Sierra Oaks Center Modernization_DWG_V4_BID SET.pdf

PDF 9 MB Posted

Attached to
Sierra Oaks Center Modernization
Solicitation number
PBK Project #: 250440
Issued by
Fresno County, California

About this file

This is a construction bid set consisting of architectural and engineering drawings for the Sierra Oaks Center Modernization project, prepared by PBK Architects, Inc. and LEAF Engineers for Sierra Unified School District located at 33276 Lodge Road, Tollhouse, California. The project encompasses modernization of the Sierra Oaks Senior Center, including demolition and replacement of flooring, fixtures, toilet compartments, electrical systems, plumbing systems, and interior finishes as indicated throughout the construction documents. The scope of work involves upgrades to flooring materials including sheet vinyl and luxury vinyl tile (LVT), installation of new bathroom fixtures and accessories, kitchen equipment modifications, lighting upgrades for Title 24 compliance, wall finishes using gypsum board and fiber-reinforced panels (FRP), and associated site work including accessible parking and signage. The project is identified with CDBG No. 24011 and County of Fresno permit number 25-011992. Prequalification documents are due Monday, September 23, 2026, and subcontractors performing work under licenses C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46, or C-51 must be prequalified prior to bidding.

The construction documents include 15 total sheets comprising general notes, site plans, floor plans, reflected ceiling plans, plumbing drawings, and electrical drawings. The project must comply with the 2022 California Building Code, California Fire Code, California Plumbing Code, California Electrical Code, and applicable Title 24 energy standards, along with County of Fresno Ordinance Title 15. All work must be performed in accordance with the construction documents and project specifications, with an Inspector of Record employed by the owner assigned to oversee compliance with Title 24 requirements. Deferred submittal items must be submitted for review no later than 60 days after the Notice to Proceed, with approval required from the Division of the State Architect before installation begins. The project contains finish schedules specifying materials such as Forbo Eternalstep sheet vinyl, Shaw Contract LVT, Nudo FRP panels, Sherwin Williams paint colors, and Bobrick Sierra Series toilet partitions, with specific accessible design requirements mandated throughout.

View the file

Other files

File Type Posted
Sierra Oaks Center Modernization_SPC_V4_BID SET.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F O

R B

LU

E

B E

A M

LA

B

E

LIN

G O

C R

1/29/2026 4:22:37 PM

04/27/2026

SIERRA USD

SIERRA OAKS

CENTER

MODERNIZATION

SIERRA UNIFIED SCHOOL DISTRICT

33276 Lodge Road Tollhouse, CA

G-000

COVER SHEET

G -000

C O

V E

R S

H E

E T

S I E

R R

A U

S D

S I E

R R

A O

A K

S

C E

N T

E R

M O

D E

R N

I Z

A T

I O

N

L o d g e

R o a d

T o llh o u s e

C A

MEP ENGINEER

LEAF Engineers 7790 N Palm Ave Fresno, CA 93711 T 559-448-8400

ARCHITECT

PBK ARCHITECTS, INC

7790 N Palm Ave Fresno, CA 93711 T 559-448-8400

DISCIPLINE

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C HIT EC

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C H IT EC

T

S T

A T E O F C A L I F O R

N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A R C H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-2

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

04/27/2026

SIERRA USD

CDBG #24011

L

IC

EN S ED A R C H IT E C

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

PROFESSIONAL SEAL

ARCHITECT PBK Architects, Inc.

DATE

PROJECT NUMBER

DRAWN BY

REVISIONS

FRESNO

7790 North Palm Avenue

Fresno, CA 93711 559-448-8400 P 559-448-8467 F

PBK.com

15 23468 7911 101214 131517 1618

15 23468 7911 101214 131517 1618

N M

O K

J L

H G

I E

D F

B A

C

N M

O K

J L

H G

I E

D F

B A

C

PERMIT NO.

PLAN CHECK NO.

/2

/2

:2 :3

P

M

A u to d e sk

D o c s:

S ie rr a U

S D

X X

X X

S ie rr a O a ks

M o d e rn iz a tio n /S ie rr a U

S D

S e n io r

C e n te r_

V

.r vt

S

IE

R R

A O

A K

S C

E N

T E

R M

O D

E R

N

IZ

A T

IO

N

S

IE

R R

A U

S D

SHEET INDEX

04/16/2026

250440

SIERRA USD

Lo dg e

R oa d T ol lh ou se

, C A

G-001

25-011992

M.S.

25-1041

Signature Date

Expiration DateLicense NumberName

STATEMENT OF GENERAL CONFORMANCE

[Date]

[Architect of Record] 02-29-2027C-00002

The drawings identified as follows:

All drawing sheets included in this set not bearing my stamp and signature.

Drawing sheets included under the following PC approval(s):

[01-234567, 02-345678] have been prepared by other design professionals or consultants who are licensed and authorized to prepare such drawings (plans) in this state. The have been examined by me for:

1) Design intent and appear to meet the appropriate requirements of Title 24, California Code of Regulations and the project specifications prepared by me, and

2) Coordination with my drawings (plans) and specifications and are acceptable for incorporation into the construction of this project.

Per Title 24, Part 1, Section 4-316(b): This Statement of General Conformance shall not be construed as relieving me of my rights, duties, and responsibilities under Sections 17302 and 81138 of the Education Code and Sections 4-336, 4-341, and 4-344 of Title 24, Part 1.

Application No.: ##-###### File No.: ##-###

G-000 - COVER SHEET

G-001 - SHEET INDEX

G-002 - GENERAL PROJECT INFORMATION

A-100 - SITE PLAN

A-100.1 - ENLARGED SITE PLAN

A-101 - FLOOR PLANS

A-102 - RCP & ENLARGED FLOOR PLANS

X-100 - DETAILS

TITLE SHEETS

ARCHITECTURAL

PLUMBING

ELECTRICAL

P-001 - PLUMBING SHEET INDEX, LEGEND, & NOTES

P-101 - PLUMBING FLOOR PLAN

P-601 - PLUMBING DETAILS

E-001 - ELECTRICAL SHEET INDEX, LEGEND, & NOTES

E-101 - ELECTRICAL FLOOR PLAN

TOTAL: 13 SHEETS

# DESCRIPTION DATE

G-000 - COVER SHEET

G-001 - SHEET INDEX

G-002 - GENERAL PROJECT INFORMATION

A-100 - SITE PLAN

A-100.1 - ENLARGED SITE PLAN

A-101 - FLOOR PLANS

A-102 - RCP & ENLARGED FLOOR PLANS

X-100 - DETAILS

TITLE SHEETS

ARCHITECTURAL

PLUMBING

ELECTRICAL

P-001 - PLUMBING SHEET INDEX, LEGEND, & NOTES

P-101 - PLUMBING FLOOR PLAN

P-601 - PLUMBING DETAILS

E-001 - ELECTRICAL SHEET INDEX, LEGEND, & NOTES

E-101 - ELECTRICAL FLOOR PLAN

E-501 - ELECTRICAL SINGLE LINE DIAGRAM

TOTAL: 14 SHEETS

Signature Date

Expiration DateLicense NumberName

[Date]

[Architect of Record] 02-29-2022C-00002C32578 10-31-2025

09-1-2025

Jeffrey S. Berrios

2/18/2026

10/31/2027

DATE

02/18/2026

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C HIT EC

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C H IT EC

T

S T

A T E O F C A L I F O R

N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A R C H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-2

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

03/05/2026

DATE

03/05/2026

5 46

G-000 - COVER SHEET

G-001 - SHEET INDEX

G-002 - GENERAL PROJECT INFORMATION

A-100 - SITE PLAN

A-100.1 - ENLARGED SITE PLAN

A-100.2 - FIRE ACCESS PLAN

A-101 - FLOOR PLANS

A-102 - RCP & ENLARGED FLOOR PLANS

X-100 - DETAILS

TITLE SHEETS

ARCHITECTURAL

PLUMBING

ELECTRICAL

P-001 - PLUMBING SHEET INDEX, LEGEND, & NOTES

P-101 - PLUMBING FLOOR PLAN

P-601 - PLUMBING DETAILS

E-001 - ELECTRICAL SHEET INDEX, LEGEND, & NOTES

E-101 - ELECTRICAL FLOOR PLAN

E-501 - ELECTRICAL SINGLE LINE DIAGRAM

TOTAL: 15 SHEETS

DATE

09/10/25

DATE

01/28/2026

DATE

02/18/2026

DATE

03/05/2026 04/06/2026 04/27/2026

CDBG NO.

24011

A299

A299

ROOM

REFERENCE

DETAIL NUMBER

CALLOUT

CENTER LINE, & SYMBOL

BEYOND LINE

ABOVE LINE

REFERENCE

COLUMN LINE

PLAN NORTH

NORTH ARROW

TRUE NORTH

NORTH ARROW

WINDOW & LOUVER TAG

REVISION TAG

LEVEL POINT

BREAK LINE

SHEET NUMBER

ELEVATION NUMBER

BUILDING SECTION

REFERENCE

LEVEL

DOOR SEQUENCE

(RE: DOOR SCHEDULE)

LEVEL

DATUM POINT

EXIT SIGN

ROOM NAME

REFERENCE

MATCHLINE

REFERENCE

WALL SECTION

REFERENCE

REFERENCE

ROOM SEQUENCE

SHEET NUMBER

ELEVATION NUMBER

REFERENCE

EXTERIOR

INTERIOR

MATERIAL TAG

(RE: ROOM FINISH SCHEDULE)

REFERENCE

EXISTING/NEW

COLUMN LINE

CASEWORK TYPE (CDS NUMBER)

SIZE (WxD)

DIRECTION SYMBOL

VIEW REFERENCE

MATERIAL INDICATIONS

EXISTING CONSTRUCTION TO

REMAIN

EXISTING CONSTRUCTION TO BE

DEMOLISHED

NEW NON-RATED

CONSTRUCTION

CONSTRUCTION TYPE SYMBOLSPROJECT SYMBOLSPROJECT SYMBOLS

PROJECT GRAPHIC REFERENCES

SHEET NUMBER

A7.10

SIM

SIM

A

CW1

AB-1

30x34

SIM

A101

A

SHEET NUMBER

DETAIL NUMBER

SHEET NUMBER

DETAIL NUMBER

LOCK

RE

WORKING POINT

SPOT ELEVATION

TOP OF FRAMING/STEEL

CURTAINWALL TAG

STOREFRONT TAG

CONCRETE

BRICK

CONC. MASONRY UNITS

(CMU)

RIGID INSULATION

BATT INSULATION

ACOUSTICAL TILE /

FABRIC PANEL

GYPSUM BOARD

PLASTER ON METAL LATH

FINISH WOOD

CONTINUOUS WOOD

BLOCKING / SHIM

PLYWOOD

EARTH

CAST STONE / SPRAY ON INSULATION

/ SAND / MORTAR

STEEL

ALUMINUM

STONE

GRAVEL

SEALANT

ROD STOCK & SEALANT

N

KEYNOTE TAGC01

BUILDING NAME (If Applicable)

SHEET SERIES TYPE

DISCIPLINE

AA-201A

LEVEL REFERENCE

BUILDING AREA (If Applicable)

0 GENERAL

1 PLANS: (Site, Floor, Finish, Graphics)

2 CEILING

3 ROOF

4 ENLARGED PLANS

5 ELEVATIONS (Exterior) 6 SECTIONS: (Bldg & Wall)

7 BLDG DETAILS

8 DIAGRAMS/COMPILED SCHEDULES:

(Partition Types, Door & Panel/Frame Types, Window Types)

9 INTERIOR FINISHES/SCHEDULES (Finish Plan, Interior Elevations, Casework/Millwork Elevations & Details, Locker Types & Details)

G GENERAL

C CIVIL

CA SPORTS CIVIL

SA SPORTS ARCH

S STRUCTURAL

L LANDSCAPE

D DEMOLITION

A ARCHITECTURAL

M MECHANICAL

E ELECTRICAL

P PLUMBING

T TECHNOLOGY

FS FOOD SERVICE

AV ACOUSTICAL

TH THEATRICAL

SUBDISCIPLINE

- NOT USED

S SITE

D DEMO

F FURNITURE

G GRAPHICS & SIGNAGE

Q EQUIPMENT

PROJECT GRAPHIC REFERENCES

BLDG AREA

BLDG AREA

RE: 01 / A-101B

SIM

A101

1 / A101

101A

ACT-1

8'-0"

CEILING TYPE

CEILING HEIGHT

CL

A7.10

S 3.

C

PARTITION TYPE TAG

(RE: PARTITION SCHEDULE)

PARTITION TYPE

STRUCTURAL CORE WIDTH

FIRE RATING TYPE

PARTITION MODIFIER

PROJECT LOCATION

LO

D

G E R

D

LODGE RD

LO

DG

E R D

SIERRA

HIGH

SCHOOL

N

ABBREVIATIONS AND LEGEND KEYS

REFER TO SCHEDULES AND LEGENDS FOR ADDITIONAL ABBREVIATIONS

REFER TO OTHER DISCIPLINES FOR ADDITIONAL ABBREVIATIONS

GOVERNING AGENCIES

VICINITY MAP

THE SCOPE OF WORK AS STATED BELOW IS FOR PLAN REVIEW PURPOSES ONLY AND DOES NOT

CONSTITUTE A DETAILED AND FULL EXPLANATION OF THE REQUIREMENTS OF THE CONTRACT

DOCUMENTS.

SCOPE OF WORK INCLUDES ALL CONSTRUCTION AND SERVICES REQUIRED TO PROVIDE:

1. DEMOLITION OF FLOORING, FIXTURES, TOILET COMPARTMENTS, AND APPLIANCES

2. CONSTRUCTION OF MODERNIZATION OF SIERRA OAKS SENIOR CENTER. TO INCLUDE UPGRADES TO

FLOORING, FIXTURES, TOILET COMPARTMENTS, ELECTRICAL, AND PLUMBING AS SHOWN IN

DRAWINGS.

COUNTY OF FRESNO

PUBLIC WORKS & PLANNING

2220 TULARE STREET SUITE 'A'

FRESNO, CA, 93721

(559) 600-4540

1. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE REQUIREMENTS OF THE CODES

AND ALL APPLICABLE LOCAL ORDINANCES. WHERE CONTRACT DOCUMENTS EXCEED SUCH

REQUIREMENTS, WITHOUT VIOLATING SUCH CODES, REGULATIONS AND ORDINANCES, CONTRACT

DOCUMENTS TAKE PRECEDENCE. WHERE CODES CONFLICT, THE MORE STRINGENT SHALL APPLY.

2. PERFORMANCE BY THE CONSTRUCTION TEAM SHALL BE CONSISTENT WITH THE CONSTRUCTION DRAWINGS AND PROJECT MANUAL (SPECIFICATIONS) AS NECESSARY TO DELIVER THE INDICATED

RESULTS OF THE DESIGN INTENT.

3. REFER TO THE PROJECT MANUAL (SPECIFICATIONS) FOR GENERAL CONDITIONS, SUPPLEMENTARY

AND SPECIAL CONDITIONS, AND OTHER REQUIREMENTS.

4. THE CONSTRUCTION DOCUMENT DRAWINGS AND PROJECT MANUAL (SPECIFICATIONS) ARE

COMPLIMENTARY, AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY BOTH.

5. THE CONTRACTOR SHALL:

A. CONFIRM ALL NEW AND EXISTING CONDITIONS WITH THE CONTRACT DOCUMENTS. NOTIFY THE

ARCHITECT IMMEDIATELY IN WRITING OF ALL DISCREPANCIES OR CONFLICTS. DO NOT PROCEED

WITH WORK IN THE AREA OF DISCREPANCY OR CONFLICT UNTIL DIRECTION IS GIVEN BY THE

ARCHITECT. IF THE CONTRACTOR PROCEEDS WITHOUT DIRECTION FROM THE ARCHITECT, IT

SHALL BE AT THE CONTRACTOR'S RISK, AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

REQUIRED CORRECTIVE ACTION.

B. REVIEW THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF SYSTEMS SHOWN ON

CONSULTING ENGINEER'S DOCUMENTS. DISCREPANCIES BETWEEN THE ARCHITECTURAL AND

CONSULTING ENGINEER'S DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR DIRECTION. CONSTRUCTION INSTALLED IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS SHALL

BE CORRECTED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.

C. CORRECT ALL WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION DOCUMENTS BY THE

CONTRACTOR AS DIRECTED BY THE ARCHITECT AND AT NO ADDITIONAL EXPENSE TO THE OWNER.

D. VISIT JOB SITE PRIOR TO BEGINNING WORK AND VERIFY ALL DIMENSIONS.

E. SECURE AND PAY FOR ALL PERMITS, GOVERNMENTAL FEES, AND LICENSES REQUIRED FOR

PROPER COMPLETION OF THE WORK. REQUEST ALL INSPECTIONS REQUIRED BY LOCAL

GOVERNMENTAL AGENCIES AND COORDINATE WORK ACCORDINGLY.

F. PROVIDE FOR THE PROPER SEQUENCE OF CONSTRUCTION, LOCATION, AND SIZE OF OPENINGS.

COORDINATE ALL CONSTRUCTION AS INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING

SHOP DRAWINGS REVIEWED BY THE ARCHITECT.

G. PROVIDE BARRICADES AND PROTECTIVE DEVICES SEPARATING CONSTRUCTION AREAS. PROVIDE

TEMPORARY PASSAGES AS REQUIRED. PRIOR TO DELIVERY OF MATERIALS TO CONSTRUCTION

ZONE AND REMOVAL OF WASTE FROM SITE, CHECK WITH OWNER FOR ACCEPTABLE ACCESS

ROUTE AND TIME. UNDER NO CIRCUMSTANCES USE AREA OUTSIDE THE CONSTRUCTION ZONE

WITHOUT PRIOR CLEARANCE FROM THE OWNER. COMPLY WITH REQUIREMENTS AS SPECIFIED IN

THE PROJECT MANUAL.

H. REMOVE ALL TRASH AND DEBRIS DAILY. DO NOT STORE BUILDING MATERIALS IN CORRIDORS AT

ANY TIME. COMPLY WITH REQUIREMENTS AS SPECIFIED IN THE PROJECT MANUAL

(SPECIFICATIONS).

I. ENACT ALL MEASURES TO PROTECT IN PLACE AND SAFEGUARD ALL ELEMENTS TO REMAIN FROM

BEING DAMAGED. REPLACE OR REPAIR ELEMENTS DAMAGED BY THE EXECUTION OF THE

CONTRACT TO EQUAL OR LIKE NEW CONDITION.

J. VERIFY POINTS OF CONNECTION, INCLUDING SIZES AND LOCATIONS, AND ALL OTHER REQUIRED

OPERATING CRITERIA WITH EQUIPMENT MANUFACTURER.

K. COORDINATE THE LOCATION AND TYPE OF ALL ACCESS PANELS REQUIRED FOR ACCESSING

MECHANICAL, PLUMBING, ELECTRICAL, AND OTHER BUILDING SYSTEMS WITH THE ARCHITECT.

L. ENSURE ALL CONSTRUCTION REMAINS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES UNTIL APPROVED BY THE INSPECTOR OF RECORD. FOR CONTINUOUS INSPECTION, TESTING, AND

OBSERVATION REQUIREMENTS, REFER TO THE TESTING AND OBSERVATION PROGRAM.

M. STIPULATE THAT ALL PROPOSED SUBSTITUTIONS ARE EQUAL IN PERFORMANCE AND COMPLY

WITH APPLICABLE CODES AND REGULATIONS. CONTRACTOR'S SUBSTITUTION OF ALTERNATE

MATERIALS OR SYSTEMS SHALL BE AT NO ADDITIONAL COST TO OWNER.

6. DO NOT SCALE THE CONSTRUCTION DOCUMENTS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED GRAPHICS. NOTIFY THE ARCHITECT IMMEDIATELY IN WRITING OF ALL ADDITIONAL REQUIRED DIMENSIONS. DO NOT PROCEED WITH WORK IN THE AREA OF DISCREPANCY OR CONFLICT UNTIL DIRECTION IS GIVEN BY THE ARCHITECT. IF THE CONTRACTOR PROCEEDS WITHOUT DIRECTION FROM

THE ARCHITECT, IT SHALL BE AT THE CONTRACTOR'S RISK, AND THE CONTRACTOR SHALL BE

RESPONSIBLE FOR ALL REQUIRED CORRECTIVE ACTION.

7. WHERE WORK OR EQUIPMENT IS INDICATED "N.I.C." (NOT IN CONTRACT) ON THE DRAWINGS, SUCH WORK AND/OR EQUIPMENT SHALL BE PROVIDED BY OTHERS. CONTRACTOR SHALL COORDINATE AND

COOPERATE TO EFFECT SUCH INSTALLATION.

8. ALL PLAN DIMENSIONS SHOWN AT CENTER OF WALL REPRESENT CENTER LINE OF STUD OR

STRUCTURAL ELEMENT UNLESS NOTED OTHERWISE.

9. ALL PLAN DIMENSIONS FOR MASONRY AND CONCRETE REPRESENT FACE OF MATERIAL AND OPENING

UNLESS NOTED OTHERWISE.

10. ALL PLAN DIMENSIONS FOR STUD WALLS REPRESENT FACE OF STUD UNLESS NOTED OTHERWISE.

11. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE REVIEW OF THE ARCHITECT UNLESS NOTED (±) OR "VERIFY". DIMENSIONS NOTED "HOLD" SHALL BE CONSIDERED AS ABSOLUTE AND USED FOR LAYOUT

CONTROL UNLESS OTHERWISE DIRECTED BY THE ARCHITECT.

12. ANY ITEM, CONDITION OR DIMENSION NOTED AS "FIELD VERIFY" OR "VERIFY IN FIELD" SHALL BE

CONFIRMED ON SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCHITECT OF RECORD

BEFORE INCORPORATING INTO THE WORK.

PARTIAL LIST OF APPLICABLE CODES

2022 California Administrative Code (CAC) ......................................................................... (Part 1, Title 24, CCR) 2022 California Building Code (CBC) ................................................................................... (Part 2, Title 24, CCR)

(2021 International Building Code Volumes 1 & 2 with 2022 California Amendments) 2022 California Electrical Code (CEC) .................................................................................. (Part 3, Title 24, CCR)

(2020 National Electrical Code with 2022 California Amendments) 2022 California Mechanical Code (CMC) .............................................................................. (Part 4, Title 24, CCR)

(2021 IAPMO Uniform Mechanical Code with 2022 California Amendments) 2022 California Plumbing Code (CPC) .................................................................................. (Part 5, Title 24, CCR)

(2021 IAPMO Uniform Plumbing Code with 2022 California Amendments) 2022 California Energy Code (CEC) ...................................................................................... (Part 6, Title 24, CCR) 2022 California Fire Code (CFC) ............................................................................................ (Part 9, Title 24, CCR)

(2021 International Fire Code with 2022 California Amendments) 2022 California Existing Building Code (CEBC) .................................................................. (Part 10, Title 24, CCR)

(2021 International Existing Building Code with 2022 California Amendments) 2022 California Green Building Standards Code (CALGreen) ............................................ (Part 11, Title 24, CCR) 2022 California Referenced Standards Code ....................................................................... (Part 12, Title 24, CCR) Title 19 CCR, Public Safety, State Fire Marshal Regulations 2022 ASME A17.1/CSA B44-13 Safety Code For Elevators and Escalators (per 2022 CBC Part 2, Ch 35) Note: Cal/OSHA Elevator Unit enforces CCR Title 8 and uses the 2004 ASME A17.1 by adoption County of Fresno Ordinance Title 15

PARTIAL LIST OF APPLICABLE STANDARDS

NFPA 13 .... Standard for the Installation of Sprinkler Systems (as amended) * ...................................... (2022 Edition) NFPA 14 .... Standard for the Installation of Standpipe and Hose Systems (as amended) * .................... (2019 Edition) NFPA 17 .... Standard for Dry Chemical Extinguishing Systems .............................................................. (2021 Edition) NFPA 17A... Standard for Wet Chemical Extinguishing Systems ............................................................. (2021 Edition) NFPA 20 ..... Standard for the Installation of Stationary Pumps for Fire Protection ................................... (2022 Edition) NFPA 22 .... Standard for Water Tanks for Private Fire Protection ........................................................... (2018 Edition) NFPA 24 .... Standard for the Installation of Private Fire Service Mains and Their Appurtenances

(as amended)*....................................................................................................................... (2022 Edition) NFPA 25 .... Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems with California Amendments (Based on NFPA 25, 2011 Edition)......................................... (2020 Edition) NFPA 72 .... National Fire Alarm and Signaling Code (as amended) * ..................................................... (2022 Edition) NFPA 80 .... Fire Doors and Other Opening Protectives ........................................................................... (2022 Edition) NFPA 92 .... Standard for Smoke Control Systems ................................................................................... (2021 Edition) NFPA 253 .. Standard Method of Test for Critical Radiant Flux of Floor Covering Systems

Using a Radiant Heat Energy Source ................................................................................... (2019 Edition) NFPA 2001 Standard on Clean Agent Fire Extinguishing Systems (as amended) * .............................. (2022 Edition) ICC 300 ...... ICC Standard on Bleachers, Folding and Telescoping Seating and Grandstands ............... (2017 Edition) UL 300 ....... Standard for Fire Testing of Fire Extinguishing Systems for Protection of Commercial Cooking

Equipment—with Revisions through December 2014........................................................... (2019 Edition) UL 464 ....... Audible Signal Appliances—with Revisions through October 10, 2003 ................................ (2016 Edition) UL 521 ....... Heat Detectors for Fire Protective Signaling Systems—with Revisions through

July 01, 2019 ......................................................................................................................... (1999 Edition) UL 1971 ..... Standard for Signaling Devices for the Hearing Impaired ..................................................... (2018 Edition)

* See CBC Chapter 35, Referenced Standards for State of California amendments to the NFPA Standards.

For a complete list of applicable NFPA standards refer to 2022 CBC (SFM) Chapter 35 and California Fire Code (CFC) Chapter 80.

CODES & STANDARDS SCOPE OF WORK

25. INSPECTOR OF RECORD REQUIREMENTS:

A. ONE OR MORE INSPECTORS EMPLOYED BY THE OWNER IN ACCORDANCE WITH THE

REQUIREMENTS OF TITLE 24 OF THE CALIFORNIA CODE OF REGULATIONS WILL BE ASSIGNED TO THE WORK. THE INSPECTORS DUTIES ARE SPECIFICALLY DEFINED IN SECTION 4-342 OF SAID TITLE 24, PART 1 AND IN ADDITION SHALL BE AS STIPULATED IN INTERPRETATION OF REGULATION

DOCUMENT IR A-8.

B. INSPECTOR SHALL BE CERTIFIED AS A CLASS _____ INSPECTOR THROUGH THE DIVISION OF THE

STATE ARCHITECT INSPECTOR EXAMINATION PROGRAM. INSPACTOR SHALL ALSO BE

SPECIFICALLY APPROVED BY THE DIVISION OF THE STATE ARCHITECT FOR THIS PROJECT AT

LEAST 10 DAYS PRIOR TO THE START OF ANY WORK FOR THIS PROJECT.

26. ALL WORK SHOWN ON THESE DRAWINGS SHALL COMPLY WITH THE REQUIREMENTS OF TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR).

27. CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE MADE BY AN ADDENDUM OR A CONSTRUCTION CHANGE DOCUMENT APPROVED BY THE DIVISION OF THE STATE ARCHITECT, AS

REQUIRED BY TITLE 24, CCR, PART 1, SECTION 4-338.

28. GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND

ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL ORDINANCES.

29. DRINKING WATER SHALL COMPLY WITH ALL LOCAL HEALTH DEPARTMENT REQUIREMENTS.

30. FOOD HANDLING FACILITIES SHALL COMPLY WITH ALL LOCAL HEALTH REQUIREMENTS AND THE

CALIFORNIA RETAIL FOOD FACILITIES LAW.

31. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS THAT THE WORK OF THE ALTERATION, REHABILITATION OR RECONSTRUCTION IS TO BE IN ACCORDANCE WITH TITLE 24, CCR. SHOULD ANY CONDITIONS SUCH AS DETERIORATION OR NON-COMPLYING CONSTRUCTION BE DISCOVERED WHICH IS NOT COVERED BY THE CONTRACT DOCUMENTS WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH TITLE 24, CCR, A CONSTRUCTION CHANGE DOCUMENT (CCD), OR A SEPARATE SET OF PLANS AND SPECIFICATIONS, DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY THE DSA BEFORE PROCEEDING WITH THE WORK. (SECTION 4-317(C), PART 1, TITLE

24, CCR).

32. ALL SLOPE AND CROSS SLOPE OF ACCESSIBLE ROUTE PAVING INDICATED ON THESE DRAWINGS WAS

DESIGNED IN COMPLIANCE WITH THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN AND THE

ACCESSIBILITY STANDARDS OF THE CALIFORNIA BUILDING CODE (CBC) TITLE 24, PART 2, CHAPTER 11B OF THE CALIFORNIA CODE OF REGULATIONS (CCR). STRICT EXECUTION OF THE SLOPE AND CROSS SLOPE OF ACCESSIBLE ROUTE PAVING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

SHOULD A CONDITION PRESENT ITSELF THAT WOULD RESULT IN AN INSTALLATION OTHER THAN WHAT IS INDICATED IN THESE DRAWINGS, PBK ARCHITECTS INC. SHALL BE NOTIFIED IN WRITING AND A

COMPLIANT RESOLUTION WILL BE FORMULATED.

33. A DSA ACCEPTED TESTING LABORATORY DIRECTLY EMPLOYED BY THE DISTRICT (OWNER) SHALL

CONDUCT ALL THE REQUIRED TESTS AND INSPECTIONS FOR THE PROJECT.

34. CONSTRUCTION WASTE MANAGEMENT PLAN MUST BE FINALIZED PRIOR TO OCCUPANCY.

1. NONE

GENERAL NOTES

13. ALL HEIGHTS ARE DIMENSIONED FROM TOP OF SLAB UNLESS NOTED "AFF" (ABOVE FINISH FLOOR)

14. "TYPICAL" MEANS COMPARABLE CHARACTERISTICS FOR THE ELEVATION OR DETAIL NOTED. WHEN A DETAIL OR NOTE IS IDENTIFIED AS "TYPICAL", THE CONTRACTOR SHALL APPLY THIS DETAIL OR NOTE TO EVERY LIKE CONDITION, WHETHER OR NOT THE REFERENCE IS REPEATED IN EVERY INSTANCE.

VERIFY DIMENSIONS AND ORIENTATION ON PLANS.

15. PROVIDE WORK NOT SPECIFICALLY DETAILED OR SPECIFIED IN ACCORDANCE WITH DETAILS OR SIZES

COVERING SIMILAR WORK.

16. "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE ELEVATION OR DETAIL NOTED. VERIFY

DIMENSIONS AND ORIENTATION ON PLANS.

17. ABBREVIATIONS THROUGHOUT THE DOCUMENTS COMPLY WITH DOCUMENT ABBREVIATION LIST OR

ARE THOSE IN COMMON USE. ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION.

18. THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY

19. THESE DOCUMENTS AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF PBK ARCHITECTS, INC., AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF PBK

ARCHITECTS, INC.

20. THE WORK SHOWN ON THESE DRAWINGS AS EXISTING CONDITIONS WAS PREPARED FROM

INFORMATION FURNISHED BY THE OWNER. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, PBK ARCHITECTS, INC. IS NOT RESPONSIBLE FOR THE ACCURACY OR ADEQUACY OF ANY WORK

SHOWN AS EXISTING NOR IS PBK ARCHITECTS, INC. RESPONSIBLE FOR ANY ERRORS OR OMISSIONS

WHICH MAY HAVE BEEN INCORPORATED INTO THESE DRAWINGS AS A RESULT.

21. FIRE SAFETY DURING CONSTRUCTION & DEMOLITION:

A. GENERAL: FIRE SAFETY DURING CONSTRUCTION SHALL COMPLY WITH CALIFORNIA FIRE CODE

(CFC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9, CHAPTER 5 AND CHAPTER 33.

B. ACCESS ROADS: FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED IN

ACCORDANCE WITH CHAPTER5, SECTION 501.4 AND CHAPTER 33, SECTION 3311.

C. WATER SUPPLY: WATER MAINS AND HYDRANTS SHALL BE OPERATION IN ACCORDANCE WITH

CHAPTER 5, SECTION 501.4 AND CHAPTER 33, SECTION 3313.

D. BUILDING ACCESS: ACCESS TO BUILDINGS FOR THE PURPOSE OF FIREFIGHTING SHALL BE

PROVIDED. CONSTRUCTION MATERIAL SHALL NOT BLOCK ACCESS TO BUILDINGS, HYDRANTS OR

FIRE APPLIANCES.

E. ALTERATIONS OF BUILDINGS: SHALL COMPLY WITH APPLICABLE PROVISIONS OF CHAPTER 33.

F. DEMOLITION OF BUILDINGS: SHALL COMPLY WITH APPLICABLE PROVISIONS OF CHAPTER 33.

G. FIRE WATCH: MAINTAIN FIRE WATCH WHEN REQUIRED BY THE BUILDING OFFICIAL AND WHEN

EXISTING FIRE PROTECTION SYSTEMS ARE SHUT DOWN FOR ALTERATIONS IN ACCORDANCE WITH CHAPTER 33, SECTION 3305.5. FIRE WATCH SHALL REMAIN IN EFFECT UNTIL EXISTING FIRE PROTECTION SYSTEMS ARE RETURNED TO SERVICE OR AS ALLOWED BY THE BUILDING OFFICIAL.

22. PENETRATIONS TO FIRE RATED MATERIALS OR ASSEMBLIES SHALL BE RESTORED TO EQUAL RATING.

FIRE STOP SYSTEMS AS LISTED BY UNDERWRITERS LABORATORIES SHALL BE INSTALLED PER FIRE

RESISTANCE DIRECTORY. FIRE STOP SYSTEMS SHALL BE AS SPECIFIED.

23. CUTTING, BORING, SAW-CUTTING OR DRILLING THROUGH STRUCTURAL ELEMENTS SHALL NOT

COMMENCE UNTIL THE DRAWINGS HAVE BEEN SUMITTED, REVIEWED, AND APPROVED BY THE

ARCHITECT OF RECORD.

24. NONRESIDENTIAL ENERGY STANDARDS COMPLIANCE STATEMENT (TITLE 24, PART 6):

THE DESIGN INDICATED HEREIN COMPLIES WITH THE REQUIREMENTS OF THE ENERGY

CONSERVATION STANDARDS OF TITLE 24, PART 6, CALIFORNIA CODE OF REGULATIONS. THE

PROPOSED BUILDING(S) WILL BE IN COMPLIANCE WITH THE ENERGY CONSERVATION STANDARDS PROVIDED IT (THEY) IS (ARE) BUILT ACCORDING TO THESE DRAWINGS AND SPECIFICATIONS AND

PROVIDED ANY FUTURE IMPROVEMENTS ARE COMPLETED ACCORDING TO THE REQUIREMENTS OF

TITLE 24, PART 6, CALIFORNIA CODE OF REGULATIONS. THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED TO INCLUDE ALL SIGNIFICANT ENERGY CONSERVATION FEATURES REQUIRED FOR

COMPLIANCE WITH THE STANDARDS. BUILDING AREAS THAT ARE UNCONDITIONED AND/OR NOT

SUBJECT TO THE STANDARDS ARE INDICATED ON THE PLANS.

ENVELOPE MANDATORY MEASURES:

A. INSTALLED INSULATING MATERIALS SHALL HAVE BEEN CERTIFIED BY THE MANUFACTURER TO

COMPLY WITH THE CALIFORNIA QUALITY STANDARDS FOR INSULATING MATERIAL.

B. ALL INSULATING MATERIALS SHALL BE INSTALLED IN COMPLIANCE WITH THE FLAME SPREAD

RATING AND SMOKE DENSITY REQUIREMENTS OF TITLE 24, PART 2, CALIFORNIA CODE OF

REGULATIONS, SECTIONS 720 AND 2603.

C. ALL EXTERIOR JOINTS AND OPENINGS IN THE BUILDING ENVELOPE THAT ARE POTENTIAL AND

OBSERVABLE SOURCES OF AIR LEAKAGE SHALL BE CAULKED, GASKETED, WEATHERSTRIPPED OR

OTHERWISE SEALED.

D. SITE CONSTRUCTED DOORS, WINDOWS, AND SKYLIGHTS SHALL BE CAULKED BETWEEN THE UNIT

AND THE BUILDING, AND SHALL BE WEATHERSTRIPPED (EXCEPT FOR UNFRAMED GLASS DOORS

AND FIRE DOORS).

E. MANUFACTURED DOORS AND WINDOWS INSTALLED SHALL HAVE AIR INFILTRATION RATES

CERTIFIED BY THE MANUFACTURER IN ACCORDANCE WITH TITLE 24, PART 6, CALIFORNIA CODE OF

REGULATIONS, SECTION 110.6.

F. MANUFACTURED FENESTRATION PRODUCTS IN THE ENVELOPE OF THE BUILDING, INCLUDING, BUT

NOT LIMITED TO, WINDOWS, SLIDING GLASS DOORS, FRENCH DOORS, SKYLIGHTS, CURTAIN

WALLS, AND GARDEN WINDOWS MUST BE LABELED FOR U-VALUE IN ACCORDANCE WITH THE

(NFRC) NATIONAL FENESTRATION RATING COUNCIL'S INTERIM U-VALUE RATING PROCEDURE.

G. DEMISING WALL INSULATION SHALL BE INSTALLED IN ALL OPAQUE PORTIONS OF FRAMED WALLS

(EXCEPT DOORS).

A

ABV above

ACOUS acoustical

ACT acoustical ceiling tile

AD area drain

ADJ adjustable

AFF above finished floor

ALT alternate

ALUM aluminum

APPROX approximate

ARCH architect / architectural

B

B.O. bottom of

BALC balcony

BD board

BET between

BLDG building

BLKG blocking

BLW below

BM beam

BOT bottom

BRKT bracket

BULKHD bulkhead

BUR built up roof

C

C.G. corner guard

CAB cabinet

CALK caulking

CDS cabinet design series

CEM cement

CER ceramic

CJ control joint

CLG ceiling

CLOS closet

CLR clear

CO cased opening

COL column

CONC concrete

CONT continous

CPT carpet

CT ceramic tile

CTR center

CW curtain wall

D

DBL double

DET detail

DIA diameter

DIM dimension

DN down

DR door

DS down spout

DW dishwasher

DWG drawing

E

E east

EA each

EIFS exterior insulation & finish system

ELEC electric(al)

ELEV elevation

EMER emergency

ENCL enclosure

EOS edge of slab

EQ equal

EQUIP equipment

ETR existing to remain

EW each way

EXP. JT. expansion joint

EXST existing

F

F.O. face of

FA fire alarm

FAP fire annunciuator panel

FD floor drain

FE fire extinguisher

FEC fire extinguisher cabinet

FG finish group

FH fire hydrant

FHC fire hose cabinet

FIN finish

FLR floor

FLUOR fluorescent

FT foot or feet

FUR furring

G

GAL gallon

GALV galvanized

GB grab bar

GC general contractor

GL glass

GND ground

GWB gypsum wall board

GYP gypsum

H

H.W.H. hot water heater

HC handicapped

HDWD hardwood

HDWR hardware

HM hollow metal

HORIZ horizontal

HR hour

HT height

I

ID inner diameter

INCAN incandescent

INSUL insulation

INT interior

J

JAN janitor

JST joist

JT joint

L

LAM laminate

LAV lavatory

LB pound(s)

LDG landing

LT light

M

MAX maximum

MECH mechanical

MEMB membrane

MFR manufacturer

MIN minimum

MISC miscellaneous

MO masonry opening

MTD mounted

MTL metal

N

N north

NIC not in contract

NO number

NOM nominal

NTS not to scale

O

O.P. overflow pipe

OA overall

OC on center

OD outside diameter

OFF office

OH opposite hand

OPG opening

OPP opposite

P

PART partition

PCT porcelain tile

PERM perimeter

PG paint grade

PLAM plastic laminate

PLAS plaster

PLYWD plywood

POLYISO polyisocyanurate

PR pair

PT paint

PTD painted

R

R riser

RAD radius

RCP reflected ceiling plan

RD roof drain

RE: refer

REF refrigerator

REINF reinforced

REQD required

RESIL resilient

RM room

RO rough opening

RTU root top unit (mech)

S

S south

SAFB sound attenunation fiber batt

SC scupper

SCHED schedule

SEAL sealant

SECT section

SF square foot

SHT sheet

SIM similar

SPEC specification

SQ square

SS stainless steel

STD standard

STF storefront

STL steel

STOR storage

STRUCT structural

SUSP suspended

SYM symmetrical

T

T tread

T&G tongue & groove

T.O. top of

TEL telephone

TER terrazzo

THK thick

THR threshold

TYP typical

U

UC undercut

UNFIN unfinished

UNO unless noted otherwise

UON unless otherwise noted

UTIL utility

V

VCT vinyl compostion tile

VERT vertical

VIF verify in field

VTR vent termination pipe

VWC vinyl wall covering

W

W west

W/ with

W/O without

WC watercloset

WIN window

WP waterproof

WS wood, solid core

WSCT wainscot

WT weight

X

XPS extruded polystrene

DEFERRED SUBMITTAL ITEMS:

INSTALLATION OF DEFERRED SUBMITTAL ITEMS SHALL NOT BE STARTED UNTIL DETAILED PLANS, SPECIFICATIONS, AND ENGINEERING CALCULATIONS HAVE BEEN ACCEPTED AND SIGNED BY THE

ARCHITECT OR ENGINEER IN GENERAL RESPONSIBLE CHARGE OF DESIGN AND SIGNED BY A

CALIFORNIA REGISTERED ARCHITECT OR PROFESSIONAL ENGINEER WHO HAS BEEN DELEGATED

RESPONSIBILITY COVERING THE WORK SHOWN ON A PARTICULAR PLAN OR SPECIFICATION AND

APPROVED BY THE DIVISION OF THE STATE ARCHITECT.

DEFFERED SUBMITTAL ITEMS SHALL BE SUBMITTED FOR REVIEW NO LATER THAN 60 DAYS AFTER THE

NOTICE TO PROCEED.

DEFERRED SUBMITTAL ITEMS FOR THIS PROJECT ARE THE FOLLOWING ITEMS:

L

IC

EN S ED A R C H IT E C

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

PROFESSIONAL SEAL

ARCHITECT PBK Architects, Inc.

DATE

PROJECT NUMBER

DRAWN BY

REVISIONS

FRESNO

7790 North Palm Avenue

Fresno, CA 93711 559-448-8400 P 559-448-8467 F

PBK.com

15 23468 7911 101214 131517 1618

15 23468 7911 101214 131517 1618

N M

O K

J L

H G

I E

D F

B A

C

N M

O K

J L

H G

I E

D F

B A

C

PERMIT NO.

PLAN CHECK NO.

/2

/2

:2 :3

P

M

A u to d e sk

D o c s:

S ie rr a U

S D

X X

X X

S ie rr a O a ks

M o d e rn iz a tio n /S ie rr a U

S D

S e n io r

C e n te r_

V

.r vt

S

IE

R R

A O

A K

S C

E N

T E

R M

O D

E R

N

IZ

A T

IO

N

S

IE

R R

A U

S D

GENERAL

PROJECT

INFORMATION

01/28/2026

250440

SIERRA USD

Lo dg e

R oa d T ol lh ou se

, C A

G-002

25-011992

M.S.

25-1041

PROJECT DIRECTORY

OWNER: SIERRA UNIFIED SCHOOL DISTRICT

33220 LODGE ROAD

TOLLHOUSE, CA

(559) 855-8314 EMAIL: kcapps@sierrausd.org

CONTACT: KELLY CAPPS

ARCHITECT: PBK ARCHITECTS, INC

7790 N PALM AVE

FRESNO, CA

(559) 448-8400 EMAIL: jeff.berrios@pbk.com

CONTACT: JEFF BERRIOS

MEP: LEAF ENGINEERS

7790 N PALM AVE

FRESNO, CA

(559) 448-8400 EMAIL: garen.lencioni@leafengineers.com

CONTACT: GAREN LENCIONI

# DESCRIPTION DATE

DATE

02/18/2026

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C HIT EC

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C H IT EC

T

S T

A T E O F C A L I F O R

N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A R C H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-2

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

DATE

03/05/2026

DATE

09/10/25

DATE

01/28/2026

DATE

02/18/2026

DATE

03/05/2026 04/06/2026

LO

D

G E R

D

SIERRA

HIGH

SCHOOL

S

THE SCOPE OF WORK AS STA

CONSTITUTE A DETAILED AND

DOCUMENTS.

SCOPE OF WORK INCLUDES A

1. DEMOLITION OF FLOORIN

2. CONSTRUCTION OF MODE

FLOORING, FIXTURES, TO

DRAWINGS.

PARTIAL LIST OF APPLICABLE CODES

2025 California Administrative Code (CAC) ......................................................................... (Part 1, Title 24, CCR) 2025 California Building Code (CBC) ................................................................................... (Part 2, Title 24, CCR)

(2024 International Building Code Volumes 1 & 2 with 2025 California Amendments) 2025 California Electrical Code (CEC) .................................................................................. (Part 3, Title 24, CCR)

(2023 National Electrical Code with 2025 California Amendments) 2025 California Plumbing Code (CPC) .................................................................................. (Part 5, Title 24, CCR)

(2024 IAPMO Uniform Plumbing Code with 2025 California Amendments) 2025 California Fire Code (CFC) ............................................................................................ (Part 9, Title 24, CCR)

(2024 International Fire Code with 2025 California Amendments) 2025 California Existing Building Code (CEBC) .................................................................. (Part 10, Title 24, CCR)

(2024 International Existing Building Code with 2025 California Amendments) 2025 California Green Building Standards Code (CALGreen) ............................................ (Part 11, Title 24, CCR) 2025 California Referenced Standards Code ....................................................................... (Part 12, Title 24, CCR) Title 19 CCR, Public Safety, State Fire Marshal Regulations County of Fresno Ordinance Title 15

PARTIAL LIST OF APPLICABLE STANDARDS

NFPA 17 .... Standard for Dry Chemical Extinguishing Systems .............................................................. (2024 Edition) NFPA 25 .... Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems with California Amendments (Based on NFPA 25, 2011 Edition)......................................... (2023 Edition) NFPA 72 .... National Fire Alarm and Signaling Code (as amended) * ..................................................... (2025 Edition) NFPA 92 .... Standard for Smoke Control Systems ................................................................................... (2024 Edition)

* See CBC Chapter 35, Referenced Standards for State of California amendments to the NFPA Standards.

For a complete list of applicable NFPA standards refer to 2025 CBC (SFM) Chapter 35 and California Fire Code (CFC) Chapter 80.

CODES & STANDARDS

5 3467

04/27/2026

GENERAL ARCH PLAN NOTES

1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE, CONTACT ARCH IF

CLARIFICATION IS NECESSARY IN ORDER TO DETERMINE THE INTENT OF THE CONTRACT

DOCUMENTS.

2. DRAWINGS NOTED AS "N.T.S" OR "NTS" ARE NOT TO SCALE.

3. ALL DIMENSIONS ARE TO STRUCTURAL COLUMN LINES OR THE SURFACE OF PARTITION ASSEMBLY

U.N.O.

4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE COMMENCING WORK. NOTIFY

ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH AFFECTED WORK.

5. NOTES OR DIMENSIONS NOTED AS "TYPICAL" OR "TYP." OR "TYP" SHALL APPLY TO CONDITIONS THAT

ARE THE SAME OR SIMILAR.

6. DIMENSIONS NOTED AS "FIELD VERIFY" OR "V.I.F." OR "VIF" SHALL BE MEASURED AND CONFIRMED AT

THE PROJECT SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCH. BEFORE INCORPORATING

INTO THE WORK.

7. DIMENSIONS NOTED AS "CLEAR" OR "CLEAR INSIDE" OR "CLR" REQUIRE SPECIFIC COORDINATION

AMONG DISCIPLINES AND OR MANUFACTURERS.

8. REFER TO PARTITION TYPES ON A-800 SERIES SHEETS.

9. ALIGN FINISHED FACE OF WALLS WHERE WALL PARTITIONS OF DIFFERING THICKNESS ABUT AND OR

ADJOIN IN THE SAME PLANE.

10. PROVIDE AND INSTALL CONTINUOUS REVEAL TRIM AT JOINT WHERE GYPSUM BOARD WALL

PARTITIONS ABUT AND OR ADJOIN MASONRY WALL PARTITIONS IN THE SAME PLANE.

11. ALL INTERIOR CMU OUTSIDE CORNERS SHALL HAVE BULLNOSE U.N.O.

12. ALL DOORS SHALL BE SET 4 INCHES OFF THE ADJACENT PERPENDICULAR WALL ON THE HINGE SIDE

OF THE DOOR U.N.O., NOTIFY ARCH. OF ANY DOOR-RELATED CONFLICTS, INCLUDING BUT NOT

LIMITED TO CONFLICTS CONCERNING ACCESSIBILITY STANDARDS.

13. ALL DOOR THRESHOLDS AT ALL EXTERIOR DOORS SHALL BE SET IN FULL BED OF SEALANT.

14. COORDINATE ALL ROOF DRAIN LEADER LOCATIONS WITH FLOOR PLAN PRIOR TO FLOOR SLAB

CONSTRUCTION.

15. ALL FLOOR SLOPES TO FLOOR DRAINS SHALL NOT EXCEED 1:48.

16. PROVIDE AND INSTALL SELF-LEVELING UNDERLAYMENT WHERE UNEVEN FLOOR SLAB EXISTS PRIOR

TO INSTALLATION OF FLOOR FINISHES.

17. COORDINATE HOUSEKEEPING PAD LOCATIONS AND DIMENSIONS WITH EQUIPMENT TO BE INSTALLED.

18. ALL REQUIRED ACCESSIBLE CLEARANCES FOR ALL ITEMS, INCLUDING BUT NOT LIMITED TO ALL

COUNTER TOPS, ALL PLUMBING FIXTURES, ALL DRINKING FOUNTAINS, ALL ELECTRIC WATER

COOLERS, ALL LAVATORIES, ALL URINALS, ALL TOILETS SHALL BE STRICTLY ENFORCED.

19. APPLY BITUMINOUS COATING TO ALL CONCEALED STRUCTURAL STEEL MEMBERS AT ALL EXTERIOR

CANOPY LOCATIONS.

20. REFER TO OTHER DISCIPLINE DOCUMENTS FOR ADDITIONAL SCOPE OF WORK.

21. ALL EXISTING DOOR OPENING HARDWARE SHALL BE EITHER LEVER ACTION, PANIC, PUSH-PULL, OR

SIMILAR TYPE.

22. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY

OR SPECIAL KNOWLEDGE/EFFORT.

23. THE UNLATCHING OF ANY DOOR OR LEAF FOR EGRESS SHALL REQUIRE NOT MORE THAN ONE

MOTION IN A SINGULAR LINEAR OR ROTATIONAL DIRECTION TO RELEASE ALL LATCHING AND

LOCKING DEVICES.

24. EXISTING DOOR HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MINIMUM AND 48" MAXIMUM ABOVE THE FINISHED FLOOR. LOCKS USED ONLY FOR

SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT.

25. THE EXISTING RAMP AND GUARDRAIL SHALL COMPLY WITH THE CURRENT OR PROCEEDING EDITION

OF THE CALIFORNIA BUILDING CODE SECTION 11B-405.

26. FIELD VERIFY SIGN ABOVE THE PRIMARY ENTRANCE STATING "THIS DOOR TO REMAIN UNLOCKED

WHEN THE SPACE IS OCCUPIED".

27. THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN CBC CHAPTER 10.

28. THE PATH OF EGRESS TO ANY EXIT SHALL NOT BE BLOCKED.

29. AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM OR SPACE THAT CAN BE LOCKED TO PREVENT

ACCESS.

30. FIELD VERIFY ILLUMINATED EXIT SIGNAGE EXISTS AT ALL EGRESS DOORS.

31. MINIMUM SIZE OF EGRESS EXIT DOORS TO COMPLY WITH CBC 1010.1.1

EXISTING

FACILITY

(NOT IN SCOPE)

SIERRA OAKS

SENIOR CENTER

8'

-9

/8

1,177'-11 3/8"

PROPERTY LINE

PROPERTY LINE

P R

O P

E R

T Y

L

IN

E

P R

O P

E R

T Y

L

IN

E

SIERRA

HIGH

SCHOOL

LODGE ROAD

LODGE R

OAD

LO

D

G E

R O

A D

2, 2'

1,224'

1, 4'

2"

1,141' - 4"

2,553'

2, 1'

SEPTIC TANK

TIED INTO SITE'S

WASTEWATER

HEADWORKS

SYSTEM

GENERAL SITE PLAN NOTES

1. VERIFY ALL SITE SIGNAGE LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION OF SITE SIGNAGE.

2. EXISTING ACCESSIBLE PATH OF TRAVEL ELEMENTS; PARKING, RAMPS, ENTRANCES, ETC. MUST

COMPLY WITH CURRENT OR PRECEDING EDITION OF THE CALIFORNIA BUILDING CODE CHAPTER 11B.

L

IC

EN S ED A R C H IT E C

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

PROFESSIONAL SEAL

ARCHITECT PBK Architects, Inc.

DATE

PROJECT NUMBER

DRAWN BY

REVISIONS

FRESNO

7790 North Palm Avenue

Fresno, CA 93711 559-448-8400 P 559-448-8467 F

PBK.com

15 23468 7911 101214 131517 1618

15 23468 7911 101214 131517 1618

N M

O K

J L

H G

I E

D F

B A

C

N M

O K

J L

H G

I E

D F

B A

C

PERMIT NO.

PLAN CHECK NO.

/2

/2

:2 :3

P

M

A u to d e sk

D o c s:

S ie rr a U

S D

X X

X X

S ie rr a O a ks

M o d e rn iz a tio n /S ie rr a U

S D

S e n io r

C e n te r_

V

.r vt

S

IE

R R

A O

A K

S C

E N

T E

R M

O D

E R

N

IZ

A T

IO

N

S

IE

R R

A U

S D

SITE PLAN

01/28/2026

250440

SIERRA USD

Lo dg e

R oa d T ol lh ou se

, C A

A-100

25-011992

M.S.

25-1041

1" = 200'-0"1 SITE PLAN N

# DESCRIPTION DATE

DATE

02/18/2026

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C HIT EC

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

L

IC

ENS E D A R C H IT EC

T

S T

A T E O F C A L I F O R

N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER RI O

SC 32578

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A RC H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-23

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

EN S ED A R C H IT E C

T

S T

A T E O F C A L I F O

R N

IA

RENEWAL DATE

9-30-2

JO

HN

HA MILTON SM

IT

HC 15885

L

IC

ENS E D A R C H IT EC

T

S T

A

T E O F C A L IF O

R N

IA

RENEWAL DATE

10-31-27

JE

FF

REY S. BER

RI O

SC 32578

GENERAL ARCH PLAN NOTES

1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE, CONTACT ARCH IF

CLARIFICATION IS NECESSARY IN ORDER TO DETERMINE THE INTENT OF THE CONTRACT

DOCUMENTS.

2. DRAWINGS NOTED AS "N.T.S" OR "NTS" ARE NOT TO SCALE.

3. ALL DIMENSIONS ARE TO STRUCTURAL COLUMN LINES OR THE SURFACE OF PARTITION ASSEMBLY

U.N.O.

4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE COMMENCING WORK. NOTIFY

ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH AFFECTED WORK.

5. NOTES OR DIMENSIONS NOTED AS "TYPICAL" OR "TYP." OR "TYP" SHALL APPLY TO CONDITIONS THAT

ARE THE SAME OR SIMILAR.

6. DIMENSIONS NOTED AS "FIELD VERIFY" OR "V.I.F." OR "VIF" SHALL BE MEASURED AND CONFIRMED AT

THE PROJECT SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCH. BEFORE INCORPORATING

INTO THE WORK.

7. DIMENSIONS NOTED AS "CLEAR" OR "CLEAR INSIDE" OR "CLR" REQUIRE SPECIFIC COORDINATION

AMONG DISCIPLINES AND OR MANUFACTURERS.

8. REFER TO PARTITION TYPES ON A-800 SERIES SHEETS.

9. ALIGN FINISHED FACE OF WALLS WHERE WALL PARTITIONS OF DIFFERING THICKNESS ABUT AND OR

ADJOIN IN THE SAME PLANE.

10. PROVIDE AND INSTALL CONTINUOUS REVEAL TRIM AT JOINT WHERE GYPSUM BOARD WALL

PARTITIONS ABUT AND OR ADJOIN MASONRY WALL PARTITIONS IN THE SAME PLANE.

11. ALL INTERIOR CMU OUTSIDE CORNERS SHALL HAVE BULLNOSE U.N.O.

12. ALL DOORS SHALL BE SET 4 INCHES OFF THE ADJACENT PERPENDICULAR WALL ON THE HINGE SIDE

OF THE DOOR U.N.O., NOTIFY ARCH. OF ANY DOOR-RELATED CONFLICTS, INCLUDING BUT NOT

LIMITED TO CONFLICTS CONCERNING ACCESSIBILITY STANDARDS.

13. ALL DOOR THRESHOLDS AT ALL EXTERIOR DOORS SHALL BE SET IN FULL BED OF SEALANT.

14. COORDINATE ALL ROOF DRAIN LEADER LOCATIONS WITH FLOOR PLAN PRIOR TO FLOOR SLAB

CONSTRUCTION.

15. ALL FLOOR SLOPES TO FLOOR DRAINS SHALL NOT EXCEED 1:48.

16. PROVIDE AND INSTALL SELF-LEVELING UNDERLAYMENT WHERE UNEVEN FLOOR SLAB EXISTS PRIOR

TO INSTALLATION OF FLOOR FINISHES.

17. COORDINATE HOUSEKEEPING PAD LOCATIONS AND DIMENSIONS WITH EQUIPMENT TO BE INSTALLED.

18. ALL REQUIRED ACCESSIBLE CLEARANCES FOR ALL ITEMS, INCLUDING BUT NOT LIMITED TO ALL

COUNTER TOPS, ALL PLUMBING FIXTURES, ALL DRINKING FOUNTAINS, ALL ELECTRIC WATER

COOLERS, ALL LAVATORIES, ALL URINALS, ALL TOILETS SHALL BE STRICTLY ENFORCED.

19. APPLY BITUMINOUS COATING TO ALL CONCEALED STRUCTURAL STEEL MEMBERS AT ALL EXTERIOR

CANOPY LOCATIONS.

20. REFER TO OTHER DISCIPLINE DOCUMENTS FOR ADDITIONAL SCOPE OF WORK.

21. ALL EXISTING DOOR OPENING HARDWARE SHALL BE EITHER LEVER ACTION, PANIC, PUSH-PULL, OR

SIMILAR TYPE.

22. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY

OR SPECIAL KNOWLEDGE/EFFORT.

23. THE UNLATCHING OF ANY DOOR OR LEAF FOR EGRESS SHALL REQUIRE NOT MORE THAN ONE

MOTION IN A SINGULAR LINEAR OR ROTATIONAL DIRECTION TO RELEASE ALL LATCHING AND

LOCKING DEVICES.

24. EXISTING DOOR HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MINIMUM AND 48" MAXIMUM ABOVE THE FINISHED FLOOR. LOCKS USED ONLY FOR

SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT.

25. THE EXISTING RAMP AND GUARDRAIL SHALL COMPLY WITH THE CURRENT OR PROCEEDING EDITION

OF THE CALIFORNIA BUILDING CODE SECTION 11B-405.

26. FIELD VERIFY SIGN ABOVE THE PRIMARY ENTRANCE STATING "THIS DOOR TO REMAIN UNLOCKED

WHEN THE SPACE IS OCCUPIED".

27. THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN CBC CHAPTER 10.

28. THE PATH OF EGRESS TO ANY EXIT SHALL NOT BE BLOCKED.

29. AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM OR SPACE THAT CAN BE LOCKED TO PREVENT

ACCESS.

30. FIELD VERIFY ILLUMINATED EXIT SIGNAGE EXISTS AT ALL EGRESS DOORS. PROVIDE TACTILE SIGNS

AT EGRESS DOORS IF NOT EXISTING.

31. MINIMUM SIZE OF EGRESS EXIT DOORS TO COMPLY WITH CBC 1010.1.1

32. NO MECHANICAL WORK REQUIRED FOR THIS PERMIT. HVAC UNITS, REGISTERS, AND DUCTWORK TO

REMAIN IN PLACE AS IS.

GENERAL SITE PLAN NOTES

1. VERIFY ALL SITE SIGNAGE LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION OF SITE SIGNAGE.

2. EXISTING ACCESSIBLE PATH OF TRAVEL ELEMENTS; PARKING, RAMPS, ENTRANCES, ETC. MUST

COMPLY WITH CURRENT OR PRECEDING EDITION OF THE CALIFORNIA BUILDING CODE CHAPTER 11B.

N M

O K

J L

I

DATE

03/05/2026

GENERAL ARCH PLAN NOTES

1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE, CONTACT ARCH IF

CLARIFICATION IS NECESSARY IN ORDER TO DETERMINE THE INTENT OF THE CONTRACT

DOCUMENTS.

2. DRAWINGS NOTED AS "N.T.S" OR "NTS" ARE NOT TO SCALE.

3. ALL DIMENSIONS ARE TO STRUCTURAL COLUMN LINES OR THE SURFACE OF PARTITION ASSEMBLY

U.N.O.

4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE COMMENCING WORK. NOTIFY

ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH AFFECTED WORK.

5. NOTES OR DIMENSIONS NOTED AS "TYPICAL" OR "TYP." OR "TYP" SHALL APPLY TO CONDITIONS THAT

ARE THE SAME OR SIMILAR.

6. DIMENSIONS NOTED AS "FIELD VERIFY" OR "V.I.F." OR "VIF" SHALL BE MEASURED AND CONFIRMED AT

THE PROJECT SITE BY THE CONTRACTOR AND REVIEWED WITH THE ARCH. BEFORE INCORPORATING

INTO THE WORK.

7. DIMENSIONS NOTED AS "CLEAR" OR "CLEAR INSIDE" OR "CLR" REQUIRE SPECIFIC COORDINATION

AMONG DISCIPLINES AND OR MANUFACTURERS.

8. REFER TO PARTITION TYPES ON A-800 SERIES SHEETS.

9. ALIGN FINISHED FACE OF WALLS WHERE WALL PARTITIONS OF DIFFERING THICKNESS ABUT AND OR

ADJOIN IN THE SAME PLANE.

10. PROVIDE AND INSTALL CONTINUOUS REVEAL TRIM AT JOINT WHERE GYPSUM BOARD WALL

PARTITIONS ABUT AND OR ADJOIN MASONRY WALL PARTITIONS IN THE SAME PLANE.

11. ALL INTERIOR CMU OUTSIDE CORNERS SHALL HAVE BULLNOSE U.N.O.

12. ALL DOORS SHALL BE SET 4 INCHES OFF THE ADJACENT PERPENDICULAR WALL ON THE HINGE SIDE

OF THE DOOR U.N.O., NOTIFY ARCH. OF ANY DOOR-RELATED CONFLICTS, INCLUDING BUT NOT

LIMITED TO CONFLICTS CONCERNING ACCESSIBILITY STANDARDS.

13. ALL DOOR THRESHOLDS AT ALL EXTERIOR DOORS SHALL BE SET IN FULL BED OF SEALANT.

14. COORDINATE ALL ROOF DRAIN LEADER LOCATIONS WITH FLOOR PLAN PRIOR TO FLOOR SLAB

CONSTRUCTION.

15. ALL FLOOR SLOPES TO FLOOR DRAINS SHALL NOT EXCEED 1:48.

16. PROVIDE AND INSTALL SELF-LEVELING UNDERLAYMENT WHERE UNEVEN FLOOR SLAB EXISTS PRIOR

TO INSTALLATION OF FLOOR FINISHES.

17. COORDINATE HOUSEKEEPING PAD LOCATIONS AND DIMENSIONS WITH EQUIPMENT TO BE INSTALLED.

18. ALL REQUIRED ACCESSIBLE CLEARANCES FOR ALL ITEMS, INCLUDING BUT NOT LIMITED TO ALL

COUNTER TOPS, ALL PLUMBING FIXTURES, ALL DRINKING FOUNTAINS, ALL ELECTRIC WATER

COOLERS, ALL LAVATORIES, ALL URINALS, ALL TOILETS SHALL BE STRICTLY ENFORCED.

19. APPLY BITUMINOUS COATING TO ALL CONCEALED STRUCTURAL STEEL MEMBERS AT ALL EXTERIOR

CANOPY LOCATIONS.

20. REFER TO OTHER DISCIPLINE DOCUMENTS FOR ADDITIONAL SCOPE OF WORK.

21. ALL EXISTING DOOR OPENING HARDWARE SHALL BE EITHER LEVER ACTION, PANIC, PUSH-PULL, OR

SIMILAR TYPE.

22. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY

OR SPECIAL KNOWLEDGE/EFFORT.

23. THE UNLATCHING OF ANY DOOR OR LEAF FOR EGRESS SHALL REQUIRE NOT MORE THAN ONE

MOTION IN A SINGULAR LINEAR OR ROTATIONAL DIRECTION TO RELEASE ALL LATCHING AND

LOCKING DEVICES.

24. EXISTING DOOR HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MINIMUM AND 48" MAXIMUM ABOVE THE FINISHED FLOOR. LOCKS USED ONLY FOR

SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT.

25. THE EXISTING RAMP AND GUARDRAIL SHALL COMPLY WITH THE CURRENT OR PROCEEDING EDITION

OF THE CALIFORNIA BUILDING CODE SECTION 11B-405.

26. FIELD VERIFY SIGN ABOVE THE PRIMARY ENTRANCE STATING "THIS DOOR TO REMAIN UNLOCKED

WHEN THE SPACE IS OCCUPIED".

27. THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN CBC CHAPTER 10.

28. THE PATH OF EGRESS TO ANY EXIT SHALL NOT BE BLOCKED.

29. AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM OR SPACE THAT CAN BE LOCKED TO PREVENT

ACCESS.

30. FIELD VERIFY ILLUMINATED EXIT SIGNAGE EXISTS AT ALL EGRESS DOORS. PROVIDE TACTILE SIGNS

AT EGRESS DOORS IF NOT EXISTING.

31. MINIMUM SIZE OF EGRESS EXIT DOORS TO COMPLY WITH CBC 1010.1.1

32. NO MECHANICAL WORK REQUIRED FOR THIS PERMIT. HVAC UNITS, REGISTERS, AND DUCTWORK TO

REMAIN IN PLACE AS IS.

33. ALL EXISTING EXIT DOORS EQUIPPED WITH PANIC HARDWARE. CONTRACTOR TO FIELD VERIFY.

EXISTING

FACILITY

(NOT IN SCOPE)

SIERRA OAKS

SENIOR CENTER

8'

-9

/8

1,177'-11 3/8"

PROPERTY LINE

PROPERTY LINE

P R

O P

E R

T Y

L

IN

E

P R

O P

E R

T Y

L

IN

E

SIERRA

HIGH

SCHOOL

LODGE ROAD

LODGE R

OAD

LO

D

G E

R O

A D

2, 2'

1,224'

1, 4'

2"

1,141' - 4"

2,553'

2, 1'

SEPTIC TANK

TIED INTO SITE'S

WASTEWATER

HEADWORKS

SYSTEM

EXISTING WATER

TANK (200,000 GAL) AT

ADJACENT FARM,

WATERBOARD WALL

NO. CA1000280

GENERAL SITE PLAN NOTES

1. VERIFY ALL SITE SIGNAGE LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION OF SITE SIGNAGE.

2. EXISTING ACCESSIBLE PATH OF TRAVEL ELEMENTS; PARKING, RAMPS, ENTRANCES, ETC. MUST

COMPLY WITH CURRENT OR PRECEDING EDITION OF THE CALIFORNIA BUILDING CODE CHAPTER 11B.

15 23468 7911 101214 131517 1618

15 23468 7911 101214 131517 1618

N M

O K

J L

H G

I E

D F

B A

C

N M

O K

J L

H G

I E

D F

B A

C

/2

/2

:4

:4

P

M

A u to d e s k D o c s /S ie rr a U

S D

S ie rr a O a k s M o d e rn iz a ti o n /S ie rr a U

S D

S e n io r C e n te r_ V

.r v t

1" = 200'-0"1 SITE PLAN N

DATE

09/10/25

DATE

01/28/2026

DATE

02/18/2026

DATE

03/05/2026 04/06/2026

EXISTING

SEPTIC TANK

TIED INTO SITE'S

WASTEWATER

HEADWORKS

SYSTEM

NFPA 1142 WATER STORAGE CALCULATION INFORMATION

Site Information

Acreage ±70

# of Buildings 23

Occupancy/Use Case Educational

Fully…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .