SOLE SOURCE JUSTIFICATION
MANDATORY TEMPLATE FOR FEDERAL PROCUREMENTS UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
1. Estimated Dollar Value:
$59,371.00
2. Anticipated Period of Performance:
March 2023
3. Does the anticipated Period of Performance include option years? If no, explain.
No; after the work is completed, there is no need for option years.
4. Sources Sought Notice posted to Contract Opportunities and attached to this document?
☐ Yes ☐✔ No
5. Market Research conducted and attached to this document? If not, explain.
Yes; The Contractor's cost proposal is attached. The proposal compares favorably to the Independent Government Cost Estimate and is therefore considered fair and reasonable.
6. Is this a new requirement or a follow-on to an expiring award?
☐ New requirement ☐✔ Follow-on to an expiring award
7. Describe the requirement. Please note that the requirement is the minimum acceptable specification or capability, and is not necessarily the best in the industry. Please note whether any additional follow-on work is anticipated in response to the current proposed effort.
Remove and Replace approx. 150 LF of 2 1/2" CW piping insulation, to include aluminum jacketing, and faulty heat trace tape (75LF) on roof serving the AHU. Demo approx. 700 SF of water damaged ceiling sheetrock in Lab #114. Demo approx. 100 SF of water damaged ceiling sheetrock in Lab #117.Demo approx. 65 SF of water damaged sheetrock from East Wall of Lab #114. Remove and retain existing ceiling HVAC registers and light fixtures. Install new sheet rock ceilings and wall areas, approx. 865 SF to include mud, tape, and sanding. Prime and Paint all newly installed sheetrock to match existing paint. Re-install HVAC diffusers and light fixtures. Dispose Demo material off site. Clean up work areas.
8. List the proposed vendor and contact information.
GSI CONSTRUCTION CORPORATION, INC.
VETERAN OWNED GENERAL CONTRACTORS
2993 Wallace Lake Rd, Pace, Florida 32571 Phone (850) 554-7149
FL # CGC 1521478 MS # 20278-MC
9. Describe why the proposed vendor is the only vendor from which the requirement can be obtained. Examples of acceptable justifications include but are not limited to: sole manufacturer and seller, adherence to warranty provisions, urgency, etc. If other vendors can provide similar products or services, describe why they cannot meet our particular requirement.
This work is physically located within the interior and rooftop of an active construction project for renovations at Bldg. #8 located at ARS in Stoneville, MS.
As provided in FAR 16.505 (b)(2)(C) which states... The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order...
GSI is the contractor for this active project and needs to perform this work for several reasons; 1) Warranty - in order for certain elements of their warranty to remain valid, 2) Urgency - there is an urgent need to have this work completed so that the newly formed Pollinator Unit can occupy the building. The occupants were ready to move into the building when burst water pipes caused interior damage within two labs. This work needs to occur quickly in order that conditions do not worsen, i.e. mold damage, etc,
3) Safety and Efficiency - from a site safety and work flow standpoint, GSI needs to perform this work to ensure that all work performed by all subcontractors within the bounds of the project proceeds safely, continuously, and in an uninterrupted fashion as has been for the duration of the ongoing renovation.
The proposed cost compares favorably to the Independent Government Estimate therefore I conclude that the cost is fair and reasonable and award is recommended.
10. Certification:
I hereby certify that the information provided above is accurate and complete to the best of my knowledge and belief.
Technical Representative Date
11. CO Certification:
I hereby determine that the circumstances of this procurement action deem only one source reasonably available. Also, the quoted price is determined to be fair and reasonable as documented on the SAP e-File Checklist and Award Summary.
Contracting Officer Date
12. Reviewed By:
Section Head Date
| $59,371.00 |
| March 2023 |
| No; after the work is completed, there is no need for option years. |