Solicitation 1240BD23Q0129 Geotechnical Drilling.pdf
PDF 597 KB Posted
- Attached to
- GEOTECH DRILLING-- LAKE BRANCH HOOD RIVER
- Solicitation number
- 1240BD23Q0129
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
40BD
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 2
046W CODE 16. ADMINISTERED BYCODE
X
X
X
541380
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR40BD
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
06/26/2023 1400 PD
06/14/2023
509-423-2224JORGE SOMOZA
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
1240BD23Q0129
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 2 1102003OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
SANDY OR 97055
16400 CHAMPION WAY
NORTHWEST OREGON CONTRACTING AREA
USDA FOREST SERVICE
15. DELIVER TO
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$19
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
USDA-FS CSA NORTHWEST 2
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 30 Days After Notice to Proceed Period of Performance: 09/01/2023 to 10/31/2023
0001 Geotech Drilling - Lake Branch Hood River Product/Service Code: F015 Product/Service Description: NATURAL
RESOURCES/CONSERVATION- WELL DRILLING/EXPLORATORY
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
JORGE SOMOZA
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
2 2 of
Geotech Drilling – Lake Branch Hood River 1240BD23Q0129
SECTION B – CONTINUATION OF SF-1449
SCHEDULE OF ITEMS
Project Description: Geotech Drilling Lake Branch
Vendor Name: __________________________________Vendor UEI:___________________
Item Supplies/Services Qty Unit of Issue
Unit Price Total Price
0001AA Mobilization 1 Lump
Sum
0001AB Mud Rotary Drilling 80 Liner
Feet
0001AC Core (HQ or NQ size) 20 Liner
0001AD Standard Penetration Testing 10 Each $ $ 0001AE State Reporting and Fees 2 Each $ $ 0001AF Hole Abandonment to State
Standards 100 Liner
0001AG Containers for Core and Auger Samples
All Lump
0001AH Traffic Control All Lump
TOTAL ALL $
One award will be made from this solicitation, contractors must submit pricing for all items.
For technical questions, contact Cole Smith at 541-225-6242 or email cole.smith@usda.gov
The estimated start work date is September 1, 2023. All work shall be completed within 30 calendar days after the effective date of the Notice to Proceed.
CAN YOU BE SET UP (MOBILIZATION AND DRILL SET UP) BY SEPTEMBER 1ST 2023 ?
YES_____ N0 ______
Description of Requirement
This contract requires quotes from professional geotechnical drilling firms to perform comprehensive and safe geotechnical drilling services for the US Forest Service. The contractor shall provide qualified labor, supervision, transportation, equipment, drill rig, hoses, pumps and any necessary equipment and supplies to perform core drilling, hollow stem augering, and Standard Penetration Testing
Location
The Lake Branch Hood River Bridge site is located on Forest Service Road (FSR) 13 at MP 10.8 (Lat 45.497958° Long. -121.830905°– via Google Earth). From Hood River, OR travel on OR-281S for approx. 10.5 miles. Turn slight right on Lost Lake Road for 0.2 miles, then turn left to stay on Lost Lake Road for approx.
13.4 miles. Turn right onto FS Road 13 and travel approx. 1 mile to the project site.
mailto:cole.smith@usda.gov
SECTION C - CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) FAR and AGAR Deviations to clauses may be viewed at: Policies & Regulations | USDA
52.204-13 System for Award Management Maintenance (OCT 2018)
52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)
52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services (DEC 2022)
(DEVIATION 2017-1)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders– Commercial Products and Commercial Services (JUN 2023) (DEVIATION 2017-1, DEVIATION DEC 2022)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31
U.S.C.3903 and 10 U.S.C. 3801)
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19
U.S.C. 3805note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] ☐ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (June 2020), with Alternate I (Nov
2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
☐ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).
https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.usda.gov/da/ocp/ppd/policies-regulations https://www.usda.gov/sites/default/files/documents/far-class-deviation-implement-whistleblower-protection.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-implement-whistleblower-protection.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-regarding-threshold-small-disadvantaged-business.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-regarding-threshold-small-disadvantaged-business.pdf
☐ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
☐ (4) 52.203-17, Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Jun 2020) (DEVIATION 2017-1) (Whistleblower Guidance to Contractor Employees)
☐ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
☐ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
☐ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
☒ (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).
☐ (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101note).
☐ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
☐ (11) [Reserved].
☐ (12) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C.657a).
☐ (13) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022)
(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
☐ (14) [Reserved] ☒ (15) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C.644).
☐ (ii) Alternate I (Mar 2020) of 52.219-6.
☐ (16) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
☐ (ii) Alternate I (Mar 2020) of 52.219-7.
☐ (17) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and
(3)).(DEVIATION DEC 2022)
☐ (18) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2022) (15 U.S.C. 637(d)(4)).
☐ (ii) Alternate I (Nov 2016) of 52.219-9.
☐ (iii) Alternate II (Nov 2016) of 52.219-9.
☐ (iv) Alternate III (Jun 2020) of 52.219-9.
☐ (v) Alternate IV (Sep 2021) of 52.219-9.
☐ (19) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
☐ (ii) Alternate I (MAR 2020) of 52.219-13
☐ (20) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C.637s) [Contracting Officer check as appropriate.]
☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.
☐ (21) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).
☐ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2022) (15 U.S.C.
657f).
☒ (23) (i) 52.219-28, Post Award Small Business Program Rerepresentation (MAR 2023) (15 U.S.C.
632(a)(2)).
☐ (ii) Alternate I (MAR 2020) of 52.219-28.
https://www.usda.gov/sites/default/files/documents/far-class-deviation-implement-whistleblower-protection.pdf https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fcontent.govdelivery.com%2Fattachments%2FUSDAPSD%2F2023%2F04%2F04%2Ffile_attachments%2F2456937%2FWhistleblower%2520Guidance.docx&wdOrigin=BROWSELINK https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fcontent.govdelivery.com%2Fattachments%2FUSDAPSD%2F2023%2F04%2F04%2Ffile_attachments%2F2456937%2FWhistleblower%2520Guidance.docx&wdOrigin=BROWSELINK https://www.usda.gov/sites/default/files/documents/far-class-deviation-regarding-threshold-small-disadvantaged-business.pdf
☐ (24) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
☐ (25) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).
☐ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).
☐ (27) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 637(a)(17)).
☒ (28) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
☒ (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Dec 2022) (E.O.13126).
☒ (30) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
☒ (31) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
☐ (ii) Alternate I (Feb 1999) of 52.222-26.
☐ (32) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
☐ (ii) Alternate I (Jul 2014) of 52.222-35.
☒ (33) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C.793).
☐ (ii) Alternate I (Jul 2014) of 52.222-36.
☐ (34) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
☐ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
☒ (36) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).
☐ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter78 and E.O. 13627).
☐ (37) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
☐ (38) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
☐ (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
☐ (41) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
☐ (ii) Alternate I (Oct 2015) of 52.223-13.
☐ (42) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
☐ (ii) Alternate I (Jun 2014) of 52.223-14.
☐ (43) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C. 8259b).
☐ (44) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s
13423 and 13514).
☐ (ii) Alternate I (Jun 2014) of 52.223-16.
☒ (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O.
13513).
☐ (46) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
☐ (47) 52.223-21, Foams (Jun 2016) (E.O. 13693).
☐ (48) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
☐ (ii) Alternate I (Jan 2017) of 52.224-3.
☐ (49)(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).
☐(ii) Alternate I (Oct 2022) of 52.225-1
☐ (50) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (DEC 2022) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501- 4732), Public Law. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112- 41, 112-42, and 112-43.
☐(ii) Alternate I [Reserved] ☐(iii) Alternate II (Dec 2022) of 52.225-3.
☐(iv) Alternate III (Jan 2021) of 52.225-3.
☐(v) Alternate IV (Oct 2022) of 52.225-3.
☐ (51) 52.225-5, Trade Agreements (Dec 2022) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
☒ (52) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
☐ (53) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C.
Subtitle A, Part V, Subpart G Note).
☐ (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
☐ (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
☐ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).
☐ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov
2021) (41 U.S.C.4505, 10 U.S.C.3805).
☐ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41
U.S.C.4505, 10 U.S.C.3805).
☒ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) (31
U.S.C. 3332).
☐ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul
2013) (31 U.S.C.3332).
☐ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C.3332).
☐ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
☐ (63) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
☐ (64) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46 U.S.C.
55305 and 10 U.S.C. 2631).
☐ (ii) Alternate I (Apr 2003) of 52.247-64.
☐ (iii) Alternate II (Nov 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
Contracting Officer check as appropriate.] ☒ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
☒ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage/Fringe Benefits
_____GS-6______ ___$18.44______/__plus Fringe Benefits
☐ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple
Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
☐ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May
2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
☐ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
☐ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
☒ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).
☒ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
☐ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan
2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328)
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).
(viii) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C.4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C.793).
(x) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C.4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
(E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(xiii) (A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O
13627).
(B) Alternate I (Mar 2015) of 52.222-50(22 U.S.C. chapter 78 and E.O 13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for
Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xvi) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).
(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(B) Alternate I (Jan 2017) of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C.
1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801)
(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46 U.S.C. 55305 and 10 U.S.C.2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
52.217-8 Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the life of the contract.
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984)
52.242-17 Government Delay of Work (APR 1984)
52.252-6 Authorized Deviations in Clauses (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Agriculture Acquisition Regulation (48 CFR 4) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
Project Labeling for Official Correspondence
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. All correspondence, e.g. e-mails, letters, etc., transmitted between the USDA FS staff and contractors, shall be clearly marked with the BPA Call No. and Project Title. This practice ensures official contract documents are accurately identified for document filing purposes.
452.204-70 Modification for Contract Closeout (DEVIATION JUL 2022)
Upon contract closeout for contracts utilizing Simplified Acquisition Procedures (SAP) according to FAR 13:
(a) If unobligated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (CO) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The CO shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) If unobligated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The CO may also request a Release of Claims be completed by the contractor, although not required for contract and orders using SAP procedures.) If the bilateral modification and Release of Claims are not returned to the CO within 60 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
452.211-74 Period of Performance (FEB 1988)
The period of performance of this contract is from Contract Award through October 30th 2023.
452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 15 days after the date of contract award. The conference will be held at the Headquarters of the Willamette National Forest, 3106 Pierce Parkway, Suite D, Springfield OR 97477.
452.236-73 Archaeological or Historic Sites (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
https://www.usda.gov/sites/default/files/documents/agar-class-deviation-contract-closeout-clause.pdf
452.236-74 Control of Erosion, Sedimentation, and Pollution (NOV 1996)
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.
452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Superintendent.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement.
The notification shall include as a minimum:
1. The name, address, telephone number and DUNS number of the subcontractor.
2. The date upon which the subcontract was entered into and its duration.
3. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
SCHEDULES FOR SERVICE CONTRACTS
The Contractor shall, within ten (10) days from receipt of a request from the Contracting Officer, submit a time chart or schedule of proposed progress to ensure completion of the work within the time set forth in this contract. If the Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve progress; in addition, the Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the contract.
PROSECUTION OF WORK
(a) Work shall be scheduled to provide completion of segments on a daily basis unless otherwise herein provided. Refer to the Schedule of items for seasonal restrictions that will dictate the priority of units to be completed first.
(b) A Work Schedule shall be prepared by the Contractor based on priorities provided in the contract unless superseded by the Contracting Officer in advance of work.
(c) The Contracting Officer may require the Contractor to finish the portion in progress before additional work is started on any additional portion.
(d) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel and equipment during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site.
(e) The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner.
CONTRACTOR QUALITY CONTROL PLAN
A. Quality Control Plan
The Contractor shall provide a Quality Control Plan (QCP) as part of this Technical Proposal. The Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:
- How quality will be monitored to ensure performance standards are met.
- How the work will be supervised.
- How results of the monitoring will result in quality performance.
- Identify the personnel responsible for performing quality control.
B. Contractor Quality Control Inspection
The Contractor shall assure themselves that performance meets contract specifications, in accordance with FAR 52.212-4, Contract Terms and Conditions -- Commercial Items, paragraph (a), prior to requesting the Government to inspect for payment or acceptance. The Contractor shall contact the Contracting Officer upon completion of a unit. The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.
EMERGENCY CONTROL (AGAR 452.236-77) (NOV 1996)
(a) Contractor's Responsibility for Fighting Fire. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish, all fires on the work site other than those fires in use as part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the FAR 52.212-4 -- Contract Terms and Conditions -- Commercial Items (c) Changes.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
(a) The Government will conduct inspections of each unit to determine work quality. Initial inspections will be made periodically as work progresses or as work is completed to determine acceptability of method and manner of performance, the end product of the maintenance operations, and to make measurements for payment. All materials and equipment specified in this contract to be used in the work will be inspected and approved by the COR before drilling commences.
(b) Standards for acceptable performance are stated in the specifications, Statement of Work, Section 4 of the contract.
UNSATISFACTORY PERFORMANCE
If the percentage of satisfactory work falls below 80 percent, the Government will immediately notify the Contractor in writing and order improvement of the quality of future work. If the quality of future work is not raised above the 80 percent within two consecutive workdays after receipt of notice in writing of unsatisfactory work, the Contractor's right to proceed may be terminated and the contract considered in default. Repeated failure to perform work at or above 80 percent acceptable performance shall also be considered reason for contract termination and default action.
REWORK AND REINSPECTION AFTER REWORK
When inspection results are below 80 percent and the deficiency is correctable, payment will not be made until the deficiency has been corrected. Reinspection after rework will be made in the same manner as the first inspection but on different plot lines. The Contractor shall pay for inspections necessitated by the rework.
SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.
USE OF PREMISES
a. The Contractor shall comply with the regulations governing the operation of premises that are occupied and shall perform its contract in such a manner as not to interrupt or interfere with the conduct of Government business.
b. Before any camp is opened or operated on National Forest land or lands administered by the Forest Service, the Contractor shall request permission (in writing) from the COR. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a camping permit will be issued.
c. It is further stipulated that in addition to clean up of any campsites, the Contractor shall remove its equipment from National Forest land before final acceptance and payment of the project.
TRASH AND REFUSE MATERIAL
Contractor shall remove all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to: used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper garbage, etc. All placement of sanitary facilities will require prior approval of the Contracting Officer.
STORAGE OF MATERIALS AND EQUIPMENT
Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
POTENTIAL SAFETY HAZARDS
(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[ ] Confined space entry.
[ ] Temporary excavation/deep trenching/slope stability.
[ ] Tree falling.
[ ] Fall hazard from work heights exceeding six feet.
[ ] Blasting.
[X] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[X] Heavy equipment operation.
[X] Tree climbing and/or tower climbing.
[X] Fire hazards.
[X] Hazardous materials handling.
[X] Electrical hazard.
[X] Hydraulic and/or pneumatic and/or other high pressure hazards.
[X] Mechanical hazards such as pulleys, springs, etc.
[X] Other: Uneven ground conditions.
SECTION D – CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Title Pages
1. Statement of Work 4
Page No Description
2. DOL Wage Determination No. 2015-5583 11
3. Fire Protection and Suppression (R6-FS-6300-52) 6
4. Past Performance 1
SECTION 1
GENERAL
1.1 Scope of contract
This contract requires quotes from professional geotechnical drilling firms to perform comprehensive and safe geotechnical drilling services for the US Forest Service. The contractor shall provide qualified labor, supervision, transportation, equipment, drill rig, hoses, pumps and any necessary equipment and supplies to perform core drilling, hollow stem augering, and Standard Penetration Testing. Drilling services are to include all mobilization, moving, setting up, traffic control for the immediate work site (typically warning signs and cones) loading, providing samples and core for logging at the site by the Forest Service, and providing cardboard containers for core and auger samples.
Standard Penetration Testing (SPT) shall be performed as directed (typically at 5 foot intervals or a change in material strength). HQ or NQ core drilling may be required below the SPT refusal depth for a maximum of 10 feet into bedrock. A minimum of 70% core recovery is required.
1.2 Location and Description
The Lake Branch Hood River Bridge site is located on Forest Service Road (FSR) 13 at MP 10.8 (Lat 45.497958° Long. -121.830905°– via Google Earth). From Hood River, OR travel on OR-281S for approx. 10.5 miles. Turn slight right on Lost Lake Road for 0.2 miles, then turn left to stay on Lost Lake Road for approx.
13.4 miles. Turn right onto FS Road 13 and travel approx. 1 mile to the project site. FS Road 13 at the project location is a single lane, aggregate forest road. At a minimum, traffic control shall consist of warning signs and traffic cones that conform to the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD).
Drilling will consist of 2 holes, each requiring drilling from on top of the roadway on each side of the existing bridge. NOTE: The contractor not permitted to use the existing bridge, as the condition is unsafe for vehicular traffic. The bridge is accessible from both sides of the road.
SECTION 2
DEFINITIONS
Auger: A cork screw like drill tool designed to remove the soil from a drill hole without using air or water. This method does not require vibration or impact to create the drill hole.
Bentonite: A Clay material that is mined in the mid-west and typically ground into a powder. Bentonite is normally used in test drilling to prevent the drill hole from caving. It is also used in cosmetics and even some candy bars.
Mud Rotary Drilling: An open hole, fluid based recirculatory method of drilling. The drilling fluid lubricates the drill bit, carries drill cuttings to the surface and provides hydrostatic pressure in the borehole to keep the hole open for sampling.
Core Drilling: A mechanism designed to rotate and to cause an annular-shaped rock-cutting bit to penetrate rock formations, produce cylindrical cores of the formations penetrated, and lift such cores to the surface, where they may be collected and examined.
Core Drilling – HQ: 2.5” Diameter core drilling
Core Drilling – NQ: 2” Diameter core drilling
I.D.: Inner Diameter
O.D.: Outer Diameter
Standard Penetration Test (SPT): An industry standard test that is used to determine the density of subsurface soils. This test documents the number of "blows" required to advance a steel test spoon one-foot by dropping a 140 pound hammer thirty inches. The recorded number of blows is referred to as an " N Value"
SPT Refusal Depth: The depth at which the recorded number of blows during an SPT test exceeds 50 while traveling less than 6 inches.
SECTION 3
CONTRACTOR FURNISHED CRITICAL ITEMS/SERVICES
Drilling Machine - The drilling machine shall consist of a truck, track, or skid mounted drill capable of advancing 8-inch hollow stem augers (or mud rotary style drill equipment) to a minimum depth of 50 feet. The drilling machine shall be furnished in working order and complete with all the materials, operating accessories, modifications, and attachments that may be necessary to fulfill the requirements of this contract. This includes, but is not limited to, drill fluid pumps; core barrel and rod; diamond core bits; SPT barrels, hammers, and assorted equipment and water tanks, hoses, and accessory pumps. Drilling equipment shall be free of mud and organic material that may serve as a seed source and reasonably free of fluid leaks upon arrival at the drill site.
Core Drilling Equipment- H-sized triple tube or split tube wireline core drilling equipment shall be used.
Diamond bits, casing shoes and advancers, and reaming shells shall be provided by the Contractor.
Auger Drilling Equipment- Hollow stem augers shall have minimum I.D. of 4 inches and maximum O.D. of 10 inches, for soil sampling to refusal and H-sized coring to continue sampling. All sampling rods, split spoon samplers, shoes, and auger tools shall be provided by the Contractor.
Sample Containers – Contractor shall provide cardboard containers for core and auger samples. Provide wood blocks (typically 1.5” x 1.5” by 3”) to record depths and other relevant information in the box.
Pavement Patching – Contractor shall provide and install cold asphalt mix patches in all holes created in pavement at a minimum depth of 8”.
Water and Tank(s) -- The Contractor shall be responsible for transport of the initial tank of potable water for drilling operations. If additional water is necessary, drafting sites are shown on the attached Vicinity Maps.
Drafting equipment shall include a screen around the intake (foot valve) with openings no larger than 3/32 -inch. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
Spark Arresters- All stationary and mobile diesel and gasoline engines, except exhaust turbo-charged engines, used in the Contractor's operations and in camps shall be equipped with spark arresters that meet current Forest Service standards.
Personnel Requirements- The Contractor shall furnish licensed, journey-level drill operator(s) and Helper(s).
The Contracting Officer (CO) will have the authority to require the replacement of any Contractor's personnel not exhibiting adequate capability or reasonable safety and responsibility in their job performance. Such replacement shall be made within 48 hours after notification by the CO to the Contractor's Representative on the job.
SECTION 4
PERFORMANCE WORK STATEMENT TASKS AND CRITICAL SUBTASKS
Core Drilling - Core drilling operations shall be consistent with industry standards or ASTM D 2113 Standard Practice for Rock Core Drilling and Sampling of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .