Sol_140P8421Q0071.pdf
PDF 362 KB Posted
- Attached to
- Remove & Replace HVAC Systems at Lava Beds NM Federal contract opportunity
- Solicitation number
- 140P8421Q0071
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8421Q0071_Amd_0002.pdf | ||
| 140P8421Q0071_LAB_HVAC_Provisions_and_Clauses_(2)_asd_0002.docx | DOCX document | |
| Sol_140P8421Q0071_Amd_0001.pdf | ||
| Att_03_-_Wage_Determination.pdf | ||
| Att_02_-_Specifications.docx | DOCX document | |
| Att_04-__Relevant_Experience__Past_Performance__Technical_Qualifications.docx | DOCX document | |
| 140P8421Q0071_LABE_HVAC_Attach_J01_Quote_Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040531974
NPS, PWR - PORE MABO
Point Reyes National Seashore
1 Bear Valley Road Point Reyes Station CA 94956-9703
PPR
Helli Newsom 530-242-3402
106/24/2021
140P8421Q0071
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
REMOVE AND REPLACE SEVERAL HVAC UNITS AT LAVA BEDS NATIONAL MONUMENT, SISKIYOU
COUNTY, CALIFORNIA
The National Park Service, Lava Beds National Monument, has the requirement for the removal of existing HVAC systems and replacement/installation of seven new HVAC systems at three separate locations at Lava Beds National Monument.
The locations are at four (4) houses, two four-unit apartment buildings, and the
Inter-Agency Fire Cache building. The contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation.
Per FAR 36.204, the project range is estimated to be between $25,000 and $100,000.
The North American Industry Classification System (NAICS) code is 238220 with a corresponding size standard of $16.5 million of gross annual receipts for the last three years.
This acquisition is a Total Small Business Set-Aside. Offers are solicited only
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 60 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
07/28/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
DOI, NPS, PWR - PORE MABO - WHIS
Whiskeytown National Recreation Area
PO Box 188 Whiskeytown CA 96095
PR2
Elizabeth Chico
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 43
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P8421Q0071 from small business concerns. Offers that are received from concerns that are not small business concerns, shall not be considered.
Houses 41, 42, 43, and 44 at Lava Beds National
Monument: Remove existing and install one new
2-ton heat pump system at each residence.
Apartment Buildings 45 & 46 are both four-unit apartment buildings: Install new ductless heating and air conditioner systems in each building. Each system consists of one outdoor unit and four indoor units.
Inter-Agency Fire Cache: Remove existing and install new duel fuel heating and cooling system.
The contractor is responsible for removal and disposal of the existing units.
The work of this contract consists of labor, supervision, equipment, tools, travel, parts, and materials necessary to accomplish the described work at Lava Beds National Monument.
All work is to be performed under a single contract.
Legacy Doc #: NPS
Delivery: 10/16/2021
Delivery Location Code: 0009060588
NPS, Lava Beds NM
1 Indian Well Headquarters
Tulelake CA 96134 US
Period of Performance: 08/16/2021 to 10/16/2021
00010 In accordance with Specifications: Remove and 1 EA replace 2-ton heat pump systems at each of the following residences at Lava Beds National
Monument.
Residences: 41, 42, 43, and 44.
Product/Service Code: 4530
Product/Service Description: FUEL BURNING
EQUIPMENT UNITS
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 43
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P8421Q0071
00020 In accordance with Specifications: Purchase & 1 EA
Install New mini-split systems (consisting of one outdoor unit and four indoor units) at each of the following 4-unit apartment buildings at Lava
Beds National Monument.
Apartment building 45 (four apartment units)
Apartment building 46 (four apartment units)
Product/Service Code: 4530
Product/Service Description: FUEL BURNING
EQUIPMENT UNITS
00030 In accordance with Specifications: Remove and 1 EA replace duel fuel Heating and Cooling System at the Inter-Agency Fire Cache building at Lava Beds
National Monument.
Product/Service Code: 4530
Product/Service Description: FUEL BURNING
EQUIPMENT UNITS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
RFQ No. 140P8421Q0071- Remove & Replace HVAC Units Lava Beds National Monument
140P8421Q0071
TABLE OF CONTENTS
SECTION B – BID SCHEDULE
B.1 – Bid Schedule
SECTION C – SPECIFICATIONS/DRAWINGS
C.1 – Specifications/Drawings
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
E.1 – FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998)
SECTION F – DELIVERIES OR PERFORMANCE
F.1 – FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998)
F.2 – FAR 52.211-10, Commencement, Prosecution, and Completion of Work (Apr 1984) .11
F.3 – Deliverable (Post-Award): Contractor’s Daily Logs
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 – Contract Administration
G.2 – Contractor Performance Assessment Reporting System (November 2015)
G.3 – DIAR 1452.201-70, Authorities and Delegations (Sep 2011)
G.4 – Correspondence
G.5 – Appointment of Contractor Representative/Superintendent
G.6 –Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Apr 2013)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 – Wage Rates
Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section J). The project is located in San Benito County, CA
H.2 – Interpretation of Contract – Notice of Ambiguities
H.3 – Workers Compensation
H.4 – Site Specific Safety and Health Plan
SECTION I – CONTRACT CLAUSES
I.1 – FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998)
INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT
TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT
FORM)
I.2 –DIAR 1452.203-70, Restrictions on Endorsements – Department of the Interior (Jul 1996)
I.3 – DIAR 1452.204-70, Release of Claims – Department of the Interior (Jul 1996)
I.4 – DIAR 1452.228-70, Liability Insurance – Department of the Interior (Jul 1996)
I.5 – DIAR 1452.237-70, Information Collection – Department of the Interior (Jul 1996) ...21
I.7 – FAR 52.225-9, Buy American Act—Construction Materials (May 2014)
I.8 – Archeological Findings
I.9 – Conduct of Operations
I.10 – 52.219-13 NOTICE OF SET-ASIDE OF ORDERS. (MAR 2020)
SECTION J – LIST OF ATTACHMENTS
J.1 – List of Attachments
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS
K.1 – FAR 52.252-1, Solicitation Provisions Incorporated by Reference (Feb 1998)
K.2 – DIAR 1452.215-71, Use and Disclosure of Proposal Information – Department of the Interior (Apr 1984)
K.3 – FAR 52.204-8, Annual Representations and Certifications (Mar 2020)
K.5 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-
REPRESENTATION. (OCT 2020)
L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
L.1 – FAR 52.252-1, Solicitation Provisions Incorporated by Reference (Feb 1998)
ALTERNATIVE LINE ITEM PROPOSAL
L.2 – Magnitude of Construction Project
L.3 – FAR 52.216-1, Type of Contract (Apr 1984)
L.4 – FAR 52.222-5, Construction Wage Rate Requirements – Secondary Site of the Work (May 2014)
L.5 – FAR 52.222-23, Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)
L.6 – FAR 52.225-10, Notice of Buy American Requirement – Construction Materials (May 2014)
L.7 – FAR 52.236-27, Site Visit (Construction) (Feb 1995)
L.8 Quotation Package (What to Submit)
SECTION M – EVALUATION FACTORS FOR AWARD
M.1 Evaluation Factors for Award
Section B – Bid Schedule
B.1 – Bid Schedule
Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for all line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs.
In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
LINE ITEM 00010- Remove and replace 2-ton heat pump systems at each residence: 41, 42, 43, 44 (total of four systems, one at each residence)
LINE ITEM 00020- Install new ductless Heating and Air Conditioning systems at Apartment Buildings 45 and 46 (one each for each apartment building). Each apartment building consists of four (4) apartment units. One indoor unit for each apartment, in each building, total of eight (8), and one outdoor unit for each building, total of two (2)
LINE ITEM 00030- Remove and replace duel fuel heating and cooling system at the Inter- Agency Fire Cache Building $____________________
Section C – Specifications/Drawings
C.1 – Specifications/Drawings
The Contractor shall furnish the necessary personnel, materials, equipment, services and appurtenances as necessary to successfully complete the work in accordance with the following documents, which are incorporated into this solicitation:
Section J, Attachment 01- Specifications
Section D – Packaging and Marking
There are no clauses in this section.
Section E – Inspection and Acceptance
E.1 – FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far
Clause Title Date 52.246-12 Inspection of Construction Aug 1996
Section F – Deliveries or Performance
F.1 – FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far
Clause Title Date 52.211-18 Variation in Estimated Quantity Apr 1984 52.242-14 Suspension of Work Apr 1984
F.2 – FAR 52.211-10, Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
F.3 – Deliverable (Post-Award): Contractor’s Daily Logs
Contractor shall prepare a daily log for each day work is performed under this contract. Copies of daily logs shall be submitted to the Contracting Officer, and may be compiled and submitted weekly, with payroll. Time necessary for completion of daily log is approximately 15 to 30 minutes. The contractor may choose to use its own format as long as the following elements are included on the log:
(a) Project Name
(b) Contract number
(c) Date
(d) Prime Contractor and/or Subcontractor
(e) Work performed, including number of employees by job categories (indicate if
"prime" or "sub")
(f) Heavy equipment on job, hours worked (indicate if "prime" or "sub")
(g) Materials delivered
(h) Official visitors to site
(i) Inspections performed
(j) Verbal instruction received from government on construction deficiencies
(k) Certification (prime contractor's signature/COR's signature)
Section G – Contract Administration Data
G.1 – Contract Administration
The Contracting Officer's Representative (COR) for this contract will be established via separate correspondence.
The Administrative Contracting Officer (ACO) will be:
Helli Newsom, Contract Specialist Whiskeytown National Recreation Area National Park Service 14412 JF Kennedy Memorial Dr.
Whiskeytown, CA 96950
(209) 769-9567 helli_newsom@nps.gov
The Contracting Officer (CO) with overall responsibility for this contract will be:
Elizabeth Chico, Contracting Officer Lassen Volcanic National Park National Park Service 38050 Hwy 36 E Mineral, CA 96063
(530) 595-6113 elizabeth_chico@nps.gov
G.2 – Contractor Performance Assessment Reporting System (November 2015)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations may be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS.
CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS - pronounced “peepers”) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.mil/ . The CPARS User Manual, registration for Online Training for Contractor Representatives, and a practice application may be found at this site.
5) Within 60 days after the end of a performance period, the CO will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in Block 22, and then signing and dating Block 23 of the form.
Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government.
e) If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
f) Your response is due within 30 calendar days after receipt of the CPAR.
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.
http://www.cpars.csd.disa.mil/ https://www.cpars.gov/cparsfiles/pdfs/CPARS_User_Manual.pdf https://www.cpars.csd.disa.mil/webtrain.htm http://www.cpars.csd.disa.mil/
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
G.3 – DIAR 1452.201-70, Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.4 – Correspondence
Copies of all correspondence and written notices between the Contracting Officer’s Representative and the Contractor shall be sent to the cognizant Contracting Officer at the address below, or by email. All correspondence sent by email shall state the contract number in the subject line of the email.
Contracting Officer responsible for administering this contract:
Helli Newsom, Contract Specialist Whiskeytown National Recreation Area National Park Service 14412 JF Kennedy Memorial Dr.
Whiskeytown, CA 96950
(209) 769-9567 helli_newsom@nps.gov
G.5 – Appointment of Contractor Representative/Superintendent
Prior to commencement of work on this contract, the contractor shall provide to the Contracting Officer, the name and telephone number of at least one responsible individual who will serve to respond to operational problems and/or emergencies on a daily basis. The contractor agrees that notice to the designated representative shall constitute notice to the contractor and agrees to be bound by any commitments or representations made by the representative.
G.6 –Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Apr 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: The Contractor must upload their actual business invoice as an attachment when submitting their payment request through the IPP system.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production
Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
Section H – Special Contract Requirements
H.1 – Wage Rates Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section J). The project is located in Siskiyou County, CA.
H.2 – Interpretation of Contract – Notice of Ambiguities
(a) This written contract and any and all identified writings or documents incorporated by reference herein or physically attached hereto constitute the parties' complete agreement and no other prior or contemporaneous agreements either written or oral shall be considered to change, modify or contradict it. Any ambiguity in the contract will not be strictly construed against the drafter of the contract language but shall be resolved by applying the most reasonable interpretation under the circumstances, giving full consideration to the intentions of the parties at the time of contracting.
(b) It shall be the obligation of the Contractor to exercise due diligence to discover and to bring to the attention of the Contracting Officer at the earliest possible time any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated. Failure to comply with such obligation shall be deemed a waiver and release of any and all claims for extra costs or delay arising out of such ambiguities, discrepancies, inconsistencies, and conflicts.
H.3 – Workers Compensation
The Contractor is required to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of the Labor Code of the State of California. Evidence of coverage is required before commencement of project work.
H.4 – Site Specific Safety and Health Plan
A site specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions. The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.
As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent, and contracting office.
Should any unforeseen hazard become evident during the performance of work, the contractor shall bring such hazard to the attention of the safety office and COR, both verbally and in writing for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.
Prior to submittal to the COR, the site specific safety and health plan shall be signed and dated by the prime contractor's safety and health manager and site superintendent. The site specific safety and health plan shall be part of the contractor's safety and Health program. The contractor shall submit to the COR the contractor's site specific safety and health plan for review and approval by the safety office.
Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational Safety and Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirements of applicable laws, criteria, ordinances, regulations, and referenced documents vary the most stringent requirements shall apply.
Section I – Contract Clauses
I.1 – FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far
Clause Title Date 52.203-19 Prohibition on Requiring Certain Internal
Confidentiality Agreements or Statements Jan 2017
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
Jun 2020
52.204-13 System for Award Management Maintenance Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance Jul 2016 52.204-19 Incorporation by Reference of Representations and
Certifications
DEC 2014
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
AUG 2020
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
Jun 2020
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
Nov 2015
52.219-6 Notice of Total Small Business Set-Aside Mar 2020 52.219-28 Post-Award Small Business Program Representation May 2020 52.222-3 Convict Labor Jun 2003 52.222-6 Construction Wage Rate Requirements Aug 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records Aug 2018 52.222-9 Apprentices and Trainees Jul 2005 52.222-10 Compliance with Copeland Act Requirements Feb 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination - Debarment May 2014 52.222-13 Compliance with Construction Wage Rate
Requirements and Related Regulations May 2014
52.222-14 Disputes Concerning Labor Standards Feb 1988
52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities Apr 2015 52.222-26 Equal Opportunity Sep 2016 52.222-27 Affirmative Action Compliance Requirements for
Construction Apr 2015
52.222-37 Employment Reports on Veterans Jun 2020 52.222-50 Combating Trafficking in Persons Jan 2019 52.222-55 Minimum Wages Under Executive Order 13658 Dec 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 Jan 2017 52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.223-6 Drug Free Workplace May 2001 52.223-17 Affirmative Procurement of EPA-designated Items in
Service and Construction Contracts Aug 2018
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
Jun 2020
52.225-13 Restrictions on Certain Foreign Purchases Jun 2008 52.227-4 Patent Indemnity -- Construction Contracts Dec 2007 52.228-2 Additional Bond Security Oct 1997 52.228-11 Pledges of Assets Aug 2018 52.228-12 Prospective Subcontractor Requests for Bonds May 2014 52.228-13 Alternative Payment Protections Jul 2000 52.228-14 Irrevocable Letter of Credit Nov 2014 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-23 Assignment Of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts Jan 2017 52.232-33 Payment by Electronic Funds Transfer -- System for
Award Management Oct 2018
52.232-39 Unenforceability of Unauthorized Obligations Jun 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors Dec 2013
52.233-1 Disputes- Alt I May 2014 52.233-3 Protest After Award Aug 1996 52.233-4 Applicable Law For Breach Of Contract Claim Oct 2004 52.236-2 Differing Site Conditions Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work Apr 1984 52.236-5 Material and Workmanship Apr 1984 52.236-6 Superintendence by the Contractor Apr 1984 52.236-7 Permits and Responsibilities Nov 1991 52.236-8 Other Contracts Apr 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements Apr 1984
52.236-10 Operations and Storage Areas Apr 1984
52.236-11 Use and Possession Prior to Completion Apr 1984 52.236-12 Cleaning Up Apr 1984 52.236-13 Accident Prevention Nov 1991 52.236-14 Availability and Use of Utility Services Apr 1984 52.236-17 Layout of Work Apr 1984 52.236-21 Specifications and Drawings for Construction Feb 1997 52.236-26 Preconstruction Conference Feb 1995 52.243-5 Changes and Changed Conditions Apr 1984 52.244-6 Subcontracts for Commercial Items Jun 2020 52.246-21 Warranty of Construction Mar 1994 52.249-1 Alt I Termination for Convenience of the Government
(Fixed-Price) (Short Form)
APR 1984
52.253-1 Computer Generated Forms Jan 1991 52.249-10 Default (Fixed-Price Construction) Apr 1984
I.2 –DIAR 1452.203-70, Restrictions on Endorsements – Department of the Interior (Jul 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
I.3 – DIAR 1452.204-70, Release of Claims – Department of the Interior (Jul 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
I.4 – DIAR 1452.228-70, Liability Insurance – Department of the Interior (Jul 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$500,000 each person $500,000 each occurrence $500,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
I.5 – DIAR 1452.237-70, Information Collection – Department of the Interior (Jul 1996)
If performance of this contract requires the contractor to collect information on identical items from ten or more public respondents, no action shall be taken or funds expended in the solicitation or collection of such information until the contractor has received from the Contracting Officer written notification that approval has been obtained from the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1980. The Contractor agrees to provide all information requested by the Contracting Officer which is necessary to obtain approval from OMB.
I.6 – FAR 52.222-36 – Equal Opportunity for Workers With Disabilities (Jun 2020)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.7 – FAR 52.225-9, Buy American Act—Construction Materials (May 2014)
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and https://www.acquisition.gov/content/221408-contract-clause#i1095976
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
“NONE”
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I.8 – Archeological Findings
(a) Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operations in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, he will be compensated by an equitable adjustment under the General Provisions of the Contract.
I.9 – Conduct of Operations
At all times the Contractor shall conduct his organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal holidays or at night may be performed only with the prior consent of the Contracting Officer. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park except with approval of the Contracting Officer.
I.10 – 52.219-13 Notice of Set-Aside of Orders. (MAR 2020)
(a) The Contracting Officer may set aside orders for the small business concerns identified in 19.000(a)(3).
https://www.acquisition.gov/far/19.000#FAR_19_000
(b) The Contracting Officer will give notice of the order or orders, if any, to be set aside for small business concerns identified in 19.000(a)(3) and the applicable small business program.
This notice, and its restrictions, will apply only to the specific orders that have been set aside for any of the small business concerns identified in 19.000(a)(3).
Section J – List of Attachments
J.1 – List of Attachments
The following attachments are furnished herein and form a part of the solicitation/contract:
Attachment Number
List of Documents, Exhibits, and Other Attachments
01 Bid Sheet, 1 page 1 page June 24, 2021
02 Specifications 25 pages June 24, 2021
03 Construction Wage Rates 8 pages June 24, 2021
Relevant Experience, Past Performance, & Technical Qualifications Form, 4 pages
4 pages June 24, 2021
Section K – Representations, Certifications and Other Statements of Offerors
K.1 – FAR 52.252-1, Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.