Sol_140G0223Q0114.pdf

PDF 2 MB Posted

Attached to
UMESC CCTV - INSPECTION, PM & UPGRADES Federal contract opportunity
Solicitation number
140G0223Q0114
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to UMESC CCTV - INSPECTION, PM & UPGRADES, newest first.
File Type Posted
Sol_140G0223Q0114_Amd_0002.pdf PDF
Sol_140G0223Q0114_Amd_0001.pdf PDF
Capture2_0001.PNG PNG image
Exhibit_A__CCTV_Plan_R_0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140G0223Q0114

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

05/15/2023 0040619454

1 65

PO BOX 25046

204 DENVER FEDERAL CENTER

DENVER CO 80225-0046

USGS OAG DENVER ACQUISITION BRANCH

USGS Upper Midwest Environ Sci Ctr

2630 Fanta Reed Road

LaCrosse

WI 54603

573 397-2277Mary Wilson

05/30/2023 1700 ED

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

1) This Synopsis/Solicitation Notice is to announce the U.S. Department of Interior (DOI), U.S. Geological Survey has a requirement for

INSPECTION, PREVENTATIVE MAINTENANCE, UPGRADE AND

REPAIR SERVICES OF AN EXISTING CLOSED-CIRCUIT

VIDEO SYSTEM in accordance with the attached solicitation.

2) The synopsis/solicitation number is 140G0223Q0114 and is being issued as a Request for Quote (RFQ).

3) The award for this requirement shall be made using the policies in the Federal Acquisition Regulations (FAR) Part 12, Acquisition of Commerical Items, and in conjunction with the Continued ...

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 65

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140G0223Q0114 policies and procedures for solicitation, evaluation, and award prescribed in FAR 13.5

Simplified Procedures for Certain Commerical

Items, as appropriate for this acquisition. Award shall be made to the vendor whose quote, conforming to this RFQ is determined to be the most advantageous to the government.

4) This solicitation is a SET ASIDE for Small

Businesses. The associated NAICS 561621 -

Security Systems Services (except Locksmiths)

5) A copy of this solicitation may be accessed by clicking "Attachments/Links"

6) All requirements for preparation, submission, and receipt of quotes are contained in this solicitation and shall be adhered to.

7) All questions and quote must be emailed to the

Contracting Officer, Beth Wilson at bwilson@usgs.gov

00010 BASE: 07/01/2023 - 06/30/2024

Services, non-personal, to provide all plant, equipment, labor, supervision and materials

(unless otherwise provided herein) necessary for the Inspection, Preventative Maintenance, Upgrade and Repair Services for an Existing

Closed-Circuit Video (CCV) System per the attached Statement of Work.

IT Approval Num: 0070283743

Period of Performance: 07/01/2023 to 06/30/2024

00020 Option Year One: 07/01/2024 - 06/30/2025

Services, non-personal, to provide all plant, equipment, labor, supervision and materials

(unless otherwise provided herein) necessary for the Inspection, Preventative Maintenance, Upgrade and Repair Services for an Existing

Closed-Circuit Video (CCV) System per the attached Statement of Work.

IT Approval Num: 0070283743

(Option Line Item)

Anticipated Exercise Date 04/01/2024

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 65

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140G0223Q0114

Period of Performance: 07/01/2024 to 06/30/2025

00030 Option Year Two: 07/01/2025 - 06/30/2026

Services, non-personal, to provide all plant, equipment, labor, supervision and materials

(unless otherwise provided herein) necessary for the Inspection, Preventative Maintenance, Upgrade and Repair Services for an Existing

Closed-Circuit Video (CCV) System per the attached Statement of Work.

IT Approval Num: 0070283743

(Option Line Item)

Anticipated Exercise Date 04/01/2025

Period of Performance: 07/01/2025 to 06/30/2026

00040 Option Year Three: 07/01/2026 - 06/30/2027

Services, non-personal, to provide all plant, equipment, labor, supervision and materials

(unless otherwise provided herein) necessary for the Inspection, Preventative Maintenance, Upgrade and Repair Services for an Existing

Closed-Circuit Video (CCV) System per the attached Statement of Work.

IT Approval Num: 0070283743

(Option Line Item)

Anticipated Exercise Date 04/01/2026

Period of Performance: 07/01/2026 to 06/30/2027

00050 Option Year Four: 07/01/2027 - 06/30/2028

Services, non-personal, to provide all plant, equipment, labor, supervision and materials

(unless otherwise provided herein) necessary for the Inspection, Preventative Maintenance, Upgrade and Repair Services for an Existing

Closed-Circuit Video (CCV) System per the attached Statement of Work.

IT Approval Num: 0070283743

(Option Line Item)

Anticipated Exercise Date 04/01/2027

Period of Performance: 07/01/2027 to 06/30/2028

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

CLAUSES AND PROVISIONS

STATEMENT OF WORK FOR CLOSED-CIRUIT VIDEO (CCV) SYSTEM MAINTENANCE AND

UPGRADE SERVICES

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS-COMMERCIAL ITEMS (MAR 2023)

52.217-8 – Option to Extend Services (Nov 1999) 52.217-9 – Option to Extend the Term of the Contract (Mar 2000) GS0339 Green Acquisition (JUL 2018) GS0919 Legal Holidays (JAN 2002) GS0925 Unscheduled Closures – Fixed Price (MAR 2003) GS1330 Key Personnel (JUL 2001) GS1332 Contractor's Representative (JUL 2001) GS1338 Notice to the Government of Delays (JUL 2001) GS1346 Compliance with Occupational Safety and Health Act -- Government-Owned (APR 2003) 35 GS1348 Accident Reporting (APR 2003) GS1350 Supervision of Contractor's Employees (JUL 2007) GS1363 Nonpersonal Services - Independent Contractor (JUL 2007) 36 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013) GS1131 Deobligation of Unexpended Funds

PROVISONS

52.252-2 Clauses Incorporated by Reference. (FEB 1998) 52.204-20 Predecessor of Offeror (AUG 2020) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) 52.204-26 Covered Telecommunications Equipment or Services-Representation (OCT 2020) 52.212-3 Offeror Representations and Certifications – Commercial Items (DEC 2022) 52.216-1 Type of Contract (APR 1984) 52.219-1 Small Business Program Representations (MAR 2020) 52.222-22 Previous Contracts and Compliance Reports (Feb 1999) 52.222-25 Affirmative Action Compliance (Apr 1984) 52.237-1 Site Visit (APR 1984) 52.212-2 Evaluation - Commercial Items. (NOV 2021)

QUOTATION SUBMISSION

STATEMENT OF WORK FOR CLOSED-CIRUIT VIDEO (CCV) SYSTEM MAINTENANCE

AND UPGRADE SERVICES

1. GENERAL INFORMATION

a. Introduction Inspection, Preventative Maintenance, Upgrade and Repair Services of the

Existing Closed-Circuit Video (CCV) system for the Upper Midwest Environmental Sciences Center (UMESC).

b. Background: The CCV system UMESC facility at 2630 Fanta Reed Road in La Crosse, WI supplies security video coverage of interior and exterior portions of Segment A, B, C, D wings of the main building, Building G, the exterior pond areas, the cold storage building, and the front entrance.

c. Scope: This statement of work (SOW) sets forth the requirements for the contractor to provide annual inspection, upgrades, testing and maintenance of the CCV system in the UMESC facility. During the 5-year period of performance of this contract the government may add or remove fixed cameras, network video recorder (NVR), flat panel monitor, and miscellaneous supporting equipment. Additions may be due to the construction of new buildings, facilities or equipment; removals may be due to the replacement or obsolescence of existing buildings, facilities or equipment. In the case of adding equipment, the Contractor may request an equitable adjustment to incorporate the new equipment into the Contractor’s maintenance service. Likewise, an equitable adjustment shall be due the government for equipment that no longer requires maintenance due to obsolescence or for service not performed at the request by the Government. The primary function of the CCV system is for monitoring of the facilities to protect Federal employees and to detect and deter illegal activity on Federal property.

2. WORK REQUIREMENTS

a. Request for Quotation (RFQ) package:

i. Contractor shall provide, as part of their quote, unit costs for labor and travel and representative material costs for system compatible devices (cameras, CCV server, CCV network switches, CCV server, software), and material cost per lineal foot for wire, cabling and conduit, and other system components the Contractor deems as representative as components utilized for typical repair components for the UMESC CCV system. Include manufacturer and associated part numbers with material unit pricing. Any repair work on the system that is not mentioned in this SOW will be billed based on the Contractor unit pricing as listed in this section during the Period of Performance for this Contract.

ii. Contractor shall Provide a Base quote for the services identified in this Statement of Work (SOW) for the first year of service. Contractor shall provide pricing for option years for each year of successive 4 years of service should the Government choose to exercise additional years of service with this Contractor.

iii. All system device specifications submitted by the Contractor shall meet the minimum requirements and specifications within this Statement of Work

(SOW).

b. Work Requirements: Work to include the following:

i. All equipment will meet requirements specified in the National Defense

Authorization Act. See Appendix A

ii. See Appendix B for locations of existing and proposed new CCV devices and equipment.

iii. Existing CCV System utilizes a Pelco VideoXpert Pro Power recording platform in a redundant array of independent disks (RAID) 6 configuration. Current operating version is Pelco VideoXpert VxOpsCenter v3.10.1.6, with Pelco VideoXpert VxToolbox v3.10.1.16 – software.

iv. All new equipment, firmware and software installed shall be 100% compatible with existing monitoring devices and monitoring systems.

v. The existing CCV system currently is compliant with the National Defense Authorization Act (NDAA) of 2019. All newly installed devices, software and firmware installed under this contract shall not invalidate the compliance of the system under the 2019 NDAA.

vi. Testing: All server hardware, cameras, CCV switches and wireless devices shall be fully tested annually for functionality. Minimum functional service and testing work under this Contract to include:

1. All CCV cameras shall be tested for proper operation, positioning and orientation, network connectivity, motion sensitivity and recording response to motion detection. All CCV cameras shall be verified as having connection and uptime to CCV server per manufacturers requirements and industry standards.

2. Server software shall be checked for and upgraded to manufacturer’s most current firmware and software. All control panel equipment shall be tested for proper voltages during trouble and alarm conditions.

3. CCV camera databases will be checked for proper labelling and addressing and updated accordingly.

4. Complete documentation and recommendations shall be provided for control panel equipment.

5. The contractor shall provide a proposed schedule with the initial proposal for completing the inspection, testing and maintenance in accordance with paragraphs 2.b.v. The schedule shall be approved by the UMESC Technical Liaison (TL) prior to commencement of any services. Any subsequent changes require prior approval by the TL.

ii. Contractor shall coordinate equipment and proposed work with the UMESC TL to minimize impact of work to facility operations.

iii. The Contractor shall coordinate with the UMESC TL to ensure the system(s) are tested and verified as operational per UMESC requirements, industry best practices for commercial buildings and national/local building codes.

c. Upgrades

i. See Attachment A showing locations for new cameras to be installed under this

Contract.

ii. All exterior cameras shall include fans, heaters and devices necessary to allow for camera operation from -30ºF to 122ºF in normal and low ambient light conditions, including infra-red for optimal night vision.

iii. Contractor shall utilize either interior 1800 cameras that have a viewshed of at least 100 down hallways or 900 cameras that shall have a 100-foot viewshed to meet coverage requirements.

iv. All cameras shall have sufficient resolution and video quality to allow for identification of vehicles, license plates or persons within the camera field of view. Minimum 5-megapixel (MP) camera resolution.

v. Ethernet (PoE)+ managed switches shall have at a minimum 1 Gigabit ethernet data ports with 2 Gigabit Interface Converter (GBIC) uplink ports.

vi. Contractor shall coordinate equipment and proposed work with the UMESC TL to minimize impact of new system to existing facility network bandwidth.

vii. All new cameras shall be compatible with and integrated to the existing CCV server.

viii. All equipment connected to alternating current (AC) or Power over Ethernet (PoE) power shall be protected from surges. Equipment protection shall withstand surge test waveforms described in IEEE C62.41.1 and IEEE C62.41.2.

Fuses shall not be used for surge protection.

ix. The following types of wiring shall be used where applicable 22/2, 22/4, RG59 coax, Cat 6e and 18/2 (all plenum rated wiring) where required by manufacturer’s specifications and shall be routed through the hollow wall or surfaced mounted inside “Panduit Duct & Raceway.” Wiring shall be installed on dedicated support system using supports such as j-hooks or saddle support systems at no more than five-foot (5’0”) intervals. Cable supports will be securely attached directly to building structure. Do not attach cabling or supports to ductwork, piping, grid hangers, conduit, or equipment and shall not be directly lying on top of tiles.

x. The Contractor shall coordinate with the UMESC TL to ensure any new devices are installed and operational per UMESC requirements, industry best practices for commercial buildings and national/local building codes.

d. Project Documentation and Training:

i. Contractor shall provide a report showing results of annual system testing. Tests shall document for each device:

1. Device system identifier and location at the facility

2. Model Number

3. Device Media access control address (MAC address) and Internet

Protocol address (IP address)

4. Device firmware pre and post upgrade

5. Server CCV software pre and post upgrade

6. Device system verification

7. Bandwidth test results, where applicable

8. Server existing storage

ii. Training on upgraded system shall be performed on-site by factory trained technicians. Training shall cover revised access, programming, troubleshooting and general accessibility and operations of the system. 3 copies of relevant training literature shall be supplied as part of the on-site training. Training session shall be no less than 2 hours in length and cover all aspects of the CCV system with regards to access, troubleshooting and day to day operations.

iii. All accessible components and devices shall be logged for:

9. Exact location of each device tested, including system address or zone location.

10. Test results and applicable data bandwidth readings.

11. Any discrepancies found shall be noted individually and on a separate summary page.

iv. All documentation and recommendations will be provided to Customer

v. The documentation shall follow the format below in style and sequence:

1. Covers - Shall be of durable synthetic stock with the following information printed on the front cover:

a. Project Title.

b. Facility Name and Address.

c. Date of Publication.

d. Prepared by information.

e. Title page – The title page shall reference the same information as the Cover Page.

f. Table of Contents – Shall list by page number and section, all important sections and subsections included in the manual.

g. General Section – shall contain an overall description of the system, including types of equipment installed and system operation.

h. Manufacturers help desk contact information.

i. Contractor emergency contact information.

e. Technical Requirements

i. Work shall be performed during regularly scheduled facility hours (7:30am-

4pm; Mon. – Fri.). However, if facility personnel will be negatively impacted by the work, after hours and weekend work may be authorized. Any work performed by the Contractor outside of normal facility hours must be coordinated with the USGS FOS at least 48 hours in advance.

ii. Contractor shall be capable of providing on-staff technicians factory-trained in servicing installed equipment. Contractor shall be capable of servicing or repairing equipment on-site within 24 hours of notification by UMESC of requesting emergency service or repairs.

iii. Contractor shall use service technicians certified by the manufacturer in the service, installation and operation of the existing CCV server and devices.

iv. Coordinate electrical and control work with the TL to ensure any facility equipment or network communication is not interrupted or disturbed.

Contractor will be responsible for any work performed as part of this contract that causes damage to existing equipment, interruption of network service or negatively impacts ongoing research.

v. Contractor shall provide equipment as necessary to minimize debris in and around work areas. Contractor shall daily clean or surfaces or equipment impacted by service or installation work and remove any debris created by the demolition and/or installation from this project.

vi. Contractors shall notify the USGS TL prior to entry into other areas of the facility not directly related to this project scope. Entry into offices, mechanical/electrical spaces and or laboratories without permission from USGS TL is prohibited.

vii. Any issues affecting project completion or delivery dates shall be communicated to the USGS TL as soon as practical but no later than 24 hours.

viii. The contractor shall submit the following design information and drawings for approval prior to starting installation work on this project:

1. Shop Drawings: Submit updated shop drawings showing proposed product components and locations for new CCV components.

2. Operation, installation, and maintenance manuals including wiring diagrams.

3. Information on system software indicating operating systems, firmware and hardware data.

ix. Final Inspection and Acceptance Criteria

1. Upon successful completion of the installation of any new devices, the

Contractor shall test the systems to ensure that all devices are correctly installed and fully operational. A minimum of two (2) copies of all pre-test results shall be furnished to the USGS TL for review. Proper documentation of the test shall show date, time and results.

2. Acceptance by the Government will be given only after the satisfactory completion of the installation of the system, training, receipt of submittals, all testing data and any other requirements within the PWS.

Project acceptance can be issued only by the project Contracting Officer (CO).

x. Warranty Work and Service

1. The Contractor shall guarantee that all installed parts; components, systems and workmanship meet the specifications set forth in this PWS. Additionally, the Contractor shall warranty all Contractor supplied components, workmanship and/or systems for a (minimum) period of 12 months from the date of Government acceptance.

2. Should any Contractor supplied part, component, workmanship or system, fail within that period of time, the Contractor shall immediately replace or repair that part, component, or system within 48 hours at no further cost to the Government. If the Contractor is unable to start and/or finish the repair or replacement, the Contractor shall be liable for all costs incurred by the Government to correct the issue(s).

3. The Contractor shall not be responsible for the repair or replacement of any part, component, or system that fails due to fire, flood, riots and vandalism or because of the misuse of equipment by Government employees.

4. USGS UMESC reserves the right to expand or add to the system during the warranty period using firm(s) other than the Contractor for such expansion without affecting the Contractor's responsibilities, provided the expansion is performed by an authorized dealer for the affected equipment.

f. Performance Work Statement:

1. PERFORMANCE REQUIREMENTS MATRIX

Requirement Performance Objectives

Performance Threshold

PWS

Sectio n

Method of Surveillanc e

Performanc e Standard

Penalty if Performan ce Threshold Not Met

Successful Inspection, Testing and Maintenance

Inspection, Testing and Maintenance completed in accordance with NEC codes and guidelines

2.b.v Annual Inspection

In Accordance With NEC

Timely Inspection Testing and Maintenance

Inspection, Testing and Maintenance completed in accordance with Schedule

2.b.v Scheduled Inspection

100% Monitored and documented with

UMESC TL

Repair Response Time

Contractor responds within working days of notification or discovery

2.e.x.

Monthly Evaluation by UMESC TL and Customer Complaints

90% Timely and In Accordance with PWS

Upgrades Upgrades completed in accordance with NEC requirements, applicable industry standards and manufacturers recommendatio ns

2.c Inspection by UMESC TL and Customer Complaints

90% Timely and In Accordance with PWS

Reports Submission of complete and accurate Reports In Accordance With PWS

2.b.v Evaluation by UMESC TL and Facility Engineer

99% Complete and Accurate

Customer Satisfaction Client Satisfaction Survey

Evaluation by UMESC

TL

95% Resolution (No

Complaints by UMESC TL of Site Safety Officer)

Security Requirements

Performance in accordance with PWS Security Requirements

3.d.ii 3.d.iii

Report to

UMESC

TL

95%

g. Deliverables

i. Facility approved schedule of all first-year upgrades, repairs, inspection and testing services to be completed within 365 days of contract award. All subsequent year upgrade, repair, inspection and testing services to be completed within 365 days of CO notification of exercising additional option year services.

3. SUPPORTING INFORMATION

a. Place of Performance: UMESC; 2630 Fanta Reed Rd. La Crosse, WI. Exterior and

Interior.

b. Period of Performance:

Base: 07/01/2023 through 06/30/2024 Option Year One: 07/01/2024 through 06/30/2025 Option Year Two: 07/01/2025 through 06/30/2026 Option Year Three: 07/01/2026 through 06/30/2027 Option Year Four: 07/01/2027 through 06/30/2028

c. Government Furnished Property (GFP): None

d. Special Considerations

i. The installing contractor shall show proof of emergency service available 24-hours-a-day, 7-days-a-week.

ii. The contractor shall comply with all UMESC safety and security operations and procedures.

iii. The Contractor shall account for all forms of Government-provided identification issued to the to the Contractor employees in connection with performance under this contract. The contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

1. When no longer needed for Contract performance

2. Upon completion of the Contractor employee's employment

3. Upon contract completion or termination.

Appendix A.

The National Defense Authorization Act (NDAA) prohibits U.S. government agencies from purchasing or using telecommunications, video surveillance services, or equipment from certain foreign technology vendors. These vendors include:

Huawei Technologies ZTE Corporation Hytera Communications Corporation Hangzhou Hikvision Digital Technology Company Dahua Technology Company; and all subsidiaries.

Technologies provided by these vendors have been categorized by multiple authorities as an unacceptable supply chain risk. The Department of the Interior (DOI) Office of the Chief Information Officer (OCIO) has developed this policy in coordination with the DOI Office of Acquisition and Property Management (PAM) to prohibit acquisition of the banned products. Requirements of NDAA Section 889 will be considered during the planning phase and included as appropriate in the final technical specifications. All proposed telecommunication and video surveillance equipment will be evaluated during the solicitation phase to ensure all proposed equipment and technical specifications are in affirmative compliance with Section 889 of the National Defense Authorization Act (NDAA) to be eligible for award.

Directive Requirements:

Devices manufactured by prohibited foreign technology vendors identified in the NDAA must be removed from the DOI Enterprise to include any associated security and surveillance systems that collect or process any DOI data. The procurement and use of telecommunications equipment produced by these foreign technology vendors is prohibited. Internet domains known to be operated by these vendors will be blocked at the DOI Network perimeter.

The Prohibition On Use Or Procurement under Section 889 subsection (a)(1)(A) shall take effect one year after the date of the enactment of this Act. The Act became Public Law No: 115-232 on 08/13/2018. All Bureaus and Offices are required to identify and remove devices that have been identified as prohibited foreign technology vendors by 08/13/2019.

Appendix B.

52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/ http://www.doi.gov/pam/aindex.html http://farsite.hill.af.mil/reghtml/Regs/far2afmcfars/fardfars/Far/52_000.htm?zoom_highlight=52%2E212-4

52.202-1 Definitions (JUN 2020) 52.203-19 Prohibition on Reporting Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) http://www.acquisition.gov/far/ http://www.doi.gov/pam/aindex.html

52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporation (NOV 2015) 52.212-4 Contract Terms and Conditions – Commercial Items (DEC 2022) 52.223-6 Drug-Free Workplace (MAY 2001) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) 52.246-4 Inspection of Services-Fixed-Price (Aug 1996)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES

OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (MAR 2023)

a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C.

3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) ( 31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

☐(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655). ☐(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) ( 41 U.S.C. 3509)).

☐(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub.

L. 109-282) ( 31 U.S.C. 6101 note).

☐(5) [Reserved].

☐(6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

☐(7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) ( 31 U.S.C. 6101 note).

☐(9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

☐(10) [Reserved].

☐(11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

☐(12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) ( 15 U.S.C. 657a).

☐(13)[Reserved].

X (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) ( 15 U.S.C. 644).

☐(ii) Alternate I (Mar 2020) of 52.219-6.

☐(15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) ( 15 U.S.C. 644).

☐(ii) Alternate I (Mar 2020) of 52.219-7.

☐(16) 52.219-8, Utilization of Small Business Concerns (Oct 2022) ( 15 U.S.C. 637(d)(2) and (3)).

☐(17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2022) ( 15 U.S.C. 637(d)(4)).

☐(ii) Alternate I (Nov 2016) of 52.219-9.

☐(iii) Alternate II (Nov 2016) of 52.219-9.

☐(iv) Alternate III (Jun 2020) of 52.219-9.

☐(v) Alternate IV (Sep 2021) of 52.219-9.

☐(18) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) ( 15 U.S.C. 644(r)).

☐(ii) Alternate I (Mar 2020) of 52.219-13.

☐(19) 52.219-14, Limitations on Subcontracting (Oct 2022) ( 15 U.S.C. 637s).

☐(20) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) ( 15 U.S.C. 637(d)(4)(F)(i)).

☐(21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2022) ( 15 U.S.C. 657f).

X (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (MAR 2023) ( 15 U.S.C.

632(a)(2)).

☐(ii) Alternate I (Mar 2020) of 52.219-28.

☐(23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Oct 2022) ( 15 U.S.C. 637(m)).

☐(24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) ( 15 U.S.C. 637(m)).

☐(25) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).

X (26) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15U.S.C. 637(a)(17)).

X (27) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

X (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Dec 2022) (E.O.13126).

X (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (30) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

☐(ii) Alternate I (Feb 1999) of 52.222-26.

☐(31) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

☐(ii) Alternate I (Jul 2014) of 52.222-35.

X (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

☐(ii) Alternate I (Jul 2014) of 52.222-36.

☐(33) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

☐(34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

X (35) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) ( 22 U.S.C. chapter 78 and E.O.

13627).

☐(ii) Alternate I (Mar 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).

☐(36) 52.222-54, Employment Eligibility Verification (May 2022) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

☐(37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-th

☐(ii) Alternate I (May 2008) of 52.223-9 ( 42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

☐(38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

☐(39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

☐(40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

☐(ii) Alternate I (Oct 2015) of 52.223-13.

☐(41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

☐(ii) Alternate I (Jun2014) of 52.223-14.

☐(42) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) ( 42 U.S.C. 8259b).

☐(43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

☐(ii) Alternate I (Jun 2014) of 52.223-16.

X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O.

13513).

☐(45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

☐(46) 52.223-21, Foams (Jun2016) (E.O. 13693).

☐(47) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).

☐(ii) Alternate I (Jan 2017) of 52.224-3.

☐(48) (i) 52.225-1, Buy American-Supplies (Oct 2022) ( 41 U.S.C. chapter 83).

☐(ii) Alternate I (Oct 2022) of 52.225-1.

X (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (Dec 2022) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501- 4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112- 41, 112-42, and 112-43.

☐(ii) Alternate I [Reserved].

☐ (iii) Alternate II (Dec 2022) of 52.225-3.

☐(iv) Alternate III (Jan 2021) of 52.225-3.

X (v) Alternate IV (Oct 2022) of 52.225-3.

☐(50) 52.225-5, Trade Agreements (Dec 2022) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

☐(52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C.

Subtitle A, Part V, Subpart G Note).

☐(53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ( 42 U.S.C. 5150).

☐(54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov2007) ( 42 U.S.C. 5150).

☐(55) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

☐(56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ( 41 U.S.C. 4505, 10 U.S.C. 3805).

☐(57) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) ( 41 U.S.C. 4505, 10 U.S.C. 3805).

X (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).

☐(59) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) ( 31 U.S.C. 3332).

☐(60) 52.232-36, Payment by Third Party (May 2014) ( 31 U.S.C. 3332).

☐(61) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).

☐(62) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) ( 15 U.S.C. 637(d)(13)).

☐(63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).

☐(ii) Alternate I (Apr 2003) of 52.247-64.

☐(iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

☐(1) 52.222-41, Service Contract Labor Standards (Aug 2018) ( 41 U.S.C. chapter67).

☐(2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).

☐(3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).

☐(4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

X (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ( 41 U.S.C. chapter 67).

☐(6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) ( 41 U.S.C. chapter 67).

☐(7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

☐(8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

☐(9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) ( 42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) ( 41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2022) ( 15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018) ( 41 U.S.C. chapter 67).

(xiii)

(A) 52.222-50, Combating Trafficking in Persons (Nov 2021) ( 22 U.S.C. chapter 78 and E.O 13627).

(B) Alternate I (Mar 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ( 41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) ( 41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).

(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

(xix)

(A) 52.224-3, Privacy Training (Jan 2017) ( 5 U.S.C. 552a).

(B) Alternate I (Jan 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C.

Subtitle A, Part V, Subpart G Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) ( 42 U.S.C. 1792).

Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.

(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C.

55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247- 64.

(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.

52.217-8 – Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor prior to the expiration date of the contract.

52.217-9 – Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor prior to the expiration date of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

52.242-17 Government Delay of Work (Apr 1984)

(a)If the performance of all or any part of the work of this contract is delayed or interrupted (1)by an act of the Contracting Officer in the administration of this contract that is not expressly or impliedly authorized by this contract, or (2)by a failure of the Contracting Officer to act within the time specified in this contract, or within a reasonable time if not specified, an adjustment (excluding profit) shall be made for any increase in the cost of performance of this contract caused by the delay or interruption and the contract shall be modified in writing accordingly. Adjustment shall also be made in the delivery or performance dates and any other contractual term or condition affected by the delay or interruption. However, no adjustment shall be made under this clause for any delay or interruption to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an adjustment is provided or excluded under any other term or condition of this contract.

(b) A claim under this clause shall not be allowed-

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved; and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the delay or interruption, but not later than the day of final payment under the contract.

GS0231 Technical Liaison-Technical Direction (JUL 2018)

a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.

(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting

Officer is authorized to obligate funds on this or any other contract action.

(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.

(d) The Technical Liaison assigned for this contract is:

Name: TBD Phone:

Email:

(e) Only the Contracting Officer may designate a new Technical Liaison.

GS0339 Green Acquisition (JUL 2018)

The USGS is committed to promoting the natural environment and protecting the health and well-being of people.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .