Sol_140L2621R0010.pdf

PDF 373 KB Posted

Attached to
2021 TWIN FALLS FUELS HERBICIDE APPLICATIONS
Solicitation number
140L2621R0010
Issued by

About this file

This is a solicitation for herbicide application services. The Bureau of Land Management seeks a contractor to apply herbicides across approximately 34,824 acres in Twin Falls, Idaho between September 8 and October 1, 2021. Applications will include imazapic, aminopyralid, and adjuvant. Rates vary by location from 6 to 8 ounces of imazapic per acre and 5 ounces of aminopyralid for one location. The contractor must provide qualified applicators with Idaho licenses, GPS navigation with sub-meter accuracy, and documentation of applications. The response due date is July 21, 2021. The contractor will be responsible for purchasing herbicides and returning any unused chemicals. The contract is set-aside for small businesses and includes standard terms for safety, restoration, historic preservation, and prevailing wages.

View the file

Other files

File Type Posted
2021_Twin_Falls_Fuels_Herbicide_Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

LDA

BOISE ID 83709

1387 S. VINNELL WAY

BLM ID STATE OFC HR&ADMN (ID953)

0004276370 CODE 16. ADMINISTERED BYCODE

X

X

X

115112

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED ORLDA

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

07/21/2021 1000 MD

07/07/2021

(208) 373-3910Patricia Fort (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140L2621R0010

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 54 0040528289OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

SHOSHONE ID 83352-1522

400 W F ST.

BLM-ID SHOSHONE FIELD OFFICE (Twin

15. DELIVER TO

BOISE ID 83709

1387 S. VINNELL WAY

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$8.00

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

BLM ID-STATE OFC HR&ADM SVC (ID953)

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 10/01/2021 Period of Performance: 09/08/2021 to 10/01/2021

00010 2021 TWIN FALLS FUELS HERBICIDE APPLICATIONS

Product/Service Code: F105 Product/Service Description: ENVIRONMENTAL

SYSTEMS PROTECTION- PESTICIDES SUPPORT

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Patricia Fort

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

54 2 of

SOLICITATION NO: 140L2621R0010

TITLE: 2021 Twin Falls Herbicide Applications Page 3

INFORMATION TO PROSPECTIVE QUOTERS

This is a combined Synopsis/Solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. Firm, fixed-price quotes are requested under Request for Quotation (RFQ) Solicitation number 140L2621R0010. This document incorporates provisions and clauses which are in effect through Federal Acquisition Regulations 2021-05. This solicitation is set-aside for small business under North American Industry Classification System (NAICS) code 115112. The Small Business Annual Receipts for the preceding three (3) fiscal years does not exceed $8.0 Million.

No Site Visit will be held.

Due Date: Wednesday, July 21, 2021, at 10:00 am MDT. Quotes will be accepted via Email at pfort@blm.gov.

Offerors must be registered and active in the System for Award Management (SAM) database found at https://www.sam.gov.

In accordance with this Solicitation Section 4 - Solicitation Provisions

See FAR 52.212-2 Evaluation - Commercial Items

The overall proposal shall consist of a completed Standard Form 1449, completed Bid Schedule, and a detailed work plan that demonstrates the capability to meet the technical aptitude of the Statement of work.

To expedite the handling of your quotation, please check the following items:

❏ Is the unit price legible?

❏ Is the extended price correct?

❏ Have you initialed any changes or erasures?

SUBMIT ONLY REQUESTED ITEMS NOT THE ENTIRE SOLICITATION

mailto:pfort@blm.gov https://www.sam.gov/

TITLE: 2021 Twin Falls Herbicide Applications Page 4

TABLE OF CONTENTS

Section 1: Solicitation/Contract Form See Standard Form 1449

Section 2: Contract Clauses 19

Section 3: List of Documents, Exhibits, and Other Attachments 32

Section 4: Solicitation Provisions 37

TITLE: 2021 Twin Falls Herbicide Applications Page 5

SECTION 1: BID SCHEDULE

Offerors are to complete Block 17a and blocks 30 - 31 of the SF-1449.

2021 TWIN FALLS FUELS HERBICIDE APPLICATIONS

Line Item Number Description

Estimated Quantity

Unit of Issue Unit Price Total Cost

001A Wildhorse Fuel Break Herbicide Application 6,369 Acre $ $

002A Upper Rim Herbicide Application 979 Acre $ $ 003A Dog Creek Herbicide Application 1,564 Acre $ $ 004A Spud Herbicide Application 3,428 Acre $ $ 005A Laidlaw Herbicide Application 1,243 Acre $ $ 006A Berger Herbicide Application 970 Acre $ $ 007A Straw Stack Herbicide Application 1,116 Acre $ $ 008A Winter Camp 3 & 4 Herbicide

Application 7,577 Acre $ $ 009A Horse Butte South Herbicide

Application 5,007 Acre $ $ 010A Bruneau Wilderness Herbicide

Application 3,467 Acre $ $ 011A Jarbidge Fuel Break Herbicide

Application 3,104 Acre $ $ 012A Herbicide Imazapic 1,981 Gallons $ $ 013A Herbicide Aminopyralid 250 Gallons $ $ 014A Adjuvant 262.5 Gallons $ $

2021 TWIN FALLS FUELS HERBICIDE APPLICATIONS - TOTAL $

NOTE: THIS SOLICITATION IS “ALL OR NONE”

Herbicide Application Total Estimated Acres: 34,824 Estimated Start Date: 09/08/2021 Performance Time: 11 days of actual spraying The allowed performance time is to ensure pre-emergent herbicides are applied before fall germination of annual grasses.

Line items 001A for application, 6,369 acres, will be at a rate of;

8 ounces/acre of imazapic and 5 ounces/acre of aminopyralid. Diluent (water) will be at the three (3) gallon rate.

Line item 002A, 005A, 006A, 007A, 009A, 010A, and 011A for application, 15,886 acres, will be at a rate of;

8 ounces/acre of imazapic. Diluent (water) will be at the three (3) gallon rate.

Line items 003A, 004A, and 008A for applications, 12,569 acres, will be at a rate of;

6 ounces/acre of imazapic. Diluent (water) will be at the three (3) gallon rate.

TITLE: 2021 Twin Falls Herbicide Applications Page 6

Adjuvant will need to be added at a rate of 32 ounces for every 100 gallons of diluent (water).

If not all herbicide or adjuvant is applied, the unused herbicide and adjuvant will be returned to the

Government.

Estimated Start Date is dependent upon weather and fire conditions during this time period. The application maybe later than the projected start date listed.

Contractor shall be required to start work within three days after being notified by the Contracting Officer Representative.

TITLE: 2021 Twin Falls Herbicide Applications Page 7

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

DETAILED SPECIFICATIONS - 2021 TWIN FALLS FUELS HERBICIDE APPLICATIONS

1. Approximate Total Acreage: 34,824 acres

2. Location of Work Sites as shown on Work Location Maps

Item # 001A Wildhorse Fuel Break Herbicide Application - 6,369 acres Project is located approximately 5 to 12 miles east and southeast of Richfield, Idaho, in Lincoln County.

The project includes BLM land. Elevation varies from a low of 4,600 feet to a high of 5,050 feet.

8 ounces of imazapic per acre and 5 ounces aminopyralid per acre.

Item # 002A Upper Rim Herbicide Application - 979 acres Project is located approximately 3 to 6 miles northeast of King Hill, Idaho, in Elmore County. The project includes BLM land. Elevation varies from a low of 3,150 feet to a high of 3,700 feet.

8 ounces of imazapic per acre.

Item # 003A Dog Creek Herbicide Application - 1,564 acres Project is located approximately 8 to 11 miles north of Gooding, Idaho, in Gooding County. The project includes BLM land. Elevation varies from a low of 4,050 feet to a high of 4,400 feet.

6 ounces of imazapic per acre.

Item # 004A Spud Herbicide Application - 3,428 acres Project is located approximately 8 to 13 miles southeast of Carey, Idaho, in Blaine and Lincoln Counties.

The project includes BLM land. Elevation varies from a low of 4,600 feet to a high of 4,850 feet.

6 ounces of imazapic per acre.

Item # 005A Laidlaw Herbicide Application - 1,243 acres Project is located approximately 20 to 22 miles southeast of Carey, Idaho, in Minidoka County. The project includes BLM land. Elevation varies from a low of 4,500 feet to a high of 4,600 feet.

8 ounces of imazapic per acre.

Item # 006A Berger Herbicide Application - 970 acres Project is located approximately 9 to 13 miles west/southwest of Filer, Idaho, in Twin Falls County. The project includes BLM land. Elevation varies from 4,150 feet to 4,350 feet.

8 ounces of imazapic per acre.

Item # 007A Straw Stack Herbicide Application - 1,116 acres Project is located approximately 10 to 12 miles west of Castleford, Idaho, in Owyhee County Idaho. The project includes BLM land. Elevation varies from 4,000 feet to 4,400 feet.

8 ounces of imazapic per acre.

Item # 008A Winter Camp 3&4 Herbicide Application - 7,577 acres Project is located approximately 20 to 24 miles southwest of Castleford, Idaho, in Owyhee County. The project includes BLM and Idaho State lands. Elevation varies from 4,750 feet to 5,050 feet.

6 ounces of imazapic per acre.

TITLE: 2021 Twin Falls Herbicide Applications Page 8

Item # 009A Horse Butte South Herbicide Application - 5,007 acres Project is located approximately 29 to 34 miles southwest of Castleford, Idaho, in Owyhee County. The project includes BLM and Idaho State lands. Elevation varies from 4,800 feet to 5,000 feet.

8 ounces of imazapic per acre.

Item # 010A Bruneau Wilderness Herbicide Application - 3,467 acres Project is located approximately 12 to 17 miles northwest of Murphy Hot Springs, Idaho, in Owyhee, County. The project includes BLM and Idaho State lands. Elevation varies from 5,000 feet to 5,350 feet.

8 ounces of imazapic per acre.

Item # 011A Jarbidge Fuel Breaks Herbicide Application - 3,104 acres Project is located approximately 12 to 29 miles southwest and south of Glenns Ferry, Idaho, in Elmore and Owyhee Counties. The project includes BLM and state land. Average elevation varies from 2,850 feet to 4,000 feet.

8 ounces of imazapic per acre.

3. Requirements of Equipment to be supplied by the Contractor: Sufficient to meet specifications of the contract.

4. Loading Facilities: Use of any loading area, federal, state or private land, shall be arranged by and at the discretion and risk of the contractor.

5. Work Crew Requirements: Work crew for handling and mixing of herbicide and loading equipment shall be furnished by the contractor.

6. Herbicides and Adjuvant to be Furnished by the Contractor: The contractor shall be responsible for purchasing, securing, and providing the herbicide and adjuvant for this contract. The herbicides are imazapic and aminopyralid. A paid invoice showing purchase price of the herbicide and adjuvant from a vendor shall be provided to the Government to guarantee proof of purchase. Government will pay the contractor for herbicides and adjuvant once a contractor’s invoice is provided to the Government.

7. Kind of Herbicides and Adjuvant Requested:

Imazapic - Panoramic 2SL by Alligare, LLC in 1.0 gallon containers or Plateau® by BASF in 1.0 gallon containers or Imazapic 2SL by Nufarm in 1.0 gallon containers and Aminopyralid - Milestone® by Dow AgriSciences in 2.5 gallon containers or Milestone® by Corteva in 2.5 gallon containers and

Adjuvant - Alligare 90 by Alligare, LLC in 2.5 gallon containers or Activator 90 by Loveland Products in 2.5 gallon containers or Ad Spray 90 by Helena Herbicide Company in 2.5 gallon containers

The herbicides and adjuvants are on the Bureau of Land Management’s approved herbicide and adjuvant lists. The herbicides are rangeland approved.

8. Return Location to Government of any Unused Herbicide and Adjuvant: Shoshone Field Office Warehouse, 400 West F Street, Shoshone, Idaho. Contact Tony Owens at (208) 732-7208 or (208) 308- 3968 prior to returning herbicide.

TITLE: 2021 Twin Falls Herbicide Applications Page 9

9. Rate of Application: 6 to 8 ounces of imazapic per acre (see line items above) 5 ounces of aminopyralid per acre (see line items above) 32 ounces of adjuvant per 100 gallons of diluent (water) 3 gallons of diluent (water)

10. Remarks and Other Requirements: The timing of the treatment will need to be kept flexible in order to maximize the effects of the herbicide. Apply the spray solution in properly maintained and calibrated equipment capable of delivering the desired volume. Controlling drift is the responsibility of the applicator. Contractor shall be required to start work within three days after being notified by the Contracting Officer Representative.

11. Performance Time Allowed:

All Line Items - 11 Days of Actual Spraying The allowed performance time is to ensure pre-emergent herbicides are applied before fall germination of annual grasses.

12. Applicators: The Offeror shall include, for all of the contractor’s applicators, a current Idaho Professional Applicator License in the Agricultural Pesticide Category. The Government may inspect each applicator for their current Idaho Professional Applicator’s License in the Agricultural Pesticide Category before work on this contract.

13. Special Restrictions: A section of the Jarbidge Fuel Break herbicide application is within the United States Air Force’s Saylor Creek Training Range Restricted Area. The area is restricted and must be accessed with the permission of the Air Force. The contractor shall be responsible for contacting the Air Force, prior to beginning the contract, to make arrangements for operational access into the restricted areas. This restriction may limit the hours of application due to closure of the areas at certain times of the day and/or week.

TITLE: 2021 Twin Falls Herbicide Applications Page 10

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

HERBICIDE SPRAYING

1.0 GENERAL

1.1 The purpose of this contract is to secure services for herbicide spraying and the herbicides and adjuvant to be applied. Contractor shall provide information on the amount of equipment and personnel available, to show their ability to complete the contract in the amount of time allowed. Contractor shall furnish herbicide(s) and adjuvant (see detailed instructions item # 7, Kind of Herbicides and Adjuvant Requested). The contractor shall supply all labor, equipment, tools, diluent (water), materials, supervision, supplies, and incidentals; and perform all work necessary to complete applications, in accordance with these specifications, the Detailed Specifications in this contract, and the herbicide label(s). If not all herbicide or adjuvant is applied, the unused herbicide and adjuvant are the property of the Government.

1.2 Contractor shall plan accordingly for labor, equipment, tools, materials, diluent (water), supervision, supplies, and incidentals; and perform all work necessary to complete the application.

1.3 The contractor shall stop operation if inclement weather conditions (wind or rain) occur during the spraying operation. (See Section 5.0 Execution of Work) as specified per label.

1.4 Applicator Logs

A. The contractor shall maintain a daily written log.

B. This log or record shall be signed by the applicator operator and turned into the Project Inspector upon completion of the contract.

1.5 The Government will pay for treatment spraying by the acre upon submission of proper invoices, after acreage is determined to have been sprayed by using the computer generated shape file from a GPS Differential Guidance System, and a flow control report is given to the Government for verification the correct diluent (water) rate was applied.

1.6 The contractor shall conduct herbicide spraying procedures safely and in accordance with the herbicide label restrictions of the herbicide and the herbicide application restrictions of the State of Idaho. (See Section 7.0 - Safety).

1.7 The contractor shall follow Environmental Protection Agency (EPA) guidelines for application of herbicides.

1.8 The contractor shall strictly adhere to the herbicide label instructions.

1.9 The Government will have the option to inspect the contractor's equipment and work before, during, and after completion of this contract.

2.0 LOCATIONS

2.1 The Government will provide work location maps for the sites that are to be treated with herbicide.

TITLE: 2021 Twin Falls Herbicide Applications Page 11

2.2 Work sites may be marked by the Government with flagging. However, the entire boundary of the work site will not be marked.

2.3 The Government will provide GPS perimeter data of the boundaries of all sites that are to be treated with herbicides.

3.0 HERBICIDES and ADJUVANTS

3.1 Herbicide

A. The contractor shall supply herbicides required to complete the specifications of this contract.

B. Herbicide application rates for targeted species are listed in the detailed instructions. The contractor shall adhere to the application rate the Government has determined for each site. The rate will be within the herbicide label’s rate.

3.2 Adjuvants

A. The contractor shall supply and use adjuvant required to complete the specifications of this contract.

B. Drift agents may be used. If a drift control additive is used, read and carefully observe the cautionary statements and all other information appearing on the additive label. The contractor shall provide the drift agent. Controlling drift is the responsibility of the contractor.

C. Dye shall not be used for marking sprayed areas.

D. All drift agents shall be handled as specified in Section 7.0 - Safety.

E. No additional payment will be made to the contractor for the use of contractor furnished drift agents. These expenses shall be included in the unit price bid per acre for herbicide spraying.

4.0 EQUIPMENT and PERSONNEL

4.1 General - The contractor shall spray designated areas in conformance with these specifications, the Detailed Specifications, and the herbicide label. Unless otherwise specified, the contractor shall furnish herbicides, adjuvants, equipment, labor, supplies, and materials required to complete the schedule. The contractor shall furnish proper equipment with applicators experienced in applying herbicides in rough featureless terrain. The contractor shall service and repair their equipment as necessary to maintain satisfactory progress on work. Contractor shall be responsible for all costs incidental to equipment move-in and move-out associated with the project.

4.2 Equipment

A. The contractor shall furnish sufficient equipment to satisfactorily spray the designated areas in the time specified as required in the Detailed Specifications. Equipment shall be capable of traveling at adequate speed to give proper control and distribution of herbicide. Equipment shall have communications with the Government. Contractor furnished radio(s) shall be provided to the Project Inspector(s) or Contracting Officer’s Representative (COR). Contract will not commence until radio communication is established.

TITLE: 2021 Twin Falls Herbicide Applications Page 12

B. Base of Operations - The contractor shall provide such loading facilities as may be required for competent performance of contract. Use of any loading area shall be arranged by and at the discretion and risk of the contractor, and the Government will not be held responsible for any loss, mishap, or accident due to conditions of any loading facility used. Any applicable fees for loading facilities are the responsibility of the contractor. If the contractor wishes to use BLM land, this must be approved in advance by the Contracting Officers Representative (COR) or Project Inspector. The BLM may require the contractor to provide appropriate warning signs for traffic if BLM roads are used as loading sites.

C. Dust Abatement - Any material used for dust abatement, other than water, will be approved by the COR prior to use.

D. Flight Hazards - If contractor’s aircraft(s) is/are utilized, hazards such as the presence of power lines or anemometer towers on the work site are the responsibility of the contractor to identify.

All appropriate precautions shall be taken by the contractor. Flight hazards which have been identified by the Government in the Detailed Specifications or Work Location Maps may not be the only hazards present at the work sites and it is the contractor's responsibility to check all work sites for flight or other hazards. There are known power lines on some of the project’s sites.

4.3 Spray Equipment

A. Spray tanks, nozzles and boom length shall follow herbicide label requirements.

4.4 Personnel

A. Applicators - See detailed instructions item # 12 Applicators

B. Work Crew - Shall be furnished by the contractor for handling and mixing the herbicide and loading the equipment. Mixers and Loaders shall hold a Mixer/Loader certification of training.

The contractor shall furnish qualified mechanic(s) for maintenance and repairs of equipment necessary to complete awarded schedule(s) within required time frames.

4.5 Differentially Corrected Global Positioning System (DGPS)

A. Requirement - contractor shall be required to utilize a Differentially Corrected Global Positioning System (DGPS) for electronic navigation. System must be capable of utilizing ArcMap or ARC- INFO shape files created by the Government and given to the contractor on a Universal Serial Bus (USB) thumb drive or by email.

(a) Ground flaggers and an auto-flagger system (if aircraft is utilized) can supplement the DGPS system, but not substitute for it.

(b) Differentially Corrected Global Positioning System (DGPS)

Navigation - DGPS is required for tracking, and data collection. The contractor shall provide all guidance equipment, materials, computers, printers, personnel, and services required for the system to be used. The system shall be sufficiently sensitive to provide immediate deviation indications (real-time).

The DGPS system must be capable of determining a differentially corrected location with an error of no more than two meters in the horizontal plane. The guidance system shall be capable of updating current position at a rate of a minimum of one time per second. Differential correction must cover the complete operational area.

TITLE: 2021 Twin Falls Herbicide Applications Page 13

During operation, differentially corrected signal must be accurately recorded at least 90% of the operational time.

Differential correction may be, provided by a portable differential station, FM radio fixed towers, or satellite.

Software provided with DGPS must be designed for parallel offset in increments equal to the assigned swath width of the application equipment.

Equipment Requirements

Software: Software provided with DGPS must be designed for parallel offset in increments equal to the assigned swath width of the application equipment.

Project Log: Must be capable of a minimum rate of one-second logging intervals. Full record includes position, time altitude, speed, track, application system on/off, job name/number, and differential correction status. The computer program must be capable of calculating and show total acres treated during application and also capable of downloading to a computer for analysis and review. The project log must show and differentiate between spray-on and spray-off when viewed on a computer monitor or printer. Export files of each project log shall be provided and must be compatible with ArcMap or ARC-INFO GIS system on a USB Thumb Drive. The contractor shall provide software that is compatible and which will enable the files to convert into viewable files for ArcMap or ARC-INFO GIS.

The contractor shall, upon request by the COR or Project Inspector, be able to supply project log data on a USB Thumb Drive for review at any time during the contract. The Contract will not be considered complete until the data has been reviewed and deemed complete with no skips in the treated areas. The contractor shall email a map with project log data at the end of each day’s application to the COR.

The DGPS system must be capable of zooming in on any portion of the treatment to view a specific area with greater detail.

Hardware

Visual Display Monitor and Control Keypad: (1) capable of displaying swath width over project path: (2) mounted in a location that will allow the applicator to view the screen; (3) have a method to display nested polygons to indicate sensitive or no-spray areas within or adjacent to treatment blocks: (4) have a feature that allows the applicator to return to the exact location of application shutdown and complete application without omitted or doubled treated areas: (5) be able to input reference waypoints (A-B line): (6) have a feature which alerts applicator when they are about to enter or exit a specific treatment block or an exclusion area within a block.

Course Deviation Indicator (CDI): The course deviation indicator or course deviation light must have the capability to display both cross-track error and intercept angle to desired heading. Cross-track error shall be adjustable down to (1) foot.

Memory

Must be capable of storing up to 8 hours of continuous project log data.

TITLE: 2021 Twin Falls Herbicide Applications Page 14

5.0 EXECUTION OF WORK

5.1 Pre-Work Conference - Prior to commencement of work, a meeting may be requested by the Contracting Officer to be attended by the contractor, the Contracting Officer's Representative (COR), and the Project Inspector(s). The meeting will be held at the Shoshone Field Office at a time mutually agreeable to the contractor and the Contracting Officer to discuss the work schedule and to familiarize both parties with the responsibilities of each under this contract. At this time a work schedule showing dates, locations, equipment and employees working on this project shall be provided by the contractor to the Contracting Officer or delegated COR.

5.2 Priority of Work - Priority of the line items for each schedule will be determined prior to application start by the Government.

5.3 Environmental Conditions

A. Work Period - Spraying Operations will be permitted only during daylight hours. The contractor shall have personnel on project site prior to commencing daily application and during application.

Contractor shall notify COR or Project Inspector of changing weather conditions prior to commencing and during applications. The COR or Project Inspector will allow contractor to continue or stop application as weather factors dictate. The COR or Project Inspector will give permission to start, approximately one (1) hour from notification of conditions, depending on the location of project from the nearest Field Office of the COR or Project Inspector(s). Because of possible adverse weather conditions in Southern Idaho during the period of performance of this contract, the contractor will be allowed to work seven days per week including Saturdays and Sundays.

B. Wind - The contractor shall follow the herbicide label section on Spray Drift Management - Wind. The contractor’s applicator(s) should be familiar with local wind patterns and how those wind patterns could affect herbicide drift.

C. Relative Humidity - Refer to the herbicide label when making applications in low relative humidity conditions.

D. Site Conditions - No herbicide applications will be allowed if conditions do not meet the herbicide label requirements.

5.4 Spraying

A. Coverage - The entire surface within the designated boundaries of the project area shall receive uniform coverage with the herbicide except for areas excluded by the Government. Areas excluded from the spraying operation within the designated boundaries will not be included in the acreage computed for payment. Any areas not covered by contractor shall be reapplied or compensated by suitable contract adjustment, at the option of and at no additional cost to the Government. (See Section 5.6 Field Quality Control and Section 5.9 Completion of Contract)

B. Rate of Spraying - Herbicide shall be applied at the application rate per acre according to Section C Detailed Specifications (these will be within herbicide label rates). The diluent (water) for the herbicide will follow the herbicide label limits for ground or aerial application. The diluent (water) must be clean and free of dirt particles. Any surface water will not be considered clean.

Contractor shall be required to demonstrate that they can provide adequate and uniform coverage.

Spray formulation shall be thoroughly mixed according to the herbicide label.

TITLE: 2021 Twin Falls Herbicide Applications Page 15

C. Application Paths - Shall be patterned to secure a uniform distribution of herbicide. Contractor shall insure straight and/or regular paths of application. The contractor shall keep spray applications within the perimeter of the Government provided shape file. Irregular paths or areas sprayed outside of the perimeter will result in immediate stoppage of work. Corrective action shall be taken immediately by the contractor to insure evenly spaced, straight, and/or regular application paths and complete coverage of application areas. Contractor should avoid overlapping and stripping.

D. Swath Width - Effective swath width shall not exceed the maximum for adequate coverage of supplied spraying equipment.

E. Application Height - Spray boom shall be set at a height to obtain proper distribution and uniform coverage of herbicide on target species. Contractor shall follow herbicide label instructions on Spray Drift Management to obtain proper boom height.

F. Spray Drift Management - The interaction of many equipment and weather related factors determines the potential for spray drift. The contractor is responsible for considering all these factors when making application decisions. Avoiding spray drift is the responsibility of the contractor.

5.5 Sprayer Clean Up - Shall be conducted according to the herbicide label instructions. Avoiding contamination of the work site is the responsibility of the contractor.

5.6 Field Quality Control

A. Tests for Uniformity - The Government representative may make tests to determine uniformity of herbicide application. Randomly spaced water sensitive cards or equivalent will be utilized.

5.7 Work Stoppages - The Government reserves the right to stop spraying operations at any time when conditions are considered sufficiently unfavorable. Stoppage shall continue until spraying operations are authorized by the Government. Any time work is suspended by the Government because of unsuitable spraying conditions, the day(s) will not be counted against the contract completion time. However, no monetary compensation will be given to the contractor by reason of such work suspension. Contractor agrees to work diligently to complete the spraying application. Partial days in which any amount of spraying was accomplished may be counted as full days of performance time if the Government deems contractor is not being diligent in completing the contract.

5.8 Termination for Convenience of the Government - The Contracting Officer may, by written notice to the contractor, terminate this contract, in whole or in part, when it is in the best interest of the Government.

To the extent that this contract is so terminated, the Government will be liable only for payment in accordance with the payment provisions of this contract for work satisfactorily completed prior to the effective date of termination.

5.9 Completion of Contract - The Contract will be considered completed and payment due when all areas furnished to the contractor by the Government have been sprayed to the standards specified above.

Test(s) for uniformity may be made at the time of spraying. The Government will pay for herbicide spraying by the acre upon submission of proper invoices, after acreage is determined to have been sprayed by using the computer generated shape file from a GPS Differential Guidance System, and a flow control report is given to the Government for verification of the correct diluent (water) rate was applied.

TITLE: 2021 Twin Falls Herbicide Applications Page 16

The contractor shall also provide a copy of their Herbicide Application Record for each day’s and project area’s application(s) of herbicide. An application record is required by the State of Idaho for any application by a licensed applicator.

5.10 Risk Damages - The contractor shall assume all risks in connection with performance of the contract and shall be liable for and save Government harmless on account of any damages to persons or property in connection with the prosecution of the work, including the applicator(s) or other employees of the contractor.

6.0 MEASUREMENT and PAYMENT

6.1 Method of Measurement

A. Units - Application of herbicide solution will be measured and paid for by the number of acres sprayed to the nearest whole acre.

B. Measurement - Measurement for payment for spraying will be the actual area, in acres, within the designated boundaries satisfactorily sprayed in conformance with these specifications. Measurement will be made from either physical surveys of the areas or a computer generated shape file created in a GPS Differential Guidance System at the option of the Government. The shape file will be used in ArcMap for final acreage measurement. Acreages will be computed from horizontal distances as shown on maps at the option of the Government.

6.2 Basis of Payment

A. Payment - Payment will be made at the unit price per acre and gallons specified in the Bid Schedule which is made a part hereof and shall include the cost of all work described in this paragraph and the Detailed Specifications, including any respraying, if such work is required.

7.0 SAFETY

7.1 Transportation of Herbicides and Adjuvants - The contractor shall be responsible for the transport of herbicides and adjuvants used to fulfill the specifications of this contract to the contractor’s loading site.

The contractor shall secure herbicide and adjuvant containers in mixing area to prevent spillage. The contractor shall load and transport herbicide and adjuvant from the pickup point to the work sites and shall be responsible for its protection from loss or damage due to weather, rodents, insects, theft, or any other hazard. Any herbicide or adjuvant damaged or lost while in the custody of the contractor shall be replaced by the contractor and actual cost to the Government for replacement will be deducted from payments due the contractor. All unused herbicide and adjuvant shall be returned to the Government (see detailed instructions item # 8, Return Location to Government of any Unused Herbicide and Adjuvant), by the contractor upon completion of work or termination of the contract.

7.2 Protective Clothing and Equipment - The contractor shall supply protective clothing and equipment to contract workers that guarantee minimal exposure throughout the herbicide application process. The contractor shall follow requirements on protective clothing and equipment which appears on the herbicide and adjuvant labels and/or Safety Data Sheets.

7.3 Storage of Herbicides and Adjuvants - The contractor shall be responsible for the storage of all herbicide and adjuvants.

TITLE: 2021 Twin Falls Herbicide Applications Page 17

7.4 Mixing and Application of Herbicides and Adjuvants

A. The contractor shall mix herbicides and adjuvants in accordance with the proportions listed on the herbicide labels.

B. By law, the application of an herbicide, either directly or through drift, must not expose workers or other people. The contractor may need to perform a reconnaissance of a spray unit to ensure no people are present in the unit, prior to commencing spray operations. The contractor shall be very aware and cautious of any environmental hazard present during herbicide application. Upon completion of herbicide application, the contractor shall thoroughly clean equipment and dispose of waters, residues, rinses, and unused herbicides only according to EPA and Idaho State regulations. All empty herbicide and adjuvant containers shall be triple rinsed and punctured by the contractor after mixing. The contractor shall be responsible for proper disposal of the empty boxes, labels, and lids. The contractor shall be responsible for the proper disposal or recycling of the empty containers.

7.5 Spills and Accidents - The contractor shall be responsible if accidents and/or spills occur. The contractor shall immediately report accidents and/or spills to the BLM authorized officers and appropriate local authorities. The contractor shall provide immediate treatment of contaminated or injured persons and seek professional medical attention when necessary. The contractor shall control spills quickly and shall secure additional help when the contractor cannot effectively or safely handle the spill cleanup. Spills will be the responsibility of the contractor and shall be cleaned up to the satisfaction of the local authorities.

8.0 GLOSSARY

ADJUVANT: An inert material added to an herbicide formulation or tank mix to increase the effectiveness of the active ingredient.

DILUENT: A liquid used to dilute so that it can easily flow, water for this application.

DRIFT: The movement of airborne particles by air motion or wind away from the intended target area.

HERBICIDE: A substance that is toxic to plants and is used to control unwanted vegetation.

LABEL: All written, printed or graphic matter on or attached to pesticide containers as required by law.

RATE: The amount of active ingredient or acid equivalent applied per unit area or other treatment unit.

TITLE: 2021 Twin Falls Herbicide Applications Page 18

SECTION 2 - CONTRACT CLAUSES

1. 52.252-2 Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far#

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Jun 2020)

52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.212-4 Contract Terms and Conditions - Commercial Items (Oct 2018) 52.215-8 Order of Precedence-Uniform Contract Format (Oct 1997) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

(Sept 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Alt I) (Jul 1995) 52.223-6 Drug-Free Workplace (May 2001) 52.232-23 Assignment of Claims (May 2014) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.242-15 Stop-Work Order (Aug 1989)

2. 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Jan 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.] XX (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509)).

https://www.acquisition.gov/browse/index/far#

TITLE: 2021 Twin Falls Herbicide Applications Page 19

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUNE 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.

109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (PUB. L. 111-117, section 743

OF DIV. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (PUB. L. 111-117, section 743 OF DIV. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41U.S.C. 2313).

__ (10) [Reserved].

__ (11)(i)52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).

__ (ii) Alternate I (MAR 2020) of 52.219-3.

__ (12)(i)52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (MAR 2020) of 52.219-4.

__ (13) [Reserved] XX (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) of 52.219-6. (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-6.

__ (iii) Alternate II (NOV 2011).

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (iii) Alternate II (MAR 2004) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv) Alternate III (JUN 2020) of 52.219-9.

__ (v) Alternate IV (JUN 2020) of 52.219-9.

__ (18)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (MAR 2020) of 52.219-13.

__ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).

XX (22)(i) 52.219-28, Post Award Small Business Program Rerepresentation (NOV 2020) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.219-28.

__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (MAR 2020) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).

__ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

__ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

XX (27) 52.222-3, Convict Labor (JUNE 2003) (E.O. 11755).

__ (28) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2020) (E.O. 13126) XX (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

XX (30) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

TITLE: 2021 Twin Falls Herbicide Applications Page 20

__ (ii) Alternate I (FEB 1999) of 52.222-26.

XX (31) 52.222-35, Equal Opportunity for Veterans (JUN 2020)(38 U.S.C. 4212).

__ (ii) Alternate I (JULY 2014) of 52.222-35.

XX (32) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

__ (ii) Alternate I (JULY 2014) of 52.222-36 XX (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

__ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.13496).

XX (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (MAR 2015) of 52.222-50 (22U.S.C. chapter 78 and E.O. 13627).

XX (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (37)(i)52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

__ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016) (E.O. 13693).

__ (40)(i)52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (OCT 2015) of 52.223-13.

__ (41)(i)52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (JUN 2014) of 52.223-14.

__ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

__ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (JUN 2014) of 52.223-16.

XX (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

13513).

__ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

__ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

__ (47) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a) __ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (48) 52.225-1, Buy American—Supplies (JAN 2021) (41 U.S.C. chapter 83).

__ (49)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (JAN 2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108- 77, 108-78, 108-286, 108-302, 109-53, 109-169, 109- 283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (JAN 2021) of 52.225-3.

__ (iii) Alternate II (JAN 2021) of 52.225-3.

__ (iv) Alternate III (JAN 2021) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

XX (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

TITLE: 2021 Twin Falls Herbicide Applications Page 21

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.5150).

__ (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

__ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (57) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

XX (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C. 3332).

__ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management

(JUL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .