Sol_140L4326Q0086.pdf

PDF 504 KB Posted

Attached to
Hart Bar Concrete Project Federal contract opportunity
Solicitation number
140L4326Q0086
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

This is a Solicitation, Offer, and Award document (Standard Form 1442) for a firm fixed-price construction contract to build a reinforced concrete slab at Hart's Bar day use area near Plush, Oregon, on Bureau of Land Management (BLM) Lakeview District lands.

The project requires construction of a reinforced concrete slab for installation of a shade structure, pathway, and parking space that meets Architectural Barriers Act accessibility requirements. The work includes excavation of existing aggregate parking lot to specified depth, placement of 1½ inch minus base rock to minimum 6-inch compacted depth, construction of forms for a cast-in-place concrete slab, placement of #3 rebar at 18 inches on center with 60 ksi yield strength, and concrete placement with minimum 28-day compressive strength of 3,000 psi. The contractor is responsible for all cleanup and disposal. The bid schedule contains two line items: Item 0001 for Mobilization (lump sum) and Item 0002 for Reinforced Concrete at 16 linear feet. Contractor must commence work within 30 calendar days of receiving the notice to proceed and complete all work within 120 calendar days. Performance and payment bonds are required within 5 days of award. Sealed offers are due by August 10, 2026, at 12:00 PM local time at the BLM OR-ST Office Procurement Management Branch in Portland, Oregon. This is a small business set-aside. The government will evaluate offers based primarily on price with consideration of past performance. Joseph Duncan is the contracting officer's representative (phone: 503-808-6535). A pre-bid site visit and pre-work meeting with the assigned Contracting Officer Representative are strongly recommended and required respectively. Numerous federal clauses apply, including Davis-Bacon Act wage requirements, Buy American construction materials preferences, and various environmental and security provisions.

View the file

Other files for this federal contract opportunity

Other files attached to Hart Bar Concrete Project, newest first.
File Type Posted
Sol_140L4326Q0086_Amd_0001.pdf PDF
B09_RFI_Questions_1_0001.docx DOCX document
Section_C_Attach_1_HartBarPainting_Spec.docx DOCX document
Section_J_Attachment_1_Wage_Determination_OR20260080.pdf PDF
Section_C_Attach_4_Location_Map.pdf PDF
Section_C_Attach_2_HartBarConcrete_Spec.docx DOCX document
Section_C_Attach_3_Maps_and_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140L4326Q0086

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

LHA

Joseph Duncan 5038086535

07/20/2026

08/10/2026

30 120

See Section C and Attachments 1 thru 4.

1 60

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

LHA

Matthew Duane

Hart Bar Concrete Project, Plush OR SOLICITATION NO. 140L4326Q0086 BLM Lakeview District Office Page 3 of 62

Section Title Part I—The Schedule

A Solicitation/contract form B Bid schedule C Specifications/Drawings D Packaging and marking E Inspection and acceptance F Deliveries or performance G Contract administration data H Special contract requirements

Part II—Contract Clauses I Contract clauses

Part III—List of Documents, Exhibits, and Other Attachments

J List of attachments Part IV—Representations and Instructions

K Representations, certifications, and other statements of offerors

L Instructions, conditions, and notices to offerors M Evaluation factors for award

BLM Lakeview District Office Page 4 of 62

SECTION B – BID SCHEDULE

This requirement is for one (1) Firm Fixed Price Construction contract for the Lakeview District Office Hart Bar Concrete Project in Plush, OR.

Item no. Item Description Quantity Unit of Measure

Unit Price Total

0001 Mobilization 1 LS $ $ 0002 Reinforced Concrete 16* LF $ $

GRAND TOTAL $

*Estimated Quantity LS = Lump Sum CY = Cubic Yard

Company Name:_____________________________________________________________________

Company Point of Contact:_____________________________________

Phone Number:______________________________________________

Email:_____________________________________________________

SAM UEI No.:_____________________________________________________________

PERFORMANCE PERIOD: See Section F below.

THIS SOLICITATION IS SET ASIDE FOR SMALL BUSINESS CONCERNS.

(End of Section B)

BLM Lakeview District Office Page 5 of 62

SECTION C – SPECIFICATIONS/DRAWINGS

1.0 GENERAL

1.1 Objective

Construction of a reinforced concrete slab for installation of a shade structure (not part of this project), pathway, and parking space. All proposed work is required to meet ABA (Architectural Barries Act) to make the site wheelchair accessible. All sites are within the Bureau of Land Management Lakeview District, OR.

1.2 Project Location and Background

Background The Lakeview Field Office desires to increase the accessibility of their recreation sites. This project will meet the accessibility requirements for federal facilities.

Concrete Work Location The proposed concrete work will take place at Hart’s Bar day use area near Plush Oregon, see plans for vicinity map.

1.3 Description of the work

The Contractor shall provide all personnel, materials, and equipment necessary to construct the reinforced concrete slab in accordance with the attached plans and specifications. Such actions must comply with all applicable local, state, and federal laws.

2.0 CONTRACTOR-FURNISHED PROPERTY AND SERVICE

2.1 Property and Services

Duties include construction of a reinforced concrete. The contractor is responsible for cleanup, disposal, and additional cost related to this project.

Project Requirements:

a. Existing aggregate parking lot shall be excavated to a depth allowing for compacted base, construction of forms, and placement of rebar required for the slab.

b. 1 ½ inch minus base rock shall be placed to a minimum compacted depth of 6 inches.

c. Forms shall be constructed to pour a cast in place concrete slab at the finished dimensions shown in the attached plans.

d. Rebar shall be placed in a manor to provide clear spaces to formed, earth and finish surfaces as shown in attached plans. Rebar shall be #3 bar, 18 inches on center both ways, and having a yield strength of 60 ksi.

e. Concrete shall be placed, consolidated and cured in accordance with the attached plans and specifications. Concrete shall have a minimum 28 day compressive strength of 3,000 psi.

f. Project cleanup.

2.2 Personnel

The contractor shall furnish all necessary qualified personnel to perform the specified work.

BLM Lakeview District Office Page 6 of 62

3.0 COMMUNICATION

3.1 Contracting Officer (CO)

Any requests for modification to the contract MUST be completed through the CO in advance of work completion.

3.2 Contracting Officer Representative (COR)

We recommend a pre-bid site visit with contractor. All activities must be planned in coordination with the Primary COR. Any technical questions must be asked through the COR. The COR does not have authority to deviate or approve any modification to the contract.

• Primary COR, Bob Smith, District Engineer, phone: 458-232-2422, email: rasmith@blm.gov

3.3 Scheduling

A pre-work meeting must be scheduled with the assigned COR at least 5 working days prior to commencing any work.

4.0 GOVERNMENT-PROVIDED ITEMS

4.1 Site Location

The proposed concrete work will take place at Hart’s Bar day use area near Plush Oregon, see plans for vicinity map.

5.0 INSPECTION/ACCEPTANCE/PAYMENT

5.1 Inspection

The Government will perform an inspection and approve required deliverables to ensure that all contract specifications have been met. Government inspections are to be performed in a sequential order, prior to the next task being allowed to commence. Inspection order is as follows:

a. Excavation

b. Compacted base rock

c. Completed forms

d. Rebar

e. Finished concrete

5.2 Acceptance

Final inspection and acceptance of all services and deliverables to be provided. Call will be made by the Government upon receipt of the completed invoice and all applicable receipts.

5.3 Payment

Invoices for payment may be submitted as outlined.

6.0 ATTACHMENTS

6.1 Attachments are for informational purposes only and include:

a. Paint Specifications

b. Concrete Specifications mailto:rasmith@blm.gov

BLM Lakeview District Office Page 7 of 62

c. Maps and Drawings

d. Location Map

7.0 CONSTRUCTION SPILL PROVISIONS

7.1 Products

a. Spark Arresters: Shall meet the requirements of the State of Oregon’s regulations.

7.2 Execution

HAZARDOUS MATERIAL CONTAINMENT/CLEANUP

a. During contractor operations on lands managed by the BLM, in event of a release as defined in Oregon Administrative Rules (OAR), Chapter 340, Division 142, Oil and Hazardous Materials Emergency Response Requirements, the Contractor shall immediately implement the SPCC plan as referenced herein and notify the on-site Government Contract Representative (COR or PI). The Government Representative will initiate the District’s Hazardous Materials Contingency Plan and/or Spill Containment Plan reporting requirements. The Government Representative will remain on scene until relieved by the District Hazardous Materials Management Coordinator (HMMC) or his/her representative.

b. Spill Prevention, Control, and Countermeasure Plan (SPCC): The Contractor shall develop an SPCC Plan as defined under 40 CFR Part 112. The SPCC Plan will be reviewed and accepted by the Contracting Officer prior to initiating project work. The SPCC Plan shall, as a minimum, contain the following information:

1. Response Priorities

2. Contractor Representative in Charge

3. Duties of Contractor Personnel

4. Contractor Emergency Response Procedures

5. Contents of Spill Containment Kit (SCK)

6. Spill Response Diagram

Upon request, an example of a SPCC may be obtained from the Lakeview District Environmental Protection Specialist for Hazardous Materials.

c. Spill Containment Kit (SCK): The Contractor shall have a SCK, as described in the SPCC, on-site during any operation and provide training to employees on how components of the SCK are used. The SCK must be designed for use with petroleum products, and must contain, as a minimum, the following items:

1. Two Bales (4 Booms/Bale, of 8" dia. X 10’ length Oil-only Absorbent Booms)

2. Two Bales (100 Pads/Bale, of Oil-only Absorbent Pads, minimum of 17"x19"x1/4")

3. One Oil-only Absorbent Sweep (minimum of 18" dia. X 100' length)

BLM Lakeview District Office Page 8 of 62

4. One Floating On-Water Containment Boom (minimum 18” width x 100’ length) (only required for in-stream or riparian work within 50 feet or less of a waterway.)

5. Gloves (PVC and Latex), Goggles, and Garbage Bags sufficient to contain soiled absorbents.

d. The Contractor shall implement the Emergency Response Actions described in the SPCC plan. Those actions include, but are not limited to, immediate action to protect employee health and safety, immediate action to stop the flow of product from the equipment, removal of equipment from the waterway if required and/or possible, deployment of the absorbent booms and pads downstream from the equipment, and any other immediate action as specified by Federal and/or State On-Scene Coordinators or his/her representative. The Contractor shall be responsible for cleanup/removal and proper disposal of contaminated materials from the site.

e. If the HMMC determines that additional resources are needed, the HMMC will implement the District’s Hazardous Materials Contingency Plan and the District Spill Containment Plan. The Contractor may be responsible for any or all costs associated with this level of effort. The amount of actual damage will be deducted by the Government from the amount due the Contractor prior to final payment.

(End of Section C)

BLM Lakeview District Office Page 9 of 62

SECTION D – PACKAGING AND MARKING

Section Does Not Apply

(End of Section D)

BLM Lakeview District Office Page 10 of 62

SECTION E – INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference:

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

(End of Section E)

BLM Lakeview District Office Page 11 of 62

SECTION F – DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The Contractor shall be required to (a) commence work under this contract within thirty (30) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 120 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

(End of Section F)

BLM Lakeview District Office Page 12 of 62

SECTION G – CONTRACT ADMINISTRATION DATA

G.1.0 In accordance with FAR clause 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts, the Contractor is required to annually report the product types and dollar value of any USDA-designated biobased products purchased during the previous fiscal year (October 1- September 30) through the System for Award Management (SAM). The report is due no later than October 31 of each year during contract performance and at the end of contract performance. Failure to submit the report into SAM in a timely manner may result in contractual remedies.

G.2.0 In accordance with FAR clause 52.223-11, Ozone-Depleting Substances and FAR clause 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners, the Contractor is required to label products that contain ozone-depleting substances and comply with the applicable requirements of sections 608 and 609 of the Clean Air Act (42 U.S.C. 7671g and 7671h).

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor https://www.cpars.gov/ http://www.cpars.csd.disa.milj/ https://www.cpars.gov/ http://www.cpars.csd.disa.mil/

BLM Lakeview District Office Page 13 of 62 offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(FEB 2021)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.

The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

1. Invoice billed according to contract line items and rates.

2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.

3. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.

4. If final payment is billed, the last invoice shall state “FINAL”.

5. Contractor’s Release of Claims shall be submitted with the final invoice.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

BLM Lakeview District Office Page 14 of 62

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Section G)

BLM Lakeview District Office Page 15 of 62

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 BONDS

When a financial protection is covered by an individual surety, the Contractor shall email the signed Standard Form 28 Affidavit of Individual Surety to the contracting office using the instructions in Section H.15.2 below.

H.2.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.3.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.4.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.4.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work where the Contractor proceeds during unsafe adverse weather or site conditions, and/or fire danger. Historical average days of severe weather have been included in the performance period. The Contractor will not be entitled to additional contract time or compensation for any such suspensions except when unusually severe weather or unforeseen conditions exist.

H.4.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.5.0 DRAWINGS

H.5.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size.

Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the Contracting Officer.

H.6.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.6.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.6.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.6.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

H.6.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

BLM Lakeview District Office Page 16 of 62

H.7.0 SUBSTITUTION – PROCESSION OF WORK

Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the quotation accepted. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.

H.8.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.9.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.10.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

BLM Lakeview District Office Page 17 of 62

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

H.11.0 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.12.0 CONSTRUCTION WAGE RATES APPLICABLE TO TRUCK DRIVERS

29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.

H.14.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.

H.15.0 SUBMITTALS

H.15.1 LIABILITY INSURANCE

In accordance with clause 1452.228-70, upon contract award submit a copy of an acceptable insurance certificate to the Contracting Officer prior to beginning the work by sending it to jeduncan@ios.doi.gov.

H.15.2 PAYMENT PROTECTION

Contractor shall furnish all executed Payment Protections in accordance with clause 52.228-13 to the Contracting Officer. The electronically signed Standard Forms 25 and 25-A shall be sent via email to jeduncan@ios.doi.gov.

H.16.0 SITE VISIT

The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

Site visits may be arranged during normal duty hours by contacting:

Name: David McGhee

Address: 1301 S G St, Lakeview OR 97630

BLM Lakeview District Office Page 18 of 62

Telephone: 541-947-6185

The following clause is provided in full text:

SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (August 2016)

(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau Personnel Security Office (PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated National Criminal History Check (NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.

(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable Background Investigation.

(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.

(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO’s review and approval. If the employee does not already have a complete investigation, they must apply for one. The employee may begin work with an EOD, but must receive a favorable background investigation to continue working on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.

(e) Electronic Questionnaire for Investigations Processing (e-QIP) – The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:

▪ e-QIP application (on-line)

▪ Fair Credit Release

▪ OF-306

▪ Fingerprints via USAccess Credentialing Centers

The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee’s background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.

(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule

BLM Lakeview District Office Page 19 of 62 when an individual’s continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.

(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination. Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.

(h) Physical Security Requirements - DOI Access Cards.

(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.

(2) To gain unsupervised access to Government facilities, Contractor employees must present their

DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required. Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility. Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee’s access to Government facilities or revoking of authorized access.

(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI Access Cards, keys, and other Government property issued to that employee. The Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the Contractor to comply with these requirements may result in the Contractor’s liability for all costs associated with correcting any resultant breech in building security.

(i) Issuance & Maintenance - DOI Access Cards

(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request. Contractor employees will receive email notificat ions to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.

(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee’s DOI Access Card becomes lost or stolen, the contractor employee shall notify the COR immediately to request a new DOI Access Card.

(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee’s DOI Access Card or certificates will expire before the contract is completed, the COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card’s certificate or card expiration, the COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.

(j) Information Technology Security Requirements.

(1) Training – If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor’s employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual Role-Based Security training for IT professionals. The Contractor shall comply with all Bureau/DOI IT security training requirements in effect during contract performance. The COR will notify the Contractor of all Bureau mandatory IT training. The Contractor shall submit training completion certificates to the COR for all required training. Failure to meet this training requirement may result in removal of the contractor employee from the contract. The Bureau will determine if the contractor can later return to the contract.

(2) Access to Contractor’s Facilities for IT audit purposes - The Contractor shall afford Bureau and the Department of the Interior Office of Inspector General access to the Contractor’s and subcontractors’ facilities, installations, operations, documentation, databases, and personnel used in performance of the contract.

Access shall be provided to the extent required to carry out a program of IT inspection, investigation, and audit that will safeguard against threats and hazards to the integrity, availability, and confidentiality of Government data or to

BLM Lakeview District Office Page 20 of 62 the function of computer systems operated on behalf of the Government and to preserve evidence of computer crime. If the Contractor questions the Government employee’s right to access its facilities, it should contact the CO for resolution.

(3) Contractor Location - Custom software development and outsourced operations shall be located in the United States to the maximum extent practical. If such services are proposed to be performed abroad, the Contractor shall provide an acceptable security plan that addresses the mitigation of problems related to communication, control, and protecting the confidentiality, integrity, and availability of IT systems and information.

(4) Applicable Standards - The Contractor shall follow all applicable Federal, DOI, and Bureau Bulletins, Directives, Guidelines, Manuals, Processing Standards, Memoranda, Policies and Standards; applicable OMB Memoranda; and all current National Institute of Standards & Technology (NIST) Special Publications. To comply with Federal Acquisition Regulation Subpart 39.101(d), contractors shall use the common security configurations available from the NIST website at http://checklists.nist.gov. NIST documents are available on the internet at http://csrc.nist.gov/publications/PubsSPs.html. OMB memoranda are available on the internet at http://www.whitehouse.gov/omb/memoranda/. The Contractor shall request copies of DOI and Bureau documents by contacting the COR.

(5) Incident Reporting - The Contractor shall immediately report computer security incidents affecting Bureau/DOI data and systems in accordance with the Bureau Computer Incident Response policy. The Contractor shall request copies of the Bureau Computer Incident Response policy by contacting the COR.

(6) Assessment and Authorization (A&A) and Continuous Monitoring.– The Contractor shall comply with Bureau policy when developing, upgrading, modifying or supporting applications and/or systems that require A&A and Continuous Monitoring. The Contractor shall request copies of Bureau A&A policy by contacting the COR. The A&A requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(k) Documentation - The Contractor shall document all work performed and ensure that the appropriate Assessment and Authorization (A&A) documents are updated to reflect the work performed and the current state of Bureau systems and networks. The Documentation requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(l) Personnel Changes, Contractor Request - The Contractor shall immediately notify the COR and PSO when an employee is reassigned or leaves the Contractor’s employment and prior to any termination. The Contractor must adhere to the Bureau or Office’s mandatory exit clearance procedure. Once the COR has been notified that a Contractor employee is leaving the contract, the COR will initiate the exit clearance process in the DOIAccess System and forward to the Contractor the necessary instructions and form required to be completed prior to the contractor's employee’s departure. This form must be completed by the Contractor's employee and signed by both the Contractor's employee and the COR and then forwarded to the bureau/office specific program responsible for employee, volunteer, and contractor departures.

(m) Personnel Removal, Government Request - The Government retains the right to direct the Contractor to remove any prime or subcontractor personnel, regardless of prior clearance or background investigation adjudication status, whose actions, while assigned to this contract, clearly conflict with the security interests of the Government. The justification for the Government’s direction to remove Contractor personnel will be documented and provided to the Contractor by the CO.

(n) Subcontract Inclusion - The requirements of this clause must be incorporated into any subcontract if the subcontractor’s employee must have access to Bureau facilities.

(End of clause)

FIRE REQUIREMENTS PROCEDURES OUTLINE

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

BLM Lakeview District Office Page 21 of 62

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.

Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:

• Fire tools must be on site;

• Fire extinguisher must be in all vehicles;

• Chainsaws must have a .023-inch mesh screen installed in the exhaust;

• Only unmodified saws are to be used in the forest;

• Approved spark arresters must be on all internal combustion engines;

• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;

• No smoking is permitted while working or traveling through any operations area in the forest;

• No use of explosives is permitted unless approved by the State Forester's representative;

• Permits to burn are required unless waived by a representative of the State Forester.

• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).

Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.

2. FIRE PRECAUTION LEVELS

There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.

It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.

Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after…