Section_J_-_Att_No__003_Salmon_Restoration_90__CD.pdf

PDF 11 MB Posted

Attached to
ENVIRONMENTAL CONSULTING SERVICES Federal contract opportunity
Solicitation number
140P8622Q0086
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET SUB-SHEET DESCRIPTION

1 G1 TITLE SHEET (THIS SHEET)

2 G2 GENERAL NOTES, DEFINITIONS, LEGEND

3 G3 STOCKPILE AND STAGING AREAS

4 G4 ACCESS PLAN

5 G5 QUANTITIES

6 G6 QUANTITIES II

7 D1 DEMOLITION PLAN (NOT INCLUDED)

8 C1 PLAN INDEX AND OVERVIEW

9 C2 SITE PLAN: AREA 7

10 C3 SITE PLAN: ACCESS TO AREAS 5 & 6

11 C4 SITE PLAN: AREA 6

12-13 C5-C6 SITE PLAN: ACCESS TO AREA 5

14 C7 SITE PLAN: AREA 5

15 C8 PROFILES: AREA 7

16 C9 PROFILES: AREA 6

17 C10 PROFILES: AREA 5

18 C11 SECTIONS: AREA 7

19-20 C12-C13 SECTIONS: AREA 6

21-22 C14-C15 SECTIONS: AREA 5

23 C16 SECTIONS: L1 AND R2 RSP KEY-IN DETAILS (NOT INCLUDED)

24 C17 RSP BURIAL: AREA 6

25 C18 CHANNEL BED BACKFILL: AREA 6

26 C19 FABRIC PLACEMENT AND RSP REMOVAL DETAILS

27 W1 LWD SITE PLAN: AREA 7

28 W2 LWD SITE PLAN: AREA 6

29 W3 LWD SITE PLAN: AREA 5

30-33 W4-W7 LWD DETAILS: AREA 7

34-38 W8-W12 LWD DETAILS: AREA 6

39 W13 LWD DETAILS: CREEK STA 37+30

40-42 W14-W17 LWD DETAILS: AREA 5 (W17 NOT INCLUDED)

SHEET INDEX

PARK BOUNDARY

LEGEND

PAVED ROAD

COUNTY LINE

TRAIL

CREEK

PARK HEADQUARTERS

RANGER STATION

INFORMATION CENTER

LIGHTHOUSE

PARKING

STATE PARK

ADJACENT NATIONAL PARK

ACCESS

FROM

Northern Hydrology and Engineering

Engineering - Hydrology - Geomorphology - Water Resources

STATE

NATIONAL PARK SERVICE

DENVER SERVICE CENTER REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT DRAWING NO.

PMIS/PKG NO.

OF

SHEET

SCALE OF MILES

10 0 10NORTHWESTERN

CALIFORNIA

RESTORE SALMON HABITAT, PHASE 2

MUIR WOODS

MARIN CALIFORNIA

RESTORATION

MUIR WOODS NATIONAL MONUMENT

PACIFIC WEST

XXX

XX

XX

312237

DRAFT 90% DESIGNS 3/1/2022

THIS PROJECT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SAN FRANCISCO

AutoCAD SHX Text

FORT

AutoCAD SHX Text

FUNSTON

AutoCAD SHX Text

FORT

AutoCAD SHX Text

MASON

AutoCAD SHX Text

PRESIDO

AutoCAD SHX Text

ALCATRAZ

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

AutoCAD SHX Text

SAUSALITO

AutoCAD SHX Text

MUIR

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

STINSON

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

MUIR WOODS

AutoCAD SHX Text

NATIONAL

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

TIBURON

AutoCAD SHX Text

MT. TAMALPAIS

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

CAMINO

AutoCAD SHX Text

ALTO

AutoCAD SHX Text

ANGEL ISLAND

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

RIDGE

AutoCAD SHX Text

CREST

AutoCAD SHX Text

BLVD.

AutoCAD SHX Text

SAN FRANCISCO

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

BAY BRIDGE

AutoCAD SHX Text

RODEO

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

BAKER BEACH

AutoCAD SHX Text

CLIFF HOUSE

AutoCAD SHX Text

FORT POINT

AutoCAD SHX Text N.H.S.

AutoCAD SHX Text

PACIFIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

HQ.

AutoCAD SHX Text

TO

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(TOLL)

AutoCAD SHX Text

POINT

AutoCAD SHX Text

BONITA

AutoCAD SHX Text

SAN FRANCISCO BAY

AutoCAD SHX Text

GOLDEN GATE

AutoCAD SHX Text

BRIDGE

AutoCAD SHX Text

(TOLL)

AutoCAD SHX Text

SAN FRANCISCO CO.

AutoCAD SHX Text

SAN MATEO CO.

AutoCAD SHX Text

MARION CO.

AutoCAD SHX Text

SAN FRANCISCO CO.

AutoCAD SHX Text

ALAMEDA CO.

AutoCAD SHX Text

SAN FRANCISCO CO.

AutoCAD SHX Text

TO

AutoCAD SHX Text

SOUTH

AutoCAD SHX Text

SAN FRANCISCO

AutoCAD SHX Text

TO

AutoCAD SHX Text

PACIFICA & SWEENEY

AutoCAD SHX Text

RIDGE AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TOMALES

AutoCAD SHX Text

PETALUMA

AutoCAD SHX Text

NOVATO

AutoCAD SHX Text

NAPA

AutoCAD SHX Text

FAIRFIELD

AutoCAD SHX Text

VALLEJO

AutoCAD SHX Text

CONCORD

AutoCAD SHX Text

WALNUT

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

HAYWARD

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

BERKELEY

AutoCAD SHX Text

SAN RAFAEL

AutoCAD SHX Text

SAN

AutoCAD SHX Text

MATEO

AutoCAD SHX Text

PALO

AutoCAD SHX Text

ALTO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

FRANCISCO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

PABLO

AutoCAD SHX Text

BAY

AutoCAD SHX Text

PACIFIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

MUIR WOODS

AutoCAD SHX Text

NATIONAL

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

POINT

AutoCAD SHX Text

REYES

AutoCAD SHX Text N.S.

AutoCAD SHX Text

SWEENEY

AutoCAD SHX Text

RIDGE

AutoCAD SHX Text

AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HQ.

AutoCAD SHX Text

MUIR WOODS NATIONAL MONUMENT

AutoCAD SHX Text

PO BOX 2515

AutoCAD SHX Text

MCKINLEYVILLE, CA 95519

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

NOTES

XXX

XXXXXX

2 XX

JKA, BSP, JRP

JRP, THB

JKA

2/26/2021

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G2

CO CONTRACTING OFFICER

CLIN CONTRACT LINE ITEM NO.

CHNL CHANNEL

CSP CALIFORNIA STATE PARK

DS DOWNSTREAM

DIA DIAMETER

ELEV ELEVATION

FT, ' FOOT

H HORIZONTAL

MAX MAXIMUM

MIN MINIMUM

N NORTH

NA NOT APPLICABLE

NPS NATIONAL PARK SERVICE

NTS NOT TO SCALE

P POOL

REF REFERENCE

GENERAL ABBREVIATIONS

SHEET NUMBER WHERE

SECTION/DETAIL IS

DRAWN OR TAKEN

LETTER INDICATES SECTION OR

DETAIL, NUMBER INDICATES

SECTION OR DETAIL NUMBER

A#

FR/TO

XS1 = CHANNEL CROSS SECTION 1

D1 = DETAIL 1

GENERAL NOTES:

1. THE LANDOWNER IS NATIONAL PARK SERVICE. LANDOWNER CONTACT

INFORMATION

CAROLYN SHOULDERS, PROJECT MANAGER

GOLDEN GATE PARK RECREATION AREA

FORT MASON, BLG. 201

SAN FRANCISCO, CA 94123

PHONE: (415) 289-1841

2. PROJECT ENGINEER INFORMATION

JEFFREY K ANDERSON

NORTHERN HYDROLOGY AND ENGINEERING

PO BOX 2515

MCKINLEYVILLE, CA 95519

707-839-2195

3. ALL WORK SHALL COMPLY WITH THESE PLANS, SPECIFICATIONS, AND

NOTES.

4. THE PROJECT ENGINEER RESPONSIBLE FOR PREPARATION OF THESE PLANS

AND SPECIFICATIONS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR

UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO

THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PROJECT

ENGINEER RESPONSIBLE FOR PREPARATION OF THESE PLANS.

5. SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER

RELATIVE THERETO IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON

THESE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT AN

RFI TO NPS FOR ADDITIONAL INFORMATION BEFORE CONDUCTING WORK

ON THAT PORTION OF THE PROJECT.

6. ALL REVISIONS TO THESE PLANS MUST BE MADE BY THE PROJECT

ENGINEER RESPONSIBLE FOR THE PLAN PREPARATION, AND SHALL

ACCURATELY BE SHOWN ON REVISED PLANS

7. THE PERMISSIBLE PERIOD OF WORK IN THE CHANNEL IS LIMITED TO

AUGUST 1 THROUGH OCTOBER 31. NO EQUIPMENT MAY WORK IN A LIVE

CHANNEL. CONDUCT ALL WORK FOLLOWING AN APPROVED DEWATERING

AND WATER DIVERSION PLAN.

8. THE PROJECT IS LOCATED WITHIN AN OPERATING NATIONAL PARK. THE

PARK WILL REMAIN OPEN TO VISITORS 7 DAYS PER WEEK DURING THE

CONSTRUCTION PERIOD. THE CONTRACTOR MAY PROPOSE INTERMITTENT

TRAIL CLOSURES, BUT ALL TRAIL CLOSURES MUST BE APPROVED BY NPS.

TRAILS SHALL REMAIN OPEN TO THE PUBLIC TO THE EXTENT POSSIBLE.

9. ACCESS TO THE SITE, STAGING, AND STOCKPILE AREAS ARE HIGHLY

RESTRICTED.

10. NUMEROUS HISTORIC FEATURES OCCUR AT MUIR WOODS, INCLUDING

TRAILS, WOODEN FOOTBRIDGES ON THE MAIN TRAIL, AND MANY OTHERS,

AND NEITHER ACCESS NOR ACTIONS SHALL BE TAKEN EXCEPT WHERE

SHOWN, UNLESS OTHERWISE SPECIFICALLY APPROVED BY THE CO.

11. PROTECT EXISTING LOG CHECK DAMS AND ROCK GRADE CONTROL

STRUCTURES WHEREVER THEY OCCUR.

12. ARCHAEOLOGICAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN THE

VICINITY SHALL BE HALTED, AND CONTRACTING OFFICER SHALL BE

NOTIFIED IMMEDIATELY

13. THE CONTRACTOR SHALL USE ONLY DESIGNATED SPECIFIC SITES FOR

STORAGE OF EQUIPMENT AND MATERIALS AS SHOWN ON THESE PLANS

AND SPECIFICATIONS.

14. LINE AND GRADE: THE LAYOUT CONTROL, DIMENSIONS AND CONTOURS

SHOWN ARE INTENDED TO PROVIDE THE CONTRACTOR SUFFICIENT

INFORMATION TO LAYOUT AND PERFORM INITIAL STAKING OF THE

PROJECT. THE STAKES SHALL BE REVIEWED AND ADJUSTED WITH THE

CONTRACTING OFFICER PRIOR TO ANY GRADING. ADJUSTMENTS TO THE

GRADING WILL BE REQUIRED AS DIRECTED BY THE CONTRACTING OFFICER

TO ACHIEVE A FUNCTIONAL, RESTORED CREEK. CAD FILES WILL BE MADE

AVAILABLE FOR THE CONTRACTOR'S CONVENIENCE. IN THE EVENT OF A

CONFLICT, THE HARD COPY DRAWINGS SHALL GOVERN.

15. PLAN FEATURES ARE LABELLED ACCORDING TO THEIR CHANNEL STATION.

CHANNEL STATIONS ARE SHOWN IN UNITS OF FEET. FOR INSTANCE,

CHANNEL STATION 50+00 IS 100 FEET UPSTREAM OF CHANNEL STATION

49+00. CHANNEL STATION 45+37 IS 37 FEET UPSTREAM OF CHANNEL

STATION 45+00.

16. THE INTENT OF THE PROJECT EARTHWORK IS TO REUSE ALL MATERIAL

ON-SITE INCLUDING, BUT NOT LIMITED TO, SOIL, BED MATERIAL, AND

WOODY DEBRIS. ONLY THOSE MATERIALS SPECIFICALLY DESIGNATED FOR

OFF-SITE DISPOSAL SHOULD BE REMOVED FROM THE SITE.

17. COPIES OF ALL ENVIRONMENTAL PERMITS WILL BE PROVIDED TO THE

CONTRACTOR, AND MUST BE KEPT ON-SITE AT ALL TIMES DURING

CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN AT HIS/HER OWN

EXPENSE ALL PERMITS, LICENSES, INSURANCE POLICIES, ETC., NOT

ALREADY OBTAINED AS MAY BE NECESSARY TO COMPLY WITH STATE AND

LOCAL LAWS ASSOCIATED WITH THE PERFORMANCE OF THE WORK.

CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMITS.

18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF ALL

EQUIPMENT AND MATERIALS.

19. HEAVY EQUIPMENT IS PERMITTED FOR USE IN THE CHANNEL. ALL

EQUIPMENT USE SHALL FOLLOW AN APPROVED ACCESS PLAN.

20. METHODS OF PROTECTING THE CREEK, BANKS AND TERRESTRIAL AREAS

SHALL FOLLOW AN APPROVED ACCESS PLAN TO BE SUBMITTED BY

CONTRACTOR FOR NPS REVIEW AND APPROVAL.

21. ALL WORK REQUIRES SPECIFIED PROTECTIONS FOR WATER RESOURCES,

THE CHANNEL BED, ENDANGERED SPECIES, NOISE, AND VEGETATION, PER

SECTION 014500.

22. THIS WORK REQUIRES CAREFUL SEQUENCING TO:

A. RELOCATE SOIL FROM GRADED BANKS TO FILL PLACEMENT LOCATIONS

FURTHER UPSTREAM OR DOWNSTREAM,

B. RELOCATE SOME RSP TO BURIAL AREAS THAT ARE NOT ADJACENT TO RSP

REMOVAL SEGMENTS

Northern Hydrology & Engineering

RSP-A##-##+##

NAME LEGEND

CROSS-REFERENCE LEGEND

RSP STATION

NAME OF RSP, LETTER "L"OR "R"

INDICATES RSP EXISTS ON LEFT BANK

OR RIGHT BANK, RESPECTIVELY.

ROCK SLOPE

PROTECTION

MATERIAL DEFINITIONS

RSP ROCK SLOPE PROTECTION

SFT SQUARE FOOT

SPECS SPECIFICATIONS

STA STATION

SWD SMALL WOODY DEBRIS

TYP TYPICAL

US UPSTREAM

V VERTICAL

XS CROSS-SECTION

TREE

DESIGN LOG

BOARDWALK

EXISTING WOOD USED IN DESIGN

BOULDER

MAJOR CONTOUR [5 FT]

CONTROL POINT

RSP REMOVAL EXTENT (PLAN VIEW)

PROJECT ALIGNMENT

GRADING BOUNDARY

PLACED RSP

DESIGN ELEMENTS

ROCK GRADE CONTROL

REMOVE TRAIL (SECTION VIEW)

EXISTING ELEMENTS

MINOR CONTOUR [1 FT]

WOOD GRADE CONTROL

DESIGN THALWEG

WOODEN FENCE

SPOT ELEVATION

THALWEG ELEVATION

RSP BURIAL AND BED GRADING AREA

SYMBOLOGY

UNDISTURBED BED MATERIAL (DETAIL)

ROADS

TRAIL

BUILDING OUTLINE

CASCADE

EQUIPMENT ACCESS (G5 OVERVIEW)

MUIR WOODS NATIONAL MONUMENT BOUNDARY

PINNING LOGS (OVERVIEW)

SWD POST PLACEMENT (OVERVIEW)

RSP - REMOVE

FABRIC TYPE 2 (DETAIL)

FABRIC TYPE 1 (DETAIL)

EXISTING GROUND (SECTION VIEW)

RIPRAP (OVERVIEW, REMOVE)

COARSENED BED MATERIAL

BRIDGE

DESIGN GROUND (SECTION VIEW)

BACKING ROCK TOE OF BANK

TOP OF BANK

RIPRAP (OVERVIEW)

LOG GRADE CONTROL

RIPARIAN AREA (BY OTHERS)

BACKFILL BED MATERIAL

EQUIPMENT ACCESS (PLAN VIEW)

EXISTING SEWER LINE

ALTERED SEWER LINE (BY OTHERS)

NPS LAW ENFORCEMENT AND MANAGEMENT AREA

RELOCATED OR REUSED VEGETATION

PANORAMIC HWY

M

UIR

W

OODS R

D

HWY 1

DEER PARK FIRE RD

Redwood Creek

FR

AN

K

VA

LL

EY

R D

ALICE EASTWOOD RD

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

STAGING & STOCKPILE AREAS

XXX

XXXXXX

3 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G3

1000 0 1000 2000

SCALE OF FEET

OVERVIEW MAP

Northern Hydrology & Engineering

Redwood Creek

<E> BATHROOM

ENTRANCE

PLAZA

<E> SEWER LINE

<E> FLAG POLE

VISITOR

CENTER

M U

IR

W

O O

D S N

A

TIO

N A

L M O

N U

M

EN

T M

O U

N

T TA

M A

LPA

IS STA

TE PA

R

K

PA

R C

EL N

O

. 02-106

N

PS LA

W

EN

FO

R

C

EM

EN

T A

N D

M A

N A

G

EM

EN

T A

R

EA

WATERSHED

MODEL

<E> MEDIAN (APPROX.

ALIGNMENT)

<P> TEMP.

FENCING<P> CONSTRUCTION

ACCESS

<P> CONSTRUCTION ACCESS

TO AREAS 5 AND 6 TBD

BASED ON SITE CONDITIONS

WITH NPS APPROVAL

<P> STAGING

AREA

<E> SIDEWALK

30 0 30 60

SCALE OF FEET

AREA OF DETAIL: STAGING AT AREA 7

TEMPORARY USE OF PARKING SPACES RESTRICTED TO IMPORTING LOGS. SCHEDULE SPECIFIC USE DATES IN ADVANCE FOR APPROVAL BY NPS.

<P> GATE 2: USE BEFORE VISITING HOURS FOR MOBILIZATION/DEMOBILIZATION AND LARGE LOADS. VISITORS ACCESS RESTROOMS THROUGH

THIS ROUTE.

TEMPORARILY REMOVE FROM PLAZA AND VISITOR PATHWAY: 6 BACKLESS BENCHES, 4 BACKED BOLTED BENCHES, AND TRASH CANS.

RELOCATE WITH NPS COORDINATION: 8-10 BACKLESS BENCHES AND TRASH CANS TO VISITOR USE AREAS (SEE NOTE 2). STORE OTHERS AT PHOTO CORNER ON ADMIN RD. (SHEET G4) REPLACE ALL TO ORIGINAL LOCATIONS AFTER CONSTRUCTION.

TEMPORARY PLACEMENT LOCATION FOR BACKLESS BENCHES.

REMOVE ALL <E> 6" X 6" WHEEL STOPS AND USE TEMPORARILY FOR CONTRACTOR ACCESS NEEDS OR DISCARD. RETAIN EXISTING PATHWAY THROUGH MEDIANS. RELOCATE <E> SPLIT RAIL FENCE TO ALIGNMENT OF NORTH WHEEL STOP. INSTALL FENCE POSTS IN GROUND SECURELY TO REMAIN IN PLACE AFTER WORK IS COMPLETED; CONCRETE FOOTINGS NOT LIKELY TO BE NEEDED.

KEY

<P> GATE 1: TWO-DOORED GATE THAT SWINGS OUT TO BLOCK PEDESTRIAN PATHWAY BRIEFLY. TO BE USED AS THE PRIMARY GATE.

<E> ADA PARKING

<P> GATE 3: CONTRACTOR ACCESS FOR IMPORT OF LWD. NPS WILL USE THIS GATE TO MAINTAIN BATHROOMS.

GRADING

BOUNDARY

PROTECT OR TEMPORARILY REMOVE SPLIT RAIL FENCE ON CREEK SIDE OF STAGING AREA AS NEEDED; REPLACE AFTER WORK.

GENERAL STAGING AND STOCKPILING NOTES:

1. THE CONTRACTOR SHALL SET UP STAGING AT AREA 7 TO CLEARLY DEFINE AND ACCOMMODATE VISITOR ACCESS THROUGH THE ENTRANCE PLAZA. THE CONTRACTOR SHALL EMPLOY SAFETY MEASURES WHEN VEHICLES CROSS VISITOR USE AREAS.

2. MINIMIZE STAGING AREA AND MAXIMIZE VISITOR USE AREA WHERE POSSIBLE.

3. VEGETATED AREA NEXT TO STAGING AREA MAY NOT BE USED FOR WORKER FOOT TRAFFIC. USE DEFINED ACCESS ROUTES.

AVOID VEGETATED AREAS OR PLACE ORANGE FENCE TO ENSURE WORKERS AVOID IT.

INSTALL SCREENED CHAIN LINK FENCE TO CREATE A VISITOR PATH A MIN. OF 15’ WIDE BETWEEN THE RELOCATED SPLIT RAIL FENCE AND

CHAIN LINK FENCE.

AREA OF DETAIL: CONLON STOCKPILE AREA

30 0 30 60

SCALE OF FEET

ACCESS

BETWEEN

STOCKPILES

<E> PARKING LOT

TO CONLON AVE

TO MUIR

BEACH

NPS PROPERTY

(EAST SIDE OF

PANORAMIC HWY)

TO MILL

VALLEY &

HWY 101

CONLON LOT

STOCKPILE

AREA

AREA OF

DETAIL

STAGING

AT AREA 7

NPS LAW

ENFORCEMENT

AND

MANAGEMENT

AREA

MUIR WOODS

ENTRANCE

MUIR WOODS NATIONAL

MONUMENT BOUNDARY

<E> PP (APPROX)

TURN-OUTS ALONG EAST SIDE OF PANORAMIC

HWY BETWEEN HWY 1 AND ALICE EASTWOOD

RD AVAILABLE FOR MATERIAL TRANSFERS AS

DETERMINED UNDER ENCROACHMENT PERMIT

TO BE OBTAINED FROM MARIN COUNTY BY

CONTRACTOR

EXTENT OF

RIPRAP

REMOVAL

PROJECT REACH

DOUG FIR

REMOVAL

15 FT MIN.

8.5 FT 5 FT

8.5 FT

8.5 FT14 FT

36 FT111 FT

46 FT

10 FT MIN.

CATHEDRAL GROVE

BOHEMIAN GROVE

MUIR WOODS

VISITOR CENTER

RESTROOMS

HILLSIDE TRAIL

BRIDGE 3

BRIDGE 1.5

BRIDGE 1

15+00

20+00 25+00

30+0035+00

40+00

45+00

50+00

BRIDGE 2 MUIR WOODS RD

FRANK VALLEY RD

MOUNT TALMAPAIS STATE PARK

MUIR WOODS NATIONAL MONUMENT

WATER MAIN

SHUT OFF VALVE

(APPROX.)

ADMIN RD

CANOPY VIEW TRAIL

EAST. MAIN TRAIL

W

EST M

AIN TRAIL

"PHOTO CORNER"

STORE BENCHES

HERE (SEE SHEET G3)

EXISTING ROCK CHECK

DAM (CASCADE)

100 0 100

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

ACCESS PLAN

XXX

XXXXXX

4 XX

JKA, BSP, JRP

JRP, THB

JKA

2/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G4

GENERAL NOTES:

1. EQUIPMENT ACCESS IS STRICTLY LIMITED TO THE ROUTES SHOWN AND ARE PROHIBITED FROM

BOARDWALKS. EQUIPMENT MAY NOT DRIVE, OPERATE , OR STAGE ON GROUND SURFACE AREAS

EXCEPT ON THOSE SHOWN, WITH MINOR EXCEPTIONS AFTER REVIEW AND APPROVAL FROM NPS.

2. WORK SHALL BE CONDUCTED WITH EQUIPMENT SUITABLE FOR 8.5 FT WIDE ACCESS ROUTES.

3. CONTRACTOR SHALL COORDINATE WITH NPS FOR TEMPORARY TRAIL CLOSURES, AS SHOWN. NPS

WILL NOT CLOSE TRAIL SEGMENTS ON BOTH SIDES OF THE CREEK AT THE SAME TIME. ACCESS 4 IS THE ONLY TRAIL THAT MAY BE CLOSED IF WORK IS NOT CURRENTLY UNDERWAY. ALL OTHER ACCESS

ROUTES MUST REMAIN OPEN UNLESS CURRENTLY IN USE.

4. ACCESS 5 AND 8 ON WEST AND EAST MAIN TRAIL, RESP., SHALL NOT BE CLOSED AT THE SAME TIME.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING APPROVED TRAIL CLOSURES TO PREVENT VISITOR

ACCESS TO WORK ZONES.

6. PROTECT ALL ASPHALT ON TRAILS DURING USE, EXCEPT WHERE ASPHALT WILL BE REMOVED.

7. ALL FOOT TRAFFIC SHALL REMAIN WITHIN BOUNDARIES AT ACCESS ROUTES AND SHALL NOT USE

SHORT-CUTS THROUGH VEGETATION. TEMPORARY FENCING SHALL BE PLACED ALONG BOUNDARIES

OF ACCESS ROUTES THROUGH VEGETATED AREAS.

8. BRIDGE 1.5 IS NOT SUITABLE FOR HEAVY EQUIPMENT. INSTALL TEMPORARY CROSSING FOR HAULING.

Northern Hydrology & Engineering

FLOW

INSTALL TRAIL CLOSURE FENCE WHEN ACCESS 8 ON EAST MAIN TRAIL IS IN USE. KEEP EAST

MAIN TRAIL OPEN TO VISITORS BY LIMITING PERIOD OF USE AND ALWAYS WHEN ACCESS 5

TRAIL ON WEST MAIN TRAIL IS CLOSED.

ALL FOOT TRAFFIC ON FLOODPLAIN IS LIMITED TO FENCED AREA ALONG ACCESS 2.

KEY

TEMPORARILY REMOVE FENCE RAILS FOR EQUIPMENT ACCESS.

REMOVE BOARDWALK RAMP FOR EQUIPMENT ACCESS TO ASPHALT TRAIL IN WORK

ZONE; PROTECT AND REPLACE.

LIMIT EQUIPMENT ACCESS ON TRAIL; TOO NARROW UPSTREAM OF THIS POINT.

PROTECT ASPHALT ON PAVED TRAILS (TYP).

VISITOR ACCESS TO HILLSIDE TRAIL SHALL ALWAYS REMAIN OPEN. CONTRACTOR

SHALL BRIEFLY PAUSE VISITOR TRAFFIC TO HILLSIDE TRAIL AS NEEDED TO

PROTECT VISITORS.

PLACE TRAIL CLOSURE FENCE. OPEN ONLY FOR CONTRACTOR USE. PROHIBIT

VISITOR ACCESS WHEN IN USE.

INSTALL TRAIL CLOSURE FENCE WHEN ACCESS 6 ON WEST MAIN TRAIL IS IN USE.

LEAVE OPEN FOR VISITOR ACCESS DURING WORK TO THE EXTENT POSSIBLE AND

ALWAYS WHEN ACCESS 8 TRAIL ON EAST MAIN TRAIL IS CLOSED.

ACCESS 9 ACROSS

FLOODPLAIN FENCED

MAX. 3 FT WIDE FOOTPATH

TO PUMP AND DIVERSION

APPROX. UPSTREAM

EXTENT OF DEWATERING

(STA 46+85)

RAMP 5

LEFT BANK

(STA 45+35)

RAMP 4

RIGHT BANK

(STA 44+60)

ACCESS 7 IN CHANNEL

(STA 43+20 TO STA 46+85)

ACCESS 8 SHORT-TERM

WORK AREA ON TRAIL

(STA 43+20 TO STA 46+85)

APPROX. DOWNSTREAM

EXTENT OF DEWATERING

(STA 43+20)

ACCESS 6 AND STAGING AREA 3

ACROSS FLOODPLAIN MAX 8.5 FT

(STA 40+80 TO STA 45+80)

ACCESS 5 ON WEST MAIN TRAIL

UPSTREAM OF BRIDGE 2, AS

SHOWN

APPROX. UPSTREAM

EXTENT OF

DEWATERING

(STA 34+10)

ACCESS 4

IN CHANNEL

(STA 30+60 TO

STA 34+10)

ACCESS 4 AND STAGING AREA 2 ON WEST MAIN TRAIL

BETWEEN BRIDGE 1 AND BRIDGE 2, AS SHOWN, AND

ASPHALT TRAIL REMOVAL AREA

RAMP 3

RIGHT BANK

(STA 31+75)

APPROX. DOWNSTREAM

EXTENT OF DEWATERING

(STA 30+60)

TEMPORARILY REMOVE INTERPRETIVE SIGN.

PROTECT PIPE STEM.

ACCESS 2 ACROSS FLOODPLAIN MAX. 8.5 FT

WIDE FENCED FROM CHANNEL TO TRAIL

(STA 23+65 STA 28+70)

APPROX. UPSTREAM

DEWATERING EXTENT

(STA 25+05)

RAMP 2

RIGHT BANK

(STA 23+65)

STAGING AREA 1

(SEE SHEET G3 FOR

DETAIL)

APPROX. DOWNSTREAM

DEWATERING EXTENT

(STA 21+25)

RAMP 1

LEFT BANK

(STA 22+75)

ACCESS 1 IN CHANNEL

(STA 21+40 TO STA 25+05)

ACCESS 3 SPUR

ACROSS FLOODPLAIN

LEFT BANK

AREA 7 GRADING

BOUNDARY

FLOW

PROPERTY

BOUNDARY (TYP.)

AREA 6

GRADING

BOUNDARY

EQUIPMENT ARE EXCLUDED FROM BOARDWALKS (TYP).

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

QUANTITIES I

XXX

XXXXXX

5 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G5 Northern Hydrology & Engineering

TABLE 2. RSP VOLUMES

GENERAL NOTES ON RSP VOLUMES:

· VOLUMES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY; CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL VOLUMES.

· ESTIMATED VOLUMES REPRESENT CURRENT RSP PLACEMENT ON THE BANKS, WHICH IS TIGHTLY INTERLOCKED WITH MINIMAL VOID SPACE. RSP VOLUME ESTIMATES WERE COMPUTED BY MULTIPLYING THE LENGTH, THICKNESS, AND SLOPE LENGTH (SEE RSP

DIMENSIONS TABLE, THIS SHEET).

· RSP SECTION LENGTH AND SLOPE LENGTH WERE SURVEYED AND SECTION THICKNESS WAS ESTIMATED BY PROBING 1.5 FT BELOW GROUND SURFACE ALONG THE TOP OF BANK BEHIND RSP SECTIONS.

· IT IS NOT KNOWN HOW FAR RSP SECTIONS EXTEND BELOW THE CHANNEL BED OR BANK. EXPLORATORY EXCAVATION SHALL BE CONDUCTED AT THE TOES OF ALL RSP SEGMENTS TO IDENTIFY POSSIBLE PRESENCE OF BURIED RSP. ALL SUBSURFACE ROCK SHALL BE

REMOVED AS PART OF THIS WORK, UNLESS THE TOP OF THE SUBSURFACE ROCK IS BELOW THE ELEVATIONS SPECIFIED IN THESE DRAWINGS. HISTORICAL PHOTOS DO NOT SHOW TRENCHING THAT WOULD INDICATE SUBSURFACE ROCK OR THAT RSP WAS CONSTRUCTED

WITH MORE LAYERS ON THE BANK THAN CURRENTLY VISIBLE .

TABLE 1. RSP DIMENSIONS

NOTES ON ASPHALT AND BASE ROCK VOLUME ESTIMATES:

· AREA 2: VOLUME OF ASPHALT AND BASE ROCK WAS ESTIMATED BASED ON STRATIGRAPHY

OBSERVED IN PITS THAT WERE DUG ADJACENT TO THE TRAIL. EXTENT OF BASE ROCK MAY BE WIDER

THAN ASPHALT. ACTUAL DIMENSIONS ALONG THE LENGTH OF THE TRAIL MAY VARY.

TABLE 3. ASPHALT AND TRAIL BASE ROCK VOLUMES

NOTE: NA = NOT APPLICABLE

NOTES ON METHODS FOR RSP VOLUME ESTIMATES (SEE ALSO: RSP DIMENSIONS TABLE, THIS SHEET):

· RSP L1 (SECTION TO BE REMOVED): LAYER 1 ROCK WAS DIVIDED INTO TWO SECTIONS: 1) A DOWNSTREAM ~65 FT LONG SECTION OF EMBEDDED ~1 FT DIA ROCK AND 2) AN UPSTREAM ~45 FT LONG SECTION ~2 FT DIA ROCK. A SECOND LAYER WAS

OBSERVED BY PROBING. THE TOE OF THE UPSTREAM SECTION (TO BE REMOVED) WAS EXPOSED; THEREFORE, NONE OF THE RSP IN L1 IS ASSUMED TO BE EMBEDDED BELOW THE CHANNEL BED.

· RSP R1 (SECTION TO BE REMOVED): LAYER 1 ROCK IS A SINGLE ~70 FT LONG SECTION CONSISTING OF WELL-EMBEDDED ~2 FT DIA ROCK. THE TOE OF THE RSP WAS COVERED IN A GRAVEL BAR DURING OBSERVATION, WHICH WAS NOT EXCAVATED OR

EXPLORED TO COFIRM DEPTH OF RSP. TWO LOCATIONS WERE PROBED BEHIND LAYER 1 AND NO SECOND LAYER WAS OBSERVED.

· R2 (SECTION TO BE REMOVED): LAYER 1 ROCK IS A SINGLE ~70 FT LONG SECTION CONSISTING OF ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING. THE TOE OF THE R2 SECTION (TO BE REMOVED) WAS EXPOSED; THEREFORE, NONE OF THE

RSP IN R2 IS ASSUMED TO BE EMBEDDED BELOW THE CHANNEL.

· RSP R2B: LAYER 1 ROCK IS ESTIMATED TO BE A SINGLE ~40 FT LONG SECTION CONSISTING OF A SINGLE LAYER OF ~1.5 FT DIA ROCK, ORIGINATING FROM THE NORTH END OF BRIDGE 1.5 AND EXTENDING INTO THE UPSTREAM CHANNEL BANK.

· RSP L2: LAYER 1 ROCK WAS DIVIDED INTO FOUR SECTIONS: 1) AN UPSTREAM ~40 FT LONG SECTION OF WELL-EMBEDDED ~1 FT DIA ROCK, 2) A ~55 FT LONG SECTION OF ~2 FT DIA ROCK, INCLUDING A ~10 FT LENGTH OF LAUNCHED BOULDERS, 3) A FAILED

~15 FT LONG SECTION OF ~1 FT DIA (REMAINING) ROCK THAT LAUNCHED BOULDERS INTO THE CHANNEL, AND 4) A DOWNSTREAM ~20 FT LONG SECTION OF EMBEDDED ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING.

· RSP R3 (SECTION TO BE REMOVED): LAYER 1 ROCK WAS DIVIDED INTO THREE SECTIONS: 1) AN UPSTREAM ~70 FT LONG SECTION OF ~2 FT DIA ROCK, WITH A ~10 FT LONG FAILURE, 2) A ~40 FT LONG SECTION OF ~1.5 FT DIA ROCK, WITH LAUNCHED ROCK

ALONG THE TOE OF THE BANK 3) ~70 FT LONG SECTION OF ~2 FT DIA ROCK, WITH BOULDERS LAUNCHED IN THE CHANNEL. A SECOND LAYER WAS OBSERVED BY PROBING.

· RSP R6: LAYER 1 ROCK WAS DIVIDED INTO THREE SECTIONS: 1) AN UPSTREAM ~60 FT LONG SECTION OF WELL-EMBEDDED ~2 FT DIA ROCK, 2) A FAILED 20 FT LONG SECTION AND 3) A DOWNSTREAM ~50 FT LONG SECTION OF LOOSE ~2.5 FT DIA ROCK.

LAYER 2 VOLUME ASSUMES A SOLID 0.5 FT LAYER BEHIND THE DOWNSTREAM 75 FT OF LAYER 1. LAYER 2 ASSUMPTION IS BASED ON OBSERVATIONS OF 0.5 FT ROCK EMBEDDED IN THE BANK AT FAILURE LOCATIONS, THOUGH A SOLID LAYER WAS NOT OBSERVED AND 0.5 FT ROCK COULD BE CHINK MATERIAL, NOT A SECOND LAYER. PROBING 6 LOCATIONS (TO 1.5' DEPTH) BEHIND THE ROCK WAS NON-CONCLUSIVE. SUBSURFACE ROCK ESTIMATE ASSUMES SUBSURFACE ROCK ALONG THE DOWNSTREAM

~50 FT SECTION OF RSP ONLY (WHERE EMBEDDED ROCK WAS OBSERVED IN CHANNEL BED).

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

QUANTITIES II

XXX

XXXXXX

6 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G6 Northern Hydrology & Engineering

TABLE 6. ESTIMATED SOIL VOLUMES FOR BANK GRADING AFTER RSP REMOVAL

TABLE 4. ESTIMATED RSP BURIAL, RE-USE AND STOCKPILING VOLUMES

1. SOIL VOLUMES WERE ESTIMATED BY DIFFERENCING THE EXISTING AND DESIGN SURFACES UTILIZING AUTOCAD CIVIL3D, THEN SUBTRACTING THE ROCK VOLUME ESTIMATE TO REMOVE THE PORTION OF THE EXISTING SURFACE THAT IS ROCK. DUE TO THE UNKNOWN

ROCK EXTENT INTO THE BANK, ACTUAL SOIL VOLUMES MAY VARY.

TABLE 5. ESTIMATED CHANNEL BED VOLUMES

TABLE 7. PLANT SALVAGE LIST

1. ORIENT LOOKING DOWNSTREAM TO DETERMINE LEFT OR RIGHT BANKS

CATHEDRAL

GROVE

MUIR WOODS

VISITOR CENTER

RESTROOMS

EXISTING ROCK CHECK

DAM (CASCADE)

L6

L5

L4

R6

R5

L3R4

R3

L2

R2

R1

L1

HILLSIDE TRAIL

BRIDGE 3

BRIDGE 2

BRIDGE 1.5

BRIDGE 1

DESIGN

AREA 5

DESIGN

AREA 6

DESIGN

AREA 7

SHEET C7

SHEET C2

SHEET C3

SHEET C4

SHEET C5

SHEET C6

109 110

R2B

15+00

20+00 25+00

30+00

35+00

40+00

45+00

50+00

FRANK VALLEY RD

CANOPY VIEW TRAIL

EAST MAIN TRAIL

W

EST M

AIN TRAIL

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

PLAN INDEX & OVERVIEW

XXX

XXXXXX

8 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C1200

SCALE OF FEET

1000100

Northern Hydrology & Engineering

SURVEY CONTROL NETWORK BY OBERKAMPER & ASSOCIATES, 2017. GEOMETRIC DATUM:NORTH AMERICAN DATUM OF 1983 - NAD83(2011) EPOCH 2010.00 REALIZIATION. PROJECTION:CALIFORNIA STATE PLANE COORDINATE SYSTEM (SPCS) ZONE III, U.S. SURVEY FT. VERTICAL DATUM:NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FT.

SURVEY CONTROL NETWORK

FLOW

M U

IR

W

O O

D S

NA

TI

O

NA

L M

O

NU

M

EN

T

M O

U

NT

T

AM

AL

PA

IS

S

TA

TE

P

AR

K

PA

RC

EL

N O

. 0 2-

NP

S

LA

W

E

NF

O

RC

EM

EN

T

AN

D M

AN

AG

EM

EN

T

AR

EA

MUIR WOODS NATIONAL MONUMENT

MOUNT TAMALPAIS STATE PARK

25+00

S

SR

R

A A

A

A A

A A

A

AA

AAA A

A

M

M

B B

B

A

B

B

R

R

R

R

AA

RA

A

A

A

A

CREEK STA 20+71

CREEK STA 25+46

100200

400418

136 135

136137

128 129 130 131

138139

133.0131132133

134135 134 131.0

135.6

DEMOLISH SECTION OF SEWER LINE BETWEEN <E> MANHOLE AND RESTROOM (APPROX.

ALIGNMENT).

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

SITE PLAN: AREA 7

XXX

XXXX

9 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C2

FLOW

<E> RESTROOM

<E> PHONE BOOTH

XS 1

C11

APPROX. WIDTH <E> RSP TO REMAIN IN PLACE

PROTECT <E> PIPE (ALIGNMENT APPROX.)

NO ACCESS IN CHANNEL UPSTREAM OF THIS POINT

BURY RSP INTO TO LEFT BANK BEHIND DOWNSTREAM END OF REMAINING L1 (SHEET C16)

TOPPLE TREES WHOLE WITH ROOTBALLS INTACT FOR REUSE

<P> ACCESS ROUTE TO BE LOCATED TO AVOID <E> STANDS OF ELYMUS CALIFORNICUS (TO

BE FLAGGED BY NPS). NO TREES SHALL BE REMOVED. TIE BACK BRANCHES TO EXTENTS

POSSIBLE, WITH MINOR TRIMMING, AS NECESSARY.

OBSERVE AND PROTECT <E> TREE AND ROOTS

KEY

ENTRANCE

PLAZA

VISITOR

CENTER

BOARDWALK <E> FLAG

POLE

M U

IR W

O

O D

S N

ATIO

N

AL M

O

N U

M

EN

T

M O

U N

T TAM

ALPAIS STATE PARK

PARC

EL N

O . 02-106

N

PS LAW

EN

FO

RC

EM

EN

T AN

D M

AN

AG

EM

EN

T AREA

XS 2

C11

<E> MANHOLE

R1

L1XS 3

C11

STAGING AREA

<E> SEWER LINE

EXPOSED

BEDROCK

<E> "CASCADE"

ROCK CHECK DAM

DOWNSTREAM LIMIT OF

DEWATERING

UPSTREAM LIMIT OF

DEWATERING

<E> PLUGGED AND GROUTED

SEWER LINE

<E> SEWER LINE

<E> "MIDDLE" ROCK

CHECK DAM

<P> ACCESS ROUTE

<E> PHONE CABLE

IN PIPE ( APPROX.)

DEMOLISH <E> PHONE CABLE IN CONDUIT, ABOVE GROUND AND SUBSURFACE (ALIGNMENT

APPROX)

SAW CUT GROUTED SEWER LINE 6-12" FROM <E> MANHOLE. IF PLUG BETWEEN CUT AND

MANHOLE IS LOOSENED OR REMOVED, RECAP THE CUT END WITH GROUT.

MARK <E> SEWER LINE ALIGNMENT PRIOR TO REMOVAL TO IDENTIFY ANY TREES THAT

MAY POTENTIALLY BE IMPACTED. DEMOLISH SEWER LINE AND BACKFILL WITH SOIL

PER SPECIFICATIONS.

<E> GATE

<E> MANHOLE

<E> SEWER LINE

<E> DROP INLET

& CULVERT

POSSIBLE AREA TO STORE SALVAGED VEGETATION (LEFT BANK AND/OR CHANNEL)

15 0 15 30

SCALE OF FEET

LP1

C8

<P> NEW RIPARIAN (BY

OTHERS)

LP2

C8

BR

ID

G E

R

A

A

R

R

RA

CREEK STA 25+46 400418

137138139140141

142143

143 142

148 149

142143

135CREEK STA 29+60

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

SITE PLAN: ACCESS TO AREAS 5 & 6

XXX

XXXX

10 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C3

FLOW

15 0 15 30

SCALE OF FEET

TEMPORARILY REMOVE FENCE RAILS FOR EQUIPMENT ACCESS

KEY

CREATE TEMPORARY STABLE ACCESS NEXT TO <E> TREES. RESTORE GROUND TO ORIGINAL CONDITION

AFTER USE. DO NOT CUT HILLSLOPE. PROTECT BARK ON STANDING TREES. STORE DUFF AND

BRANCHES TO REPLACE AFTER WORK. USE LANDSCAPE CLOTH BENEATH ANY PLACED MATERIAL.

"BRIDGE 1" ROCK

CHECK DAM (E)

BOARDWALK (E)

SEWER LINE (E)

NO

C

ON

ST

RU

CT

IO

N

AC

CE

SS

T

O

BR

ID

GE

CONSTRUCTION ACCESS ROUTE

"MIDDLE" ROCK

CHECK DAM (E)

VISITOR

CENTER

TRANSPLANT AND PROTECT AZALEAS TO THESE LOCATIONS - EXAMPLES SHOWN

MUIR WOODS NATIONAL MONUMENTMOUNT TAMALPAIS STATE PARK PARCEL NO. 02-106

NPS LAW ENFORCEMENT AND MANAGEMENT AREA

PROTECT <E> PIPE (ALIGNMENT APPROX)

BRIDGE 1.5

30+00

Az

TH A

B

A

A

RR

R R

B

R

R

R

RR

R

R

Az B

A

A

R

R

146147148

149 148 14

147 146 145 144

4 145

145146

138.5

144.7

139.5

142.9

140.0

B

A

AA

A

HH

145.5

141.0

R

Az

148155

142 143 144

150155

142 140

139140 141 0

10020

148 147

149148147146 145144

145 146 147

CREEK STA 29+60

CREEK STA 34+91

R

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

SITE PLAN: AREA 6

XXX

XXXX

11 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C4

FLOW

APPROXIMATE

DOWNSTREAM EXTENT OF

DEWATERING

ROCK

OUTCROP

<E> BOARDWALK: NO

CONSTRUCTION ACCESS

XS 8

C13

XS 5

C12

XS 4

C12

XS 7

C13

XS #

C--

R3

L2

R2B

R2

15 0 15 30

SCALE OF FEET

XS 6

C12

APPROX. UPSTREAM

EXTENT OF DEWATERING

REMOVE <E> TRAIL

SAVE <E> ALDER & PROTECT ROOTS UPSTREAM (US) & DOWNSTREAM (DS) OF TRUNK: RSP

TO REMAIN 0-5 FT US; REMOVE RSP W/O TEARING ROOTS 5-6 FT US; REMOVE RSP WITH OBS.

OF ROOTS 6-12 US; RSP TO REMAIN 0-3 FT DS; REMOVE RSP W/ OBS.OF ROOTS 3-10 FT DS.

PROTECT AND SAVE <E> TREE AND ROOTS IN PLACE

PROTECT <E> LOG GRADE CONTROL

LOWER FLOODPLAIN

SAVE AZALEA AND PROTECT ROOTS. ENSURE PLANT DOES NOT TOPPLE DURING RSP

REMOVAL. CONDUCT WITH NPS OBSERVATION.

MOUND SOIL AT BASE OF REDWOOD

REMOVE AND REPLACE EXISTING LOG JAM

REMOVE 18 <E> BOULDERS PLUS NUMEROUS COBBLE PIECES FROM CHANNEL BED

IN FRONT OF L2 RSP SECTION

MOVE LOG FOR ACCESS AS NEEDED (LOCATION TBD)

DEMOLISH AND REMOVE BRIDGE 1.5 (SHEET D1). REUSE OR BURY UNDERLYING RSP

AND COBBLE PER DESIGNS AND SPECIFICATIONS. FOLLOW GRADING LINES TO FILL

AND BLEND FLOODPLAIN WITH ADJACENT TOPOGRAPHY.

PROTECT REDWOOD AND ITS ROOTS.RELOCATE AZALEA PER SPECIFICATIONS: PREPARE RELOCATION SITES FOR AZALEAS PRIOR

TO SALVAGING

REMOVE CULVERT AND INSTALL ROCK GRADE CONTROL.

KEY RSP INTO RIGHT BANK BEHIND UPSTREAM END OF REMAINING R2 (SHEET C16).

INSTALL EROSION CONTROL FABRIC (SHEET C19, DETAIL 1) FROM KEY-IN TO 8 FT

UPSTREAM OF KEY-IN.

KEY

TEMPORARILY REMOVE ALL PARTS OF <E> BOARDWALK RAMPS FOR EQUIPMENT ACCESS:

STORE, COVER ABOVE GROUND (E.G., ON <E> BOARDWALK), AND REPLACE (SEE SPECS FOR

DETAILS)

<E> DECK LENGTH

APPROX. 18.5 FT

<E> DECK LENGTH

APPROX. 17.0 FT

8 10

LP4

C9

LP3

C9

35+00

7148149

152151

149150 149

CREEK STA 39+08

CREEK STA 34+30

CREEK STA 37+30

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

SITE PLAN: ACCESS TO AREA 5

XXX

XXXX

12 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C5

FLOW

KEY

REMOVE BOARDWALK RAMP AS A SINGLE PIECE FOR EQUIPMENT ACCESS

TREE TAG #157

15 0 15 30

SCALE OF FEET

BR

ID

G E

40+00

R

R

149150

156157 154

158 157

CREEK STA 43+44

CREEK STA 38+21

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

SITE PLAN: ACCESS TO AREA 5

XXX

XXXX

13 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C6

FLOW

N O

C O

N

ST

RU

CT

IO

N

A

CC

ES

S

TO

B

RI

D

G E

15 0 15 30

SCALE OF FEET

LP5

C10

45+00

R

RR

R

B

B

TO

H H H H H H

R B

R

BB

B

B

B

B

B

R R

R

R

TO TO

156157 154

158 157

158 159

157158

162161

156 155

158 0

CREEK STA 42+70

CREEK STA 47+95

Northern Hydrology & Engineering

FLOW

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

SITE PLAN: AREA 5

XXX

XXXXXX

14 XX

JKA, BSP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C7

XS 11

C15

XS 10

C14 XS 9

C14

R6

INSTALL BURIED RSP IN LEFT BANK PER DESIGNS AND SPECIFICATIONS. EXISTING

CONTOURS WILL BE REESTABLISHED, AS FEASIBLE.

SAVE HAZELNUT TREES

REMOVE RSP FROM BANK AND CHANNEL BED

REMOVE RSP FROM BANK AND CHANNEL BED; GRADE BANK AS SHOWN IN SITE

PLAN AND CROSS-SECTION (SHEET C14)

CUT REDWOOD ALONG CUT LINE TO MAXIMIZE REMAINING LENGTH

KEY

NO EQUIPMENT ACCESS

PROTECT <E> LOG GRADE CONTROL

APPROXIMATE

DOWNSTREAM

EXTENT OF

DEWATERING

APPROXIMATE UPSTREAM

EXTENT OF DEWATERING AND

EQUIPMENT ACCESS

NO EQUIPMENT ACCESS

APPROX

5.5 FT

TRAIL WIDTH LIMITATION NORTH OF CONSTRICTION BETWEEN REDWOODS. FOOT TRAFFIC

ONLY. LIMITED EQUIPMENT (<5.5 FT WIDE) ALLOWED PER NPS APPROVAL.

FO

OT

TR

AFF

IC

O

NLY

EQUIPMENT ACCESS ROUTE

15 0 15 30

SCALE OF FEET

LP5

C10

EL

EV

A

TI

O N

(F T)

STATION (FT)

200210220230240250260270280290300310320330340350360370380390400410420

STA: 368

ELEV:133.0

STA: 362

ELEV:131.0

STA: 345

ELEV:134.0 STA: 308

ELEV:133.4

STA: 300

ELEV:131.0

STA: 279

ELEV:132.9

STA: 252

ELEV:132.5

STA: 245

ELEV:129.0

STA: 203

ELEV:133.2

STA: 222

ELEV:129.0

STA: 246

ELEV:129.7

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180190200

STA: 118

ELEV:132.4

STA: 105

ELEV:128.0

STA: 78

ELEV:128.0

STA: 57

ELEV:130.9

STA: 38

ELEV:131.4

STA: 196

ELEV:133.5

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110115

STA: 111

ELEV:134.0

STA: 109

ELEV:134.5

STA: 94

ELEV:134.5

STA: 76

ELEV:134.0

STA: 25

ELEV:132.0

STA: 17

ELEV:131.5

STA: 3

ELEV:131.0

STA: 0

ELEV:129.7

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LONGITUDINAL PROFILES: AREA 7

XXX

XXXXXX

15 XX

BSP, BB

BD, JRP

JRP, BSP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C8

1V:2H

LP 1

C2

AREA 7 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP 1

C2

AREA 7 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP 2

C2

AREA 7 SIDE CHANNEL LONGITUDINAL PROFILE

AREA 7 SIDE CHANNEL

ALIGNMENT INGRESS (STA 115)

AREA 7 SIDE CHANNEL

ALIGNMENT EGRESS (STA 0)

FLOW

FLOW

A

TI

O N

(F T)

STATION (FT)

180190200210220230240250260270280290300310320330340350360

STA: 317

ELEV:143.5

STA: 310

ELEV:143.0

STA: 305

ELEV:141.0

STA: 273

ELEV:143.5

STA: 264

ELEV:144.0

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180

STA: 57

ELEV:141.5

STA: 31

ELEV:138.5

STA: 17

ELEV:140.5STA: 179

ELEV:143.2

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130138

STA: 122

ELEV:143.9

STA: 99

ELEV:144.0

STA: 98

ELEV:144.4

STA: 62

ELEV:143.0

STA: 37

ELEV:140.0

STA: 14

ELEV:141.0

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LONGITUDINAL PROFILES: AREA 6

XXX

XXXXXX

16 XX

BSP, JRP, BB

BD

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C9

1V:2H

LP3

C4

AREA 6 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP3

C4

AREA 6 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP4

C4

AREA 6 SIDE CHANNEL LONGITUDINAL PROFILE

FLOODPLAIN EGRESS (STA 0)

AREA 6 SIDE CHANNEL

ALIGNMENT EGRESS (STA 0)

AREA 6 SIDE CHANNEL

ALIGNMENT INGRESS (STA 138)

FLOW

A

TI

O N

(F T)

STATION (FT)

190200210220230240250260270280290300310320330340350360370380

STA: 378

ELEV:157.5

STA: 367

ELEV:155.8

STA: 350

ELEV:156.7

STA: 334

ELEV:157.8

STA: 318

ELEV:158.4

STA: 288

ELEV:157.3

STA: 272

ELEV:157.1

STA: 263

ELEV:153.7

STA: 230

ELEV:157.0

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180190

STA: 103

ELEV:154.7 STA: 98

ELEV:153.2

STA: 90

ELEV:153.9

STA: 69

ELEV:153.3

STA: 59

ELEV:152.9

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LONGITUDINAL PROFILE: AREA 5

XXX

XXXXXX

17 XX

BSP, BB

BD

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C10

1V:2H

LP5

C7

AREA 5 MAIN CHANNEL LONGITUDINAL PROFILE

LP5

C7

AREA 5 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 59

STA: 11

ELEV:136.0

STA: 21

ELEV:134.1

STA: 46

ELEV:132.7

STA: 44

ELEV:133.0

STA: 48

ELEV:133.0 STA: 50

ELEV:133.1

STA: 52

ELEV:133.5

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 60 70 79

STA: 8

ELEV:139.9

STA: 19

ELEV:134.5 STA: 22

ELEV:134.0

STA: 25

ELEV:134.0

STA: 27

ELEV:134.5

STA: 28

ELEV:135.0

STA: 32

ELEV:135.4 STA: 39

ELEV:135.0

STA: 43

ELEV:133.5

STA: 48

ELEV:133.3

STA: 51

ELEV:134.5

STA: 51

ELEV:134.8

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

GRADING SECTIONS 1

XXX

XXXXXX

18 XX

BSP, JRP, BD

BD, JRP

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C11

1V:1H

CROSS SECTION AT AREA 7 DESIGN STA 144

(CREEK STA 22+43)

XS 1

C2

1V:1H

XS 2

C2

EXISTING GROUND

DESIGN GROUND

GRADING SECTION AT AREA 7 DESIGN STA 308

(CREEK STA 24+03)

REMOVE RSP SECTION L1 TO THE

LIMITS SHOWN ON SITE PLANS

(SHEET C2)

BUILD BAR WITH CHANNEL BED

MATERIAL TO DESIGN CONTOURS

AND LIMITS

GRADE SLOPE AND DAYLIGHT INTO

<E> GROUND, OBSERVING AND

PROTECTING TREE ROOTS AND

STEMS UNLESS MARKED FOR

REMOVAL

FILL CHANNEL WITH BED

MATERIAL AND RAISE RIFFLE

ELEVATION

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 52

STA: 2

ELEV:144.4 STA: 10

ELEV:144.0

STA: 18

ELEV:142.5

STA: 25

ELEV:138.5

STA: 29

ELEV:138.5

STA: 35

ELEV:142.7

STA: 37

ELEV:142.7

STA: 43

ELEV:146.2

STA: 52

ELEV:147.2

STA: 34

ELEV:138.2

STA: 33

ELEV:136.7

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 6060

STA: 5

ELEV:144.1 STA: 8

ELEV:143.0

STA: 12

ELEV:142.6

STA: 16

ELEV:143.0

STA: 20

ELEV:144.4

STA: 22

ELEV:145.5 STA: 24

ELEV:145.5

STA: 27

ELEV:144.5

STA: 31

ELEV:143.8

STA: 33

ELEV:144.0

STA: 37

ELEV:145.7

STA: 59

ELEV:147.3

STA: 27

ELEV:139.5

STA: 25

ELEV:138.0

STA: 0

ELEV:147.4

GRADING SECTION AT AREA 6 DESIGN STA 155

(CREEK STA 32+16)

GRADING SECTION AT AREA 6 DESIGN STA 40

(CREEK STA 31+00)

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

GRADING SECTIONS 2

XXX

XXXXXX

19 XX

BSP, JRP

BD, JRP

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C12

1V:1H

XS 5

C4

1V:1H

XS 6

C4

ESTIMATED EXTENTS OF

R2 RSP REMOVAL

EXCAVATE TRAIL ASPHALT AND

BASE ROCK

EXCAVATE TRAIL ASPHALT AND

BASE ROCK

ESTIMATED EXTENTS OF

R3 RSP REMOVAL

ESTIMATED EXTENTS OF

L2 RSP REMOVAL

CONSTRUCT CHANNEL TO

BACK OF RSP BANK SLOPE

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 44

1 1

STA: 39

ELEV:149.0STA: 33

ELEV:147.7

STA: 28

ELEV:143.9

STA: 18

ELEV:144.5

STA: 26

ELEV:140.5

STA: 25

ELEV:139.0

STA: 29

ELEV:144.5

STA: 25

ELEV:143.8

STA: 3

ELEV:144.9

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 52

1 1

STA: 9

ELEV:145.5 STA: 23

ELEV:144.5 STA: 29

ELEV:143.6

STA: 32

ELEV:144.0

STA: 35

ELEV:147.0

STA: 39

ELEV:147.9 STA: 46

ELEV:147.8

STA: 29

ELEV:140.5

STA: 27

ELEV:139.0

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

GRADING SECTIONS 3

XXX

XXXXXX

20 XX

BSP, JRP

BD, JRP

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C13

1V:1H

XS 7

C4

1V:1H

XS 8

C4

GRADING SECTION AT AREA 6 DESIGN STA 247

(CREEK STA 33+01)

GRADING SECTION AT AREA 6 DESIGN STA 270

(CREEK STA 33+23)

ESTIMATED EXTENTS OF

R3 RSP REMOVAL

SECTION OF R3 RSP TO REMAIN TO

PROTECT <E> ALDER STEM AND

ROOTS

MOUND SOIL TO COVER AN

PROTECT REDWOOD ROOTS

EXCAVATE TRAIL ASPHALT AND

BASE ROCK

CONSTRUCT CHANNEL BENCH

FROM BANK SLOPE OF RSP

REMOVAL

EXCAVATE TRAIL ASPHALT AND

BASE ROCK

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 49

STA: 12

ELEV:154.7

STA: 17

ELEV:154.7

STA: 26

ELEV:153.1

STA: 32

ELEV:156.0

STA: 34

ELEV:156.2

STA: 40

ELEV:159.9

STA: 28

ELEV:153.5

STA: 6

ELEV:160.7

STA: 1

ELEV:160.5

STA: 10

ELEV:151.9

STA: 15

ELEV:151.9

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 60 65

STA: 10

ELEV:152.7

STA: 34

ELEV:155.3

STA: 42

ELEV:156.5

STA: 19

ELEV:158.0

STA: 5

ELEV:152.7

STA: 6

ELEV:159.8

STA: 2

ELEV:159.9

STA: 27

ELEV:156.0

3.4 FT

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

AREA 5 GRADING SECTIONS

XXX

XXXXXX

21 XX

BSP, JRP

BD, JRP

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C14

1V:1H

XS 9

C7

1V:1H

XS 10

C7

GRADING SECTION AT AREA 5 DESIGN STA 69

(CREEK STA 43+88)

GRADING SECTION AT AREA 5 DESIGN STA 124

(CREEK STA 44+41)

0.5 FT

3.4 FT

0.5 FT

0.5

GRADE CHANNEL BANK TO

BANK SLOPE OF RSP REMOVAL

ESTIMATED EXTENTS OF

RSP REMOVAL

INSTALL LAYER 1

MATERIAL TO DESIGN

ELEVATIONS

INSTALL LAYER 2

MATERIAL TO DESIGN

ELEVATIONS

INSTALL LAYER 1

MATERIAL TO DESIGN

ELEVATIONS

INSTALL LAYER 2

MATERIAL TO DESIGN

ELEVATIONS

ESTIMATED EXTENTS OF

RSP REMOVAL

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 60 69

STA: 2

ELEV:160.0

STA: 6

ELEV:160.0 STA: 16

ELEV:159.0

STA: 23

ELEV:153.5

STA: 28

ELEV:153.4

STA: 39

ELEV:156.5

STA: 37

ELEV:155.9

STA: 32

ELEV:153.5

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

GRADING SECTIONS 5

XXX

XXXXXX

22 XX

BSP, JRP

BD, JRP

BSP, JRP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C15

1V:1H

XS 11

C7

GRADING SECTION AT AREA 5 DESIGN STA 164

(CREEK STA 44+78)

0.5

3.4 FT

0.5 FT

GRADE CHANNEL BANK TO

BANK SLOPE OF RSP REMOVAL

ESTIMATED EXTENTS OF

RSP REMOVAL

INSTALL LAYER 1

MATERIAL TO DESIGN

DEPTH

INSTALL LAYER 2

MATERIAL TO DESIGN

DEPTH

30+50

32+50

34+00

140160

240260

AVOID RSP BURIAL IF

POSSIBLE, DESIGN POOL

LOCATION (SHEET C4)

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180190200210220230240250260270280290300310315

1.5 FT (MIN.)

AVOID RSP

BURIAL IF

POSSIBLE

STA: 295

ELEV:141.9

STA: 222

ELEV:140.5

STA: 221

ELEV:140.0

STA: 207

ELEV:140.0

STA: 206

ELEV:139.5

STA: 70

ELEV:139.5

STA: 69

ELEV:138.8

STA: 54

ELEV:138.8

STA: 53

ELEV:138.2

STA: 11

ELEV:144.5

SCALE OF FEET

12.5012.5

LP6

- SECTION VIEW OF RSP BURIAL

1V:2H

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

RSP BURIAL: AREA 6

XXX

XXXXXX

24 XX

JKA, BSP

BD, JRP

BSP, JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C17

EXCAVATION AND RSP PLACEMENT

SEE SHT C18 FOR BACKFILL WITH BED MATERIAL DESIGN

NOTE:

1. RSP BURIAL DESIGNS SHOW THE DEPTH OF EXCAVATION TRENCHES IS 4.5 FEET; HOWEVER, THE

CONTRACTOR MAY EXCAVATE DEEPER TO BURY MORE RSP IN A SMALLER AREA AS LONG AS BANKS REMAIN STABLE DURING TRENCHING. TOP ELEVATIONS OF BURIED ROCK SHALL NOT EXCEED THOSE

SHOWN ON DRAWINGS. FINAL BED ELEVATIONS SHALL NOT BE EXCEEDED WITHIN SPECIFIED

TOLERANCES.

2. ALL RSP PLACED IN BURIAL ZONES SHALL BE COVERED WITH NATIVE BED MATERIAL.

3. NO RSP SHALL BE PLACED AT AN ELEVATION HIGHER THAN SHOWN IN DRAWINGS, BUT IT MAY BE

PLACED DEEPER.

4. BEFORE BED EXCAVATION, SCRAPE TOP 0.3 FT OFF BED SURFACE, STOCKPILE SEPARATELY FROM

OTHER BED MATERIAL.

EXCAVATION

EXTENT

RSP BURIAL

EXTENT

REMOVE RSP R3

PLACE RSP

REMOVE RSP L2

REMOVE RSP R2B

REMOVE RSP R2

FLOW

REMOVE BRIDGE 1.5

FOUNDATION ROCK

EXISTING GROUND

DESIGN GROUND

LP6

30+50

34+00

240260280

300320

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180190200210220230240250260270280290300310320328

AT THIS LOCATION, DESIGN THALWEG ALIGNMENT

NOT WITHIN RSP BURIAL EXTENTS

STA: 316

ELEV:143.3

STA: 291

ELEV:141.0

STA: 265

ELEV:144.0 STA: 159

ELEV:143.0

STA: 80

ELEV:143.0 STA: 58

ELEV:141.5 STA: 32

ELEV:138.5

STA: 18

ELEV:140.5

STA: 118

ELEV:139.5

1 1

SCALE OF FEET

12.5012.5

1V:2H

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD RESTORE SALMON HABITAT

PHASE 2

CHANNEL BED BACKFILL: AREA 6

XXX

XXXXXX

25 XX

JKA, BSP, CP

CP, BD

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C18

NOTE:

1. RSP BURIAL DESIGNS SHOW THE DEPTH OF EXCAVATION TRENCHES IS 4.5 FEET; HOWEVER, THE

CONTRACTOR MAY EXCAVATE DEEPER TO BURY MORE RSP IN A SMALLER AREA AS LONG AS BANKS REMAIN STABLE DURING TRENCHING. TOP ELEVATIONS OF BURIED ROCK SHALL NOT EXCEED THOSE

SHOWN ON DRAWINGS. FINAL BED ELEVATIONS SHALL NOT BE EXCEEDED WITHIN SPECIFIED

TOLERANCES.

2. ALL RSP PLACED IN BURIAL ZONES SHALL BE COVERED WITH NATIVE BED MATERIAL.

3. NO RSP SHALL BE PLACED AT AN ELEVATION HIGHER THAN SHOWN IN DRAWINGS, BUT IT MAY BE

PLACED DEEPER.

4. BEFORE BED EXCAVATION, SCRAPE TOP 0.3 FT OFF BED SURFACE, STOCKPILE SEPARATELY FROM

OTHER BED MATERIAL.

REMOVE RSP R3

REMOVE RSP L2

REMOVE RSP R2B

REMOVE RSP R2

FLOW

REMOVE BRIDGE 1.5

FOUNDATION ROCK

BACKFILL WITH BED MATERIAL DESIGN

SEE SHT C17 FOR EXCAVATION AND RSP PLACMENT

GRADING

BOUNDARY

LP7

THALWEG PROFILE VIEW OF BACKFILL WITH BED MATERIAL DESIGN

EXISTING GROUND

DESIGN GROUND

LP7

FABRIC BOTTOM END

ANCHOR PER DETAIL 4D

1 FT FABRIC OVERLAP

IN DOWNSTREAM

DIRECTION (TYP)

WOOD STAKE

PER SPECIFICATIONS

TYPE 2 FABRIC

OVERLAYS TYPE

1 FABRIC, SEE

DETAIL 4C FOR

FABRIC LAYOUT

1.5

WOOD STAKES PER SPECIFICATIONS (TYP)

FABRIC

GRADE EXISTING GROUND

TO DESIGN GRADE

FABRIC TOP END

ANCHOR SEE

DETAIL 11E

FABRIC

BOTTOM END

ANCHOR PER

DETAIL 4D

3 FT BEYOND

GRADING

PROTECT ROOTS AS SPECIFIED

3 FT MIN

1'

1' WOOD STAKE

PER SPECIFICATIONS

FABRIC

FABRIC ANCHOR

TRENCH

1'

FABRIC

FABRIC ANCHOR

TRENCH

WOOD STAKES

PER SPECIFICATIONS

2' BELOW

ADJACENT

THALWEG

FLOW

FABRIC BOTTOM END

ANCHOR PER DETAIL 4D

FABRIC TOP END

SEE DETAIL 4E1 FT FABRIC

OVERLAP IN

DOWNSTREAM

DIRECTION (TYP)

WOOD STAKE PER

SPECIFICATIONS

ANCHOR

UPSTREAM AND

DOWNSTREAM

ENDS OF

FABRIC SIMILAR

TO DETAIL

4D & 4E

TYPE I FABRIC EXTENT;

SEE DETAIL 4B

WRAP FABRIC OVER

VEGETATION (TYP)

EL

EV

A

TI

O N

(F T)

STATION (FT)

DESIGN

GRADE

DETAIL 2: RSP REMOVAL TYPICAL CROSS-SECTION, BACKFILL WITH BED MATERIAL

LAYER 2 ROCK MAY

OCCUR BEHIND

LAYER 1 ROCK

POTENTIAL

OVERHANGING BANK

AFTER ROCK REMOVAL

EXISTING

GRADE

PRESERVE

VEGETATIONREMOVE RSP

FROM BANK

BACKFILL WITH BED

MATERIAL TO A MIN. 1 FT

ABOVE WATER LEVEL

WATER

LEVEL

IF FOUND, REMOVE

SUBSURFACE RSP, BACKFILL

WITH BED MATERIAL

MINIMIZE BANK

DISTURBANCE

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

DETAILS 2

XXX

XXXXXX

26 XX

JKA, BP, JRP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C19

DETAIL 1: FABRIC DETAILS

DETAIL 1A: FABRIC TRENCH DETAIL DETAIL 1B: TYPE 1 FABRIC LAYOUT

DETAIL 1D: FABRIC ANCHOR BOTTOM DETAIL 1E: FABRIC ANCHOR TOP

DETAIL 1C: TYPE 2 FABRIC LAYOUT

Northern Hydrology & Engineering

DETAIL 2: RSP REMOVAL DETAIL

25+00

S

SR

R

A A

A

A A

A A

A

AA

AAA A

A

M

M

B B

B

A

B

B

R

R

R

R

AA

RA

A

A

A

A

CREEK STA 20+71

CREEK STA 25+46

100200

400418

R311

CH011

CH012

I-01 I-02

I-03

I-05I-06I-07

I-08

I-18

I-04 I-09

I-19

I-23 I-16 I-17

I-10

I-11

I-13

I-12

CH011

R311 L224

I-20

L223

L225

R313

CH012

I-21

I-22 I-14

I-15

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD SITE PLAN: AREA 7

XXX

XXXX

27 XX

BSP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W1

FLOW

<E> RESTROOM

ENTRANCE

PLAZA

VISITOR

CENTER

M U

IR W

O

O D

S N

ATIO

N

AL M

O

N U

M

EN

T

M O

U N

T TAM

ALPAIS STATE PARK

PARC

EL N

O . 02-106

N

PS LAW

EN

FO

RC

EM

EN

T AN

D M

AN

AG

EM

EN

T AREA

STAGING AREA

EXPOSED

BEDROCK

<E> "CASCADE"

ROCK CHECK DAM

DOWNSTREAM LIMIT OF

DEWATERING

UPSTREAM LIMIT OF

DEWATERING

<E> "MIDDLE" ROCK

CHECK DAM

R004

R305

R302

R304 R303

R302

R301

L016

R010

L016

R310

CH002

CH006

CH004

CH007

R401 R303Az

TH A

B

A

A

RR

R R

B

R

R

R

RR

R

R

Az B

A

A

R

R

B

A

AA

A

HH

R

Az

R310

R010 R309

R305

CH006

R307

R004

R400

CH002

R301

CH004

CH013

R402

CH007

R003

R309

R304

R009

10020

CREEK STA 29+60

CREEK STA 34+91

CREEK STA 34+30

R

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD SITE PLAN: AREA 6

XXX

XXXX

28 XX

BSP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W2

FLOW

APPROXIMATE

DOWNSTREAM EXTENT OF

DEWATERING

ROCK

OUTCROP

<E> BOARDWALK: NO

CONSTRUCTION ACCESS

15 0 15 30

SCALE OF FEET

APPROX. UPSTREAM

EXTENT OF DEWATERING

REMOVE <E> TRAIL

CH014

L1012

L1012

L1026

L1019

CH014

L1021

L1026 L1019

L212

L034

L212

CH016

CH015

CH017

R308

R308

R

RR

R

B

B

TO

H H H H H H

R B

R

BB

B

B

B

B

B

R R

R

R

TO TO

CH016

CH017

CH015

L1021

CREEK STA 42+70

CREEK STA 47+95

CH014

Northern Hydrology & Engineering

FLOW

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD SITE PLAN: AREA 5

XXX

XXXXXX

29 XX

BSP

JRP, THB

JKA

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W3

NO EQUIPMENT ACCESS

PROTECT <E> LOG GRADE CONTROL

APPROXIMATE

DOWNSTREAM

EXTENT OF

DEWATERING

APPROXIMATE UPSTREAM

EXTENT OF DEWATERING AND

EQUIPMENT ACCESS

NO EQUIPMENT ACCESS

APPROX

5.5 FT

FO

OT

TR

AFF

IC

O

NLY

133 13

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD DETAILS: AREA 7 STA 90

XXX

XXXXXX

30 XX

BSP

BD, THB

BSP

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W4

SCALE OF FEET

I-07

ORDER #4

I-06

ORDER #4

I-05

ORDER #4

I-02

ORDER #2

I-01

ORDER #1

I-04

ORDER #1

I-03

ORDER #3

I-08

DESIGN STA 90 WOOD STRUCTURE - LOOKING UPSTREAM

I-01

DESIGN STA 90 WOOD STRUCTURE - LOOKING DOWNSTREAM

I-18

FLO

W

FL

O

W

I-02

I-03 I-05

I-06

I-07

I-18

I-08

I-01

I-04

I-02

I-03

I-05

I-06

I-07

I-18

I-08

I-04

FLO

W

A

A/B INDICATES A OR B END OF LOG SHOWN IN TABLE

A

A

A

A

A

A

A

B

B

B

B

B

B

B

B

4 13

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD DETAILS: AREA 7 STA 190

XXX

XXXXXX

31 XX

BSP

BD, THB

BSP

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W5

SCALE OF FEET

I-16

ORDER #3

I-10

ORDER #2

I-23

ORDER #4

I-19

ORDER #1

I-09

I-23

I-17

ORDER #4

FLO

W

FL

OW

FL

OW

I-10

I-17

I-09

I-16

I-19

I-09 I-17

I-10

I-19

I-16

I-23

DESIGN STA 190 WOOD STRUCTURE - LOOKING UPSTREAM

I-11

DESIGN STA 190 WOOD STRUCTURE - LOOKING DOWNSTREAM

A

A/B INDICATES A OR B END OF LOG SHOWN IN TABLE

A A

A

A

A

B

B

B

B

3 13

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD DETAILS: AREA 7 STA 230

XXX

XXXXXX

32 XX

BSP

BD, THB

BSP

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W6

SCALE OF FEET

I-11

ORDER #1

I-12

ORDER #2

I-13

ORDER #2

CH011

R311

L224

L224

R311

CH011

I-11

I-12

I-13

DESIGN STA 230 WOOD STRUCTURE - LOOKING UPSTREAM

FL

O

W

L224

R311

CH011

I-11

I-12

I-13

FLO

W

FL

OW

DESIGN STA 230 WOOD STRUCTURE - LOOKING DOWNSTREAM

A

A/B INDICATES A OR B END OF LOG SHOWN IN TABLE

A

A

A

AA

B

B

B

B

4 13

4 13 3 13

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD DETAILS: AREA 7 STA 320

XXX

XXXXXX

33 XX

BSP

BD, THB

BSP

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W710

SCALE OF FEET

L225

R313

ORDER #2

I-20

ORDER #1

I-14

ORDER #2

I-15

ORDER #4

I-21

ORDER #1

L225

ORDER #3

CH012

ORDER #2

I-22

ORDER #1

DESIGN STA 320 WOOD STRUCTURE - LOOKING DOWNSTREAM

I-15

I-20

I-14

CH012

R313

I-22

I-21

L225

I-15

I-20

I-14

CH012

R313

I-22

I-21

FLO

W

DESIGN STA 320 WOOD STRUCTURE - LOOKING UPSTREAM

FLOW

FLOW

A

A/B INDICATES A OR B END OF LOG SHOWN IN TABLE

A

A

A

A

A

B

B

B

B

B

B

L223

ORDER #1 L223

L223

A

B

A

141140

2 14

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD DETAILS: AREA 6 STA 50

XXX

XXXXXX

34 XX

BSP

BD, THB

BSP

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W8

SCALE OF FEET

R303

ORDER #2

R401

ORDER #2

R009

ORDER #2

R304

ORDER #1

DESIGN STA 50 WOOD STRUCTURE - LOOKING UPSTREAM

R303

R401

R304

DESIGN STA 50 WOOD STRUCTURE - LOOKING DOWNSTREAM

R303

R401

R304

R009

R009

FLO

W

FLOW

FLOW

A

B

A

A

A

B

B

A/B INDICATES A OR B END OF LOG SHOWN IN TABLE

3 14

4 14

Northern Hydrology & Engineering DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

RESTORE SALMON HABITAT

PHASE 2

LWD DETAILS AREA 6 STA130

XXX

XXXXXX

35 XX

BSP

BD, THB

BSP

3/1/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237W9

SCALE OF FEET

CH006

ORDER #2

CH004

ORDER #1

R301

ORDER #3

DESIGN STA 130 WOOD STRUCTURE…