized Capital (BSAC), and environmental (as applicable). Follow P120 guidelines for tier level 3 based on project triage tool. Pricing shall be broken down by Construction Specification Institute (CSI) divisions.

b) Base Bid-

c) Option 1-

d) Option 2-

Section 7: Period of Performance Once notice to proceed has been issued, the contractor has 90 calendar days to complete the project. The contractor must also promptly begin the badging process at the time of notice to proceed. Please allow a minimum of 30 days to complete the badging process.

Extensions will be granted for unforeseen conditions and other factors outside of the contractor’s control at the Contracting Officer’s discretion.

Section 8: Universal Scope Requirements ALL of the requirements in this section are MANDATORY for ALL GSA projects

See the attached Universal Scope Requirements document for the full details outlining each item

Failure to comply with any and all of the requirements will result in the project not being accepted as complete

REQUIREMENTS for ALL Projects (Construction, Design & Design/Build)

a. Safety and Health Program

b. Asbestos Containing Materials. To comply with federal and state regulations as well as GSA policy, an asbestos pre-alteration assessment is required for all construction projects as outlined in Section B of the Universal Scope Requirements.

c. Lead Containing Paint / Lead Based Paint

d. Accessibility

e. Green Purchasing

f. Construction Indoor Air Quality (IAQ) Management Plan

g. Construction Waste Diversion

REQUIREMENTS for ALL projects IF APPLICABLE

h. Excavation Permit

i. Utility Locates

j. gBuild

k. Historic Compliance

l. Commissioning (for all new AHUs or all new building system equipment)

m. GSA IT Network

n. Building Monitoring and Control Systems (BMC)

o. Advanced Metering System

p. Sustainable Environmental Management System (SEMS)

Section 9: Submittals

1) Contractor shall submit a Method of Procedures (MOP) to the GSA Delivery Project Manager (PM) for approval prior to commencement of work. At a minimum, the MOP shall include:

a) Brief narrative describing method of accomplishment, construction techniques, etc

b) Project schedule (to include critical path, major milestones, long lead time items, mob & de-mob, inspection dates, substantial completion, and occupancy dates)

c) Service/Utility Outages (if necessary)

d) Phasing schedule (if necessary)

e) Any building infrastructure/BAS equipment that may be impacted

2) Pre-alteration assessment report

3) Manufacturer's specifications, instructions and material specification sheets in original form

4) Submittal register/ log for all products specified to establish a standard of quality to include. Submittal register response by the government shall be (14) calendar days or less.

a) For pricing purposed please assume 1 hard copy of submittals and 1 electronic copy to be sent to the project manager.

Distribution list including final quantities will be finalized after receipt of the submittal log/ register by GSA project manager.

5) If product samples are not submitted in a timely fashion, any delays caused by the contractor will not warrant a time extension.

After completion of all work, the Contractor shall submit to the project manager the manufacturer's specifications, instructions and material specification sheets in original form. Additionally, the Contractor shall submit all inventory changes (removals, additions, upgrades, etc., and new condition codes) to the COR.

6) Submittal response by the government shall be (14) calendar days or less.

7) Submittals for this Project:

a) Filler Compound (if used)

b) Vinyl Tile

Section 10: General Requirements

1) Contractor Use of the Premises

a) During the period of the project, the contractor will have access to the site only during business hours of 8:00 am 5:00

pm. No on-site work shall be performed outside these hours or on holidays unless otherwise directed by the Contracting Officer. The contractor will need to coordinate with the Contracting Officer to arrange access to the parking lot. The contractor shall make every effort to cause a minimum of damage to parking lots, any other paved areas, any items that need to be moved during the course of the project, and any areas not included in this scope of work. Any damage caused will be repaired at the contractor’s expense.

b) Any oud work shall be done during non-working hours such as before 7:00am and after 5:00pm. Any loud work will need to work around the courts schedule.

2) Progress Meetings

a) Progress meetings are not required for this project. The project manager and building team representative shall make daily inspections of the work progress.

3) Equipment

The contractor shall provide all equipment associated with the entire project, operate in a safe manner and adhere to all OSHA and GSA standards.

4) Equipment and Material Storage The contractor shall provide and store all equipment, the materials specified above, and any other materials required completing the project. The materials are required to be kept clean and dry throughout the duration of the project.

Contractor to coordinate with building manager for location of storage sheds.

5) Sanitary Facilities Provide and maintain temporary toilet facilities in accordance with State Health Department and GSA requirements.

6) Electricity, Water, and Gas GSA will pay for electricity, water, and gas during the course of this project. The contractor is responsible for making connections to the existing systems. Temporary electrical work shall meet the requirements of NFPA 70-1996 (NEC), Article

305. When temporary connections are removed, restore existing utility services to their original condition.

7) Contractor’s Field Office The contractor may provide an office for their own use. Size, location, and construction shall be subject to approval.

8) Fire Watch Contractor shall be responsible for providing fire watch if required per attached GSA fire watch guidelines.

9) Fire Alarm Impairment and Hot Work When a fire suppression or alarm system impairment is required, contractor shall provide written outage request to GSA for approval in advance of impairing any systems. Contractor shall be responsible for having a GSA approved NICET certified fire alarm contractor perform all system impairments. During fire alarm/suppression impairments or hot work procedures, contractor shall provide a fire watch per the GSA Regional Fire Watch Guidelines.

10) Protection of Public The building site will continue to be used by tenants. The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry. The contractor shall illuminate barricades and obstructions at night and maintain safe building access and egress for tenants.

11) Housekeeping The project site shall be kept in a neat, orderly, and safe condition at all times. The contractor shall provide enough containers for collecting construction debris and construction materials to be recycled. The contractor shall wet down dry materials and rubbish to prevent blowing dust and keep volatile wastes in covered containers.

12) Transportation and Deliveries The contractor shall arrange deliveries of materials in accordance with construction schedules; coordinate with COR to avoid conflict with other tenants and other work conditions at the site. Contractor must make GSA PM & CO aware of any lead times that may affect the project schedule.

13) Cleaning Before scheduling the final inspection, the Contractor shall accomplish six items: (1) Remove all tools, equipment, surplus material, and rubbish; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Remove grease, dirt, stains, foreign materials, and labels from finished surfaces; (4) Thoroughly clean building interiors; (5) Pickup all construction debris from the site; and (6) At time of final inspection, project shall be thoroughly cleaned and ready for use.

14) Protection of the Building The construction contractor is responsible for the protection of all existing building property for damage due to work performed under this contract. Any damage caused by the performance of this contract shall be repaired to match like or better condition at no additional cost to the government

15) Disruptive Work All painting, staining, or other activity which may cause noxious or undesirable fumes and/ or any noisy work that may be disruptive to the tenants/ public must be performed after normal working hours. The use of paint or stain that does not generate odors is preferred and may be required if the space will be occupied the following day with prior written approval from GSA.

Section 11: Badging & Security

1) Contractor is responsible to follow GSA’s security and badging requirements as provided at contract award.

2) US Access shared enrollment centers can be found at fedidcard.gov. Travel distances to the nearest center should be accounted for during the badging process.

Section 12: Payments

1) Information regarding payment requests and payment is in the solicitation/ contract. Please contact the CO if you have any questions regarding payments.

Section 13: Substantial Completion & Final Inspection

1) When project, or designated portion of project is complete, request a final inspection. Upon receipt of request that project is substantially complete, the Contracting Officer will proceed with the inspection within ten days of receipt of request or will advise the contractor of items that prevent the project from being designated substantially complete.

Section 14: Attachments

1) Universal Scope requirements

2) Pre-Alteration Asbestos Report

"General Decision Number: ND20230012 01/13/2023

Superseded General Decision Number: ND20220012

State: North Dakota

Construction Type: Building

County: Burleigh County in North Dakota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/13/2023

(Wage Determination)

BOIL0647-006 01/01/2021

Rates Fringes

BOILERMAKER......................$ 40.94 28.44

ELEC0714-013 07/04/2022

Rates Fringes

ELECTRICIAN......................$ 36.49 11.86+10.5%

IRON0512-006 05/01/2022

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 35.95 33.11

PLUM0300-017 05/30/2022

Rates Fringes

PLUMBER..........................$ 35.88 18.85

PLUM0300-020 06/07/2021

Rates Fringes

PIPEFITTER.......................$ 38.19 17.42

* SFND0669-002 01/01/2023

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 36.78 22.41

SHEE9010-001 06/06/2022

Rates Fringes

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 28.19 21.15

* SUND2012-001 08/18/2014

Rates Fringes

BRICKLAYER.......................$ 24.46 13.96

CARPENTER........................$ 15.78 ** 0.00

CEMENT MASON/CONCRETE FINISHER...$ 17.73 4.24

HVAC MECHANIC (Installation of HVAC Unit Only)...............$ 24.46 5.47

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)...............$ 16.73 2.94

LABORER: Common or General......$ 13.64 ** 0.00

LABORER: Mason Tender - Brick...$ 15.32 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 14.23 ** 4.50

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 23.06 4.00

OPERATOR: Crane.................$ 26.18 9.39

OPERATOR: Forklift..............$ 23.06 15.47

OPERATOR: Loader................$ 25.98 0.00

PAINTER (Brush and Roller).......$ 21.86 8.41

ROOFER...........................$ 17.17 2.66

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 24.14 0.00

TRUCK DRIVER: Dump Truck........$ 19.81 5.42

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

II. Prices

II.A. Basis of Pricing

(1) Contract Prices. All Contract prices set forth in this Section include all costs necessary to complete the work for which the price is established (e.g., Base Contract, Unit Price, Options) in accordance with the Contract Documents, including, but not limited to, the cost of work performed by subcontractors and consultants, indirect costs, fees, expenses, taxes, and profit.

(2) Knowledge of Conditions Affecting Price. FAR 52.236-3, Site Investigations and Conditions Affecting the Work, is incorporated by reference in this Contract. The Contractor shall be presumed to have established all prices with knowledge of general and local conditions that may affect the cost of Contract performance at the site where the Work is to be performed, to the extent that such information is reasonably obtainable.

(3) Unit Prices and Allowances. If any portion of the Work is to be performed on a unit price basis, the Unit Price shall include all costs of coordinating and incorporating the unit-priced portion of the Work into the Base Contract Work. The Contractor shall only be obligated to perform unit-priced work to the extent that an Allowance has been established. The Contractor shall be obligated to perform such work in excess of a unit quantity for which an Allowance is established only if directed by the Contracting Officer in writing. The Contractor shall be bound to the unit price or prices set forth herein in all equitable adjustments for changes including unit priced work, and no markups shall be applied to such unit prices.

(4) Options. If any portion of the Work is to be performed upon the timely exercise of an Option, the Option Price shall include all costs of coordinating and incorporating the Option-priced portion of the Work into the Base Contract Work. An adjustment to the Contract price for such additional work shall be computed solely on the basis of the Option price or prices set forth herein. Unless otherwise specified, all options may be exercised within 90 days of Contract award.

(5) Bid Rates. If this Contract includes Bid Rates to be used in determination of equitable adjustments (e.g., overhead, profit, daily rates for time-related costs), such rates shall be deemed to include all costs recoverable as components of an equitable adjustment consistent with the requirements, definitions, and exclusions applicable to equitable adjustments set forth in this Contract, and consistent with the Contractor's cost accounting practices. Unless otherwise specified, the bid rates shall be deemed to include only the Contractor's costs, and not the costs of any subcontractors.

II.B. Contract Price Form

Utilize box 17a of the Standard Form (SF1442) and an additional attachment to submit the cost proposal and breakdown.

III. Terms and Conditions

III.A. Commencement, Prosecution, and Completion of Work

FAR 52.211-10, Commencement, Prosecution, and Completion of Work and GSAR 552.211-10, Commencement, Prosecution and Completion of Work is supplemented as follows:

The Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of the Work, as defined in GSAR 552.211-70 Substantial Completion (Mar 2019) and the time specified in Section I (Project Information), “Period of Performance” clause. If the Contract specifies different completion dates for different phases or portions of the Work, the Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of such phases or portions of the Work within the times specified.

III.B. Contractor Responsibilities

GSAR 552.236-71, Contractor Responsibilities is located in Section IV.A. of this Agreement and is supplemented as follows:

(1) The Contractor shall secure and pay for all necessary permits and governmental fees, licenses, and inspections that are customarily secured after award of the Contract and that are legally required at the time of award. The Contractor shall provide a copy of the permits required for execution of the work to the Contracting Officer prior to commencement of any related work.

III.C. Material and Workmanship

All equipment, material, and articles incorporated into the Work shall be new and of the most suitable grade for the purpose intended, unless otherwise specified in this Contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number shall be regarded as establishing a standard of quality and performance and shall not be construed as limiting competition. Unless specifically directed by the Contracting Officer, the Contractor may use any equipment, material, article, or process that is equal to that named in the specifications, so long as it is of comparable quality and meets specified characteristics, or, if no such characteristics are specified, the relevant performance characteristics of the specified item.

III.D. Project Schedule

(1) The Project Schedule shall be a rational, reasonable and realistic plan for completing the Work, and conform to requirements specified in this clause and elsewhere in this Contract.

(2) The Contractor understands and acknowledges that the preparation and proper management of the Project Schedule is a material component of the Work, and that the Contract price includes all costs of compliance with Project Schedule requirements.

(3) The Project Schedule shall depict all major activities necessary to complete the Work.

(4) Prior to NTP, the Contractor shall submit its Project Schedule to the Contracting Officer. The Contractor shall submit the Project Schedule in PDF and hardcopy print format.

(5) The Project Schedule shall incorporate both major tasks as well as milestone events specified in the Contract, including, as applicable, NTP, Substantial Completion, and milestones related to specified work phases and site restrictions. The Project Schedule shall also include Contractor-defined milestones to identify target dates for critical events, based upon the Contractor's chosen sequence of work and be linked to the tasks that drive those milestones.

(6) Unless a shorter period for updates is specified elsewhere, the Contractor shall update the Project Schedule weekly to reflect its actual progress in completing the Work, and submit the updated Project Schedule to the Contracting Officer.

(7) If the Contractor revises the Project…