Sol_140P6326Q0032.pdf
PDF 502 KB Posted
- Attached to
- JECA Q13 WINDOWS & EXTERIOR DOORS Federal contract opportunity
- Solicitation number
- 140P6326Q0032
About this file
This is a Request for Quotation (RFQ) for construction services issued by the National Park Service for Quarters 13 at Jewel Cave National Monument in Custer, South Dakota. The solicitation number is 140P6326Q0032, issued July 22, 2026, with offers due August 24, 2026, at 11:00 AM Mountain Time.
The project involves removal and replacement of doors and windows at a government residential structure originally constructed in 1978. The building requires targeted repair and modernization to address deterioration from harsh winter conditions, temperature fluctuations, and moisture exposure. Work must be completed within 90 calendar days after issuance of Notice to Proceed, with commencement required within 10 calendar days of that notice. The contract is a firm fixed-price construction contract with an estimated project magnitude between $25,000 and $100,000. Performance and payment bonds equal to 100 percent of the final contract award amount are required within 10 days of award. The solicitation is set aside 100 percent for HUBZone small businesses, with a small business size standard of $19 million under NAIC Code 238350 (Finish Carpentry Contractors). A site visit is highly encouraged and scheduled for August 5, 2026, at 10:00 AM Mountain Time. Quoters must submit a completed SF 1442 with lump sum pricing in Block 17, SAM-registered UEI number in Block 14, and an Experience Questionnaire demonstrating capability to perform door and window removal/replacement work. All quotes must be electronically submitted to joseph_kirk@ios.doi.gov and must acknowledge any solicitation amendments. Wage rate determinations under the Davis-Bacon Act and numerous federal acquisition regulations apply, including construction-specific labor standards, buy American requirements for materials, and liability insurance requirements of $50,000 per person, $100,000 per occurrence, and $100,000 property damage.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6326Q0032_Amd_0001.pdf | ||
| B09_Solicitation_Amendment_1_Attach_1_Q_and_A_0001.pdf | ||
| B08_Solicitation_Attach_3_Experience_Questionnaire.xls | XLS spreadsheet | |
| B08_Solicitation_Attach_1_SOW.docx | DOCX document | |
| B08_Solicitation_Attach_2_WD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P6326Q0032
NPS, MWR - NEKOTA MABO
DOI, NPS, MWR - NEKOTA MABO
820 Columbus St Rapid City SD 57701
Joseph Kirk Joseph_Kirk@ios.doi.gov
0044052329
PMN
Joseph Kirk 6055740510
07/22/2026
08/24/2026
10 90 Commencement Section H
This is a request for quotation. The resulting contract is expected to be a firm fixed price construction contract. The complete specifications, drawings, provisions and clauses are available on http://www.sam.gov.
Project Description: Quarters 13 at Jewel Cave National Monument is a government residential structure originally constructed in 1978, reflecting the standard residential design practices and materials of its era. The building supports park housing needs and is located approximately 13 miles from Custer, South Dakota. Over time, exposure to the region¿s harsh winter conditions, temperature fluctuations, and moisture has contributed to deterioration of building elements, reducing energy, and aging structural and utility components. This project aims to address these deficiencies through targeted repair and modernization efforts while preserving the character of the residence. Improvements will enhance building safety, integrity, and long-term habitability for park staff.
Project Location: Jewel Cave National Monument, 11149 US Highway 16, Custer South Dakota, 57730, Custer
County
Continued...
1 31
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
NPS, MWR - NEKOTA MABO
DOI, NPS, MWR - NEKOTA MABO
820 Columbus St Rapid City SD 57701
PMN
Joseph Kirk
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
Magnitude of Project: Between $25,000 and
$100,000.
Bonds: Required as stated in block 12.
Payment bond in the amount of 100% of final contract award amount.
NAIC Code: 238350 Finish Carpentry Contractors.
The small business size standard is $19 million.
Notice of Set Aside: This project is set aside
100 % for HUBZone Set Aside.
Site Visit: A site visit is highly encouraged.
A site visit is scheduled for August 5, 2026.
Mountain Time. For more details, see pg. 14
Section H (Site Visit Details) for specific guidance. RSVP for this site visit. Email:
Joseph Kirk, joseph_kirk@ios.doi.gov.
Schedule: The performance period is anticipated to be 90 calendar days, after issuance of
Notice to Proceed.
Wage Rates: Wage rate determinations
(Construction) formerly known as the Davis
Bacon Act are incorporated into the terms and conditions as attachments.
System for Award Management (SAM): The successful offeror must be registered in SAM and have current online Representations and
Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.
Method and Instruction for submitting quotes:
Refer to Section L. Complete quote package shall be emailed directly to the Contract
Specialist.
Questions: All questions pertaining to this solicitation shall be submitted IN WRITING via email joseph_kirk@ios.doi.gov. All questions must be submitted in writing no later than 3 days after site visit.
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
Delivery: 90 Days After Notice to Proceed
Delivery Location Code: 0011283144
NPS, MWR, Jewel Cave NM
11149 US HWY 16
Bldg B12
Custer SD 57730-8166 US
00010 Remove and replace doors and windows per attached SOW.
Product/Service Code: Z2FZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER RESIDENTIAL BUILDINGS
140P6326Q0032 Replace Doors and Windows Page 5 of 31 Jewel Cave National Monument
Part I – The Schedule SECTION A – Solicitation/Contract Form Special Notice for Bidders SECTION B – Bid Schedule SECTION C – Specifications/Drawings SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) SECTION F - Deliveries or Performance 52.242-14 -- Suspension of Work (Apr 1984) SECTION G - Contract Administration Data 1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021) Submittal Process Request for Information (RFIs) Construction Schedule Requirements Schedule of Values Construction Contract Administration Compliance with recent Executive Orders 14148/14208 SECTION H - Special Contract Requirements Site Visit Details Pre-Construction Meeting Commencement, Prosecution and Completion or Work Part II—Contract Clauses Section I: Contract Clauses 52.203-17 Contractor Employee Whistleblower (Nov 2023) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) Deviation (May 2026) 52.204-13 System for Award Management Maintenance (Oct 2018) Deviation (May 2026) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.219-28 Post-Award Small Business Program Representation (Jan 2025) Deviation (Jan 2026) 52.222-3 Convict Labor. (Jun 2003) 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation (May 2018) Deviation (May 2026) 52.222-6 Construction Wage Rate Requirements (Aug 2018) Deviation (May 2026) 52.222-7 Withholding of Funds. (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees. (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements. (Feb 1988) 52.222-11 Subcontracts (Labor Standards). (May 2014) Deviation (May 2026) 52.222-12 Contract Termination - Debarment. (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (May 2014)...15 52.222-14 Disputes Concerning Labor Standards. (Feb 1988) 52.222-15 Certification of Eligibility. (May 2014) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) Deviation (Oct 2023) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) 52.223-5 Pollution Prevention and Right-to-Know Information. (May 2024) 52.223-23 Sustainable Products and Services (May 2024) Deviation (May 2026) 52.225-9 Buy American Act - Construction Materials (Oct 2022) 52.226-7 Drug-Free Workplace (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity -- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance--Work on a Government Installation (JAN 1997) 52.228-11 Individual Surety--Pledges of Assets (Feb 2021) Deviation (May 2023)
140P6326Q0032 Replace Doors and Windows Page 6 of 31
52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014) 52.232-16 Progress Payments (Nov 2021) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Disputes. (May 2014) Deviation (Nov 2025) Alternate I (Nov 2025) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) Deviation (Nov 2025) 52.236-2 Differing Site Conditions (Apr 1984) Deviation (Jan 2026) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) Deviation (Jan 2026) 52.236-5 Material and Workmanship (Apr 1984) Deviation (Jan 2026) 52.236-6 Superintendence by the Contractor (Apr 1984) Deviation (Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) Deviation (Jan 2026) 52.236-8 Other Contracts (Apr 1984) Deviation (Jan 2026) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) Deviation (Jan 2026) 52.236-10 Operations and Storage Areas (Apr 1984) Deviation (Jan 2026) 52.236-11 Use and Possession Prior to Completion (Apr 1984) Deviation (Jan 2026) 52.236-12 Cleaning Up (Apr 1984) Deviation (Jan 2026) 52.236-13 Accident Prevention. (NOV 1991) Deviation (Jan 2026) - Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) Deviation (Jan 2026) 52.236-17 Layout of Work (Apr 1984) Deviation (Jan 2026) 52.236-21 Specifications and Drawings for Construction (Feb 1997) Deviation (Jan 2026) 52.242-13 Bankruptcy (July 1995) 52.243-5 Changes and Changed Conditions (Apr 1984) Deviation (Nov 2025) 52.246-21 Warranty of Construction. (Mar 1994) 52.248-3 Value Engineering—Construction (Oct 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) & Alternate I (Sep 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 1452.203-70 Restrictions on Endorsements- Department of Interior (Jul 1996) 1452.204-70 Release of Claims Department of Interior (Jul 1996) 1452.228-70 Liability Insurance Department of Interior (Jul 1996) Part III— List of Documents, Exhibits, and Other Attachments SECTION J – List of Attachments Part IV – Representations and Instructions SECTION K - Representations, Certifications, and Other Statements of Offerors 52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations Representation (Nov 2015) Deviation (May 2026) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) Deviation (May 2026) SECTION L - Instructions, Conditions, and Notices to Offerors Required Submissions:
52.204-7 System for Award Management (Nov 2024) Deviation (Mar 2026) 52.204-22 Alternative Line-Item Proposal (Jan 2017) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) Electronic Submissions of Quotes 52.216-1 – Type of Contract (Apr 1984) 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014)
140P6326Q0032 Replace Doors and Windows Page 7 of 31
52.225-10 -- Notice of Buy American Requirement--Construction Materials (May 2014) 52.233-2 Service of Protest Department of the Interior (Sep 2006) DEVIATION (Jul 1996) 52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 – Authorized Deviations in Provisions (Nov 2020) 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (APR 1984)
SECTION M - EVALUATION FACTORS FOR AWARD
140P6326Q0032 Replace Doors and Windows Page 8 of 31
Part I – The Schedule
SECTION A – Solicitation/Contract Form
This solicitation is a Request for Quote (RFQ), in accordance with the Specifications/Drawings and is issued on Standard Form (SF) 1442. Award of this contract will be made according to FAR Part 13 Simplified Acquisition for Noncommercial Acquisitions Procedures. All references to “proposal” or “bid” in this solicitation shall be understood to mean “quotation.” The Government will evaluate all Quotations in an impartial manner and consideration will be given to those with the highest perceived value to the government based on responses to the evaluation factors identified in Section M. Reference Department of Interior Acquisition Regulation (DIAR) Part 1436, 1436.270-1 Uniform Contract Format.
Special Notice for Bidders
Signing of the offer shall be deemed to be a representation by the quoter that contractor owns, operates, or maintains a place of business, regularly engaged in construction projects that include having staff with experience required to perform the work described in this solicitation. Quoted price must include all materials/labor/work/taxes to complete work outlined in the Specifications.
SECTION B – Bid Schedule
Complete the Standard Form (SF) 1442: Offeror is to complete Blocks 14 through 20. Offerors shall include their SAM registered UEI number in Block 14 of the SF1442 when submitting offer. Offeror must include original signature of individual authorized to sign for the company. Indicate the lump sum for the base item as proposed in Block 17. Contractors are also encouraged to offer pricing for the alternative line. A detailed breakdown of the offeror’s proposal price (e.g., labor, materials, profit, overhead, and other pricing elements) are not requested at this time; however, may be requested by the Contracting Officer during the pre-award process. Offerors must acknowledge all solicitation amendments when submitting final quotes. See Required Submissions in Section L.
SECTION C – Specifications/Drawings
“Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.”
Please replace any mention of “substantial completion” with “final completion” throughout the entire specification document.
SECTION D - Packaging and Marking
No clauses included.
SECTION E - Inspection and Acceptance
52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
140P6326Q0032 Replace Doors and Windows Page 9 of 31
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph
(i) of this section.
(d) The presence or absence of a government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of Clause)
SECTION F - Deliveries or Performance
Work shall be completed by skilled personnel per industry standards and manufacturer specifications.
52.242-14 -- Suspension of Work (Apr 1984)
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an
140P6326Q0032 Replace Doors and Windows Page 10 of 31 adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.
However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed—
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of clause)
SECTION G - Contract Administration Data
(a) Contact Information:
The Contract Specialist/Contracting Officer administrating the Contract:
Joseph Kirk joseph_kirk@ios.doi.gov 605.574.0510 National Park Service-NEKOTA MABO 820 Columbus Street Rapid City, SD 57702
(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
(d) Any request for contract changes/modifications shall be submitted to the CO.
(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.
All field changes must be approved by the CO prior to execution.
(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
FINAL PAYMENT
Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.
AVAILABILITY OF UTILITIES SERVICES
Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made mailto:joseph_kirk@ios.doi.gov
140P6326Q0032 Replace Doors and Windows Page 11 of 31 available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.
UTILITIES CONSERVATION
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS
The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.
1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment. The COR for this contract will be:
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.
(End of Local Clause)
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice
140P6326Q0032 Replace Doors and Windows Page 12 of 31
Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Copy of vendor invoice document in PDF format, completed on the pay application document provided by contracting, which shows pricing breakdown for all line items. Once all signatures (Contractor’s / COR / CO) and approvals are completed on the pay application, the vendor can then upload this document into IPP as their invoice attachment.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
Submittal Process
(a) This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.
(b) Submittal List: A submittal list is included in the scope of work document. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the scope of work and contract terms and conditions still apply regardless of what is shown on the submittal list.
(c) Processing Time: Allow enough time for submittal review, including time for re-submittals. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the contract time will be authorized because of failure to transmit submittals enough in advance of the work to permit processing, including re-submittals. Allow 15 business days for review of each submittal and resubmittal.
Allow additional time if coordination with subsequent submittals is required.
(d) Transmittal: All material submittals shall be transmitted using National Park Service form CM-16 (attached). Package each submittal individually and appropriately for transmittal and handling. Submittals received from sources other than the Contractor will be returned without review.
(e) The Contractor shall number each submittal sequentially. Revised submittals (resubmittals) shall include an appropriate revision number.
(f) (f) Re-submit submittals until they are marked “Approved” or “Approved with notations.” Use only final submittals with mark indicating “Approved” or “Approved with notations.”
Request for Information (RFIs)
(a) Immediately on discovery of the need for additional information or interpretation of the contract documents, Contractor shall prepare and submit an RFI utilizing the form provided by the CO (attached) or one created by the Contractor that is approved by the CO. The content of the RFI shall include a detailed description of elements requiring clarification. Include all relevant facts and circumstances in the RFI. The Contractor shall sequentially number each RFI.
https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
140P6326Q0032 Replace Doors and Windows Page 13 of 31
(1) CO will not respond to RFIs submitted by other entities controlled by Contractor.
(2) Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
(b) Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
(1) RFI number, numbered sequentially.
(2) Date.
(3) RFI subject.
(4) Specification Section number and title and related paragraphs, as appropriate.
(5) Drawing number and detail references, as appropriate.
(6) Field dimensions and conditions, as appropriate.
(7) Contractor's suggested resolution. If Contractor's suggested resolution impacts the contract time or the contract amount, Contractor shall state impact in the RFI.
(8) Contractor's signature.
(9) Attachments: Include sketches, descriptions, measurements, photos, product data, shop drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
(c) Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly. The following are not considered to be RFIs and will receive no action:
(1) Requests for approval of submittals.
(2) Requests for approval of substitutions.
(3) Incomplete RFIs or inaccurately prepared RFIs.
(d) CO's action on RFIs may result in the need for a change to the contract time or the contract amount. All contract changes will be processed following the terms and conditions of the contract.
Construction Schedule Requirements
After contract award and a minimum of 3 days prior to the Pre-Construction conference, submit a baseline schedule for the construction period. The purpose of the Construction Schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The Construction Schedule will assist the Contractor, Contracting Officer, and Contracting Officer Representative, in monitoring the progress of the work, evaluating proposed changes, and processing progress payments. Prepare the Construction Baseline Schedule to show the order in which the Contractor proposes to perform the Work, and the dates on which the Contractor contemplates starting and completing all activities required. Indicate the estimated duration, sequence requirements, and relationship of each activity in relation to other activities. Consider seasonal weather conditions in planning and scheduling all work influenced by high and low ambient temperatures, wind, or precipitation to ensure completion of all work within the contract time. Contractor shall be responsible for revising schedule to include any approved updates and/or revisions.
Schedule of Values
(a) Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. Include mobilization, general condition costs, overhead and profit in the total dollar value of unit price items and in the component work activities for each lump-sum item. Do not include mobilization, general condition costs, overhead or profit as a separate item.
(b) Do not break down unit price items. Use only the contract price for unit price items.
(c) The total cost of all items shall equal the contract price. The Schedule of Values will form the basis for progress payments.
140P6326Q0032 Replace Doors and Windows Page 14 of 31
(d) An acceptable Schedule of Values shall be agreed upon by the Contractor and Contracting Officer before the first progress payment is processed.
Construction Contract Administration
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: Construction Contract Administration | U.S. Department of the Interior (doi.gov)
Compliance with recent Executive Orders 14148/14208
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph
(t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.
Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM."
SECTION H - Special Contract Requirements
Site Visit Details
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
Site Visit Date and Time: August 5, 2026, 10:00AM Mountain Time
Site Visit Location: Meeting location:
Quarters 13 Jewel Cave National Monument 11149 US Highway 16, Custer South Dakota, 57730, Custer County
National Park Service POC:
Contracting POC: Joseph Kirk, joseph_kirk@ios.doi.gov
THIS SITE VISIT DATE AND INFORMATION IS SUBJECT TO CHANGE – PLEASE MONITOR THIS
POSTING ON SAM.gov FOR ANY AND ALL AMENDMENTS THAT MAY CHANGE THIS DATE/TIME
AND INFORMATION.
Pre-Construction Meeting
If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
Commencement, Prosecution and Completion or Work https://www.doi.gov/pam/acquisition/policy/constructioncontract https://www.acquisition.gov/far/52.236-2#FAR_52_236_2 https://www.acquisition.gov/far/52.236-3#FAR_52_236_3
140P6326Q0032 Replace Doors and Windows Page 15 of 31
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
Part II—Contract Clauses
Section I: Contract Clauses
52.203-17 Contractor Employee Whistleblower (Nov 2023)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) Deviation (May 2026)
52.204-13 System for Award Management Maintenance (Oct 2018) Deviation (May 2026)
52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022)
52.219-28 Post-Award Small Business Program Representation (Jan 2025) Deviation (Jan 2026)
52.222-3 Convict Labor. (Jun 2003)
52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation (May 2018) Deviation (May 2026)
52.222-6 Construction Wage Rate Requirements (Aug 2018) Deviation (May 2026)
52.222-7 Withholding of Funds. (May 2014)
52.222-8 Payrolls and Basic Records (Jul 2021)
52.222-9 Apprentices and Trainees. (Jul 2005)
52.222-10 Compliance with Copeland Act Requirements. (Feb 1988)
52.222-11 Subcontracts (Labor Standards). (May 2014) Deviation (May 2026)
52.222-12 Contract Termination - Debarment. (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (May 2014)
52.222-14 Disputes Concerning Labor Standards. (Feb 1988)
52.222-15 Certification of Eligibility. (May 2014)
52.222-50 Combating Trafficking in Persons (Nov 2021)
52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) Deviation (Oct 2023)
52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022)
52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026).
140P6326Q0032 Replace Doors and Windows Page 16 of 31
52.223-5 Pollution Prevention and Right-to-Know Information. (May 2024)
52.223-23 Sustainable Products and Services (May 2024) Deviation (May 2026)
52.225-9 Buy American Act - Construction Materials (Oct 2022)
52.226-7 Drug-Free Workplace (May 2024).
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024)
52.227-1 Authorization and Consent (Jun 2020)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020)
52.227-4 Patent Indemnity -- Construction Contracts (Dec 2007)
52.228-2 Additional Bond Security (Oct 1997)
52.228-5 Insurance--Work on a Government Installation (JAN 1997)
52.228-11 Individual Surety--Pledges of Assets (Feb 2021) Deviation (May 2023)
(a)The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond—
(1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety. [Except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].
(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.
(c)A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.
140P6326Q0032 Replace Doors and Windows Page 17 of 31
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3)Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.
(d)The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.
(End of clause)
52.228-13 Alternative Payment Protections (Jul 2000)
(a) The Contractor shall submit one of the following payment protections:
• Payment Bond
• Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of Clause)
52.228-14 Irrevocable Letter of Credit (Nov 2014)
52.228-15 Performance and Payment Bonds -- Construction (Jun 2020) Deviation (Apr 2020)
(a) Definitions. As used in this clause-
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25) [, except that a seal is not required]). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A) [, except that a seal is not required]). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
https://www.acquisition.gov/far/28.102-1#FAR_28_102_1 https://www.gsa.gov/forms-library/performance-bond https://www.gsa.gov/forms-library/payment-bond
140P6326Q0032 Replace Doors and Windows Page 18 of 31
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States.
Treasury Circular 570 is published in the Federal…