About this file
This is a construction bid set consisting of architectural and engineering drawings for the Sierra Oaks Center Modernization project, prepared by PBK Architects, Inc. and LEAF Engineers for Sierra Unified School District located at 33276 Lodge Road, Tollhouse, California. The project encompasses modernization of the Sierra Oaks Senior Center, including demolition and replacement of flooring, fixtures, toilet compartments, electrical systems, plumbing systems, and interior finishes as indicated throughout the construction documents. The scope of work involves upgrades to flooring materials including sheet vinyl and luxury vinyl tile (LVT), installation of new bathroom fixtures and accessories, kitchen equipment modifications, lighting upgrades for Title 24 compliance, wall finishes using gypsum board and fiber-reinforced panels (FRP), and associated site work including accessible parking and signage. The project is identified with CDBG No. 24011 and County of Fresno permit number 25-011992. Prequalification documents are due Monday, September 23, 2026, and subcontractors performing work under licenses C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46, or C-51 must be prequalified prior to bidding.
The construction documents include 15 total sheets comprising general notes, site plans, floor plans, reflected ceiling plans, plumbing drawings, and electrical drawings. The project must comply with the 2022 California Building Code, California Fire Code, California Plumbing Code, California Electrical Code, and applicable Title 24 energy standards, along with County of Fresno Ordinance Title 15. All work must be performed in accordance with the construction documents and project specifications, with an Inspector of Record employed by the owner assigned to oversee compliance with Title 24 requirements. Deferred submittal items must be submitted for review no later than 60 days after the Notice to Proceed, with approval required from the Division of the State Architect before installation begins. The project contains finish schedules specifying materials such as Forbo Eternalstep sheet vinyl, Shaw Contract LVT, Nudo FRP panels, Sherwin Williams paint colors, and Bobrick Sierra Series toilet partitions, with specific accessible design requirements mandated throughout.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sierra Oaks Center Modernization_SPC_V4_BID SET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F O
R B
LU
E
B E
A M
LA
B
E
LIN
G O
C R
1/29/2026 4:22:37 PM
04/27/2026
SIERRA USD
SIERRA OAKS
CENTER
MODERNIZATION
SIERRA UNIFIED SCHOOL DISTRICT
33276 Lodge Road Tollhouse, CA
G-000
COVER SHEET
G -000
C O
V E
R S
H E
E T
S I E
R R
A U
S D
S I E
R R
A O
A K
S
C E
N T
E R
M O
D E
R N
I Z
A T
I O
N
L o d g e
R o a d
T o llh o u s e
C A
MEP ENGINEER
LEAF Engineers 7790 N Palm Ave Fresno, CA 93711 T 559-448-8400
ARCHITECT
PBK ARCHITECTS, INC
7790 N Palm Ave Fresno, CA 93711 T 559-448-8400
DISCIPLINE
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C HIT EC
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C H IT EC
T
S T
A T E O F C A L I F O R
N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A R C H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-2
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
04/27/2026
SIERRA USD
CDBG #24011
L
IC
EN S ED A R C H IT E C
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
PROFESSIONAL SEAL
ARCHITECT PBK Architects, Inc.
DATE
PROJECT NUMBER
DRAWN BY
REVISIONS
FRESNO
7790 North Palm Avenue
Fresno, CA 93711 559-448-8400 P 559-448-8467 F
PBK.com
15 23468 7911 101214 131517 1618
15 23468 7911 101214 131517 1618
N M
O K
J L
H G
I E
D F
B A
C
N M
O K
J L
H G
I E
D F
B A
C
PERMIT NO.
PLAN CHECK NO.
/2
/2
:2 :3
P
M
A u to d e sk
D o c s:
S ie rr a U
S D
X X
X X
S ie rr a O a ks
M o d e rn iz a tio n /S ie rr a U
S D
S e n io r
C e n te r_
V
.r vt
S
IE
R R
A O
A K
S C
E N
T E
R M
O D
E R
N
IZ
A T
IO
N
S
IE
R R
A U
S D
SHEET INDEX
04/16/2026
250440
SIERRA USD
Lo dg e
R oa d T ol lh ou se
, C A
G-001
25-011992
M.S.
25-1041
Signature Date
Expiration DateLicense NumberName
STATEMENT OF GENERAL CONFORMANCE
[Date]
[Architect of Record] 02-29-2027C-00002
The drawings identified as follows:
All drawing sheets included in this set not bearing my stamp and signature.
Drawing sheets included under the following PC approval(s):
[01-234567, 02-345678] have been prepared by other design professionals or consultants who are licensed and authorized to prepare such drawings (plans) in this state. The have been examined by me for:
1) Design intent and appear to meet the appropriate requirements of Title 24, California Code of Regulations and the project specifications prepared by me, and
2) Coordination with my drawings (plans) and specifications and are acceptable for incorporation into the construction of this project.
Per Title 24, Part 1, Section 4-316(b): This Statement of General Conformance shall not be construed as relieving me of my rights, duties, and responsibilities under Sections 17302 and 81138 of the Education Code and Sections 4-336, 4-341, and 4-344 of Title 24, Part 1.
Application No.: ##-###### File No.: ##-###
G-000 - COVER SHEET
G-001 - SHEET INDEX
G-002 - GENERAL PROJECT INFORMATION
A-100 - SITE PLAN
A-100.1 - ENLARGED SITE PLAN
A-101 - FLOOR PLANS
A-102 - RCP & ENLARGED FLOOR PLANS
X-100 - DETAILS
TITLE SHEETS
ARCHITECTURAL
PLUMBING
ELECTRICAL
P-001 - PLUMBING SHEET INDEX, LEGEND, & NOTES
P-101 - PLUMBING FLOOR PLAN
P-601 - PLUMBING DETAILS
E-001 - ELECTRICAL SHEET INDEX, LEGEND, & NOTES
E-101 - ELECTRICAL FLOOR PLAN
TOTAL: 13 SHEETS
# DESCRIPTION DATE
G-000 - COVER SHEET
G-001 - SHEET INDEX
G-002 - GENERAL PROJECT INFORMATION
A-100 - SITE PLAN
A-100.1 - ENLARGED SITE PLAN
A-101 - FLOOR PLANS
A-102 - RCP & ENLARGED FLOOR PLANS
X-100 - DETAILS
TITLE SHEETS
ARCHITECTURAL
PLUMBING
ELECTRICAL
P-001 - PLUMBING SHEET INDEX, LEGEND, & NOTES
P-101 - PLUMBING FLOOR PLAN
P-601 - PLUMBING DETAILS
E-001 - ELECTRICAL SHEET INDEX, LEGEND, & NOTES
E-101 - ELECTRICAL FLOOR PLAN
E-501 - ELECTRICAL SINGLE LINE DIAGRAM
TOTAL: 14 SHEETS
Signature Date
Expiration DateLicense NumberName
[Date]
[Architect of Record] 02-29-2022C-00002C32578 10-31-2025
09-1-2025
Jeffrey S. Berrios
2/18/2026
10/31/2027
DATE
02/18/2026
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C HIT EC
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C H IT EC
T
S T
A T E O F C A L I F O R
N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A R C H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-2
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
03/05/2026
DATE
03/05/2026
5 46
G-000 - COVER SHEET
G-001 - SHEET INDEX
G-002 - GENERAL PROJECT INFORMATION
A-100 - SITE PLAN
A-100.1 - ENLARGED SITE PLAN
A-100.2 - FIRE ACCESS PLAN
A-101 - FLOOR PLANS
A-102 - RCP & ENLARGED FLOOR PLANS
X-100 - DETAILS
TITLE SHEETS
ARCHITECTURAL
PLUMBING
ELECTRICAL
P-001 - PLUMBING SHEET INDEX, LEGEND, & NOTES
P-101 - PLUMBING FLOOR PLAN
P-601 - PLUMBING DETAILS
E-001 - ELECTRICAL SHEET INDEX, LEGEND, & NOTES
E-101 - ELECTRICAL FLOOR PLAN
E-501 - ELECTRICAL SINGLE LINE DIAGRAM
TOTAL: 15 SHEETS
DATE
09/10/25
DATE
01/28/2026
DATE
02/18/2026
DATE
03/05/2026 04/06/2026 04/27/2026
CDBG NO.
24011
A299
A299
ROOM
REFERENCE
DETAIL NUMBER
CALLOUT
CENTER LINE, & SYMBOL
BEYOND LINE
ABOVE LINE
REFERENCE
COLUMN LINE
PLAN NORTH
NORTH ARROW
TRUE NORTH
NORTH ARROW
WINDOW & LOUVER TAG
REVISION TAG
LEVEL POINT
BREAK LINE
SHEET NUMBER
ELEVATION NUMBER
BUILDING SECTION
REFERENCE
LEVEL
DOOR SEQUENCE
(RE: DOOR SCHEDULE)
LEVEL
DATUM POINT
EXIT SIGN
ROOM NAME
REFERENCE
MATCHLINE
REFERENCE
WALL SECTION
REFERENCE
REFERENCE
ROOM SEQUENCE
SHEET NUMBER
ELEVATION NUMBER
REFERENCE
EXTERIOR
INTERIOR
MATERIAL TAG
(RE: ROOM FINISH SCHEDULE)
REFERENCE
EXISTING/NEW
COLUMN LINE
CASEWORK TYPE (CDS NUMBER)
SIZE (WxD)
DIRECTION SYMBOL
VIEW REFERENCE
MATERIAL INDICATIONS
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
DEMOLISHED
NEW NON-RATED
CONSTRUCTION
CONSTRUCTION TYPE SYMBOLSPROJECT SYMBOLSPROJECT SYMBOLS
PROJECT GRAPHIC REFERENCES
SHEET NUMBER
A7.10
SIM
SIM
A
CW1
AB-1
30x34
SIM
A101
A
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
DETAIL NUMBER
LOCK
RE
WORKING POINT
SPOT ELEVATION
TOP OF FRAMING/STEEL
CURTAINWALL TAG
STOREFRONT TAG
CONCRETE
BRICK
CONC. MASONRY UNITS
(CMU)
RIGID INSULATION
BATT INSULATION
ACOUSTICAL TILE /
FABRIC PANEL
GYPSUM BOARD
PLASTER ON METAL LATH
FINISH WOOD
CONTINUOUS WOOD
BLOCKING / SHIM
PLYWOOD
EARTH
CAST STONE / SPRAY ON INSULATION
/ SAND / MORTAR
STEEL
ALUMINUM
STONE
GRAVEL
SEALANT
ROD STOCK & SEALANT
N
KEYNOTE TAGC01
BUILDING NAME (If Applicable)
SHEET SERIES TYPE
DISCIPLINE
AA-201A
LEVEL REFERENCE
BUILDING AREA (If Applicable)
0 GENERAL
1 PLANS: (Site, Floor, Finish, Graphics)
2 CEILING
3 ROOF
4 ENLARGED PLANS
5 ELEVATIONS (Exterior) 6 SECTIONS: (Bldg & Wall)
7 BLDG DETAILS
8 DIAGRAMS/COMPILED SCHEDULES:
(Partition Types, Door & Panel/Frame Types, Window Types)
9 INTERIOR FINISHES/SCHEDULES (Finish Plan, Interior Elevations, Casework/Millwork Elevations & Details, Locker Types & Details)
G GENERAL
C CIVIL
CA SPORTS CIVIL
SA SPORTS ARCH
S STRUCTURAL
L LANDSCAPE
D DEMOLITION
A ARCHITECTURAL
M MECHANICAL
E ELECTRICAL
P PLUMBING
T TECHNOLOGY
FS FOOD SERVICE
AV ACOUSTICAL
TH THEATRICAL
SUBDISCIPLINE
- NOT USED
S SITE
D DEMO
F FURNITURE
G GRAPHICS & SIGNAGE
Q EQUIPMENT
PROJECT GRAPHIC REFERENCES
BLDG AREA
BLDG AREA
RE: 01 / A-101B
SIM
A101
1 / A101
101A
ACT-1
8'-0"
CEILING TYPE
CEILING HEIGHT
CL
A7.10
S 3.
C
PARTITION TYPE TAG
(RE: PARTITION SCHEDULE)
PARTITION TYPE
STRUCTURAL CORE WIDTH
FIRE RATING TYPE
PARTITION MODIFIER
PROJECT LOCATION
LO
D
G E R
D
LODGE RD
LO
DG
E R D
SIERRA
HIGH
SCHOOL
N
ABBREVIATIONS AND LEGEND KEYS
REFER TO SCHEDULES AND LEGENDS FOR ADDITIONAL ABBREVIATIONS
REFER TO OTHER DISCIPLINES FOR ADDITIONAL ABBREVIATIONS
GOVERNING AGENCIES
VICINITY MAP
THE SCOPE OF WORK AS STATED BELOW IS FOR PLAN REVIEW PURPOSES ONLY AND DOES NOT
CONSTITUTE A DETAILED AND FULL EXPLANATION OF THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
SCOPE OF WORK INCLUDES ALL CONSTRUCTION AND SERVICES REQUIRED TO PROVIDE:
1. DEMOLITION OF FLOORING, FIXTURES, TOILET COMPARTMENTS, AND APPLIANCES
2. CONSTRUCTION OF MODERNIZATION OF SIERRA OAKS SENIOR CENTER. TO INCLUDE UPGRADES TO
FLOORING, FIXTURES, TOILET COMPARTMENTS, ELECTRICAL, AND PLUMBING AS SHOWN IN
DRAWINGS.
COUNTY OF FRESNO
PUBLIC WORKS & PLANNING
2220 TULARE STREET SUITE 'A'
FRESNO, CA, 93721
(559) 600-4540
1. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE REQUIREMENTS OF THE CODES
AND ALL APPLICABLE LOCAL ORDINANCES. WHERE CONTRACT DOCUMENTS EXCEED SUCH
REQUIREMENTS, WITHOUT VIOLATING SUCH CODES, REGULATIONS AND ORDINANCES, CONTRACT
DOCUMENTS TAKE PRECEDENCE. WHERE CODES CONFLICT, THE MORE STRINGENT SHALL APPLY.
2. PERFORMANCE BY THE CONSTRUCTION TEAM SHALL BE CONSISTENT WITH THE CONSTRUCTION DRAWINGS AND PROJECT MANUAL (SPECIFICATIONS) AS NECESSARY TO DELIVER THE INDICATED
RESULTS OF THE DESIGN INTENT.
3. REFER TO THE PROJECT MANUAL (SPECIFICATIONS) FOR GENERAL CONDITIONS, SUPPLEMENTARY
AND SPECIAL CONDITIONS, AND OTHER REQUIREMENTS.
4. THE CONSTRUCTION DOCUMENT DRAWINGS AND PROJECT MANUAL (SPECIFICATIONS) ARE
COMPLIMENTARY, AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY BOTH.
5. THE CONTRACTOR SHALL:
A. CONFIRM ALL NEW AND EXISTING CONDITIONS WITH THE CONTRACT DOCUMENTS. NOTIFY THE
ARCHITECT IMMEDIATELY IN WRITING OF ALL DISCREPANCIES OR CONFLICTS. DO NOT PROCEED
WITH WORK IN THE AREA OF DISCREPANCY OR CONFLICT UNTIL DIRECTION IS GIVEN BY THE
ARCHITECT. IF THE CONTRACTOR PROCEEDS WITHOUT DIRECTION FROM THE ARCHITECT, IT
SHALL BE AT THE CONTRACTOR'S RISK, AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
REQUIRED CORRECTIVE ACTION.
B. REVIEW THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF SYSTEMS SHOWN ON
CONSULTING ENGINEER'S DOCUMENTS. DISCREPANCIES BETWEEN THE ARCHITECTURAL AND
CONSULTING ENGINEER'S DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR DIRECTION. CONSTRUCTION INSTALLED IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS SHALL
BE CORRECTED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
C. CORRECT ALL WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION DOCUMENTS BY THE
CONTRACTOR AS DIRECTED BY THE ARCHITECT AND AT NO ADDITIONAL EXPENSE TO THE OWNER.
D. VISIT JOB SITE PRIOR TO BEGINNING WORK AND VERIFY ALL DIMENSIONS.
E. SECURE AND PAY FOR ALL PERMITS, GOVERNMENTAL FEES, AND LICENSES REQUIRED FOR
PROPER COMPLETION OF THE WORK. REQUEST ALL INSPECTIONS REQUIRED BY LOCAL
GOVERNMENTAL AGENCIES AND COORDINATE WORK ACCORDINGLY.
F. PROVIDE FOR THE PROPER SEQUENCE OF CONSTRUCTION, LOCATION, AND SIZE OF OPENINGS.
COORDINATE ALL CONSTRUCTION AS INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING
SHOP DRAWINGS REVIEWED BY THE ARCHITECT.
G. PROVIDE BARRICADES AND PROTECTIVE DEVICES SEPARATING CONSTRUCTION AREAS. PROVIDE
TEMPORARY PASSAGES AS REQUIRED. PRIOR TO DELIVERY OF MATERIALS TO CONSTRUCTION
ZONE AND REMOVAL OF WASTE FROM SITE, CHECK WITH OWNER FOR ACCEPTABLE ACCESS
ROUTE AND TIME. UNDER NO CIRCUMSTANCES USE AREA OUTSIDE THE CONSTRUCTION ZONE
WITHOUT PRIOR CLEARANCE FROM THE OWNER. COMPLY WITH REQUIREMENTS AS SPECIFIED IN
THE PROJECT MANUAL.
H. REMOVE ALL TRASH AND DEBRIS DAILY. DO NOT STORE BUILDING MATERIALS IN CORRIDORS AT
ANY TIME. COMPLY WITH REQUIREMENTS AS SPECIFIED IN THE PROJECT MANUAL
(SPECIFICATIONS).
I. ENACT ALL MEASURES TO PROTECT IN PLACE AND SAFEGUARD ALL ELEMENTS TO REMAIN FROM
BEING DAMAGED. REPLACE OR REPAIR ELEMENTS DAMAGED BY THE EXECUTION OF THE
CONTRACT TO EQUAL OR LIKE NEW CONDITION.
J. VERIFY POINTS OF CONNECTION, INCLUDING SIZES AND LOCATIONS, AND ALL OTHER REQUIRED
OPERATING CRITERIA WITH EQUIPMENT MANUFACTURER.
K. COORDINATE THE LOCATION AND TYPE OF ALL ACCESS PANELS REQUIRED FOR ACCESSING
MECHANICAL, PLUMBING, ELECTRICAL, AND OTHER BUILDING SYSTEMS WITH THE ARCHITECT.
L. ENSURE ALL CONSTRUCTION REMAINS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES UNTIL APPROVED BY THE INSPECTOR OF RECORD. FOR CONTINUOUS INSPECTION, TESTING, AND
OBSERVATION REQUIREMENTS, REFER TO THE TESTING AND OBSERVATION PROGRAM.
M. STIPULATE THAT ALL PROPOSED SUBSTITUTIONS ARE EQUAL IN PERFORMANCE AND COMPLY
WITH APPLICABLE CODES AND REGULATIONS. CONTRACTOR'S SUBSTITUTION OF ALTERNATE
MATERIALS OR SYSTEMS SHALL BE AT NO ADDITIONAL COST TO OWNER.
6. DO NOT SCALE THE CONSTRUCTION DOCUMENTS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED GRAPHICS. NOTIFY THE ARCHITECT IMMEDIATELY IN WRITING OF ALL ADDITIONAL REQUIRED DIMENSIONS. DO NOT PROCEED WITH WORK IN THE AREA OF DISCREPANCY OR CONFLICT UNTIL DIRECTION IS GIVEN BY THE ARCHITECT. IF THE CONTRACTOR PROCEEDS WITHOUT DIRECTION FROM
THE ARCHITECT, IT SHALL BE AT THE CONTRACTOR'S RISK, AND THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL REQUIRED CORRECTIVE ACTION.
7. WHERE WORK OR EQUIPMENT IS INDICATED "N.I.C." (NOT IN CONTRACT) ON THE DRAWINGS, SUCH WORK AND/OR EQUIPMENT SHALL BE PROVIDED BY OTHERS. CONTRACTOR SHALL COORDINATE AND
COOPERATE TO EFFECT SUCH INSTALLATION.
8. ALL PLAN DIMENSIONS SHOWN AT CENTER OF WALL REPRESENT CENTER LINE OF STUD OR
STRUCTURAL ELEMENT UNLESS NOTED OTHERWISE.
9. ALL PLAN DIMENSIONS FOR MASONRY AND CONCRETE REPRESENT FACE OF MATERIAL AND OPENING
UNLESS NOTED OTHERWISE.
10. ALL PLAN DIMENSIONS FOR STUD WALLS REPRESENT FACE OF STUD UNLESS NOTED OTHERWISE.
11. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE REVIEW OF THE ARCHITECT UNLESS NOTED (±) OR "VERIFY". DIMENSIONS NOTED "HOLD" SHALL BE CONSIDERED AS ABSOLUTE AND USED FOR LAYOUT
CONTROL UNLESS OTHERWISE DIRECTED BY THE ARCHITECT.
12. ANY ITEM, CONDITION OR DIMENSION NOTED AS "FIELD VERIFY" OR "VERIFY IN FIELD" SHALL BE
CONFIRMED ON SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCHITECT OF RECORD
BEFORE INCORPORATING INTO THE WORK.
PARTIAL LIST OF APPLICABLE CODES
2022 California Administrative Code (CAC) ......................................................................... (Part 1, Title 24, CCR) 2022 California Building Code (CBC) ................................................................................... (Part 2, Title 24, CCR)
(2021 International Building Code Volumes 1 & 2 with 2022 California Amendments) 2022 California Electrical Code (CEC) .................................................................................. (Part 3, Title 24, CCR)
(2020 National Electrical Code with 2022 California Amendments) 2022 California Mechanical Code (CMC) .............................................................................. (Part 4, Title 24, CCR)
(2021 IAPMO Uniform Mechanical Code with 2022 California Amendments) 2022 California Plumbing Code (CPC) .................................................................................. (Part 5, Title 24, CCR)
(2021 IAPMO Uniform Plumbing Code with 2022 California Amendments) 2022 California Energy Code (CEC) ...................................................................................... (Part 6, Title 24, CCR) 2022 California Fire Code (CFC) ............................................................................................ (Part 9, Title 24, CCR)
(2021 International Fire Code with 2022 California Amendments) 2022 California Existing Building Code (CEBC) .................................................................. (Part 10, Title 24, CCR)
(2021 International Existing Building Code with 2022 California Amendments) 2022 California Green Building Standards Code (CALGreen) ............................................ (Part 11, Title 24, CCR) 2022 California Referenced Standards Code ....................................................................... (Part 12, Title 24, CCR) Title 19 CCR, Public Safety, State Fire Marshal Regulations 2022 ASME A17.1/CSA B44-13 Safety Code For Elevators and Escalators (per 2022 CBC Part 2, Ch 35) Note: Cal/OSHA Elevator Unit enforces CCR Title 8 and uses the 2004 ASME A17.1 by adoption County of Fresno Ordinance Title 15
PARTIAL LIST OF APPLICABLE STANDARDS
NFPA 13 .... Standard for the Installation of Sprinkler Systems (as amended) * ...................................... (2022 Edition) NFPA 14 .... Standard for the Installation of Standpipe and Hose Systems (as amended) * .................... (2019 Edition) NFPA 17 .... Standard for Dry Chemical Extinguishing Systems .............................................................. (2021 Edition) NFPA 17A... Standard for Wet Chemical Extinguishing Systems ............................................................. (2021 Edition) NFPA 20 ..... Standard for the Installation of Stationary Pumps for Fire Protection ................................... (2022 Edition) NFPA 22 .... Standard for Water Tanks for Private Fire Protection ........................................................... (2018 Edition) NFPA 24 .... Standard for the Installation of Private Fire Service Mains and Their Appurtenances
(as amended)*....................................................................................................................... (2022 Edition) NFPA 25 .... Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems with California Amendments (Based on NFPA 25, 2011 Edition)......................................... (2020 Edition) NFPA 72 .... National Fire Alarm and Signaling Code (as amended) * ..................................................... (2022 Edition) NFPA 80 .... Fire Doors and Other Opening Protectives ........................................................................... (2022 Edition) NFPA 92 .... Standard for Smoke Control Systems ................................................................................... (2021 Edition) NFPA 253 .. Standard Method of Test for Critical Radiant Flux of Floor Covering Systems
Using a Radiant Heat Energy Source ................................................................................... (2019 Edition) NFPA 2001 Standard on Clean Agent Fire Extinguishing Systems (as amended) * .............................. (2022 Edition) ICC 300 ...... ICC Standard on Bleachers, Folding and Telescoping Seating and Grandstands ............... (2017 Edition) UL 300 ....... Standard for Fire Testing of Fire Extinguishing Systems for Protection of Commercial Cooking
Equipment—with Revisions through December 2014........................................................... (2019 Edition) UL 464 ....... Audible Signal Appliances—with Revisions through October 10, 2003 ................................ (2016 Edition) UL 521 ....... Heat Detectors for Fire Protective Signaling Systems—with Revisions through
July 01, 2019 ......................................................................................................................... (1999 Edition) UL 1971 ..... Standard for Signaling Devices for the Hearing Impaired ..................................................... (2018 Edition)
* See CBC Chapter 35, Referenced Standards for State of California amendments to the NFPA Standards.
For a complete list of applicable NFPA standards refer to 2022 CBC (SFM) Chapter 35 and California Fire Code (CFC) Chapter 80.
CODES & STANDARDS SCOPE OF WORK
25. INSPECTOR OF RECORD REQUIREMENTS:
A. ONE OR MORE INSPECTORS EMPLOYED BY THE OWNER IN ACCORDANCE WITH THE
REQUIREMENTS OF TITLE 24 OF THE CALIFORNIA CODE OF REGULATIONS WILL BE ASSIGNED TO THE WORK. THE INSPECTORS DUTIES ARE SPECIFICALLY DEFINED IN SECTION 4-342 OF SAID TITLE 24, PART 1 AND IN ADDITION SHALL BE AS STIPULATED IN INTERPRETATION OF REGULATION
DOCUMENT IR A-8.
B. INSPECTOR SHALL BE CERTIFIED AS A CLASS _____ INSPECTOR THROUGH THE DIVISION OF THE
STATE ARCHITECT INSPECTOR EXAMINATION PROGRAM. INSPACTOR SHALL ALSO BE
SPECIFICALLY APPROVED BY THE DIVISION OF THE STATE ARCHITECT FOR THIS PROJECT AT
LEAST 10 DAYS PRIOR TO THE START OF ANY WORK FOR THIS PROJECT.
26. ALL WORK SHOWN ON THESE DRAWINGS SHALL COMPLY WITH THE REQUIREMENTS OF TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR).
27. CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE MADE BY AN ADDENDUM OR A CONSTRUCTION CHANGE DOCUMENT APPROVED BY THE DIVISION OF THE STATE ARCHITECT, AS
REQUIRED BY TITLE 24, CCR, PART 1, SECTION 4-338.
28. GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND
ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL ORDINANCES.
29. DRINKING WATER SHALL COMPLY WITH ALL LOCAL HEALTH DEPARTMENT REQUIREMENTS.
30. FOOD HANDLING FACILITIES SHALL COMPLY WITH ALL LOCAL HEALTH REQUIREMENTS AND THE
CALIFORNIA RETAIL FOOD FACILITIES LAW.
31. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS THAT THE WORK OF THE ALTERATION, REHABILITATION OR RECONSTRUCTION IS TO BE IN ACCORDANCE WITH TITLE 24, CCR. SHOULD ANY CONDITIONS SUCH AS DETERIORATION OR NON-COMPLYING CONSTRUCTION BE DISCOVERED WHICH IS NOT COVERED BY THE CONTRACT DOCUMENTS WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH TITLE 24, CCR, A CONSTRUCTION CHANGE DOCUMENT (CCD), OR A SEPARATE SET OF PLANS AND SPECIFICATIONS, DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY THE DSA BEFORE PROCEEDING WITH THE WORK. (SECTION 4-317(C), PART 1, TITLE
24, CCR).
32. ALL SLOPE AND CROSS SLOPE OF ACCESSIBLE ROUTE PAVING INDICATED ON THESE DRAWINGS WAS
DESIGNED IN COMPLIANCE WITH THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN AND THE
ACCESSIBILITY STANDARDS OF THE CALIFORNIA BUILDING CODE (CBC) TITLE 24, PART 2, CHAPTER 11B OF THE CALIFORNIA CODE OF REGULATIONS (CCR). STRICT EXECUTION OF THE SLOPE AND CROSS SLOPE OF ACCESSIBLE ROUTE PAVING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
SHOULD A CONDITION PRESENT ITSELF THAT WOULD RESULT IN AN INSTALLATION OTHER THAN WHAT IS INDICATED IN THESE DRAWINGS, PBK ARCHITECTS INC. SHALL BE NOTIFIED IN WRITING AND A
COMPLIANT RESOLUTION WILL BE FORMULATED.
33. A DSA ACCEPTED TESTING LABORATORY DIRECTLY EMPLOYED BY THE DISTRICT (OWNER) SHALL
CONDUCT ALL THE REQUIRED TESTS AND INSPECTIONS FOR THE PROJECT.
34. CONSTRUCTION WASTE MANAGEMENT PLAN MUST BE FINALIZED PRIOR TO OCCUPANCY.
1. NONE
GENERAL NOTES
13. ALL HEIGHTS ARE DIMENSIONED FROM TOP OF SLAB UNLESS NOTED "AFF" (ABOVE FINISH FLOOR)
14. "TYPICAL" MEANS COMPARABLE CHARACTERISTICS FOR THE ELEVATION OR DETAIL NOTED. WHEN A DETAIL OR NOTE IS IDENTIFIED AS "TYPICAL", THE CONTRACTOR SHALL APPLY THIS DETAIL OR NOTE TO EVERY LIKE CONDITION, WHETHER OR NOT THE REFERENCE IS REPEATED IN EVERY INSTANCE.
VERIFY DIMENSIONS AND ORIENTATION ON PLANS.
15. PROVIDE WORK NOT SPECIFICALLY DETAILED OR SPECIFIED IN ACCORDANCE WITH DETAILS OR SIZES
COVERING SIMILAR WORK.
16. "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE ELEVATION OR DETAIL NOTED. VERIFY
DIMENSIONS AND ORIENTATION ON PLANS.
17. ABBREVIATIONS THROUGHOUT THE DOCUMENTS COMPLY WITH DOCUMENT ABBREVIATION LIST OR
ARE THOSE IN COMMON USE. ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION.
18. THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY
19. THESE DOCUMENTS AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF PBK ARCHITECTS, INC., AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF PBK
ARCHITECTS, INC.
20. THE WORK SHOWN ON THESE DRAWINGS AS EXISTING CONDITIONS WAS PREPARED FROM
INFORMATION FURNISHED BY THE OWNER. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, PBK ARCHITECTS, INC. IS NOT RESPONSIBLE FOR THE ACCURACY OR ADEQUACY OF ANY WORK
SHOWN AS EXISTING NOR IS PBK ARCHITECTS, INC. RESPONSIBLE FOR ANY ERRORS OR OMISSIONS
WHICH MAY HAVE BEEN INCORPORATED INTO THESE DRAWINGS AS A RESULT.
21. FIRE SAFETY DURING CONSTRUCTION & DEMOLITION:
A. GENERAL: FIRE SAFETY DURING CONSTRUCTION SHALL COMPLY WITH CALIFORNIA FIRE CODE
(CFC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9, CHAPTER 5 AND CHAPTER 33.
B. ACCESS ROADS: FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED IN
ACCORDANCE WITH CHAPTER5, SECTION 501.4 AND CHAPTER 33, SECTION 3311.
C. WATER SUPPLY: WATER MAINS AND HYDRANTS SHALL BE OPERATION IN ACCORDANCE WITH
CHAPTER 5, SECTION 501.4 AND CHAPTER 33, SECTION 3313.
D. BUILDING ACCESS: ACCESS TO BUILDINGS FOR THE PURPOSE OF FIREFIGHTING SHALL BE
PROVIDED. CONSTRUCTION MATERIAL SHALL NOT BLOCK ACCESS TO BUILDINGS, HYDRANTS OR
FIRE APPLIANCES.
E. ALTERATIONS OF BUILDINGS: SHALL COMPLY WITH APPLICABLE PROVISIONS OF CHAPTER 33.
F. DEMOLITION OF BUILDINGS: SHALL COMPLY WITH APPLICABLE PROVISIONS OF CHAPTER 33.
G. FIRE WATCH: MAINTAIN FIRE WATCH WHEN REQUIRED BY THE BUILDING OFFICIAL AND WHEN
EXISTING FIRE PROTECTION SYSTEMS ARE SHUT DOWN FOR ALTERATIONS IN ACCORDANCE WITH CHAPTER 33, SECTION 3305.5. FIRE WATCH SHALL REMAIN IN EFFECT UNTIL EXISTING FIRE PROTECTION SYSTEMS ARE RETURNED TO SERVICE OR AS ALLOWED BY THE BUILDING OFFICIAL.
22. PENETRATIONS TO FIRE RATED MATERIALS OR ASSEMBLIES SHALL BE RESTORED TO EQUAL RATING.
FIRE STOP SYSTEMS AS LISTED BY UNDERWRITERS LABORATORIES SHALL BE INSTALLED PER FIRE
RESISTANCE DIRECTORY. FIRE STOP SYSTEMS SHALL BE AS SPECIFIED.
23. CUTTING, BORING, SAW-CUTTING OR DRILLING THROUGH STRUCTURAL ELEMENTS SHALL NOT
COMMENCE UNTIL THE DRAWINGS HAVE BEEN SUMITTED, REVIEWED, AND APPROVED BY THE
ARCHITECT OF RECORD.
24. NONRESIDENTIAL ENERGY STANDARDS COMPLIANCE STATEMENT (TITLE 24, PART 6):
THE DESIGN INDICATED HEREIN COMPLIES WITH THE REQUIREMENTS OF THE ENERGY
CONSERVATION STANDARDS OF TITLE 24, PART 6, CALIFORNIA CODE OF REGULATIONS. THE
PROPOSED BUILDING(S) WILL BE IN COMPLIANCE WITH THE ENERGY CONSERVATION STANDARDS PROVIDED IT (THEY) IS (ARE) BUILT ACCORDING TO THESE DRAWINGS AND SPECIFICATIONS AND
PROVIDED ANY FUTURE IMPROVEMENTS ARE COMPLETED ACCORDING TO THE REQUIREMENTS OF
TITLE 24, PART 6, CALIFORNIA CODE OF REGULATIONS. THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED TO INCLUDE ALL SIGNIFICANT ENERGY CONSERVATION FEATURES REQUIRED FOR
COMPLIANCE WITH THE STANDARDS. BUILDING AREAS THAT ARE UNCONDITIONED AND/OR NOT
SUBJECT TO THE STANDARDS ARE INDICATED ON THE PLANS.
ENVELOPE MANDATORY MEASURES:
A. INSTALLED INSULATING MATERIALS SHALL HAVE BEEN CERTIFIED BY THE MANUFACTURER TO
COMPLY WITH THE CALIFORNIA QUALITY STANDARDS FOR INSULATING MATERIAL.
B. ALL INSULATING MATERIALS SHALL BE INSTALLED IN COMPLIANCE WITH THE FLAME SPREAD
RATING AND SMOKE DENSITY REQUIREMENTS OF TITLE 24, PART 2, CALIFORNIA CODE OF
REGULATIONS, SECTIONS 720 AND 2603.
C. ALL EXTERIOR JOINTS AND OPENINGS IN THE BUILDING ENVELOPE THAT ARE POTENTIAL AND
OBSERVABLE SOURCES OF AIR LEAKAGE SHALL BE CAULKED, GASKETED, WEATHERSTRIPPED OR
OTHERWISE SEALED.
D. SITE CONSTRUCTED DOORS, WINDOWS, AND SKYLIGHTS SHALL BE CAULKED BETWEEN THE UNIT
AND THE BUILDING, AND SHALL BE WEATHERSTRIPPED (EXCEPT FOR UNFRAMED GLASS DOORS
AND FIRE DOORS).
E. MANUFACTURED DOORS AND WINDOWS INSTALLED SHALL HAVE AIR INFILTRATION RATES
CERTIFIED BY THE MANUFACTURER IN ACCORDANCE WITH TITLE 24, PART 6, CALIFORNIA CODE OF
REGULATIONS, SECTION 110.6.
F. MANUFACTURED FENESTRATION PRODUCTS IN THE ENVELOPE OF THE BUILDING, INCLUDING, BUT
NOT LIMITED TO, WINDOWS, SLIDING GLASS DOORS, FRENCH DOORS, SKYLIGHTS, CURTAIN
WALLS, AND GARDEN WINDOWS MUST BE LABELED FOR U-VALUE IN ACCORDANCE WITH THE
(NFRC) NATIONAL FENESTRATION RATING COUNCIL'S INTERIM U-VALUE RATING PROCEDURE.
G. DEMISING WALL INSULATION SHALL BE INSTALLED IN ALL OPAQUE PORTIONS OF FRAMED WALLS
(EXCEPT DOORS).
A
ABV above
ACOUS acoustical
ACT acoustical ceiling tile
AD area drain
ADJ adjustable
AFF above finished floor
ALT alternate
ALUM aluminum
APPROX approximate
ARCH architect / architectural
B
B.O. bottom of
BALC balcony
BD board
BET between
BLDG building
BLKG blocking
BLW below
BM beam
BOT bottom
BRKT bracket
BULKHD bulkhead
BUR built up roof
C
C.G. corner guard
CAB cabinet
CALK caulking
CDS cabinet design series
CEM cement
CER ceramic
CJ control joint
CLG ceiling
CLOS closet
CLR clear
CO cased opening
COL column
CONC concrete
CONT continous
CPT carpet
CT ceramic tile
CTR center
CW curtain wall
D
DBL double
DET detail
DIA diameter
DIM dimension
DN down
DR door
DS down spout
DW dishwasher
DWG drawing
E
E east
EA each
EIFS exterior insulation & finish system
ELEC electric(al)
ELEV elevation
EMER emergency
ENCL enclosure
EOS edge of slab
EQ equal
EQUIP equipment
ETR existing to remain
EW each way
EXP. JT. expansion joint
EXST existing
F
F.O. face of
FA fire alarm
FAP fire annunciuator panel
FD floor drain
FE fire extinguisher
FEC fire extinguisher cabinet
FG finish group
FH fire hydrant
FHC fire hose cabinet
FIN finish
FLR floor
FLUOR fluorescent
FT foot or feet
FUR furring
G
GAL gallon
GALV galvanized
GB grab bar
GC general contractor
GL glass
GND ground
GWB gypsum wall board
GYP gypsum
H
H.W.H. hot water heater
HC handicapped
HDWD hardwood
HDWR hardware
HM hollow metal
HORIZ horizontal
HR hour
HT height
I
ID inner diameter
INCAN incandescent
INSUL insulation
INT interior
J
JAN janitor
JST joist
JT joint
L
LAM laminate
LAV lavatory
LB pound(s)
LDG landing
LT light
M
MAX maximum
MECH mechanical
MEMB membrane
MFR manufacturer
MIN minimum
MISC miscellaneous
MO masonry opening
MTD mounted
MTL metal
N
N north
NIC not in contract
NO number
NOM nominal
NTS not to scale
O
O.P. overflow pipe
OA overall
OC on center
OD outside diameter
OFF office
OH opposite hand
OPG opening
OPP opposite
P
PART partition
PCT porcelain tile
PERM perimeter
PG paint grade
PLAM plastic laminate
PLAS plaster
PLYWD plywood
POLYISO polyisocyanurate
PR pair
PT paint
PTD painted
R
R riser
RAD radius
RCP reflected ceiling plan
RD roof drain
RE: refer
REF refrigerator
REINF reinforced
REQD required
RESIL resilient
RM room
RO rough opening
RTU root top unit (mech)
S
S south
SAFB sound attenunation fiber batt
SC scupper
SCHED schedule
SEAL sealant
SECT section
SF square foot
SHT sheet
SIM similar
SPEC specification
SQ square
SS stainless steel
STD standard
STF storefront
STL steel
STOR storage
STRUCT structural
SUSP suspended
SYM symmetrical
T
T tread
T&G tongue & groove
T.O. top of
TEL telephone
TER terrazzo
THK thick
THR threshold
TYP typical
U
UC undercut
UNFIN unfinished
UNO unless noted otherwise
UON unless otherwise noted
UTIL utility
V
VCT vinyl compostion tile
VERT vertical
VIF verify in field
VTR vent termination pipe
VWC vinyl wall covering
W
W west
W/ with
W/O without
WC watercloset
WIN window
WP waterproof
WS wood, solid core
WSCT wainscot
WT weight
X
XPS extruded polystrene
DEFERRED SUBMITTAL ITEMS:
INSTALLATION OF DEFERRED SUBMITTAL ITEMS SHALL NOT BE STARTED UNTIL DETAILED PLANS, SPECIFICATIONS, AND ENGINEERING CALCULATIONS HAVE BEEN ACCEPTED AND SIGNED BY THE
ARCHITECT OR ENGINEER IN GENERAL RESPONSIBLE CHARGE OF DESIGN AND SIGNED BY A
CALIFORNIA REGISTERED ARCHITECT OR PROFESSIONAL ENGINEER WHO HAS BEEN DELEGATED
RESPONSIBILITY COVERING THE WORK SHOWN ON A PARTICULAR PLAN OR SPECIFICATION AND
APPROVED BY THE DIVISION OF THE STATE ARCHITECT.
DEFFERED SUBMITTAL ITEMS SHALL BE SUBMITTED FOR REVIEW NO LATER THAN 60 DAYS AFTER THE
NOTICE TO PROCEED.
DEFERRED SUBMITTAL ITEMS FOR THIS PROJECT ARE THE FOLLOWING ITEMS:
L
IC
EN S ED A R C H IT E C
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
PROFESSIONAL SEAL
ARCHITECT PBK Architects, Inc.
DATE
PROJECT NUMBER
DRAWN BY
REVISIONS
FRESNO
7790 North Palm Avenue
Fresno, CA 93711 559-448-8400 P 559-448-8467 F
PBK.com
15 23468 7911 101214 131517 1618
15 23468 7911 101214 131517 1618
N M
O K
J L
H G
I E
D F
B A
C
N M
O K
J L
H G
I E
D F
B A
C
PERMIT NO.
PLAN CHECK NO.
/2
/2
:2 :3
P
M
A u to d e sk
D o c s:
S ie rr a U
S D
X X
X X
S ie rr a O a ks
M o d e rn iz a tio n /S ie rr a U
S D
S e n io r
C e n te r_
V
.r vt
S
IE
R R
A O
A K
S C
E N
T E
R M
O D
E R
N
IZ
A T
IO
N
S
IE
R R
A U
S D
GENERAL
PROJECT
INFORMATION
01/28/2026
250440
SIERRA USD
Lo dg e
R oa d T ol lh ou se
, C A
G-002
25-011992
M.S.
25-1041
PROJECT DIRECTORY
OWNER: SIERRA UNIFIED SCHOOL DISTRICT
33220 LODGE ROAD
TOLLHOUSE, CA
(559) 855-8314 EMAIL: kcapps@sierrausd.org
CONTACT: KELLY CAPPS
ARCHITECT: PBK ARCHITECTS, INC
7790 N PALM AVE
FRESNO, CA
(559) 448-8400 EMAIL: jeff.berrios@pbk.com
CONTACT: JEFF BERRIOS
MEP: LEAF ENGINEERS
7790 N PALM AVE
FRESNO, CA
(559) 448-8400 EMAIL: garen.lencioni@leafengineers.com
CONTACT: GAREN LENCIONI
# DESCRIPTION DATE
DATE
02/18/2026
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C HIT EC
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C H IT EC
T
S T
A T E O F C A L I F O R
N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A R C H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-2
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
DATE
03/05/2026
DATE
09/10/25
DATE
01/28/2026
DATE
02/18/2026
DATE
03/05/2026 04/06/2026
LO
D
G E R
D
SIERRA
HIGH
SCHOOL
S
THE SCOPE OF WORK AS STA
CONSTITUTE A DETAILED AND
DOCUMENTS.
SCOPE OF WORK INCLUDES A
1. DEMOLITION OF FLOORIN
2. CONSTRUCTION OF MODE
FLOORING, FIXTURES, TO
DRAWINGS.
PARTIAL LIST OF APPLICABLE CODES
2025 California Administrative Code (CAC) ......................................................................... (Part 1, Title 24, CCR) 2025 California Building Code (CBC) ................................................................................... (Part 2, Title 24, CCR)
(2024 International Building Code Volumes 1 & 2 with 2025 California Amendments) 2025 California Electrical Code (CEC) .................................................................................. (Part 3, Title 24, CCR)
(2023 National Electrical Code with 2025 California Amendments) 2025 California Plumbing Code (CPC) .................................................................................. (Part 5, Title 24, CCR)
(2024 IAPMO Uniform Plumbing Code with 2025 California Amendments) 2025 California Fire Code (CFC) ............................................................................................ (Part 9, Title 24, CCR)
(2024 International Fire Code with 2025 California Amendments) 2025 California Existing Building Code (CEBC) .................................................................. (Part 10, Title 24, CCR)
(2024 International Existing Building Code with 2025 California Amendments) 2025 California Green Building Standards Code (CALGreen) ............................................ (Part 11, Title 24, CCR) 2025 California Referenced Standards Code ....................................................................... (Part 12, Title 24, CCR) Title 19 CCR, Public Safety, State Fire Marshal Regulations County of Fresno Ordinance Title 15
PARTIAL LIST OF APPLICABLE STANDARDS
NFPA 17 .... Standard for Dry Chemical Extinguishing Systems .............................................................. (2024 Edition) NFPA 25 .... Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems with California Amendments (Based on NFPA 25, 2011 Edition)......................................... (2023 Edition) NFPA 72 .... National Fire Alarm and Signaling Code (as amended) * ..................................................... (2025 Edition) NFPA 92 .... Standard for Smoke Control Systems ................................................................................... (2024 Edition)
* See CBC Chapter 35, Referenced Standards for State of California amendments to the NFPA Standards.
For a complete list of applicable NFPA standards refer to 2025 CBC (SFM) Chapter 35 and California Fire Code (CFC) Chapter 80.
CODES & STANDARDS
5 3467
04/27/2026
GENERAL ARCH PLAN NOTES
1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE, CONTACT ARCH IF
CLARIFICATION IS NECESSARY IN ORDER TO DETERMINE THE INTENT OF THE CONTRACT
DOCUMENTS.
2. DRAWINGS NOTED AS "N.T.S" OR "NTS" ARE NOT TO SCALE.
3. ALL DIMENSIONS ARE TO STRUCTURAL COLUMN LINES OR THE SURFACE OF PARTITION ASSEMBLY
U.N.O.
4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE COMMENCING WORK. NOTIFY
ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH AFFECTED WORK.
5. NOTES OR DIMENSIONS NOTED AS "TYPICAL" OR "TYP." OR "TYP" SHALL APPLY TO CONDITIONS THAT
ARE THE SAME OR SIMILAR.
6. DIMENSIONS NOTED AS "FIELD VERIFY" OR "V.I.F." OR "VIF" SHALL BE MEASURED AND CONFIRMED AT
THE PROJECT SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCH. BEFORE INCORPORATING
INTO THE WORK.
7. DIMENSIONS NOTED AS "CLEAR" OR "CLEAR INSIDE" OR "CLR" REQUIRE SPECIFIC COORDINATION
AMONG DISCIPLINES AND OR MANUFACTURERS.
8. REFER TO PARTITION TYPES ON A-800 SERIES SHEETS.
9. ALIGN FINISHED FACE OF WALLS WHERE WALL PARTITIONS OF DIFFERING THICKNESS ABUT AND OR
ADJOIN IN THE SAME PLANE.
10. PROVIDE AND INSTALL CONTINUOUS REVEAL TRIM AT JOINT WHERE GYPSUM BOARD WALL
PARTITIONS ABUT AND OR ADJOIN MASONRY WALL PARTITIONS IN THE SAME PLANE.
11. ALL INTERIOR CMU OUTSIDE CORNERS SHALL HAVE BULLNOSE U.N.O.
12. ALL DOORS SHALL BE SET 4 INCHES OFF THE ADJACENT PERPENDICULAR WALL ON THE HINGE SIDE
OF THE DOOR U.N.O., NOTIFY ARCH. OF ANY DOOR-RELATED CONFLICTS, INCLUDING BUT NOT
LIMITED TO CONFLICTS CONCERNING ACCESSIBILITY STANDARDS.
13. ALL DOOR THRESHOLDS AT ALL EXTERIOR DOORS SHALL BE SET IN FULL BED OF SEALANT.
14. COORDINATE ALL ROOF DRAIN LEADER LOCATIONS WITH FLOOR PLAN PRIOR TO FLOOR SLAB
CONSTRUCTION.
15. ALL FLOOR SLOPES TO FLOOR DRAINS SHALL NOT EXCEED 1:48.
16. PROVIDE AND INSTALL SELF-LEVELING UNDERLAYMENT WHERE UNEVEN FLOOR SLAB EXISTS PRIOR
TO INSTALLATION OF FLOOR FINISHES.
17. COORDINATE HOUSEKEEPING PAD LOCATIONS AND DIMENSIONS WITH EQUIPMENT TO BE INSTALLED.
18. ALL REQUIRED ACCESSIBLE CLEARANCES FOR ALL ITEMS, INCLUDING BUT NOT LIMITED TO ALL
COUNTER TOPS, ALL PLUMBING FIXTURES, ALL DRINKING FOUNTAINS, ALL ELECTRIC WATER
COOLERS, ALL LAVATORIES, ALL URINALS, ALL TOILETS SHALL BE STRICTLY ENFORCED.
19. APPLY BITUMINOUS COATING TO ALL CONCEALED STRUCTURAL STEEL MEMBERS AT ALL EXTERIOR
CANOPY LOCATIONS.
20. REFER TO OTHER DISCIPLINE DOCUMENTS FOR ADDITIONAL SCOPE OF WORK.
21. ALL EXISTING DOOR OPENING HARDWARE SHALL BE EITHER LEVER ACTION, PANIC, PUSH-PULL, OR
SIMILAR TYPE.
22. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY
OR SPECIAL KNOWLEDGE/EFFORT.
23. THE UNLATCHING OF ANY DOOR OR LEAF FOR EGRESS SHALL REQUIRE NOT MORE THAN ONE
MOTION IN A SINGULAR LINEAR OR ROTATIONAL DIRECTION TO RELEASE ALL LATCHING AND
LOCKING DEVICES.
24. EXISTING DOOR HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MINIMUM AND 48" MAXIMUM ABOVE THE FINISHED FLOOR. LOCKS USED ONLY FOR
SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT.
25. THE EXISTING RAMP AND GUARDRAIL SHALL COMPLY WITH THE CURRENT OR PROCEEDING EDITION
OF THE CALIFORNIA BUILDING CODE SECTION 11B-405.
26. FIELD VERIFY SIGN ABOVE THE PRIMARY ENTRANCE STATING "THIS DOOR TO REMAIN UNLOCKED
WHEN THE SPACE IS OCCUPIED".
27. THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN CBC CHAPTER 10.
28. THE PATH OF EGRESS TO ANY EXIT SHALL NOT BE BLOCKED.
29. AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM OR SPACE THAT CAN BE LOCKED TO PREVENT
ACCESS.
30. FIELD VERIFY ILLUMINATED EXIT SIGNAGE EXISTS AT ALL EGRESS DOORS.
31. MINIMUM SIZE OF EGRESS EXIT DOORS TO COMPLY WITH CBC 1010.1.1
EXISTING
FACILITY
(NOT IN SCOPE)
SIERRA OAKS
SENIOR CENTER
8'
-9
/8
1,177'-11 3/8"
PROPERTY LINE
PROPERTY LINE
P R
O P
E R
T Y
L
IN
E
P R
O P
E R
T Y
L
IN
E
SIERRA
HIGH
SCHOOL
LODGE ROAD
LODGE R
OAD
LO
D
G E
R O
A D
2, 2'
1,224'
1, 4'
2"
1,141' - 4"
2,553'
2, 1'
SEPTIC TANK
TIED INTO SITE'S
WASTEWATER
HEADWORKS
SYSTEM
GENERAL SITE PLAN NOTES
1. VERIFY ALL SITE SIGNAGE LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION OF SITE SIGNAGE.
2. EXISTING ACCESSIBLE PATH OF TRAVEL ELEMENTS; PARKING, RAMPS, ENTRANCES, ETC. MUST
COMPLY WITH CURRENT OR PRECEDING EDITION OF THE CALIFORNIA BUILDING CODE CHAPTER 11B.
L
IC
EN S ED A R C H IT E C
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
PROFESSIONAL SEAL
ARCHITECT PBK Architects, Inc.
DATE
PROJECT NUMBER
DRAWN BY
REVISIONS
FRESNO
7790 North Palm Avenue
Fresno, CA 93711 559-448-8400 P 559-448-8467 F
PBK.com
15 23468 7911 101214 131517 1618
15 23468 7911 101214 131517 1618
N M
O K
J L
H G
I E
D F
B A
C
N M
O K
J L
H G
I E
D F
B A
C
PERMIT NO.
PLAN CHECK NO.
/2
/2
:2 :3
P
M
A u to d e sk
D o c s:
S ie rr a U
S D
X X
X X
S ie rr a O a ks
M o d e rn iz a tio n /S ie rr a U
S D
S e n io r
C e n te r_
V
.r vt
S
IE
R R
A O
A K
S C
E N
T E
R M
O D
E R
N
IZ
A T
IO
N
S
IE
R R
A U
S D
SITE PLAN
01/28/2026
250440
SIERRA USD
Lo dg e
R oa d T ol lh ou se
, C A
A-100
25-011992
M.S.
25-1041
1" = 200'-0"1 SITE PLAN N
# DESCRIPTION DATE
DATE
02/18/2026
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C HIT EC
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
L
IC
ENS E D A R C H IT EC
T
S T
A T E O F C A L I F O R
N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER RI O
SC 32578
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A RC H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-23
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
EN S ED A R C H IT E C
T
S T
A T E O F C A L I F O
R N
IA
RENEWAL DATE
9-30-2
JO
HN
HA MILTON SM
IT
HC 15885
L
IC
ENS E D A R C H IT EC
T
S T
A
T E O F C A L IF O
R N
IA
RENEWAL DATE
10-31-27
JE
FF
REY S. BER
RI O
SC 32578
GENERAL ARCH PLAN NOTES
1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE, CONTACT ARCH IF
CLARIFICATION IS NECESSARY IN ORDER TO DETERMINE THE INTENT OF THE CONTRACT
DOCUMENTS.
2. DRAWINGS NOTED AS "N.T.S" OR "NTS" ARE NOT TO SCALE.
3. ALL DIMENSIONS ARE TO STRUCTURAL COLUMN LINES OR THE SURFACE OF PARTITION ASSEMBLY
U.N.O.
4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE COMMENCING WORK. NOTIFY
ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH AFFECTED WORK.
5. NOTES OR DIMENSIONS NOTED AS "TYPICAL" OR "TYP." OR "TYP" SHALL APPLY TO CONDITIONS THAT
ARE THE SAME OR SIMILAR.
6. DIMENSIONS NOTED AS "FIELD VERIFY" OR "V.I.F." OR "VIF" SHALL BE MEASURED AND CONFIRMED AT
THE PROJECT SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCH. BEFORE INCORPORATING
INTO THE WORK.
7. DIMENSIONS NOTED AS "CLEAR" OR "CLEAR INSIDE" OR "CLR" REQUIRE SPECIFIC COORDINATION
AMONG DISCIPLINES AND OR MANUFACTURERS.
8. REFER TO PARTITION TYPES ON A-800 SERIES SHEETS.
9. ALIGN FINISHED FACE OF WALLS WHERE WALL PARTITIONS OF DIFFERING THICKNESS ABUT AND OR
ADJOIN IN THE SAME PLANE.
10. PROVIDE AND INSTALL CONTINUOUS REVEAL TRIM AT JOINT WHERE GYPSUM BOARD WALL
PARTITIONS ABUT AND OR ADJOIN MASONRY WALL PARTITIONS IN THE SAME PLANE.
11. ALL INTERIOR CMU OUTSIDE CORNERS SHALL HAVE BULLNOSE U.N.O.
12. ALL DOORS SHALL BE SET 4 INCHES OFF THE ADJACENT PERPENDICULAR WALL ON THE HINGE SIDE
OF THE DOOR U.N.O., NOTIFY ARCH. OF ANY DOOR-RELATED CONFLICTS, INCLUDING BUT NOT
LIMITED TO CONFLICTS CONCERNING ACCESSIBILITY STANDARDS.
13. ALL DOOR THRESHOLDS AT ALL EXTERIOR DOORS SHALL BE SET IN FULL BED OF SEALANT.
14. COORDINATE ALL ROOF DRAIN LEADER LOCATIONS WITH FLOOR PLAN PRIOR TO FLOOR SLAB
CONSTRUCTION.
15. ALL FLOOR SLOPES TO FLOOR DRAINS SHALL NOT EXCEED 1:48.
16. PROVIDE AND INSTALL SELF-LEVELING UNDERLAYMENT WHERE UNEVEN FLOOR SLAB EXISTS PRIOR
TO INSTALLATION OF FLOOR FINISHES.
17. COORDINATE HOUSEKEEPING PAD LOCATIONS AND DIMENSIONS WITH EQUIPMENT TO BE INSTALLED.
18. ALL REQUIRED ACCESSIBLE CLEARANCES FOR ALL ITEMS, INCLUDING BUT NOT LIMITED TO ALL
COUNTER TOPS, ALL PLUMBING FIXTURES, ALL DRINKING FOUNTAINS, ALL ELECTRIC WATER
COOLERS, ALL LAVATORIES, ALL URINALS, ALL TOILETS SHALL BE STRICTLY ENFORCED.
19. APPLY BITUMINOUS COATING TO ALL CONCEALED STRUCTURAL STEEL MEMBERS AT ALL EXTERIOR
CANOPY LOCATIONS.
20. REFER TO OTHER DISCIPLINE DOCUMENTS FOR ADDITIONAL SCOPE OF WORK.
21. ALL EXISTING DOOR OPENING HARDWARE SHALL BE EITHER LEVER ACTION, PANIC, PUSH-PULL, OR
SIMILAR TYPE.
22. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY
OR SPECIAL KNOWLEDGE/EFFORT.
23. THE UNLATCHING OF ANY DOOR OR LEAF FOR EGRESS SHALL REQUIRE NOT MORE THAN ONE
MOTION IN A SINGULAR LINEAR OR ROTATIONAL DIRECTION TO RELEASE ALL LATCHING AND
LOCKING DEVICES.
24. EXISTING DOOR HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MINIMUM AND 48" MAXIMUM ABOVE THE FINISHED FLOOR. LOCKS USED ONLY FOR
SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT.
25. THE EXISTING RAMP AND GUARDRAIL SHALL COMPLY WITH THE CURRENT OR PROCEEDING EDITION
OF THE CALIFORNIA BUILDING CODE SECTION 11B-405.
26. FIELD VERIFY SIGN ABOVE THE PRIMARY ENTRANCE STATING "THIS DOOR TO REMAIN UNLOCKED
WHEN THE SPACE IS OCCUPIED".
27. THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN CBC CHAPTER 10.
28. THE PATH OF EGRESS TO ANY EXIT SHALL NOT BE BLOCKED.
29. AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM OR SPACE THAT CAN BE LOCKED TO PREVENT
ACCESS.
30. FIELD VERIFY ILLUMINATED EXIT SIGNAGE EXISTS AT ALL EGRESS DOORS. PROVIDE TACTILE SIGNS
AT EGRESS DOORS IF NOT EXISTING.
31. MINIMUM SIZE OF EGRESS EXIT DOORS TO COMPLY WITH CBC 1010.1.1
32. NO MECHANICAL WORK REQUIRED FOR THIS PERMIT. HVAC UNITS, REGISTERS, AND DUCTWORK TO
REMAIN IN PLACE AS IS.
GENERAL SITE PLAN NOTES
1. VERIFY ALL SITE SIGNAGE LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION OF SITE SIGNAGE.
2. EXISTING ACCESSIBLE PATH OF TRAVEL ELEMENTS; PARKING, RAMPS, ENTRANCES, ETC. MUST
COMPLY WITH CURRENT OR PRECEDING EDITION OF THE CALIFORNIA BUILDING CODE CHAPTER 11B.
N M
O K
J L
I
DATE
03/05/2026
GENERAL ARCH PLAN NOTES
1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE, CONTACT ARCH IF
CLARIFICATION IS NECESSARY IN ORDER TO DETERMINE THE INTENT OF THE CONTRACT
DOCUMENTS.
2. DRAWINGS NOTED AS "N.T.S" OR "NTS" ARE NOT TO SCALE.
3. ALL DIMENSIONS ARE TO STRUCTURAL COLUMN LINES OR THE SURFACE OF PARTITION ASSEMBLY
U.N.O.
4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE COMMENCING WORK. NOTIFY
ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH AFFECTED WORK.
5. NOTES OR DIMENSIONS NOTED AS "TYPICAL" OR "TYP." OR "TYP" SHALL APPLY TO CONDITIONS THAT
ARE THE SAME OR SIMILAR.
6. DIMENSIONS NOTED AS "FIELD VERIFY" OR "V.I.F." OR "VIF" SHALL BE MEASURED AND CONFIRMED AT
THE PROJECT SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCH. BEFORE INCORPORATING
INTO THE WORK.
7. DIMENSIONS NOTED AS "CLEAR" OR "CLEAR INSIDE" OR "CLR" REQUIRE SPECIFIC COORDINATION
AMONG DISCIPLINES AND OR MANUFACTURERS.
8. REFER TO PARTITION TYPES ON A-800 SERIES SHEETS.
9. ALIGN FINISHED FACE OF WALLS WHERE WALL PARTITIONS OF DIFFERING THICKNESS ABUT AND OR
ADJOIN IN THE SAME PLANE.
10. PROVIDE AND INSTALL CONTINUOUS REVEAL TRIM AT JOINT WHERE GYPSUM BOARD WALL
PARTITIONS ABUT AND OR ADJOIN MASONRY WALL PARTITIONS IN THE SAME PLANE.
11. ALL INTERIOR CMU OUTSIDE CORNERS SHALL HAVE BULLNOSE U.N.O.
12. ALL DOORS SHALL BE SET 4 INCHES OFF THE ADJACENT PERPENDICULAR WALL ON THE HINGE SIDE
OF THE DOOR U.N.O., NOTIFY ARCH. OF ANY DOOR-RELATED CONFLICTS, INCLUDING BUT NOT
LIMITED TO CONFLICTS CONCERNING ACCESSIBILITY STANDARDS.
13. ALL DOOR THRESHOLDS AT ALL EXTERIOR DOORS SHALL BE SET IN FULL BED OF SEALANT.
14. COORDINATE ALL ROOF DRAIN LEADER LOCATIONS WITH FLOOR PLAN PRIOR TO FLOOR SLAB
CONSTRUCTION.
15. ALL FLOOR SLOPES TO FLOOR DRAINS SHALL NOT EXCEED 1:48.
16. PROVIDE AND INSTALL SELF-LEVELING UNDERLAYMENT WHERE UNEVEN FLOOR SLAB EXISTS PRIOR
TO INSTALLATION OF FLOOR FINISHES.
17. COORDINATE HOUSEKEEPING PAD LOCATIONS AND DIMENSIONS WITH EQUIPMENT TO BE INSTALLED.
18. ALL REQUIRED ACCESSIBLE CLEARANCES FOR ALL ITEMS, INCLUDING BUT NOT LIMITED TO ALL
COUNTER TOPS, ALL PLUMBING FIXTURES, ALL DRINKING FOUNTAINS, ALL ELECTRIC WATER
COOLERS, ALL LAVATORIES, ALL URINALS, ALL TOILETS SHALL BE STRICTLY ENFORCED.
19. APPLY BITUMINOUS COATING TO ALL CONCEALED STRUCTURAL STEEL MEMBERS AT ALL EXTERIOR
CANOPY LOCATIONS.
20. REFER TO OTHER DISCIPLINE DOCUMENTS FOR ADDITIONAL SCOPE OF WORK.
21. ALL EXISTING DOOR OPENING HARDWARE SHALL BE EITHER LEVER ACTION, PANIC, PUSH-PULL, OR
SIMILAR TYPE.
22. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY
OR SPECIAL KNOWLEDGE/EFFORT.
23. THE UNLATCHING OF ANY DOOR OR LEAF FOR EGRESS SHALL REQUIRE NOT MORE THAN ONE
MOTION IN A SINGULAR LINEAR OR ROTATIONAL DIRECTION TO RELEASE ALL LATCHING AND
LOCKING DEVICES.
24. EXISTING DOOR HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MINIMUM AND 48" MAXIMUM ABOVE THE FINISHED FLOOR. LOCKS USED ONLY FOR
SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT.
25. THE EXISTING RAMP AND GUARDRAIL SHALL COMPLY WITH THE CURRENT OR PROCEEDING EDITION
OF THE CALIFORNIA BUILDING CODE SECTION 11B-405.
26. FIELD VERIFY SIGN ABOVE THE PRIMARY ENTRANCE STATING "THIS DOOR TO REMAIN UNLOCKED
WHEN THE SPACE IS OCCUPIED".
27. THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN CBC CHAPTER 10.
28. THE PATH OF EGRESS TO ANY EXIT SHALL NOT BE BLOCKED.
29. AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM OR SPACE THAT CAN BE LOCKED TO PREVENT
ACCESS.
30. FIELD VERIFY ILLUMINATED EXIT SIGNAGE EXISTS AT ALL EGRESS DOORS. PROVIDE TACTILE SIGNS
AT EGRESS DOORS IF NOT EXISTING.
31. MINIMUM SIZE OF EGRESS EXIT DOORS TO COMPLY WITH CBC 1010.1.1
32. NO MECHANICAL WORK REQUIRED FOR THIS PERMIT. HVAC UNITS, REGISTERS, AND DUCTWORK TO
REMAIN IN PLACE AS IS.
33. ALL EXISTING EXIT DOORS EQUIPPED WITH PANIC HARDWARE. CONTRACTOR TO FIELD VERIFY.
EXISTING
FACILITY
(NOT IN SCOPE)
SIERRA OAKS
SENIOR CENTER
8'
-9
/8
1,177'-11 3/8"
PROPERTY LINE
PROPERTY LINE
P R
O P
E R
T Y
L
IN
E
P R
O P
E R
T Y
L
IN
E
SIERRA
HIGH
SCHOOL
LODGE ROAD
LODGE R
OAD
LO
D
G E
R O
A D
2, 2'
1,224'
1, 4'
2"
1,141' - 4"
2,553'
2, 1'
SEPTIC TANK
TIED INTO SITE'S
WASTEWATER
HEADWORKS
SYSTEM
EXISTING WATER
TANK (200,000 GAL) AT
ADJACENT FARM,
WATERBOARD WALL
NO. CA1000280
GENERAL SITE PLAN NOTES
1. VERIFY ALL SITE SIGNAGE LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION OF SITE SIGNAGE.
2. EXISTING ACCESSIBLE PATH OF TRAVEL ELEMENTS; PARKING, RAMPS, ENTRANCES, ETC. MUST
COMPLY WITH CURRENT OR PRECEDING EDITION OF THE CALIFORNIA BUILDING CODE CHAPTER 11B.
15 23468 7911 101214 131517 1618
15 23468 7911 101214 131517 1618
N M
O K
J L
H G
I E
D F
B A
C
N M
O K
J L
H G
I E
D F
B A
C
/2
/2
:4
:4
P
M
A u to d e s k D o c s /S ie rr a U
S D
S ie rr a O a k s M o d e rn iz a ti o n /S ie rr a U
S D
S e n io r C e n te r_ V
.r v t
1" = 200'-0"1 SITE PLAN N
DATE
09/10/25
DATE
01/28/2026
DATE
02/18/2026
DATE
03/05/2026 04/06/2026
EXISTING
SEPTIC TANK
TIED INTO SITE'S
WASTEWATER
HEADWORKS
SYSTEM
NFPA 1142 WATER STORAGE CALCULATION INFORMATION
Site Information
Acreage ±70
# of Buildings 23
Occupancy/Use Case Educational
Fully…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .