Serv P24-032RN Reliacoat - PWS revised 11-7-24.pdf

PDF 390 KB Posted

Attached to
ReliaCoat Service Federal contract opportunity
Solicitation number
FA813225Q0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a Performance Work Statement (PWS) for contract FA813225Q0007 covering ReliaCoat service maintenance at the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB. The contractor shall provide preventive maintenance, remedial maintenance, and calibration services for 5 Command Center units and sensors for 76 PMXG, including remote service and training support.

The scope requires four one-week trips annually to perform preventive maintenance, remedial maintenance and calibration, along with professional training, data collection, interpretation and consulting to optimize spray powder capabilities. The contractor must provide commercial calibration and certification meeting ISO 17025 requirements, with detailed documentation requirements specified for calibration certificates. Key performance requirements include 100% compliance for preventive maintenance and service reporting, with 95% compliance for shipping timeframes. Additional requirements cover environmental protection, safety protocols, Foreign Object Damage prevention, tool control procedures, and specified training requirements. All work is to be performed during standard business hours Monday-Friday 0700-1600 at Tinker AFB locations.

View the file

Other files for this federal contract opportunity

Other files attached to ReliaCoat Service, newest first.
File Type Posted
Justification Sole Source Relicacoat CO SIGNED.pdf PDF
CSS RELIACOAT Services System pdf.pdf PDF
Wage Determination 2015-5315 (Rev. 24).pdf PDF
Serv P24-032RN Reliacoat - Appendix A Equipment list.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

SERV P24-032RN RELIACOAT SERVICE

CONTRACT

Prepared by

OC-ALC/OBCA

07 November 2024

Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.

Section One

Description of Services

Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform the Preventive Maintenanc, Remedial Maintenance and Calibration services at the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in the Equipment List (Appendix A).

Requested Services: A Preventative Maintenance and Remedial Maintenance Service Contract on 5 Command Center Units and Sensors for 76 PMXG to include Remote Service and Training Support.

• The Contractor shall provide four (4) one (1) week trips annually to assess and perform Preventative Maintenance, Remedial Maintenance and calibration to five (5) Command Center units and sensors at Tinker AFB.

• The Contractor shall provide professional training, data collection, interpretation and consuling to optimize spray powder capabilities.

• The Contractor shall provide remote support for data assistance through web meetings evaluations.

• The Contractor must meet all requirements outlined in accordance with (IAW) this

PWS.

Preventive Maintenance (PM): (SS-1) The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform four (4) PM’s per year on each items listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) within ten (10) business days after contract award. The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit.

On-Site Calibration: The Contractor shall provide commercial calibration and certification on five (5) each Command Center units.

The calibration of the equipment and the associated calibration certificate must meet International Organization for Standardization (ISO) 17025 requirements. The Contractor shall place a calibration sticker on five (5) each Command Center units after the calibration is completed.

Certificate of Traceability: The Contractor shall provide to the COR, a Calibration Certificate of Traceability for five (5) each Command Center units. The Calibration Certificate shall meet ISO 17025. The certificate shall include the following information as a minimum:

a. The title, e.g. “Calibration Report” or “Calibration Certificate”.

b. The name and address of the laboratory and the location of where the calibration was completed if it is different from the equipment location of Bldg. 3001, Post W-43, OC-ALC, Tinker Air Force Base (AFB), Oklahoma (OK).

c. Unique identification of the calibration report or certificate (e.g., the serial number) on each page as an identifier to ensure the page is recognized as a part of the calibration report or certificate. Each page of the calibration report or certificate shall also be numbered, if applicable, as page one (1) of XX pages. The end of the report or certificate shall be annotated clearly on the last page “End of the Calibration Report/Certificate”.

d. The name and address of the customer. Note: A requirement for the name and address may be waived with customer coordination/concurrence.

e. Identification of the method used to perform the calibration of the equipment. Note: The calibration report or certificate shall identify the method used in a manner similar to the following examples: A calibration procedure number; an American Society for Testing and Materials (ASTM), International Electro-technical Commission (I EC) or other standard specification, or a narrative description of the method used (i.e. compared with laboratory standard X at 10 points (between 10% and 100% of full scale).

f. A description of the condition of the equipment and an unambiguous identification of items calibrated.

g. The date of the receipt of calibration items where this is critical to the validity and application of the results and the dates the calibration was performed.

h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results. Note: The calibration report of certificate might not reference a sampling plan as sampling plans rarely apply to calibration; sampling plans normally are used in testing laboratories.

i. The calibration results with, where appropriate, the units of measurement. Note: Units of measurement would be appropriate if needed by the User (calibration factors, correction factors, etc.) to operate the Test, Measurement and Diagnostic Equipment (TMDE).

j. The printed names and functions as well as the legible signatures or equivalent identification of the persons authorizing the calibration report or certificate.

k. Where relevant, a statement to the effect that the results relate only to the items calibrated.

l. The conditions (e.g., environmental) under which the calibrations were completed which may have an influence on the measurement results.

m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof. Note: A calibration report or certificate which contains a statement of compliance to the original manufacturer’s specifications (with any exceptions or limitations noted) may satisfy this requirement.

n. Evidence that the measurements are traceable to the National Institute of Standards Technology (NIST). This evidence shall be so stated on the calibration report or certificate.

Completion of Calibration Services: The Contractor, upon completion of the calibration services, shall demonstrate to the COR and Government Subject Matter Expert (SME) that all aspects of the system are calibrated and are properly functioning IAW the manufacturer’s specifications, industry standards and this PWS.

Remedial Maintenance (RM): is the repair of equipment and systems with parts, materials, and labor to restore performance to the designed function in the event of any breakdown or stoppage of equipment or system where the equipment or system is unable to perform its designed function.

RM includes repairs and replacement of related components, parts, and appurtenances that have failed, no longer perform reliably, or have worn beyond safe tolerances. The Contracting Officer (CO) will make final determination of any RM work being within scope.

1.4.1 RM Procedures:

1. Upon occurrence of an equipment or system malfunction, the COR will contact the Contractor by telephone, email, or fax and provide the following information:

a) The equipment identification number (ID#)

b) A brief description of the malfunction

c) Location of equipment

d) Name and telephone number of the Government’s SME

Note: if the Contractor receives this notification via telephone, the COR will provide a written copy of the request by email or fax at their earliest convenience.

2. When RM is required, the Contractor shall submit the RM Work Request (WR) form (Attachment A) to the COR for coordination. The WR will have an estimated Not to Exceed (NTE) amount and will use the fully burdened labor rates found in the current year’s RM contract line item (CLIN).

3. The COR will coordinate the WR with the Government Subject Matter Expert (SME; End

User/Program Office) in order to validate the Contractor’s hours and materials. After the SME reviews and confirms the estimate, the WR will be submitted to the CO for final review and approval.

a) If the CO approves the RM, the CO will sign the WR and return it to the Contractor, which establishes RM approval. The Contractor will be notified that --

i. RM has been approved in the amount found on the WR;

ii. They must have CO approval prior to exceeding this amount;

iii. If they exceed the approved NTE amount without CO authorization, the Contractor does this at its own risk, and the Government is not liable to pay for anything over the NTE amount; and,

iv. They need to coordinate the RM visit with the COR immediately.

b) If the CO does not approve the WR, the Contractor will be notified and the CO’s rationale for disapproval will be provided to them.

4. The Contractor shall begin RM once the CO approves the WR and after coordinating the RM visit with the COR. The technician shall arrive on site at the equipment location to perform RM within 2 business days or if overseas, within 5 business days after the WR is approved. The Contractor shall provide and use only new parts and material unless otherwise authorized by the CO.

5. Upon completion of work, the Contractor shall promptly submit a quote for the RM work to include actual labor hours and material costs to the CO. The Government and Contractor will then negotiate a settlement for the RM. The CO will then definitize the RM by assigning it a Firm Fixed Price (FFP) amount.

6. Failure to agree on the FFP RM amount shall be a dispute with the meaning of the Disputes

Clause as found in the contract.

Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. Long lead items greater than five

(5) business days (this will change depending on the requirement) must be identified and provide sufficient documentation supporting the delay.

Service Report: (SS-2) Immediately upon completion of any maintenance and before leaving the OC-ALC, the Contractor shall provide a draft, written Service Report to the SME. When necessary the SME will forward the draft service report to the COR within 2 business days of receipt. The Contractor shall provide, by fax or email, the final service report within 5 business days to the COR. As a minimum, the final service report shall contain the following information:

• Company Name

• Requested service date

• Contract #

• Equipment ID #

• Description of Services provided

• Additional Services recommended (if any)

• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)

• Printed Name and Signature of on-site SME or COR (electronic signatures are acceptable)

• Start and Completion dates

• Complete Breakdown of the Labor Cost (hours and rate)

• Materials and Parts used

• Details of any other charges

• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)

• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)

Increase/Decrease of Equipment: The Government reserves the right to increase and/or decrease the number of the Command Center units and sensors to be serviced, through means of a modification based on the Government need during the life of the contract. The Contractor shall provide the agreed upon Command Center units PM/RM services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.

Off-Site Repair: (SS-3) The Contractor shall not remove from the premises any system, sub-system or peripheral at any time in order to affect repair without the written consent of the Government.

The Contractor shall provide written documentation which supports a request to remove from the premises any system, sub-system or peripheral. Said written documentation and request shall include, as a minimum, the information listed below.

• contract number

• part number, OC #, S/N, as applicable

• description of the part, OC #, S/N, as applicable

• corresponding estimate repair report number

When determined necessary by the COR to ship items to the Contractor’s off-site facility for repair, the Contractor shall arrange for the scheduling, repair of the failed item and provide the appropriate shipping data to the COR. The COR will process the required shipping documents and arrange for transportation of the item to the appropriate shipping bay for packaging, shipment, and transporting to the designated off-site facilities Free on Board (FOB) destination [see Attachment Appendix B (Off-Base)].

Return of Equipment: (SS-4) Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW paragraph Service Report, of this PWS.

The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.

Delivery: (SS-5) The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.

Shipping: (SS-6) The Contractor shall provide to the COR, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Free On Board (FOB) Destination. The ship to address is listed below.

ATTN: SURVEILLANCE COR #/Contract No: Serv P24-032RN

OC-ALC/OBC

Bldg. 3001 Staff Dr. Door G70 Post N68 Tinker AFB, OK 73145-3052

Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The COR will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or COR.

Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM/RM/Repair/or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

Red Tagged Items: Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21- 203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.

Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis:

This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0700-1600. If work hours are required outside the hours stated, the Contractor shall contact the COR for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or COR must be present with the Contractor.

These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air

Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the COR within five (5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the COR when employees affecting the work of this contract change status or position.

The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty CORs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB).

The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

Key Control: NOTE: All references to keys include key cards. The Contractor shall establish and implement methods to ensure all keys issued to the Contractor by the Government are not lost or misplaced, and are not used by unauthorized persons. Any keys issued to the Contractor by the Government shall not be duplicated. If a Quality Control Plan (QCP) is required in the PWS, the Contractor shall develop procedures covering key control and include them in the QCP. If a QCP is not required in the PWS, the Contractor shall develop written key control procedures. The Contractor shall provide the written key control procedures to the CO and the COR within ten (10) business days of the contract award date. The key control procedures shall include the turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrence of lost or duplication of keys to the CO and the COR. When the Government replaces locks or rekeys locks due to the Contractor’s fault, the total cost of the rekeying or the replacement of the lock or locks will be deducted from the payment for services due to the Contractor. In the event a master key is lost or duplicated due to Contractor fault, the Government will replace all locks and keys for the system and the total cost of replacing all locks and keys for the system will be deducted from the payment for services due to the Contractor. The Contractor shall prevent the use of Government issued keys by any person or persons other than the authorized contractor personnel. The Contractor shall ensure that only contractor personnel performing work under this contract or personnel authorized by the CO gain entrance into locked areas.

OC-ALC PWS/SOW Template Environmental Language

Dated 5 OCT 2017

ENVIRONMENTAL PROTECTION & SAFETY: MANDATORY on all Service Contracts.

Supervisor: Marybeth Radtke 76 MXSG/MXDEU PH# 582-4814

Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the COR three (3) business days prior to the pick-up or shipment of the part or equipment. The COR will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.

The Contractor shall ensure and provide written certification that the repaired part or equipment is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the COR two (2) business days prior to the return of the part or equipment.

Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (AFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil <http://www.e-publishing.af.mil> for downloading or ordering.”

Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB.

Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall maintain a log of all HAZMAT that is used on base.

This usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.

Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment.

Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier;

signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

Air Quality Recordkeeping: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

The Contractor shall be responsible for specific recordkeeping and reporting requirements, when applicable, mandated by Tinker Air Force Base Facility-Wide Operating Permit IAW OC-ALCI 32-101. The COR will contact the UEC for environmental requirements. The Contractor shall submit all applicable records on a monthly basis to the COR no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the (third) 3rd. The COR will forward the records to the UEC no later than the fourth (4th) day of the following month or the first subsequent business day. Contractor shall maintain a signed copy of the form(s) required per OC- ALCI 32-101 on site for one (1) year.

Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the COR if the required waste containers are not available on site..

The Contractor shall be responsible for the Initial Accumulation Point (IAP) within the Contractor assigned space. The IAP shall be under the direct control of the Contractor who generates the waste. Before accumulation begins, the Contractor shall ensure appropriate hazard labels are affixed to government furnished waste containers as specified in 49 Code of Federal Regulation (CFR) 172.400. Management procedures for IAPs include written weekly inspections and reporting. When the container has been filled, the Contractor shall seal the container, mark the Certified Filled Date on the container label using an indelible pen, place the container at a designated pick up location, and call the Hazardous Waste Management Facility (HWMF) at 734- 3285 for pick-up service. The Contractor shall ensure the HWMF picks up the container within three (3) calendar days after the Certified Filled Date. If container is not picked up within three (3) calendar days, Contractor shall notify the COR who will notify 76 MXSG/MXDEU, OC-ALC Environmental Engineering Section.

The Contractor shall perform written weekly inspections using Tinker AFB IMT Form 487, Initial Accumulation Point Management Aid. Weekly denotes once per working week. The Contractor shall submit Tinker AFB IMT Form 487 on a monthly basis to the COR no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd). The COR will forward the form(s) to the UEC no later than the fourth (4th) day of the following month or the first (1st) subsequent business day. Contractor shall maintain a signed copy of the form(s) on site for one (1) year.

Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).

Notice of intent documentation shall be provided to the COR within ten (10) days after award.

The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the COR from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

One (1) copy to the CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record.

The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.)

and whether 911 was called and which agencies responded.

Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements and an annual refresher classes, updates the person on changes to those rules. This training can be obtained through creditable training institutions or companies. All training will be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).

RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm, http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000, and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR within thirty (30) calendar days after contract award date. Annual refresher training certificates for the supervisor and employees managing the initial accumulations points (IAPs) shall be provided to the COR, within ten (10) calendar days after each option year renewal. The COR will forward a copy of the certificates to the UEC.

Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (AFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil <http://www.e-publishing.af.mil> for downloading or ordering.”

Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 <http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000> and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.

Welding and Hot Work Requirements: The Contractor shall obtain an AF Form 592, USAF Welding, Cutting and Brazing Permit, prior to the use of any welding, cutting or brazing equipment. The Contractor shall contact the 72nd ABW Fire & Emergency Services Division's Fire Prevention Office at 405-734-3981 regarding all work that involves welding, cutting, brazing, soldering, tar kettles, and open flame devices. The Contractor personnel who are performing the work shall keep this form with them at all times with them while at the worksite.

The Contractor shall meet the requirements of OSHA Standard 29 CFR 1910 Subpart Q (as applicable) and NFPA Standard 51B Standard for Fire Prevention during welding, cutting, and other hot work and as well as the AF Occupational Safety and Health (AFOSH) Standard 91-5, Welding, Cutting, and Brazing.

Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the COR will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.

Information Assurance (IA): All Contract Personnel shall successfully complete IA training prior to obtaining access to the network. IA training will be given to the Contractor by the COR.

All Contractor personnel shall comply with IA policies and revisions. The Contractor shall ensure terminated employee’s network access is removed within two (2) clock hours of termination notice. The 72nd Communications squadron reserves the right to terminate the Contractor’s access to the Tinker AFB network at any time to preserve the integrity of the local network.

OC-ALC Security and OPSEC briefing: All Contractor personnel working on base in the OC- ALC shall be required to read the OC-ALC Security and OPSEC briefings. The COR will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the COR with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security”, Chapter 6, Paragraph 6.2-6.2.3, 6.4-6.4.4.; DoDI 5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.

http://www.e-publishing.af.mil/

Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

Foreign Object Damage (FOD) and Dropped Object Prevention: (SS-7) Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training by viewing the Digital Versatile Disc (DVD) provided by the COR.

The Contract Manager shall provide written certification to the COR for each employee prior to the employees starting work in the OC-ALC shops. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the COR prior to the employees starting work in the OC-ALC shops.

Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the COR.

Tool Control and Accountability: (SS-8) While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the COR. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the COR within five (5) business days after PM, RM and calibration actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The COR will report any missing Contractor’s tools which have not been located within one

(1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the COR. The CM shall ensure each employee on the job site receives a briefing from the COR about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC- ALC Industrial Areas.

Privately Owned Motor Vehicles (POV): Contractor Contractor’s personnel shall comply with the directives pertaining to the operation of POVs on Tinker AFB, per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24- 302, in its entirety for the operation of POVs within Tinker AFB.

Required Initial and Refresher Courses for On-Base Driver’s Training: The Contractor and all Contractor employees shall take and pass the on-base Driver’s Training Course before driving on or in the Ramp areas. The Contractor shall contact the COR to schedule training. On an annual basis, the Contractor shall take the refresher on-base Driver’s Training Course. The Contractor shall submit each employee’s on-base Driver’s Training Course certificates to the COR upon completion of the initial or refresher courses.

FOD Training for Vehicle Operations: Vehicle operators shall complete all FOD awareness and prevention training, as well as testing requirements, before driving any vehicle on the flight line.

The Contractor shall comply with DAFI 13-213_TINKERAFBSUP a10.4.1 & 2.16.4.

a) A10.4.1 - Airfield entry points. Entry points are marked with warning signs stating you are entering the airfield. Only government or POV/contractor owned/government leased vehicles with an airfield or ramp pass are authorized on the airfield. A FOD checkpoint is located at each airfield entry point.

b) 2.16.4 - Contractors. In accordance with AFMAN 91-203, it is the responsibility of the Contracting Division to ensure contractors understand and comply with the airfield driving program and base personnel security access requirements. Additionally, they will inform AM and 72 SFS of contractors who will have a requirement to drive on the airfield.

No contractor is authorized to drive on Tinker airfield until properly trained and access granted. This requirement must be written in contract agreements.

Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

Foreign Nationals: The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

ISO 50001 – Energy Management System. The OC-ALC is certified to ISO 50001 Energy Management Systems. All contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

a) EnMS Training. All Contractors servicing OC-ALC facilities, systems, and equipment at Tinker AFB shall complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Tinker AFB.

b) The Contractor shall complete the required training and provide the completion notification to the COR within five (5) business days of contract award or before arriving on base.

Safety and Health on Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state, and local and the specific Air Force regulations (as applicable) regarding occupational safety and health addressed in the PWS. During the execution of the contract the Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property where the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00. The Contractor shall notify the (CO) within one (1) business day of any injury to contract personnel which occurs while on a Government installation.

Mishap notifications shall contain, as a minimum, the following information:

• Contract, Contract Number, Name and Title of Person(s) Reporting

• Date, Time and exact location of accident/incident

• Brief Narrative of accident/incident (Events leading to accident/incident)

• Cause of accident/incident, if known

• Estimated cost of accident/incident (material and labor to repair/replace)

• Nomenclature of equipment and personnel involved in accident/incident

• Corrective actions (taken or proposed)

• Other pertinent information

If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

Applicable Regulations and Air Force Instructions:

29 CFR 1910 OSHA Standards for General Industry AFI 91-203 Air Force Consolidated Occupational Safety Instruction AFI 91-207 THE US AIR FORCE TRAFFIC SAFETY PROGRAM 12 Sep 2013

AFI 31-218 AIR FORCE MOTOR VEHICLE TRAFFIC SUPERVISION

While on a government installation the Contractor shall be required to follow applicable installation traffic safety regulations and any applicable safety requirements required by the work center supervisor as it pertains to execution of the contract while in the work center; these may include but are not limited to general personal protective equipment such as safety glasses, hearing protection, and hard hats.