Solicitation - FA500020R0033 07072020.pdf

PDF 121 KB Posted

Attached to
REPAIR C-17 SIMULATOR CHILLER, BLDG. 10415 Federal contract opportunity
Solicitation number
FA500020R0033
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR C-17 SIMULATOR CHILLER, BLDG. 10415, newest first.
File Type Posted
Chiller Detail m5_1.pdf PDF
First Floor Heating m2_1_a.pdf PDF
Chiller Schedule m0_2.pdf PDF
AHU Mech Layout_m4_2.pdf PDF
Mechanical Schedule_m0_1.pdf PDF
MFR_FA500020R00033_Q and A.pdf PDF
Attch 2_ FXSB 20-5252 SPECS.pdf PDF
Attch 1_FXSB 20-5252 SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

FA500020R0033

Section A - Solicitation/Contract Form

Section B - Supplies or Services and Prices/Cost

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

FY20 F18PC374421 673 CES FM9

PLANNING FXSB205252 REPAIR C-17

SIMULATOR CHILLER, BLDG. 10415

Product Service Code: Z2JZ Firm Fixed Price

CIN: 00000000000005358076

1.0 Project

Section C - Description/Specifications/Statement of Work

Requirements The 673d Civil Engineer Squadron has a requirement for a contract for the removal and replacement of the C17 Chiller. The contractor shall provide all material, equipment, labor and general conditions to accomplish this work In accordance with the statement of work (SOW).

Section D - Packaging and Marking

Section E - Inspection and Acceptance

Section F - Deliveries or Performance

Delivery Schedule Ship To Address

Delivery Requested By

14 MAY 2020

1.0 Project

Ship To DoDAAC: F1W3EA Cage:

DunsNumber:

Duns4Number:

CountryCode:

USAF:673D CES CEP/CER/CEA

673D CES CEP/CER/CEA AF BPN

NO MILSBILLS PROCESSES 6326

ARCTIC WARRIOR JBER AK 99506-

FoB Details

Contractor Destination

Section G - Contract Administration Data

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR 36.204 Disclosure of the magnitude of construction projects.

Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. In no event shall the statement of magnitude disclose the Government's estimate. Therefore, the estimated price should be described in terms of one of the following price ranges:

(b) Between $25,000 and $100,000.

52.236-27 Site Visit (Construction) (FEB 1995) - ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 09 July 2020 at 9:00 AM AK DT

(c) Participants will meet at - If you require a base pass, please meet at the Boniface gate NLT 0930 on Thursday. If you do not need a base pass meet at Building 10415 Parking Lot JBER, AK , I will join you after I wait at the Boniface Gate for anyone else.

252.237-7023 Continuation of Essential Contractor Services. 2010-10 As prescribed in 237.7603(a), use the following clause:

CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010)

(a) Definitions. As used in this clause-

(1) "Essential contractor service" means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, including ships owned, leased, or operated in support of military missions or roles at sea; associated support activities, including installation, garrison, and base support services; and similar services provided to foreign military sales customers under the Security Assistance Program. Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.

(2) "Mission-essential functions" means those organizational activities that must be performed under all circumstances to achieve DoD component missions or responsibilities, as determined by the appropriate functional commander or civilian equivalent. Failure to perform or sustain these functions would significantly affect DoD's ability to provide vital services or exercise authority, direction, and control.

FA500020R0033

(b) The Government has identified all of the contractor services performed under this contract as essential contractor services in support of mission essential functions.

(c)(1) The Mission-Essential Contractor Services Plan submitted by the Contractor, is incorporated in this contract.

(2) The Contractor shall maintain and update its plan as necessary. The Contractor shall provide all plan updates to the Contracting Officer for approval.

(3) As directed by the Contracting Officer, the Contractor shall participate in training events, exercises, and drills associated with Government efforts to test the effectiveness of continuity of operations procedures and practices.

(d)(1) Notwithstanding any other clause of this contract, the contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission-Essential Contractor Services Plan.

(2) In the event the Contractor anticipates not being able to perform any of the essential contractor services identified in accordance with paragraph

(b) of this section during a crisis situation, the Contractor shall notify the Contracting Officer or other designated representative as expeditiously as possible and use its best efforts to cooperate with the Government in the Government's efforts to maintain the continuity of operations.

(e) The Government reserves the right in such crisis situations to use Federal employees, military personnel or contract support from other contractors, or to enter into new contracts for essential contractor services.

(f) Changes. The Contractor shall segregate and separately identify all costs incurred in continuing performance of essential services in a crisis situation. The Contractor shall notify the Contracting Officer of an increase or decrease in costs within ninety days after continued performance has been directed by the Contracting Officer, or within any additional period that the Contracting Officer approves in writing, but not later than the date of final payment under the contract. The Contractor's notice shall include the Contractor's proposal for an equitable adjustment and any data supporting the increase or decrease in the form prescribed by the Contracting Officer. The parties shall negotiate an equitable price adjustment to the contract price, delivery schedule, or both as soon as is practicable after receipt of the Contractor's proposal.

(g) The Contractor shall include the substance of this clause, including this paragraph (g), in subcontracts for the essential services.

(End of clause)

252.237-7024 Notice of Continuation of Essential Contractor Services. 2010-10 As prescribed in 237.7603(b), use the following provision:

NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010)

(a) Definitions. "Essential contractor service"and "mission-essential functions" have the meanings given in the clause at 252.237-7023, Continuation of Essential Contractor Services, in this solicitation.

(b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in Section B, during periods of crisis (This entire contract is considered an essential contractor service). The offeror shall-

(1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

(2) Address in the plan, at a minimum-

(i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;

(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;

(iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;

(iv) Any established alert and notification procedures for mobilizing identified "essential contractor service" personnel; and

(v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.

(End of clause)

Section J - List of Attachments

Number Attachment Name Attachment Description

Reference Identifier Date URL Line Item

01 FXSB 20-5252 SOW Statement of Work

01 JUL

FXSB 20-5252

SPECS

Specification

01 JUL

Section K - Representations, Certification, and other Statements of Offerors

Section L - Instrs., Conds., and Notices to Offerors

Section L - Instructions, Conditions, and Notices to Offerors (Non-commercial)

PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of Three (3) separate parts; Part I - Summary and Miscellaneous Data, Part II - Price Proposal and, Part III - Technical Proposal.

B. Specific Instructions:

1. Only submit electronic copies of the proposal

2. Submit copies via email alfredia.tyler@us.af.mil

1. PART I - SUMMARY AND MISCELLANEOUS DATA. Submit electronic copy only.

(a) The offeror shall provide a concise summary and master table of contents of the entire proposal.

(b) Complete blocks 13, 15, 16, 17 and 18 of the RFP Section A, SF1442 In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(c) Complete block 14 of the RFP Section A, SF 33, if any solicitation amendment(s) to the original solicitation documents was/were issued. Amendments will not be counted against the page limits.

(d) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(e) If applicable, provide a copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

(f) If none proposed, submit an Affirmation of no Exceptions, Deviations, or Waivers.

2. PART II - PRICE PROPOSAL - Submit electronic copy only.

(a) This part shall contain a completed Section B (Supplies or Services and Prices/Costs).

(b) Insert proposed unit prices and extended amounts in Section B for each Contract Line Item Number (CLIN) or Sub CLIN (SCLIN), including all option periods. The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct; particular care should be taken to ensure the amounts match when using a spreadsheet program, such as Microsoft EXCEL. The unit prices and extended amounts are limited to two decimal places.

(c) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal.

3. PART III - TECHNICAL PROPOSAL - Submit electronic copy only.

The factor is met when the offeror provided a proposal that identifies and meets all requirements stated in the attached SOW. Structure specifications shall be submitted with proposal.

4. Format for proposal Parts I, II, and III, shall be as follows:

(a) Each written Part of the proposal shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable).

(b) one electronic copy of each Part of the entire offer must be submitted. The electronic version of the proposal shall be submitted in a format readable by Microsoft Office 2010 which includes software programs such as WORD, EXCEL, or PowerPoint. For those pages of the proposal that cannot be submitted using Microsoft Office, such as the Standard Form 33, offerors shall include those pages electronically using Adobe Acrobat portable document files (.pdf) format. The Price Part shall be submitted in EXCEL spreadsheet format and MS WORD for price narrative. The electronic version shall be submitted via https://safe.amrdec.army.mil/safe /Guide.aspx. Proposals shall be sent to alfredia.tyler@us.af.mil and cassandra.woodard@us.af.mil. USB flash drives, floppy disks, and zip disks are not acceptable.

D. General Information:

1. Offerors are cautioned that JBER has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. Late proposals will be processed in accordance with FAR 52.215-1(c)(3),"Submission, modification, revision, and withdrawal of proposals."

FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:

New Year's Day 1 January Birthday of Martin Luther King Third Monday in January Washington's Birthday Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.216-1 Type Of Contract APR 1984 52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work MAY 2014 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.252-5 Authorized Deviations In Provisions APR 1984

Section M - Evaluation Factors for Award

EVALUATION FACTORS FOR AWARD:

This solicitation is issued using FAR Part 13 Simplified Acquisition Procedures. In accordance with FAR 13.106-2(b)(1) the Contracting Officer will be evaluating offerors using one or more, but not necessarily all of the evaluation procedures in FAR Part 14 and FAR Part 15. By submission of a quote in accordance with the instructions provided in Section L, Instructions to Offerors, the vendor accedes to the terms of this model contract. Failure to meet a requirement may result in a quote being determined unacceptable. Technical acceptability is approximately equal to price. The Award will be made using the following evaluation factors:

1. Acceptability Factor. The government will evaluate quotes on a pass/fail basis and assign an Acceptable or Unacceptable rating as described below:

Rating Description:

-Acceptable - Presents a thorough understanding of, and ability to meet objectives outlined in the Statement of Work. Technical narrative, drawings, and all required submittals shall be submitted with quote. Quote and all submittals, drawing, and technical narrative presents sufficient detail to allow the government to make an acceptability determination. Quote meets all requirements of the solicitation.

-Unacceptable - This rating is met when the vendor does not provide a quote that presents a thorough understanding of, and ability to meet objectives outlined in the Statement of Work. Technical narrative, drawings and required submittals were not provided, or do not meet the specifications outlined in the solicitation. Or sufficient detail was not provided to allow the government to make an acceptability determination.

2. Price Evaluation Factor:

-The government will use proposal analysis IAW the procedures at FAR 15.404-1(b).

Vendors are cautioned to submit sufficient information and in the format specified in Section L of this solicitation. Offerors may be asked to clarify certain aspects of their quotes. Exchanges conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for quote revision. The government intends to award a contract without discussions with respective vendors. The government, however, reserves the right to conduct discussions if deemed in its best interest.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
OFFER (Must be fully completed by offeror)
18. The offeror agrees to furnish any required performance and payment bonds.

AWARD (To be completed by Government)

13cReferences:
1solicitationNumber: FA500020R0033
5reqOrPRNumber: F1W3EA0105AW01
6projectNumber: FXSB 20-5252
7issuedBy: FA5000 673 CONS LGC

10480 SIJAN AVE STE 242

CP 907 552 5614

JBER, AK 99506-2501

United States Alfredia Tyler, Email: alfredia.tyler@us.af.mil Telephone: 317-552-3539

7code: FA5000
8addressOfferTo: FA5000 673 CONS LGC

CP 907 552 5614

10480 SIJAN AVE STE 242

JBER, AK 99506-2501

United States

numPages: 1 of 18
9aname: Alfredia Tyler
9btelephoneNumber: 317-552-3539
11beginWithinDays: 10
11completeWithinDays: 365
11see: FAR 52.211-10
11eventAwardCheckbox: No
11eventNoticeToProceedCheckbox: Yes
2typeOfSolicitationIFBcheckbox: No
2typeOfSolicitationRFPcheckbox: Yes
11periodMandatoryCheckbox: No
11periodNegotiableCheckbox: Yes
12apaymentBondsYesCheckbox: Yes
12apaymentBondsNoeckbox: No
12bCalendarDays: 10
13anumberOfCopies: 1
13adueHour: 1:00 PM
13adueDate: 7/17/2020
13bofferGuaranteeISrqdCheckbox: Yes
13bofferGuaranteeIsNOTrqdCheckbox: No
13ddaysAfterDueDateAllowed: 90
14nameAndAddressOfOfferor:
15telephoneNumber:
16remittanceAddress:
14code:
14facilityCode:
17amounts:
19amendmentDateColA:
19amendmentNumberColA:
19amendmentNumberColB:
19amendmentDateColB:
19amendmentNumberColC:
19amendmentDateColC:
20aOfferSignerNameAndTitle:
20cofferDate:
21itemsAccepted:
22amount:
23accountingAndAppropriationData:
24item:
17acceptedWithinDays:
2510USC2304c:
2541USC3304a:
26administeredByCode:
26administeredBy:
27paymentMadeBy:
30cdate:
31cdate:
30acontractorNamdAndTitle:
31acontractingOfficerNameAndTitle: Donald Dougherty

Email: donald.dougherty.1@us.af.mil Telephone: 907-552-5587

29itemsListed:
29acceptedWithItemsListedCheckbox: No
28copiesToReturn:
28negotiatedAgreementCheckbox: False
3dateIssued: 7/7/2020
2510USC2304cCheckbox: No
2541USC3304aCheckbox: Off
10describingDocuments: The 673d Civil Engineer Squadron has a requirement for a contract for the removal and replacement of the C17 Chiller. The contractor shall provide all material, equipment, labor and general conditions to accomplish this work In accordance with the statement of work (SOW).
10projectTitle: Project Title: C17 Removal & Replacement of existing Chillers
4contractNumber:
19amendmentNumberColD:
19amendmentDateColD:
19amendmentNumberColE:
19amendmentDateColE:
19amendmentNumberColF:
19amendmentDateColF:
19amendmentNumberColG:
19amendmentDateColG:
19amendmentNumberColH:
19amendmentDateColH:
19amendmentNumberColI:
19amendmentDateColI:
19amendmentNumberColJ:
19amendmentDateColJ:

File details come from the government source that posted it. Updated .