Sol_140F0521Q0012.pdf

PDF 4 MB Posted

Attached to
Condition Assessment Report
Solicitation number
140F0521Q0012
Issued by

View the file

Other files

File Type Posted
Amend 0002 QandA_0002.pdf PDF
Sol_140F0521Q0012_Amd_0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140F0521Q0012

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

03/01/2021 0040521177

1 34

300 WESTGATE CENTER DRIVE

SUITE 310

Hadley MA 01035-9589

FWS, DIVISION OF CONTRACTING AND GE

12/31/2021

FWS SENEY NATIONAL WILDLIFE REFUGE

1674 REFUGE ENTRANCE ROAD

SENEY

MI 49883-9509

413 253-8782Ryna Russell

03/12/2021 1100 ES

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Legacy Doc #: FWS Period of Performance: 05/01/2021 to 12/31/2021

00010 Condition Assessment Report for Historic Huron Islands Light Station

Delivery: 12/31/2021

00020 Estimated Reimbursable Travel Expenses

Delivery: 12/31/2021

Continued ...

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 34

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0521Q0012

Attachments:

Synopsis (2 pages)

Scope of Work (10 pages)

Appendix A (12 pages)

Terms & Conditions (8 pages)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Synopsis 140F0521Q0012

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

Solicitation 140F0521Q0012 is issued as a request for quotation (RFQ). The anticipated award date is within 5 days after the close of this announcement.

This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-03, effective 02/16/2021.

This requirement is being solicited as a 100% Small Business Set-Aside. The applicable North American Classification System (NAICS) code is 541310 – Architectural Services. The small business size standard is $8.0 Million.

The Government intends to award a firm fixed price contract resulting from this combined synopsis/solicitation.

Line Item(s):

00010 - Condition Assessment Report for Historic Huron Islands Light Station 00020 – Estimated Reimbursable Travel Expenses

Requirement Description:

The Huron National Wildlife Refuge (NWR) of the United States Fish and Wildlife Service (USFWS) is seeking a federally qualified historical architect to conduct a detailed condition assessment of seven

(7) buildings/structures within the Huron Islands Light Station built on Lighthouse (West Huron) Island between 1868 and 1934.

Period of Performance:

May 2021 – December 2021

Location of Work:

Huron National Wildlife Refuge

Terms & Conditions:

The provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition

• The provision at 52.212-2, Evaluation -- Commercial Items applies to this acquisition (refer to terms and conditions for details)

• Offerors must include a completed copy of the provision at 52.212-3 Offeror Representations and

Certifications-Commercial Items and submit with its offer.

• The clause at 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition

• The clause at 52.212-5, Contract Terms and Conditions Required to Implement Statutes or

Executive Orders -- Commercial Items, applies to this acquisition (refer to terms and conditions for details)

Any additional contract requirement(s) or terms and conditions determined by the contracting officer to be necessary for this acquisition and consistent with customary commercial practices are attached in the Terms & Conditions document.

Synopsis 140F0521Q0012

The full text of the referenced FAR clauses may be accessed electronically at https://www.acquisition.gov/far/ or see terms & conditions attached to the solicitation.

Important Submission Dates & Site Visit Info:

1. Question Submission:

All questions regarding this Solicitation must be submitted in writing to the Contracting Officer, Ryna Russell at ryna_russell@fws.gov no later than Tuesday, March 9, 2021 at 10:00am EST.

If necessary, questions received will be answered through an Amendment to this Solicitation.

2. Quote Submission:

Quotes (including all required documents) must be transmitted via e-mail to the Contracting Officer, Ryna Russell at ryna_russell@fws.gov, no later than Friday, March 12, 2021 at 11:00am EST.

Required Submission Documents:

Offerors responding to this solicitation must submit the following documents:

• SF 18: Provide a completed SF 18 with signature.

• SF 30: If applicable, provide signed amendments (SF30)

• Price Proposal: Provide your detailed proposal

• All submittal requirements listed on page 10 of the Scope of Work

Contracting Officer/Office:

Ryna Russell, Contracting Officer U.S. Fish & Wildlife Service – Hadley, MA Joint Administrative Operations (JAO) | Acquisition Goods and Services Operations ryna_russell@fws.gov https://www.acquisition.gov/far/ mailto:ryna_russell@fws.gov

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 1 of 10

Scope of Work (SOW) Huron National Wildlife Refuge

Condition Assessment Report Historic Huron Islands Light Station

Marquette County, Michigan

Introduction

The Huron National Wildlife Refuge (NWR) of the United States Fish and Wildlife Service (USFWS) is seeking a federally qualified historical architect to conduct a detailed condition assessment of seven

(7) buildings/structures within the Huron Islands Light Station built on Lighthouse (West Huron) Island between 1868 and 1934. This work is intended to be a first step in a lengthy, systematic process, and it will serve as a foundation for subsequent work.

Established in 1868, the Huron Islands Light Station is located on Lighthouse (West Huron) Island in the Huron NWR within Lake Superior in Michigan’s Upper Peninsula, approximately 50 miles northwest of Marquette, Michigan and 40 miles northeast of Baraga, Michigan, Section 28, T53N, R29W (Figure 1). The seven (7) buildings/structures within the historic light station to be assessed include the 1868 Lighthouse, 1934 Assistant Keepers Quarters, 1898 Oil House, 1898 Privy, 1898 Fog Signal Building, 1913 Pathway and 1913 Tramway/Turntable. As a note, since 1970, the refuge is also designated as the Huron Islands Wilderness.

Figure 1: Location of Huron NWR within Lake Superior.

The project will require brief archival research with materials provided, field documentation, condition analysis and report preparation. Lead project personnel must meet the Secretary of the Interior’s Professional Qualification Standards for a historical architect under 36 CFR Part 61 (refer to the following link): https://www.nps.gov/history/local-law/arch_stnds_9.htm https://www.nps.gov/history/local-law/arch_stnds_9.htm

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 2 of 10

Familiarity with Michigan’s Upper Peninsula maritime history and architecture, as well as demonstrated experience conducting condition assessments on historically significant buildings and structures is highly desirable.

Background

In 1868, the U.S. Lighthouse Board constructed the Huron Islands Lighthouse on Lighthouse (West Huron) Island. Over the years, the Lighthouse Service (and later the United States Coast Guard (USCG)) constructed other buildings to supplement the function of the lighthouse as a light station.

From 1869-1951, the Huron Islands Light Station was operated on a seasonal basis with the lighthouse keeper and assistant keeper and their families arriving on the island in the early spring and leaving as the shipping season closed in the late fall. After 1951, the station was seasonally manned by five unrelated USCG crew members. In 1972, the light was automated, eliminating the need for a seasonal occupation of the island. Since then, the USCG still periodically visits the island to check on the light and its infrastructure. The light is currently powered by a photovoltaic electrical array constructed next to the Lighthouse.

The Huron NWR was initially established around the light station in 1905 with the Wilderness designation following in 1970. In 1978, all but 11 acres of Lighthouse Island was transferred to the control of the USFWS. In 1991, the USCG desired to transfer the remaining 11 acres to the USFWS and entered into an interim lease with the USFWS. Finally, the remaining 11 acres and the lighthouse structures were transferred to the USFWS in 1998 through the General Services Administration.

Cultural resources currently located on Lighthouse Island include: the stone Lighthouse (1868), the wooden Assistant Keepers Quarters (1934), the ferro-cement Boathouse (1913), the brick Oil House (1898), the brick Privy (1898), the concrete Dock (2008) and, on the other side of the island, the brick Fog Signal Building (1898), and the concrete block Barracks (1961). There are several other remnant site features associated with the light station including a small metal/concrete Tramway/Turntable (1913), fuel storage tanks, components of infrastructure from island utilities (phone, sewer and electric), and a Pathway (1913) consisting of concrete walkways, footbridges and steps.

The 1868 Huron Islands Lighthouse was listed on the National Register of Historic Places (NRHP) on September 2, 1975 (NRHP # 75000955). The rest of the buildings/structures (except for the Dock, the Pathway and other site features) were declared eligible for listing on the NRHP by the USFWS on December 7, 2004. As of March 2021, the Pathway and Tramway/Turntable have been declared eligible to the NRHP.

The historic facilities on Lighthouse Island are greatly threatened due to benign neglect as a result of the automation of the light in 1972 and subsequent abandonment by the USCG. The situation is exacerbated by the constant budgetary constraints inside the USFWS whose mission does not emphasis historic preservation. Fortunately, starting in 1999, a newly formed non-profit organization named the Huron Island Lighthouse Preservation Association (HILPA), consisting mostly of descendants of former USCG employees stationed on the island, raised funds to complete a limited Historic Structures Report (HSR) in 2003 and replaced the roof on the lighthouse in 2006. However, the group’s energy and commitment waned in subsequent years and spotty maintenance was performed on the island facilities by the USFWS. Consequently, the buildings’ future remained precarious at best. By the early 2010’s, many of the buildings were showing accelerated wear/decay and without additional stabilization and preservation actions, the buildings will be lost forever.

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 3 of 10

In response, the USFWS, in its 2013 Comprehensive Conservation Plan (CCP), laid out the following objectives and strategies to address specific, known cultural and historic sites on the island refuge within 15 years:

Objective: Within the life of this plan, Island cultural heritage holdings will be assessed and then maintained as determined necessary. Specific strategies under this objective include:

1. Ensure archaeological and cultural resources are identified, described, and taken into consideration prior to implementing undertakings.

2. Determine need and ultimate disposition of refuge buildings – there are eight buildings/structures on Huron Island associated with the old USCG station. The exterior of the lighthouse, a National Historic Landmark [Note: it is actually a historic property and not a landmark], has been rehabbed and maintained through the efforts of the Huron Island Lighthouse Preservation Association (HILPA). The remaining buildings are in various stages of decay.

3. Coordinate with HILPA to preserve and maintain structure and historical integrity of the lighthouse and associated structures selected for preservation.

4. Ensure all doors and windows on the lighthouse building, fog horn building, and barracks are either locked or covered with plywood to protect the interior of the buildings from weather damage, to prevent vandalism, for safety concerns, and to keep the general public from entering.

5. Cover all openings in the lighthouse keeper’s quarters by the end of fall 2013.

6. Within one year of completion of this plan, cut down and remove all trees and shrubs growing against or over any of the buildings and structures to maintain the exterior condition of the buildings.

7. Establish efforts with HILPA and others to develop an oral cultural history to preserve the “community memories” and maritime history of the Huron Islands.

Stemming from the objectives and strategies in the CCP, the USFWS, along with a newly revitalized HILPA and an additional new local partner, the Keweenaw Bay Indian Community (KBIC), have spent the last two years discussing the next steps in the management of the island and its historic buildings. In 2019, because the Huron Islands Light Station is within the Huron Islands Wilderness, the USFWS completed a Minimum Requirements Analysis (MRA) to determine what can be done with the buildings and still comply with the Wilderness Act of 1964.

In the MRA, the USFWS determined action was necessary in the Wilderness to fulfill the objectives and strategies outlined in the CCP and identified four possible alternatives for the future management of the Huron Islands Light Station.

1. Preserve all structures in place using only traditional (non-motorized) tools for maintenance;

2. Preserve all structures in place with the option of using motorized tools for maintenance;

3. Preserve the lighthouse, document, and preserve/demolish other structures as determined using only traditional (non-motorized) tools for demolition and maintenance; and

4. Preserve the lighthouse, document, and preserve/demolish other structures as determined with the option of using motorized tools for demolition and maintenance.

After consideration, the USFWS chose Alternative Four as the preferred management strategy. The USFWS determined that this alternative would provide the most positive permanent benefits to Wilderness character from benchmark conditions while still allowing compatibility with the refuge’s purposes and compliance with the National Historic Preservation Act (NHPA).

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 4 of 10

In 2021, the USFWS finalized with the State Historic Preservation Office (SHPO), Partners and public comments, a Cultural Resources Management Plan (CRMP) as part of a larger National Environmental Policy Act (NEPA) analysis of Alternative Four.

Following the analysis done within the MRA and CRMP, it is the decision by the USFWS that the Huron Islands Lighthouse will be preserved in perpetuity as with all the other historic properties clustered around the Lighthouse (Assistant Keepers Quarters, Privy, and Oil House). The Dock, Pathway, Fog Signal Building, and the Tramway/Turntable will also be preserved. The Boathouse will be rehabilitated in some fashion to be determined later in consultation with the partners. Conversely, the Barracks and various other hazardous site features (fuel storage tanks, and components of infrastructure from island utilities), will be demolished and removed from the island.

The historic properties slated for either rehabilitation/retention (Boathouse) or demolition/removal (Barracks) will have any adverse effects mitigated through a Memorandum of Agreement (MOA) with the partners. A condition assessment of the Boathouse was completed in 2020. This will provide a baseline for its modified rehabilitation.

The remaining seven (7) buildings/structures that will be preserved will need to go through a series of steps to make sure all proposed preservation activities follow the 2017 Secretary of the Interior’s Standards for the Treatment of Historic Properties. A Condition Assessment Report is the first step in that path to fulfill the Preservation Standards.

Project Components

Purpose The purpose of this project is to research, document, and assess the condition of seven (7) buildings/structures built between 1868 and 1934 as part of the historic Huron Islands Light Station currently within the Huron NWR. See Appendix A for a complete outline of the resources under consideration for this project.

The final Condition Assessment Report (CAR) will consist of an analysis of the current state of the buildings/structures through:

1. Summary: brief summary of the construction history and significance of all the seven historic properties;

2. Documentation: detailed descriptions/sketches, photographs, and measurements collected during the field visit; collection/processing of appropriate paint samples for color analysis;

3. Evaluation: description of existing physical conditions of the buildings/structures; discussion of character-defining features; identification of all deficiencies;

4. Recommendations: a discussion of specific measures/treatments that should be taken to resolve these deficiencies and preserve character-defining features;

5. Priorities: the placement of these measures/treatments in priority order by urgency; and

6. Costs: the estimated costs of these measures/treatments in 2021 dollars both individually and cumulatively.

Treatment requirements will outline the laws, regulations, and functional requirements that are applicable to the recommended work areas, to include life safety, fire protection, energy, conservation, hazardous materials abatement, and accessibility. The CAR will recommend work tasks to accomplish

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 5 of 10 the proposed treatment; provide an evaluation of proposed solutions; and describe specific recommendations for work, which will include alternate solutions, if required. The listing of these projects, priority standings, and estimated costs will feed directly into the USFWS’ 5 year rolling maintenance plan for Lighthouse Island. The USFWS will be involved in every stage of the CAR from staff assistance, review, project oversight and assurances that the CAR will conform to Department of Interior standards. HILPA, SHPO and KBIC will also extensively review and comment on the CAR.

It is anticipated that the CAR will help push the USFWS to establish a long term Programmatic Agreement (PA) with HILPA, KBIC and the SHPO that will be used by the USFWS as part of a master-planning guide for the preservation, rehabilitation and public interpretation of the facilities.

The CAR and PA will accelerate their preservation and rehabilitation program activities on the islands in an attempt to recapture Great Lakes maritime history that is on the verge of being lost through significant environmental decay and neglect.

It cannot be overstated how important the CAR is for future historic preservation activities on the island. The CAR, in concert with the limited HSR, establishes a baseline analysis from which the preservation treatment standards can be applied. The CAR will document the facilities integrity through historic and physical analysis, and, with the PA, help reduce costs and save time by shortening the approval cycles for preservation activities.

Activity: Summary of Archival Research The consultant will be expected to examine records (provided by the refuge as electronic and/or physical copies) as a foundation for preparation of a CAR. A list of sources is listed in this document and include the 2003 Historic Structures Report (HSR) and 2020 Hazardous Material Cleanup Feasibility Study. Other un-compiled documentation will be provided to the contractor as well. These documents illustrate architectural and engineering drawings, historic photographs, aerial views, and maps that depict the construction and evolution of the light station. The contractor shall incorporate any relevant materials into the CAR.

Activity: Field Documentation of Conditions The contractor is required to arrange and fund travel to Lighthouse Island to field assess and document the condition of both the inside and outside of seven (7) historic buildings/structures: the stone Lighthouse (1868), the wooden Assistant Keepers Quarters (1934), the brick Oil House (1898), the brick Privy (1898), the concrete Pathway (1913) and, on the other side of the island, the brick Fog Signal Building (1898), and the metal/concrete Tramway/Turntable (1913). While the concrete Dock will be retained in its current form, it was built in 2008. Therefore, it is out of the period of significance for the light station and will not be included in this project.

While Lighthouse Island is open to the public during daylight hours, it is unprotected and remote with no electricity, potable water, or bathroom facilities. The nearest public boating access points on the mainland are at Big Bay, Michigan and near Skanee, Michigan. The boat trip may take 45 minutes to 2 hours--one way. Additionally, the seas can be rough at times and frequent fog and rain can make boat access to Lighthouse Island difficult. Given the size of the dock, the only access is through small or moderate sized watercraft. The contractor must bring their own food and water and all generated waste (garbage and fecal) must be removed off the island at the end of the day. There is no camping allowed on the island. Daytrips only.

The gateway to the island’s inland is through the 30-foot-long concrete dock on the southeast tip of the island. Passage to the buildings is through the two to three-foot-wide concrete pathway which consists

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 6 of 10 of walkways, steps and footbridges which can be moist and partially moss-covered. Accordingly, traversing the island can only be done on foot and with moderate difficulty. The contractor must have the physical abilities to carry equipment and walk around the changing elevations on the island on uneven ground. Additionally, the contractor must be able to walk carefully and climb steps within the somewhat deteriorated buildings (especially inside the 2-4 story lighthouse).

In 2020, all the buildings were assessed for hazardous materials, both inside and out, and most have been found to contain asbestos, lead-based paint and hydrocarbons to various levels. As a result, the contractor is required to take steps as appropriate (e.g. face dust mask, safety glasses, hard hat, long pants, long sleeved shirt, gloves, close-toed shoes etc.) to protect themselves from any exposure to these materials and other dangers. A copy of the hazardous materials report will be provided to the contractor.

The contractor will photograph, describe, measure each asset, recording the information within the final report. Selective collection/processing of paint samples for color analysis is also required.

Photography, Descriptions and Measurements The exterior of standing buildings should generally be recorded with at least five shots: setting, front and rear elevations, and three-quarter views from opposing corners. At least two photographs of the interior of every room should also be done. Any other special details and other features of interest should also be recorded. Structures such as the Pathway and the Tramway/Turntable should be recorded with multiple views of the setting, approaches, superstructure, substructure, and mechanical features, as appropriate. Photo files and logs will be included as deliverables under the terms of this contract.

Descriptions and measurements of the buildings/structures and their component parts shall be sufficient to enable the reader to understand how they were constructed, work together to ensure the integrity of the exterior envelope and could/should be repaired up the appropriate treatment option.

Some measurements of specific details, such as window and door openings, will help guide future contractors in any repairs or replacements.

GIS

The northernmost corner of each asset included in the study should be recorded with a handheld GPS unit to determine its Universal Transverse Mercator (UTM) and Latitude/Longitude (Lat/Long) location (to less than 2 meters). A linear feature such as the Pathway or Tramway should have more points recorded depending upon its length. Every 50-100 feet is suggested or at every significant turn or deficiency in the Pathway.

Activity: Evaluation of Measures/Treatments with Recommendations, Priorities and Cost Estimates Stemming from the collection of the descriptions, photographs and measurements, a list of measures needed to maintain the stated treatment standard shall be developed for each building/structure. Each measure should make logical sense as a confined package that would be given as an addendum to a future repair contractor under a detailed scope of work. For example, logical categories of work projects might include: foundation, steps/porches, siding/trim, roof, chimney/fireplace, windows/doors, first floor interior etc., electrical system, HVAC system, plumbing system etc. No lumping of projects into excessively large mixed categories (e.g. “all exterior” or “all interior” etc.) is allowed.

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 7 of 10

Once a list of preservation work projects is generated, the contractor should place them into priority order based upon their urgency to protect the building/structure from decay (e.g. 1-12 with 1 being the most urgent). At the same time, the contractor should forward an estimate, in 2021 dollars, of the cost to conduct each work project. This estimate should consider the unique problems/costs incurred by having the building/structure on a remote island in Lake Superior. The Wilderness MRA also outlines the special conditions that would be placed on a contractor doing the projects. All this priority/cost data can be presented in tabular format. In the end, the contractor should tabulate the total cost for all the work projects, both for each building/structure and cumulatively across the light station.

Activity: Preparation of Draft and Final Project Reports The USFWS appreciates the importance of effective management. A firm fixed price contract for the CAR will be initiated with the contractor. In order to make sure cost and schedule are met with satisfactory results the schedule will be tracked by the Refuge Manager and the Regional Historic Preservation Officer. When the CAR has met the following milestone exit criteria then the project with be determined complete by HILPA, KBIC, USFWS and the SHPO:

a) 75% Progress Review

• Site visits / field documentation of existing conditions (field notes, measurements, and photographs)

• Collect physical samples for historic paint color analysis

• Collect / review existing historic drawings, maps, and photographs

• Compile the first draft of the report to include Part I: administrative background, Part II:

Historical background and description / photos of existing conditions, Part III: Work Projects and Priorities/Costs, and Part IV: Treatment and Use Recommendations.

• Refer to the HSR for the Period of Significance and Period of Interpretation.

• Compile CAD drawings of existing conditions.

b) 95% Progress Review

• Incorporate comments by the Partners

• Physical sample paint color test reports included.

• All appendices including the selected historic drawings and photographs to be incorporated in the report

• Complete construction cost estimates for the proposed work projects in Part III.

c) Final Report

• Final editing

• Incorporate final Partners comments.

• Print / distribute final copies.

Draft and final reports for the Huron Islands Light Station project will have detailed footnotes and a bibliography, following conventions described in Kate L. Turabian, A Manual for Writers, (Chicago:

University of Chicago Press, 2018) and the Michigan SHPO 2019 Style Guide.

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 8 of 10

The reports will be prepared in Microsoft Word and will be submitted in both Word and PDF formats.

Required components of the reports will include:

-Title Cover sheet -Table of contents -Executive summary -Introduction -Part I: Administrative Background to Project -Part II: Historical Background and Existing Conditions for each Building/Structure -Part III: Evaluation of Measures/Work Projects with Priorities and Cost Estimates -Part IV: Preservation Treatment and Use Recommendations -References -Appendix: Project maps, drawings, and photographs -Other Appendices as needed, including paint color analysis

Ideal Work Schedule

Task 2021 Mar/Apr May June July Aug Sept Oct Nov Dec

Select Contractor X Kick off Meeting/Logistics X Lighthouse Island fieldwork X or X 75% draft CAR to Partners X or X

95% draft CAR to Partners X or X Final CAR to Partners X or X Progress Update to Partners X X

This project is envisioned to run from May to December 2021. Fieldwork at Lighthouse Island can take place anytime in June or July, weather permitting. Refuge staff must be notified by the May 2021 Kickoff meeting when the contractor is hoping to be at Lighthouse Island. The refuge staff or HILPA/KBIC volunteers may need to be present to open/close all the buildings. All current Covid-19 restrictions must be considered when planning for this fieldwork. If fieldwork is conducted in June, the USFWS believes that end of the project can be well before December 31st. Please note however:

review of the draft CARs by the Partners can take up to 30 calendar days each. The anticipated work schedule reflects this review time.

Deliverables The contractor will provide the following products to the USFWS:

- One electronic copy of the 75% draft report in both Microsoft Word and PDF formats.

- One electronic copy of the 95% draft report in both Microsoft Word and PDF formats.

- One electronic copy of the final report in both Microsoft Word and PDF formats.

- Five hard copies of the final report. (USFWS RHPO, USFWS Seney NWR Office, SHPO, HILPA and KBIC)

- Digital photo files and a photo log.

- Digital GIS data and CAD files.

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 9 of 10

Other Technical Conditions The contractor must meet the Secretary of the Interior’s Professional Qualification Standards for a historical architect, must have prior experience with conducting condition assessments on National Register of Historic Places listed or eligible buildings/structures, and must have a demonstrated ability to complete projects on time and within budget.

The contractor must arrange and fund travel to Lighthouse Island. Only watercraft is allowed on/next to Lighthouse Island. Wilderness rules prohibit helicopters near the island. Proposals should outline anticipated costs for travel, lodging, and meals.

The contractor will provide all hand equipment necessary to complete the recordation, including computers, cameras, measuring/inspection tools, a handheld GPS unit etc.

The USFWS will provide full access to all cultural resources on the island, including building interiors, and will supply ladders or other equipment required to facilitate a thorough examination and evaluation.

The USFWS will provide access to relevant archival materials in its collections, including documents, architectural and engineering drawings, maps, and historic photos.

Selection Criteria The Contractor will be selected based on a competitive bid and the contractor’s comprehension of the requirements, the contractor’s ability to complete the assessments, and the experience of the contractor with contracts of similar complexity, as demonstrated in the contractor’s proposal.

Reimbursable Expenses – Travel Contractor reimbursement expense reports shall be prepared and processed in accordance with the Federal Travel Regulation (FTR) as prescribed by the General Services Administration (GSA) and the per diem rates for each locality visited. Refer to FAR 31.205-46 for details. Per Diem rates can be found at the following site: https://www.gsa.gov/travel/plan-book/per-diem-rates.

Payment Schedule Payment for work will be issued upon completion of specific project tasks. The contractor should include a suggested schedule of payments in the project proposal. A final payment will be approved once the completed final project report has been accepted by the USFWS Refuge Manager and will be issued within 30 days.

Invoices must be submitted electronically through the federal Invoice Processing Platform (IPP) system.

https://www.acquisition.gov/far/31.205-46 https://www.gsa.gov/travel/plan-book/per-diem-rates

SOW - Huron Islands Light Station, Huron National Wildlife Refuge Page 10 of 10

Submittal Requirements Proposals must include:

• Cover sheet indicating fixed cost amount.

• Statement of project understanding.

• Contractor qualifications and experience through a resume.

• Qualifications of any other key personnel.

• Research design/work plan.

• Project timeline.

• Itemized project budget, including separate travel and per diem costs from labor.

• Proposed schedule of payments.

• References – Provide name(s) and Contact Information

Archival Sources (to be provided)

• Hazardous Material Cleanup Feasibility Study, Lighthouse Island, 2020, Mannik Smith Group

• Historic Structure Report, Huron Islands Lighthouse, 2003, Hitch Inc.

• Huron National Wildlife Refuge, Lighthouse (West Huron) Island Cultural Resources

Management Plan, 2021, USFWS

• Secretary of the Interior’s Standards for the Treatment of Historic Properties, 2017, NPS

• Wilderness Minimum Requirements Analysis, Huron Islands Light Station, 2019, USFWS

Appendix A -SOW

Appendix A Scope of Work

Huron National Wildlife Refuge Condition Assessment Report

Historic Huron Islands Light Station Marquette County, Michigan

USGS Topographic Map of Lighthouse Island within the Huron NWR in Lake Superior

Aerial photograph of Lighthouse Island with buildings/structures noted.

Boathouse (1913) and Dock (2008). The Lighthouse is in the background. Note the distance and rise in elevation.

Huron Islands Lighthouse (1868). The Lighthouse is a two story rectangular building with a four story square light tower. It is built from pinkish-grey Lake Superior Granite with sandstone corners, window trim and lintels. The second story is not present over the south portion of the building. Four dormers were added on in the 1940s. All its windows and doors are currently boarded up.

Western side of the Huron Islands Lighthouse.

Assistant Keepers Quarters (1934). The Assistant Keepers Quarters is a one story rectangular wooden building. The southern portion (to the left) was added in 1949. All its windows and doors are currently boarded up.

Oil House (1898). The single story Oil House is made of red brick and has a functional metal door and a metal vent on the roof.

Privy (1898). The Privy is made of red brick. While its original wooden door is currently missing, the privy doorway, window and back access panel are currently boarded up with plywood to prevent further damage to this cultural resource.

Fog Signal Building (1898). The rectangular Fog Signal Building is made of red brick. It was expanded in 1931. All its doors and windows are currently boarded up.

Pathway (1913). The Pathway includes walkways, stairs and two bridges. All concrete.

Tramway (1913). Extends southwest to Lake Superior.

Turntable (1913). Connected to the Tramway on the northeast end.

Terms & Conditions

TERMS & CONDITIONS

DEPARTMENT OF INTERIOR (DOI)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS

Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.2124 Contract Terms and Conditions Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov

• Under this contract, the following documents are required to be submitted as an attachment to the

IPP invoice: Upload a hardcopy/pdf of your invoice into IPP

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 9733131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of local Clause)

52-252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: https://www.acquisition.gov/browse/index/far

Provisions Incorporated by Reference 52.204-7 System for Award Management (Oct 2018) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.204-17 Ownership or Control of Offeror (Aug 2020) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or

Equipment (Oct 2020) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations-Representation (Nov 2015) 52.212-3 Offeror Representations and Certifications -- Commercial Items (Feb 2021) 52.219-1 Small Business Program Representations (Nov 2020) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications (Jun 2020) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org https://www.acquisition.gov/browse/index/far

Provisions Incorporated by Text

52.204-20 Predecessor of Offeror (Aug 2020)

(a) Definitions. As used in this provision–

Commercial and Government Entity (CAGE) code means–

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.

Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term "successor" does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it □ is or □ is not a successor to a predecessor that held a Federal contract or grant within the last three years.

(c) If the Offeror has indicated "is" in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code: ________________________(or mark "Unknown").

Predecessor legal name: _________________________________________

(Do not use a "doing business as" name).

(End of provision)

52.212-2 - Evaluation -- Commercial Items (Oct 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Factor #1: Technical:

Subfactor #1: The successful contractor shall document that they meet the Secretary of Interior’s professional qualification standards for a Historical Architect through submission of a resume.

Subfactor #2: The successful contractor shall exhibit and document their experience in conducting condition assessments of historic properties in the field conditions described.

Subfactor #3: The successful contractor shall exhibit and demonstrate their ability to complete projects on time and within budget.

Factor #2: Price/Cost to the Government

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of Provision)

52-252-2 - Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/browse/index/far

Clauses Incorporated by Reference 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.212-4 Contract Terms and Conditions -- Commercial Items (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (Apr 1984)

Clauses Incorporated by Text

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders— Commercial Items (Jan 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.20319, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.20423, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 11591).

(3) 52.20425, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115232).

(4) 52.20910, Prohibition on Contracting with Inverted Domestic Corporations

(NOV 2015).

(5) 52.2333, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.2334, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 10877 and

10878 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

__ (1) 52.2036, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.20313, Contractor Code of Business Ethics and Conduct (Jun 2020) (41 U.S.C. 3509)).

https://www.acquisition.gov/browse/index/far http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P2_55 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137622 http://uscode.house.gov/ http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1141983 http://uscode.house.gov/

__ (3) 52.20315, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 1115). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.20410, Reporting Executive Compensation and FirstTier Subcontract Awards (Jun 2020) (Pub. L.

109282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.20414, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111117, section 743 of Div.

C).

__ (7) 52.20415, Service Contract Reporting Requirements for IndefiniteDelivery Contracts (Oct 2016)

(Pub. L. 111117, section 743 of Div. C).

__ (8) 52.2096, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Jun 2020) (31 U.S.C. 6101 note).

__ (9) 52.2099, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41

U.S.C. 2313).

__ (10) [Reserved].

__ (11)(i) 52.2193, Notice of HUBZone SetAside or SoleSource Award (Mar 2020) (15 U.S.C. 657a).

__ (ii) Alternate I (Mar 2020) of 52.2193.

__ (12)(i) 52.2194, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Mar

2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (Mar 2020) of 52.2194.

__ (13) [Reserved] _X_ (14)(i) 52.2196, Notice of Total Small Business SetAside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020).

__ (15)(i) 52.2197, Notice of Partial Small Business SetAside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.2197.

__ (16) 52.2198, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.2199, Small Business Subcontracting Plan (Jun 2020) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.2199.

__ (iii) Alternate II (Nov 2016) of 52.2199.

__ (iv) Alternate III (Jun 2020) of 52.2199.

__ (v) Alternate IV (Jun 2020) of 52.2199.

__ (18) (i) 52.21913, Notice of SetAside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.21913.

__ (19) 52.21914, Limitations on Subcontracting (Mar 2020) (15 U.S.C. 637(a)(14)).

__ (20) 52.21916, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.21927, Notice of ServiceDisabled VeteranOwned Small Business SetAside (Mar 2020)

(15 U.S.C. 657 f).

__ (22) (i) 52.21928, Post Award Small Business Program Rerepresentation (Nov 2020) (15 U.S.C.

632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.21928.

__ (23) 52.21929, Notice of SetAside for, or Sole Source Award to, Economically Disadvantaged Women Owned Small Business Concerns (Mar 2020) (15 U.S.C. 637(m)).

__ (24) 52.21930, Notice of SetAside for, or Sole Source Award to, WomenOwned…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .