This is a scope of work document and construction plan set for the Iowa Department of Public Defense regarding hydrant replacement and water main repairs at Camp Dodge in Johnston, Iowa under RFB solicitation number 542SI423AE. The project encompasses Service Avenue water repairs including the removal of one fire hydrant assembly and installation of one replacement hydrant assembly, removal of four bollards, concrete pavement removal and replacement, subgrade and subbase preparation, hydraulic seeding, painted pavement markings, and temporary traffic control measures. The base bid includes 110.9 square yards of 7-inch PCC pavement, 56.8 square yards of pavement removal, topsoil salvage and respread of 24.7 cubic yards, excavation export of 33.0 cubic yards, and associated utility isolation procedures for water service interruption. An alternate bid option is available that includes additional work for water valve replacement (one 12-inch and one 8-inch gate valve) with corresponding additional pavement patches of 29.9 square yards and valve shutdown/startup procedures. The bids were due September 10, 2026 at 1:00 p.m. CDT, with the solicitation opening on August 20, 2026. Final construction plans were dated August 17, 2026, with previous plan submissions at 30%, 90%, and final stages.
Bidders must submit a single lump sum bid for the complete scope of work through the Items section of IMPACS with all bids remaining sealed until closure. Contractors are required to perform hydrant replacement sequentially to minimize water service disruption across multiple Camp Dodge buildings and must comply with erosion control requirements, SUDAS Section 9020 seeding standards, and temporary traffic control measures outlined in the plan details. All excavated soils and pavement removals must be disposed of at the Camp Dodge Aggregate Collection Point approximately 1.7 miles north of the project site. The State of Iowa reserves the right to take up to sixty days from invoice submission for payment processing under Iowa Code 8A.514. Inquiries regarding the solicitation should be directed to Issuing Officer Philip Payton at 515-975-6211 or philip.payton@dpd.iowa.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1434201-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR SHALL CONTACT
A.01
INDEX OF DRAWINGS
CIVIL
A.01 Title Sheet a.02 Legend and General Notes a.03 Project Overview and Erosion Control Notes
B.01 Typical Sections & Details
C.01 Quantities and Reference Information
D.01 Water Shut Down and Start up Procedure (Base Bid)
D.02 Water Shut Down Procedure (Alternate Bid)
D.03 Water Start Up Procedure (Alternate Bid)
J.01 - J.02 Traffic Control (Base and Alternate Bid)
L.01 Jointing and Geometric Plan
R.01 Removals
W.01 Water Main Repairs
Camp Dodge Site Repair Service Drive Hydrant Replacement
Contract No. 542SI423AE Johnston, Iowa
Legend and
General notes
A.02
SMA2410615
TECHNICAL SPECIFICATIONS:
GENERAL NOTES
DEMOLITION NOTES:
UTILITY NOTES:
CONSTRUCTION SURVEY:
MATERIALS TESTING:
TRAFFIC CONTROL:
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a n s p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
N
Project Overview and Erosion
Control Notes
A.03
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
N
EROSION CONTROL NOTES:
A. PROPER PLACEMENT AND MAINTENANCE OF EROSION CONTROL MEASURES IS THE
RESPONSIBILITY OF THE CONTRACTOR. EROSION CONTROL MEASURES ARE REQUIRED
TO KEEP STORM WATER CONTAMINATED WITH POLLUTANTS (E.G., SOIL, CHEMICALS,
ETC.) ON THE CONSTRUCTION SITE AND PREVENT CONTAMINANT DISCHARGES TO
NEARBY STREETS, DITCHES, SEWERS OR WATERWAYS. THIS INCLUDES ANY CONTROL
MEASURES DESCRIBED IN THE CONTRACT DOCUMENTS AND CONTROL MEASURES THAT
BECOME NECESSARY DURING CONSTRUCTION TO PROTECT AGAINST SILTATION.
Typical
Sections
AND DETAILS
B.01
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I
Quantities and
Reference Notes
C.01
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
N
ESTIMATE REFERENCE INFORMATION
SERVICE ROAD WATER MAIN REPAIRS
BASE BID updated 8/17/2026
Item No. Item Code Description
1 2010-D-1 TOPSOIL, ON-SITE
Contractor shall strip, salvage and respread topsoil to a minimum depth of 8" around project limits.
2 2010-E EXCAVATION CLASS 10 EXPORT
Item is for the export of cut material. See sheet L.01 for final grade information. Soils may be disposed of at the Camp Dodge Aggregate Collection Point approximately 1.7 miles to the north.
3 2010-J SUBBASE MODIFIED, 6"
To be placed under all PCC paving, and extending 3' past back of curb or pavement edge.
4 2010-G SUBGRADE PREPARATION 12"
To be placed under all modified subbase and PCC paving, and extending 3' past back of curb or pavement edge.
5 5010-C-2 FIRE HYDRANT ASSEMBLY
Refer to sheet W.01 for location of new hydrant assembly.Bid item includes all materials, equipment and labor required to install the hydrand assembly. Refer to sheet D.01 for water isolation plan to re energize water main.
6 5010-H FIRE HYDRANT ASSEMBLY REMOVAL
Refer to sheet R.01 for location. Bid item includes all labor and material to remove the hydrant from the 4" valve, cap the valve, and pour a thrust block. Valve and cap to be left in place.
7 7010-A PAVEMENT, PCC, 7 IN.
Refer to sheet L.01 for geometrics, elevations and typical sections.Item includes all materials, equipment, and labor required to construct per the details. Payment shall be at the bid square yard price.
8 REF #1 BOLLARD REMOVAL
Refer to sheet R.01 for locations. Contractor shall dispose of in accordance with all local, state and fedral regulations. Item includes all materials, equipment, and labor required for removal and disposal.
9 7040-H PAVEMENT REMOVAL PCC
Refer to sheet R.01 for locations. Contractor shall haul all removals to the Camp Dodge Aggregate Collection point., 1.7 miles to the North of the project. Item includes all materials, equipment, and labor required fro removal and disposal.
10 8020-B PAINTED PAVEMENT MARKINGS, WATERBORNE
Refer to sheet L.01 For locations. All striping shall be 4" wide and yellow..
11 8020-G PAINTED SYMBOLS AND LEGENDS, ADA
Refer to sheet L.01 for locations.
12 8030-A TEMPORARY TRAFFIC CONTROL
Refer to sheet J.01 and J.02 for details and location of traffic control measures. This bid item covers both the Base bid and Alternate bit.
13 9010-B HYDRAULIC SEEDING, SEEDING, FERTILIZING AND MULCHING (URBAN)
Contractor shall seed all non hard surfaced disturbed areas in accordance with SUDAS Section 9020.
14 11,020-A MOBILIZATION
Payment shall be lump sum.
15 11,050-A CONCRETE WASHOUT
Payment shall be lump sum.
ALTERNATE
Item No. Item Code Description
A1 2010-J SUBBASE MODIFIED, 6"
To be placed under all PCC paving, and extending 3' past back of curb or pavement edge.
A2 2010-G SUBGRADE PREPARATION 12"
To be placed under all modified subbase and PCC paving, and extending 3' past back of curb or pavement edge.
A3 REF #1 WATER SHUT DOWN PROCEDURE
Refer to sheet D.02 for water shut down and isolation plan. Bid item includes all materials, equipment and labor required to shut down and isolate the 2 valves that require replacement.
A4 5020-A REMOVE AND REPLACE 12" VALVE
A5
5020-A REMOVE AND REPLACE 8" VALVE
Refer to sheet W.01 for location. Bid item includes all materials, equipment and labor required to remove and replace valve. Refer to sheet W.01 for locations and notes.
A6 REF #2 WATER START UP PROCEDURE
Refer to sheet D.02 for water start up plan. Bid item includes all materials, equipment and labor required to start up water system.
A7 7010-A FULL DEPTH PATCHES, PCC, 7 IN.
Refer to sheet L.01 for geometrics, elevations and typical sections.Item includes all materials, equipment, and labor required to construct per the details. Payment shall be at the bid square yard price.
A8 7040-H PAVEMENT REMOVAL PCC
Refer to sheet R.01 for locations. Contractor shall haul all removals to the Camp Dodge Aggregate Collection point., 1.7 miles to the North of the project. Item includes all materials, equipment, and labor required fro removal and disposal.
A9 9010-B HYDRAULIC SEEDING, SEEDING, FERTILIZING AND MULCHING (URBAN)
Contractor shall seed all non hard surfaced disturbed areas in accordance with SUDAS Section 9020.
A10 11,020-A MOBILIZATION
Payment shall be lump sum and is only for the amount above the Base Bid
A11 11,050-A CONCRETE WASHOUT
Payment shall be lump sum and is only for the amount above the Base Bid.
Service Road Water Main Repairs
UPDATED 8/17/2026
BASE BID TOTAL ESTIMATED QUANTITIES
NO. ITEM DESCRIPTION UNIT QUANTITY
1 2010-D-1 TOPSOIL ON-SITE CY 24.7
2 2010-E EXCAVATION, CLASS 10, EXPORT CY 33.0
3 2010-J SUBBASE, MODIFIED SUBBASE, 6" SY 110.9
4 2010-G SUBGRADE PREPARATION 12" SY 110.9
5 5010-C-2 FIRE HYDRANT ASSEMBLY EA 1.0
6 5010-H FIRE HYDRANT ASSEMBLY REMOVAL EA 1.0
7 7010-A PAVEMENT, PCC, 7 IN. SY 110.9
8 REF #1 BOLLARD REMOVAL EA 4.0
9 7040-H PAVEMENT REMOVAL PCC SY 56.8
10 8020-B PAINTED PAVEMENT MARKINGS, WATERBORNE STA 1.2
11 8020-G PAINTED SYMBOLS AND LEGENDS ADA LS 1.0
12 8030-A TEMPORARY TRAFFIC CONTROL LS 1.0
13 9010-B HYDRAULIC SEEDING, SEEDING, FERTILIZING AND
MULCHING (URBAN)
AC 0.1
14 11,020-A MOBILIZATION LS 1.0
15 11,050-A CONCRETE WASHOUT LS 1.0
ALTERNATE
NO. ITEM DESCRIPTION UNIT QUANTITY
A1 2010-J SUBBASE, MODIFIED SUBBASE, 6" SY 29.9
A2 2010-G SUBGRADE PREPARATION 12" SY 29.9
A3 REF #1 WATER SHUT DOWN PROCEDURE LS 1.0
A4 5020-A VALVE, GATE, 12" - REMOVE AND REPLACE EA 1.0
A5 5020-A VALVE, GATE, 8" - REMOVE AND REPLACE EA 1.0
A6 REF #3 WATER START UP PROCEDURE LS 1.0
A7 7040-A FULL DEPTH PATCHES, PCC, 7 IN. SY 29.9
A8 7040-H PAVEMENT REMOVAL PCC SY 29.9
A9 9010-B HYDRAULIC SEEDING, SEEDING, FERTILIZING AND
MULCHING (URBAN)
ACRE 0.1
A10 11,020-A MOBILIZATION LS 1.0
A11 11,050-A CONCRETE WASHOUT LS 1.0
A08
B31
B30
B29
B28
B27
B25
B24
B-26
L07
B57
B58
B61
DF3
A17
A20Q
A-63
B61A
B58A
X## WATER VALVE TO REMAIN CLOSED FOR THE DURATION OF THE PROJECT
B62A
B62B
A29
W05
C03
A07
A28Q
B67
B52
A25A
A10A
A31
B34
L09
B55
B20
DF2
B36
A06
B22
W42A
B53
A64
A-25
B62C
A21A
W34
W42
B58A
W07
A18
A21
C-02
A15
A30
B66
B21
B56
B23
W18Q
W06
B60
B-14
B76
B75
B19
B15
B18
B17
B33
B32
L04
A22
A26Q A34
B38
A23
B16
L08
B59
W41
B35
B62
B68
L05
A-05
A-04
B37
B65
W16
B-13
B66
B67
W41
Base Bid
Water Isolation
Plan
D.01
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I
B30
B29
B28
B27
B25
B24
B26
L-07
A09
B57
B58
B61
DF3
A-17
A-20Q
A-63
B-61A
X-##
X-##
TEMPORARY WATER DISRUPTION DURING WATER DRAIN DOWN
WATER VALVE TO REMAIN CLOSED FOR THE DIRATION OF THE PROJECT
B62A
B62B
A29
W05
C03
A07
A28Q
B67
B52
A25A
A10A
A31
B34
L09
B55
B20
DF2
B36
A06
B22
W42A
B53
A64
A-25
B62C
A21A
W34
W42
B58A
W07
A18
A21
C-02
A15
A30
B66
B21
B56
B23
W18Q
W06
B60
B-14
B76
B75
B19
B15
B18
B17
B33
B32
L04
A22
A26Q A34
B38
A23
B16
L08
B59
W41
B35
B62
B68
L05
A-05
A-04
B37
B65
W16
B-13
B58A
Alternate
Water Shutdown
Plan
D.02
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I
B30
B29
B28
B-27
B25
B24
B26
L07
A-09
B57
B58
B61
DF3
A17
A-20Q
A-63 B61A
B58A
X##
X##
WATER VALVE THAT WERE OPENED AT THE END OF SHUT DOWN PROCEDURE
WATER VALVE TO BE OPENED
B62A
B62B
A29
W05
C03
A07
A28Q
B67
B52
A25A
A10A
A31
B34
L09
B55
B20
DF2
B36
A06
B22
W42A
B53
A64
A-25
B62C
A21A
W34
W42
B58A
W07
A18
A21
C-02
A15
A30
B66
B21
B56
B23
W18Q
W06
B60
B-14
B76
B75
B19
B15
B18
B17
B33
B32
L04
A22
A26Q A34
B38
A23
B16
L08
B59
W41
B35
B62
B68
L05
A-05
A-04
B37
B65
W16
B-13
ALTERNATE
Water Start Up
Plan
D.03
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I
Base and
Alternate bids
TRAFFIC
CONTROL 1
J.01
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
Base and
Alternate bids
TRAFFIC
CONTROL 2
J.02
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I
B2
67 B2
69 B2
B2
67 B2
69 B2
B3
B3
JOINTING
AND
GEOMETRICS
L.01
SMA2212605
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
N
ALTERNATE BID
BASE BID
ALTERNATE BID
BASE BID
67 B2
69 B2
B2
65 B2
67 B2
B3
B3
77B2
75B2
L0
74L0
B3
REMOVALS
R.01
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
N
7" PCC REMOVAL
SEE DETAIL BELOW
BASE BID
SEE DETAIL BELOW
ALTERNATE BID
DETAIL
ALTERNATE BID
DETAIL
67 B2
69 B2
B3
79 WATER
MAIN
REPAIRS
W.01
SMA2410615
C am p D od ge
S ite
R ep ai r S er vi ce D riv e
H yd ra nt
R ep la ce m en t C on tra ct N o.
SI
3A
E Jo hn st on , I ow a
P l a p l a n s
N
A p l a n s
F in a l
P l a n s
R E
V I S
I O
N
DETAIL
ALTERNATE BID
DETAIL
| A01 COVER-A.01 |
| A01 COVER-A.01 |
| A02 LEGEND-A.02 |
| A02 LEGEND-A.02 |
| A03 PROJECT OVERVIEW-A.03 |
| A03 PROJECT OVERVIEW-A.03 |
| B01 TYPICAL SECTIONS-B01 |
| B01 TYPICAL SECTIONS-B01 |
| C01 QUANTITIES AND NOTES-C01 |
| C01 QUANTITIES AND NOTES-C01 |
| D.01-D.01 |
| D.01-D.01 |
| D.02-D.02 |
| D.02-D.02 |
| D.03-D.03 |
| D.03-D.03 |
| J.01-J.01 |
| J.01-J.01 |
| J.02-J.02 |
| J.02-J.02 |
| L.01-L.01 |
| L.01-L.01 |
| R.01-R.01 |
| R.01-R.01 |
| W.01-W.01 |
| W.01-W.01 |
File details come from the government source that posted it. Updated .