About this file

This is a Request for Quotation (RFQ) for a construction project to replace security gates at Mount Rushmore National Memorial. The solicitation requires the contractor to demolish and remove two existing gates and replace them with new gates, including removal of four-inch square twenty-foot-long steel drop arm gate beams, associated counterweights, and control boxes. The project involves cutting ten-inch steel I-beams, preserving existing electrical utilities and underground gate sensors, and installing a new Lift Master BG790 Industrial AC Barrier and Gate Operator with Wishbone Gate.

The project is set aside 100% for small businesses, with a total project value between $100,000 and $250,000. A mandatory site visit is scheduled for May 29, 2025, at 10:00 am Mountain Daylight Time at the memorial. The contract is a firm fixed-price construction contract with a performance period of 90 calendar days from the Notice to Proceed. Contractors must be registered in the System for Award Management (SAM), comply with Davis-Bacon wage rates, and submit an Experience Questionnaire demonstrating technical capability in security gate replacement work performed within the past three to five years.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0044016308

NPS, MWR - NEKOTA MABO

DOI, NPS, MWR - NEKOTA MABO

820 Columbus St Rapid City SD 57701

PMN

Joseph Kirk joseph_kirk@nps.gov

Joseph Kirk 6055740510

105/28/2025

140P6325Q0011

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This is a request for quotation. The resulting contract is expected to be a firm fixed price construction contract. The complete specifications, drawings, provisions and clauses are available on http://www.sam.gov.

Project Description: The scope of this project includes the demolition and removal of two existing gates and replacement of those gates to align with existing receivers and utilize existing wiring, controls, and ground sensors. At each gate the removal of the existing four-inch square twenty-foot-long steel drop arm gate beams with their associated counterweights. Each beam and counterweight assembly weigh approximately seven hundred and fifty pounds. Also, work consists of removal of two existing four foot tall, by three feet deep, by four feet wide gate apparatus control boxes which included gate motors, mechanical components, and electrical wiring. In addition, work consists of hot work, cutting at ground level, a total of four ten-inch steel I beams to provide space for the new gate apparatus. While removing the old gates and associated cabinets, do not excavate existing concrete base. Save in place electrical utilities to be re-used. Save in place wiring associated with underground gate sensors being careful not to damage or cut short the conductors. Following completion of demolition of existing gate and gate cabinets lawfully dispose of all items off NPS property. The Lift Master BG790

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 90 calendar days and complete it within ________________ ________________ calendar days after receiving

52.211-10

06/30/2025

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

NPS, MWR - NEKOTA MABO

DOI, NPS, MWR - NEKOTA MABO

820 Columbus St Rapid City SD 57701

PMN

Joseph Kirk

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 52

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6325Q0011

Industrial AC Barrier and Gate Operator With

Wishbone Gate will constitute the salient characteristics of the Basis of Design. Provide a shop drawing of the new gate, drop arm, and associated apparatus for approval. Once approved by the COR, the contractor is instructed to install two new replacement gates. The salient features of the new gates also include a cabinet heater and Timer to Close components. Re-attach all existing gate wiring, and gate sensors to provide a fully functional drop arm gate assembly. Coordinate with COR and NPS Dispatch

Center (at Mt Rushmore NM) to commission new gates. Commissioning includes verification that the existing intercom and all existing attributes of the old gate operation are carried over to the new gates.

Project Location: Mount Rushmore National

Memorial, 13000 Hwy 244 Bldg 31, Suite 1

Keystone, Pennington County, SD

Magnitude of Project: Between $100,000 and

$250,000.

Bonds: Required as stated in block 12.

Payment bonds/protection in the amount of 100% of final contract award amount.

NAIC Code: 238290, Automatic gate (e.g., garage, parking lot) installation. The small business size standard is $22 million.

Notice of Set Aside: This project is set aside

100 % Total Small Business.

Site Visit: A site visit is highly encouraged. A site visit is schedule for May 29, 2025 at 10:00 a.m. Mountain Daylight Time. For more details, see provision 52.236-27, Site Visit

(Construction), Alternate 1 for specific guidance. RSVP for this site visit. Email: Joseph

Kirk, joseph_kirk@nps.gov.

Schedule: Work shall be completed within 90 calendar days of the start date provided on the

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 52

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6325Q0011

Notice to Proceed. The final performance period start date is contingent on issuance of Notice to

Proceed.

Wage Rates: Wage rate determinations

(Construction) formerly known as the Davis Bacon

Act are incorporated into the terms and conditions as attachments.

System for Award Management (SAM): The successful offeror must be registered in SAM and have current online Representations and

Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.

Method and Instruction for submitting quotes:

Refer to Section L. Complete quote package shall be emailed directly to the Contract Specialist.

Questions: All questions pertaining to this solicitation shall be submitted IN WRITING via email joseph_kirk@nps.gov. All questions must be submitted in writing no later than 5 days after site visit.

Delivery: 90 Days After Notice to Proceed

Delivery Location Code: 0011283157

NPS, MWR, Mount Rushmore NM

13000 Highway 244 BLDG 31 STE 1

Keystone SD 57751 US

00010 Replace Security Gates Per Specifications.

Product/Service Code: Z2PZ

Product/Service Description: REPAIR OR ALTERATION

OF OTHER NON-BUILDING FACILITIES

Period of Performance: 04/16/2025 to 11/15/2025

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

140P6325Q0011 Replace Security Gates Page 5 of 52 Mount Rushmore National Memorial

Part I – The Schedule SECTION A – Solicitation/Contract Form Special Notice for Bidders SECTION B – Bid Schedule SECTION C – Specifications/Drawings SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) SECTION F - Deliveries or Performance 52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984) 52.242-14 -- Suspension of Work (Apr 1984) SECTION G - Contract Administration Data 1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021) Submittal Process Request for Information (RFIs) Construction Schedule Requirements Schedule of Values Construction Contract Administration Compliance with recent Executive Orders 14148/14208 SECTION H - Special Contract Requirements Part II—Contract Clauses Section I: Contract Clauses 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services) (Jan 2025) (Deviation Feb 2025) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) 52.219-28 Post-Award Small Business Program Representation. (Jan 2025) 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds. (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees. (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements. (Feb 1988) 52.222-11 Subcontracts (Labor Standards). (May 2014) 52.222-12 Contract Termination - Debarment. (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (May 2014)...19 52.222-14 Disputes Concerning Labor Standards. (Feb 1988) 52.222-15 Certification of Eligibility. (May 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction. (Apr 2015) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.223-6 Drug-Free Workplace (May 2024) 52.225-9 Buy American Act - Construction Materials (Oct 2022) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity -- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-11 Individual Surety--Pledges of Assets (Feb 2021) (DEVIATION May 2023) 52.228-12 Prospective Subcontractor Requests for Bonds (Dec 2022) 52.228-13 Alternative Payment Protections (Jun 2000) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds -- Construction (Jun 2020) (DEVIATION Apr 2020) 52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014) 52.232-16 Progress Payments (Nov 2021) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014)

140P6325Q0011 Replace Security Gates Page 6 of 52

52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.236-2 Differing Site Conditions. (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (Apr 1984) 52.236-5 Material and Workmanship. (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities. (Nov 1991) 52.236-8 Other Contracts -- (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Apr 1984) 52.236-10 Operations and Storage Areas. (Apr 1984) 52.236-11 Use and Possession Prior to Completion. (Apr 1984) 52.236-12 Cleaning Up. (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) Alternate 1 (Nov 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.243-5 - Changes and Changed Conditions (APR 1984) 52.245-1 Government Property(Sep 2021) 52.246-21 Warranty of Construction. (Mar 1994) 52.248-3 Value Engineering—Construction (Oct 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) & Alternate I (Sep 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 1452.203-70 Restrictions on Endorsements- Department of Interior (Jul 1996) 1452.204-70 Release of Claims Department of Interior (Jul 1996) 1452.228-70 Liability Insurance Department of Interior (Jul 1996) Part III— List of Documents, Exhibits, and Other Attachments SECTION J – List of Attachments Part IV – Representations and Instructions SECTION K - Representations, Certifications, and Other Statements of Offerors 52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.204-8 Annual Representations and Certifications (Jan 2025) (Deviation Feb 2025) 52.204-20 Predecessor of Offeror (Aug 2020) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) 52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (Dec 2023) 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan-Certification (Aug 2009) SECTION L - Instructions, Conditions, and Notices to Offerors Required Submissions:

52.204-7 System for Award Management (Nov 2024) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.204-22 Alternative Line-Item Proposal (Jan 2017) 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (Jun 1988) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) Electronic Submissions of Quotes 52.216-1 – Type of Contract (Apr 1984) 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.225-10 -- Notice of Buy American Requirement--Construction Materials (May 2014)

140P6325Q0011 Replace Security Gates Page 7 of 52

52.233-2 Service of Protest Department of the Interior (Sep 2006) (DEVIATION) (Jul 1996) 52.236-27 – Site Visit (Construction) Alternate I (Feb 1995) 52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 – Authorized Deviations in Provisions (Nov 2020) 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (APR 1984)

SECTION M - EVALUATION FACTORS FOR AWARD

140P6325Q0011 Replace Security Gates Page 8 of 52

Part I – The Schedule

SECTION A – Solicitation/Contract Form

This solicitation is a Request for Quote (RFQ), in accordance with the Specifications/Drawings and is issued on Standard Form (SF) 1442. Award of this contract will be made according to FAR Part 13 Simplified Acquisition Procedures. All references to “proposal” or “bid” in this solicitation shall be understood to mean “quotation.” The Government will evaluate all Quotations in an impartial manner and consideration will be given to those with the highest perceived value to the government based on responses to the evaluation factors identified in Section M.

Reference Department of Interior Acquisition Regulation (DIAR) Part 1436, 1436.270-1 Uniform Contract Format.

Special Notice for Bidders

Signing of the offer shall be deemed to be a representation by the quoter that contractor owns, operates, or maintains a place of business, regularly engaged in construction projects that include having staff with experience required to perform the work described in this solicitation. Quoted price must include all materials/labor/work/taxes to complete work outlined in the Specifications.

SECTION B – Bid Schedule

Complete the Standard Form (SF) 1442: Offeror is to complete Blocks 14 through 20. Offerors shall include their SAM registered UEI number in Block 14 of the SF1442 when submitting offer. Offeror must include original signature of individual authorized to sign for the company. Indicate the lump sum for the base item as proposed in Block 17. Contractors are also encouraged to offer pricing for the alternative line. A detailed breakdown of the offeror’s proposal price (e.g., labor, materials, profit, overhead, and other pricing elements) are not requested at this time; however, may be requested by the Contracting Officer during the pre-award process. Offerors must acknowledge all solicitation amendments when submitting final quotes. See Required Submissions in Section L.

SECTION C – Specifications/Drawings

“Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.”

Please replace any mention of “substantial completion” with “final completion” throughout the entire specification document.

SECTION D - Packaging and Marking

No clauses included.

SECTION E - Inspection and Acceptance

52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

140P6325Q0011 Replace Security Gates Page 9 of 52

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph

(i) of this section.

(d) The presence or absence of a government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

SECTION F - Deliveries or Performance

Work shall be completed by skilled personnel per industry standards and manufacturer specifications.

52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

140P6325Q0011 Replace Security Gates Page 10 of 52

(End of Clause)

52.242-14 -- Suspension of Work (Apr 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.

However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed—

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

(End of clause)

SECTION G - Contract Administration Data

(a) Contact Information:

The Contract Specialist/Contracting Officer administrating the Contract:

Joseph Kirk Joseph_Kirk@nps.gov 605.574.0510 National Park Service-NEKOTA MABO 820 Columbus Street Rapid City, SD 57702

(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.

(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.

(d) Any request for contract changes/modifications shall be submitted to the CO.

(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.

All field changes must be approved by the CO prior to execution.

(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.

mailto:Joseph_Kirk@nps.gov

140P6325Q0011 Replace Security Gates Page 11 of 52

FINAL PAYMENT

Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.

AVAILABILITY OF UTILITIES SERVICES

Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.

UTILITIES CONSERVATION

The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.

OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS

The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.

1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment. The COR for this contract will be:

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

140P6325Q0011 Replace Security Gates Page 12 of 52

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.

(End of Local Clause)

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Copy of vendor invoice document in PDF format, completed on the pay application document provided by contracting, which shows pricing breakdown for all line items. Once all signatures (Contractor’s / COR / CO) and approvals are completed on the pay application, the vendor can then upload this document into IPP as their invoice attachment.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

Submittal Process

(a) This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

(b) Submittal List: A submittal list is included in the scope of work document. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the scope of work and contract terms and conditions still apply regardless of what is shown on the submittal list.

(c) Processing Time: Allow enough time for submittal review, including time for re-submittals. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the contract time will be authorized because of failure to transmit submittals enough in advance of the work to permit processing, including re-submittals. Allow 15 business days for review of each submittal and resubmittal.

Allow additional time if coordination with subsequent submittals is required.

(d) Transmittal: All material submittals shall be transmitted using National Park Service form CM-16 (attached). Package each submittal individually and appropriately for transmittal and handling. Submittals received from sources other than the Contractor will be returned without review.

(e) The Contractor shall number each submittal sequentially. Revised submittals (resubmittals) shall include an appropriate revision number.

https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

140P6325Q0011 Replace Security Gates Page 13 of 52

(f) (f) Re-submit submittals until they are marked “Approved” or “Approved with notations.” Use only final submittals with mark indicating “Approved” or “Approved with notations.”

Request for Information (RFIs)

(a) Immediately on discovery of the need for additional information or interpretation of the contract documents, Contractor shall prepare and submit an RFI utilizing the form provided by the CO (attached) or one created by the Contractor that is approved by the CO. The content of the RFI shall include a detailed description of elements requiring clarification. Include all relevant facts and circumstances in the RFI. The Contractor shall sequentially number each RFI.

(1) CO will not respond to RFIs submitted by other entities controlled by Contractor.

(2) Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

(b) Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

(1) RFI number, numbered sequentially.

(2) Date.

(3) RFI subject.

(4) Specification Section number and title and related paragraphs, as appropriate.

(5) Drawing number and detail references, as appropriate.

(6) Field dimensions and conditions, as appropriate.

(7) Contractor's suggested resolution. If Contractor's suggested resolution impacts the contract time or the contract amount, Contractor shall state impact in the RFI.

(8) Contractor's signature.

(9) Attachments: Include sketches, descriptions, measurements, photos, product data, shop drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

(c) Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly. The following are not considered to be RFIs and will receive no action:

(1) Requests for approval of submittals.

(2) Requests for approval of substitutions.

(3) Incomplete RFIs or inaccurately prepared RFIs.

(d) CO's action on RFIs may result in the need for a change to the contract time or the contract amount. All contract changes will be processed following the terms and conditions of the contract.

Construction Schedule Requirements

After contract award and a minimum of 3 days prior to the Pre-Construction conference, submit a baseline schedule for the construction period. The purpose of the Construction Schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The Construction Schedule will assist the Contractor, Contracting Officer, and Contracting Officer Representative, in monitoring the progress of the work, evaluating proposed changes, and processing progress payments. Prepare the Construction Baseline Schedule to show the order in which the Contractor proposes to perform the Work, and the dates on which the Contractor contemplates starting and completing all activities required. Indicate the estimated duration, sequence requirements, and relationship of each activity in relation to other activities. Consider seasonal weather conditions in planning and scheduling all work influenced by high and low ambient temperatures, wind, or precipitation to ensure completion of all work within the contract time. Contractor shall be responsible for revising schedule to include any approved updates and/or revisions.

Schedule of Values

140P6325Q0011 Replace Security Gates Page 14 of 52

(a) Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. Include mobilization, general condition costs, overhead and profit in the total dollar value of unit price items and in the component work activities for each lump-sum item. Do not include mobilization, general condition costs, overhead or profit as a separate item.

(b) Do not break down unit price items. Use only the contract price for unit price items.

(c) The total cost of all items shall equal the contract price. The Schedule of Values will form the basis for progress payments.

(d) An acceptable Schedule of Values shall be agreed upon by the Contractor and Contracting Officer before the first progress payment is processed.

Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: Construction Contract Administration | U.S. Department of the Interior (doi.gov)

Compliance with recent Executive Orders 14148/14208

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph

(t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM."

SECTION H - Special Contract Requirements n/a

Part II—Contract Clauses

Section I: Contract Clauses

52.204-13 System for Award Management Maintenance (Oct 2018)

52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020)

52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services) (Jan 2025) (Deviation Feb 2025)

(a)The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1)The clauses listed below implement provisions of law or Executive order:

(i)52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

https://www.doi.gov/pam/acquisition/policy/constructioncontract

140P6325Q0011 Replace Security Gates Page 15 of 52

(ii)52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(iii)52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv)52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L.

117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v)52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) (Pub. L. 115–390, title II).

(vi)52.222-3, Convict Labor (Jun 2003) (E.O.11755).

(vii)52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(viii)52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

(ix)52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(x)52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(xi) 52.233-3, Protest After Award (Aug 1996) ( 31 U.S.C. 3553).

(xii)52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) ( Pub. L. 108-77 and 108-78 ( 19 U.S.C.

3805 note)).

(2)Listed below are additional clauses that apply:

(i)52.232-1, Payments (Apr 1984).

(ii)52.232-8, Discounts for Prompt Payment (Feb 2002).

(iii)52.232-11, Extras (Apr 1984).

(iv)52.232-25, Prompt Payment (Jan 2017).

(v)52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).

(vi)52.233-1, Disputes (May 2014).

(vii)52.244-6, Subcontracts for Commercial Products and Commercial Services (Jan 2025).

(viii) 52.253-1, Computer Generated Forms (Jan 1991).

(b)The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1)The clauses listed below implement provisions of law or Executive order:

(i)52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

(ii)52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020)(Pub. L. 109-282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

140P6325Q0011 Replace Security Gates Page 16 of 52

(iii)52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025) ( E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv)52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (Jun 2020) ( 41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v)52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vi)52.222-36, Equal Employment for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii)52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(viii)52.222-41, Service Contract Labor Standards (Aug 2018) ( 41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(ix)(A)52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).

(B)Alternate I (Mar 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(x)52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act ( 43 U.S.C. 1331, et seq.))).

(xi)52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xii)52.223-5, Pollution Prevention and Right-to-Know Information (May 2024) ( 42 U.S.C. 11001-11050 and 13101-13109) (Applies to services performed on Federal facilities).

(xiii)52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products as prescribed at FAR 23.109(d)(1)).

(xiv)52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xv)52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvi)52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

140P6325Q0011 Replace Security Gates Page 17 of 52

(xvii)52.223-23, Sustainable Products and Services (May 2024)(DEVIATION FEB 2025) ( E.O. 14057, 7 U.S.C.

8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l) (Applies to contracts when the agency identifies in the statement of work, or elsewhere in the contract, the sustainable products and services that apply to the acquisition).

(xviii)(A)52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition- (1)Is set aside for small business concerns; or

(2)Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).

(B)Alternate I (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .