Section 01 11 00 _ SOW_ Pkg PB2125.docx

DOCX document 63 KB Posted

Attached to
Repair/Replace Boiler Refractory Material, Boiler #1, Bldg J00734
Solicitation number
W911S821B0008
Issued by

View the file

Other files

File Type Posted
Overhead site view.pdf PDF
4288 SubmittalRegister.pdf PDF
Solicitation W911S821B0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 11 00

STATEMENT OF WORK

Version 1.41 Issued June 17, 2020

CONSTRUCTION

RFP Final Date: March 22, 2021 Revised:

1. GENERAL DISCUSSION

1.1. Project Identification

1.1.1. Project Title: Repair Boiler Refractory Bldg. J00734

1.1.2. IJO Number(s): DEU195029J

1.1.3. Project Package Number(s): PB2125

1.2. Description of Work

1.2.1. The contractor shall supply all supervision, labor, equipment, and materials to perform all work in strict accordance with the contract specifications and this statement of work to provide a Boiler #1, Steam Plant Bldg. J00734 with repaired burner throat refractory.

1.3. Area Description

1.3.1. Location

1.3.1.1. Steam Plant Building J00734 at JBLM-McChord Field.

1.3.2. Known Existing Site Conditions

1.3.2.1. Boiler #1, at Bldg. J00734 has failing refractory material on three burner throats that require repair by replacement of ailing refractory material.

1.4. Principal Items To Be Accomplished

1.4.1. Base Construction Deliverable (Covered under one IJO DEU195029J.)

1.4.1.1. Base Item CLIN 0001. Replace three burner throats refractory material on #1 Boiler, Bldg. J00734. Repair. The contractor shall:

a. Remove and dispose of three (3 each) burner throat refractory material (Precast tile and refractory locking ring). Dispose demo material in accordance with applicable laws and regulations.

b. Provide and install 3 each, new boiler throat burner refractory material and liner tile.

c. Provide JBLM Boiler plant personnel with boiler refractory cure out schedule and instructions.

d. Provide for Washington State Dept. of Labor & Industries Boiler and Pressure Vessel inspection for final acceptance of boiler refractory repair work. Contractor shall make payments on behalf of JBLM for any Washington State boiler inspection fees, if necessary or if required for this repair work.

2. PERFORMANCE AND SCHEDULING

2.1. Performance Period Requirements

2.1.1. The contractor is required to commence work under this Task Order within five (5) calendar days after the date of issuance of the Notice to Proceed (NTP) for the Base Item, prosecute the work diligently, and complete all work on all Base Items no later than 60 calendar days after the date of issuance of the Notice to Proceed for the Base Items. The time stated for completion includes final cleanup of the premises and submission of all required close-out documentation.

2.2. Construction Phasing Requirements

2.2.1. “Reserved.”

2.3. Liquidated Damages

2.3.1. “Reserved.”

3. DRAWINGS

3.1. There are no drawings available for this project.

4. SPECIFICATIONS AND CODES

4.1. Codes

4.1.1. The contractor shall comply with the most recent edition, at time of solicitation, of all pertinent Local, State, and Federal building and life/health/safety codes, to include the following:

a. Applicable Unified Facilities Criteria (UFC)

b. UFC 1-200-01: General Building Requirements http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01

c. UFC 3-420-01: Plumbing Systems and International Plumbing Code

d. UFC 1-200-02: High Performance and Sustainable Building Requirements https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02

e. ASA IE&E SDD policy https://www.wbdg.org/FFC/ARMYCOE/POLICY/Army_SDD_Policy_Update_2017.pdf

f. EM 385-1-1 (http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx)

g. National Electrical Code, NFPA 70

h. National Fire Protection Association (NFPA) Codes

i. Telecommunication Industry Association/Electrical Industry Association Wiring Standards (Building Telecommunication Wiring Standards)

j. Army Installation Information Infrastructure Architecture Policy (I3A)

k. JBLM Design Standard specifications (http://www.lewis-mcchord.army.mil/designstandards/)

l. JBLM Master Plan, which includes Architectural Appearance Standards

m. PWE-707, Standard Operating Procedure for Construction and Demolition (C&D) Waste Planning and Reporting (Available through Government Project Manager)

4.2. Specifications

4.2.1. “Reserved.”

5. SUBMITTALS

5.1. Project Submittal Requirements

5.1.1. All submittals shall be submitted in accordance with the specification section titled SUBMITTAL PROCEDURES. Required submittals are identified in their applicable specification sections.

5.1.2. In addition to the requirements as outlined in the specification section titled SUBMITTAL PROCEDURES, an electronic copy of each submittal shall be provided to the Government. Delivery method shall be decided during the CQC coordination meeting.

5.1.3. See attached form 4288 (Submittal register).

5.2. Close-out Submittal Requirements

5.2.1. The contractor shall provide close-out submittals as required by the contract specifications.

5.2.2. The contractor shall provide a Letter of non-retention for all contract documents, plans, drawings, and specifications after the destruction of all copies that are not required by the contractor to meet legal requirements.

6. ENVIRONMENTAL AND CULTURAL RESOURCES

6.1. Asbestos Containing Material

6.1.1. Existing suspect materials involved with all disturbance work are assumed to be Asbestos-Containing Material (ACM). It is the contractor’s responsibility to either test for, or to assume the suspect material is ACM, and that it is abated /encapsulated in accordance with AHERA, Federal, and Local regulations. No Asbestos Hazard Emergency Response Act (AHERA) inspection is required when the suspect materials are assumed to be ACM. The Government reserves the right to accept assumptions of ACM-positive, or to require such AHERA surveys to be performed.

6.1.2. When performed, inspections shall be accomplished in accordance with the Asbestos Hazard Emergency Response Act (AHERA), Federal and Local regulations. A Certified AHERA Asbestos Building Inspector shall perform all inspections. The inspection documentation shall comply with AHERA, Federal and Local regulations and shall include assessment of each Asbestos-Containing Material (ACM), its location, quantity, type, friability and percentage of asbestos.

6.1.3. If the tested material is positive for asbestos, or assumed to be ACM and must be disturbed during project execution, contractor shall have a certified Asbestos Contractor perform all asbestos disturbance work necessary to complete the project in accordance with 29 CFR 1926.1101, WAC 296-62-077, 296-65, and PSCAA Regulation 3.4. A certified abatement plan and all other applicable requirements of ‘UFGS 02 82 00 Asbestos Remediation’ are also required to be submitted and accepted before work is started.

Lead-Containing Paint

6.1.4. Existing suspect painted surface materials involved in disturbance work will be considered to contain detectable lead paint. It is the contractor’s responsibility to either test for, or to assume the suspect material is either Lead Based Paint (LBP) or Lead Containing Paint (LCP), and that it is abated/encapsulated in accordance with OSHA, HUD, Federal and Local regulations. The Government reserves the right to accept assumptions of LCP/LBP-positive, or to require such LCP/LBP surveys to be performed.

6.1.5. When performed, testing shall be accomplished in accordance with OSHA and/or HUD guidelines. A Certified Lead Paint Inspector shall perform lead paint inspections. The inspection documentation shall comply with Federal and Local regulations and shall include identification of all lead paint, its location, quantity, percentage by weight, and TCLP characteristics IAW ASTM E1908-16, “Standard Guide for Sample Selection of Debris Waste from a Building Renovation or Lead Abatement Project for Toxicity Characteristic Leaching Procedure (TCLP) Testing for Leachable Lead (Pb)”

6.1.6. If the suspect lead containing material is tested and proves positive for lead, or when assumed to be a lead containing painted surface, any disturbance work concerning the painted surfaces shall be in accordance with:

a. Federal level: 29 CFR 1926.62: https://www.ecfr.gov/cgi-bin/ECFR?page=browse

b. Washington WISHA-DOSH: WAC 296-62-07521 http://app.leg.wa.gov/WAC/default.aspx?cite=296-62-07521 A contractor work plan is required to be submitted and accepted before work is started, in accordance with applicable sections of ‘UFGS 02 83 00 Lead in Remediation’.

6.2. Environmental Coordination

6.2.1. The contractor shall comply with all Joint Base Lewis-McChord (JBLM) environmental requirements, including the most current installation regulation 200-1 (Environmental Protection and Enhancement) and Design Standards specification section 01 57 19 (Temporary Environmental Controls) and 01 57 19.01 20 (Supplemental Temporary Environmental Controls). This includes the submission of an Environmental Protection Plan (EPP) prior to commencement, as detailed in section 01 57 19, which must include proposed source control, temporary, and permanent stormwater Best Management Practices (BMPs). Coordination with the JBLM Stormwater Program Office on any ground disturbing activities is required to ensure compliance with the MS4 Permit. For construction of projects disturbing 5,000 sq. ft. or more a Stormwater Pollution Prevention Plan (SWPPP) must be submitted detailing sediment and erosion control best management practices (BMPs) in accordance with PWE-633 Construction Site Stormwater Runoff Control Program and the 2012 SWMMWW. See section 8.9.4. for required permits. The JBLM Environmental Division will review the submittals (EPP & SWPPP) and provide any necessary corrections or additions to the Contracting Officer or the Contracting Officer Representative (COR). Regulation 200-1 and specification section 01 57 19 is available at the JBLM Design Standards website (http://www.lewis-mcchord.army.mil/designstandards/). The Stormwater office can be contacted at: usarmy.jblm.id-readiness.list.dpw-stormwater1@mail.mil

6.2.2. In accordance with JBLM Reg. 200-3, no construction process water or wastewater shall be discharged to the ground or stormwater conveyance system. Construction discharge must meet requirements of the NPDES Construction General Permit (CGP) for Discharges from Construction Activities and guidance documents under the MS4 Permit. In accordance with JBLM Reg. 200-2, any wastewater generated must be collected, processed, characterized, and disposed of into the JBLM sanitary sewer system or other authorized disposal method. Prior to disposal, waste water characterization must at a minimum include pH, Oil and Grease, BOD, and TSS analysis by a NELAC accredited laboratory. Additional analyses may be required if non-conventional wastes or hazardous materials are potential contaminants. Results shall be submitted for review and approval by Public Works. On site characterization by JBLM Pretreatment staff may waive analytical requirements at the discretion of the Pretreatment program manager. JBLM sanitary sewer discharge requires a Sanitary Sewer Discharge Permit issued by DPW Waste Water Treatment Plant. The Environmental Protection Plan for the project must identify any potential wastewater generation and the process of proper disposal.

6.3. Sustainable Acquisition

6.3.1. In order to comply with federally mandated sustainable acquisition requirements and Department of Defense (DOD) and Department of the Army (DA) Green Procurement Program (GPP) policies, Joint Base Lewis-McChord (JBLM) requires the purchase, supply, and use of environmentally preferable products and services. Program elements include: recovered material products, energy and water efficient products, alternative fuels and fuel efficiency, bio-based products, non-ozone depleting substances, and environmentally preferable products. For a listing of designated items, associated requirements and managing program websites, see https://sftool.gov/greenprocurement.

6.3.2. Additionally, the JBLM Guide to Sustainable Acquisition for Construction is available in the “Reference Manuals” section of the JBLM Design Standards webpage (http://www.lewis-mcchord.army.mil/designstandards/index1.htm).

6.3.3. The contractor shall comply with all applicable Federal, DOD, Army, and JBLM sustainable acquisition laws and policies. If compliant products are unavailable or determined to be impracticable based on cost or performance, the contractor shall contact the Contracting Officer or the COR for further guidance. Claims of exception must meet applicable legal criteria and be justified in writing through the submission of a completed HJB Form 225 (Sustainable Acquisition Exception). The form is available at http://www.lewis-mcchord.army.mil/designstandards/pdf/HJB%20225.pdf. Additional information is available from the JBLM Sustainable Acquisition Program at (253) 966-6466 or usarmy.jblm.id-readiness.list.dpw-green-procurement1@mail.mil.

6.4. Environmental Management System

6.4.1. Environmental Management System (EMS). The JBLM EMS conforms to the criteria defined in the international standard, ISO 14001:2004 Environmental management systems – Requirements with guidance for use.

6.4.2. In accordance with EMS procedures, the contractor shall be familiar with the JBLM environmental policy and shall ensure that this information is considered and incorporated into this project. Additional information regarding the JBLM EMS is available from the installation EMS Coordinator (253-966-6470).

6.4.3. Both the JBLM environmental policy and an environmental awareness training resource are available at the JBLM EMS webpage: https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/environmental-management-system.

6.5. Hazardous Materials

6.5.1. For any hazardous materials, the contractor shall submit an initial list of hazardous materials to be used (including unit of measure and Safety Data Sheet for each product). A copy of these documents must be submitted to the Joint Base Lewis-McChord (JBLM) Pollution Prevention Program (usarmy.jblm.id-readiness.list.dpw-aul1@mail.mil) prior to commencement. These items must be reviewed by Pollution Prevention and authorized for use by addition to the contractor’s Authorized Use List (AUL) issued by JBLM Pollution Prevention Program. The contractor shall not use any hazardous materials not listed on its current AUL issued by Pollution Prevention.

6.5.2. For any in-use hazardous materials, the contractor shall submit a hazardous material inventory on HJB Form 953 noting the hazardous materials used, the units of measure, quantities used, storage locations, and other information indicated on the form. Submittal is due by the 15th day following the calendar year quarter in which the hazardous materials were used or stored on JBLM. Submit all HJB 953 inventories electronically via email to the Contracting Officer or the COR, with usarmy.jblm.id-readiness.list.dpw-hm-inventory1@mail.mil included in the carbon copy (“cc”) line of the email. Questions regarding the form may be directed to the JBLM Pollution Prevention Program (966-6469). The current HJB Form 953 and form instructions are available at Section 01 57 19 of the JBLM Design Standards (https://www.lewis-mcchord.army.mil/designstandards/index1.htm).

6.6. Archaeological Requirements

6.6.1. “Reserved.”

6.7. Construction and Demolition (C&D) Waste Planning and Reporting

6.7.1. The DOD Integrated (Non-Hazardous) Solid Waste Management Policy requires all facilities to meet a non-hazardous solid waste diversion goal of 60% Construction and Demolition Diversion. Create a waste management plan in accordance with section 01 74 19 of the JBLM Design Standards to meet or exceed the 60% C&D waste diversion target.

6.7.2. Complete and submit quarterly C&D Diversion and Disposal Reporting Form (HJB Form 229) in accordance with form instructions and paragraph "Reports" in Section 01 74 19 of the JBLM Design Standards. The form and instructions can be accessed via the links at Division 01 Section 01 57 19 of the JBLM Design Standards website (http://www.lewis-mcchord.army.mil/designstandards/index1.htm). Section 01 74 19 can also be accessed via the Design Standards website.

6.8. Place holder for National Environmental Policy Act (NEPA) review process restrictions that are generated by the NEPA review conducted by Environmental Division.

6.8.1. “Reserved.”

7. SPECIAL ACCESS REQUIREMENTS

7.1. Reserved.

8. OTHER CONDITIONS AFFECTING WORK

8.1. Work Coordination

8.1.1. Interfacing With Others

8.1.1.1. The contractor shall plan its work activities in a manner such that there will be minimal interference and inconvenience to ongoing traffic and daily operations in the facility and local areas.

8.1.1.2. All work will be scheduled and coordinated with the Government Project Management Team or their designee at all times (Steam Plant Supervisor, Michael Coulter).

8.1.1.3. The contractor may not block traffic, roads, access routes, or exits without prior coordination with the Project Manager or other authorized Government representative.

8.1.2. Pre-Construction Conference

8.1.2.1. The contractor shall attend a pre-work meeting presided over by the Project Manager prior to commencing construction activities. The contractor shall contact the Project Manager within five (5) calendar days of issuance of the contract NTP to establish a date and time for the preconstruction meeting. The contractor shall submit a site-specific construction schedule and a site specific Work Plan at that meeting for Government approval unless these items have been previously approved by the Government. The schedule shall be in sufficient detail to identify all aspects of the work including all significant project tasks with durations and start and finish times.

8.2. Contractor Personnel and Sub-Contractor Qualifications:

8.2.1. The contractor’s management team, i.e. Project Manager and Superintendent, shall have a minimum of 5 years related experience working on projects of similar nature, scope and dollar value.

8.2.2. Sub-contractors tasked with Boiler refractory repair work shall have satisfactorily completed a minimum of two projects of similar nature, scope and dollar value.

8.3. Site Safety and Health Officer

8.3.1. The contractor shall provide a Site Safety and Health Officer (SSHO) as required in the specification section titled GOVERNMENTAL SAFETY REQUIREMENTS. The contractor SSHO may be assigned other duties in addition to the duties required as SSHO.

8.4. Construction Quality Control System Manager

8.4.1. The contractor shall provide a Construction Quality Control (CQC) System Manager as required in the specification section titled QUALITY CONTROL. The CQC System Manager may be assigned other duties in addition to the duties required as CQC System Manager.

8.5. Compliance with Rules, Regulations, and Statutes

8.5.1. All contractor employees shall observe and comply with all applicable Local, State, and Federal rules, regulations, and statutes including those concerning fire, safety, sanitation, security, vehicle safety, environmental and hazardous material handling while performing this contract. All work shall meet or exceed all applicable industry standards.

8.6. Firearms

8.6.1. Contractor personnel shall carry no firearms while performing work under this contract.

8.7. Work Hours

8.7.1. The construction activity period shall be restricted to 7:30 a.m. to 4:30 p.m. daily, Monday through Friday, excluding Federal holidays. Work hours other than as specified above shall be coordinated with and approved by the COR.

8.8. Site Utilities

8.8.1. Outages

8.8.1.1. Any utility outages, including but not limited to, electrical, mechanical, fire protection and plumbing systems, shall be coordinated at least ten (10) working days prior to proposed outages. Coordination will be documented on the appropriate outage request form (separate document for utilities and fire protection systems). Outages shall be scheduled to minimize interruptions to normal using agency operations.

8.8.2. Potable Water

8.8.2.1. The Government shall make available to the contractor, from existing outlets and supplies, reasonable amounts of potable water without charge. The contractor shall conserve potable water furnished. The contractor at its own expense shall install and maintain necessary temporary connections and distribution lines and shall remove the connections and lines prior to final acceptance of construction. All connections must be coordinated through the Directorate of Public Works.

8.9. Permits

8.9.1. The contractor shall obtain and submit copies of ALL permits, unless otherwise specified. Each permit shall be obtained before starting the respective items of work. This includes, but is not limited to, permits necessary for decontaminating water and sewer systems, and digging permits.

8.9.2. Contractors must obtain a "Dig Permit" from Public Works prior to any ground disturbing activities.

8.9.3. Once utilities have been marked as part of the dig permit process, the contractor shall document (photographs and plan drawings) and maintain the markings for the duration of the project.

8.10. Safety

8.10.1. USACE Safety and Health Requirements Manual (EM 385-1-1), available online at http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx, shall be considered to be a part of this contract and will be enforced as such. The contractor shall prepare an accident prevention plan in accordance with the most current version of EM 385-1-1.

8.11. Operation and Maintenance Requirements

8.11.1. “Reserved.”

8.12. Construction Facilities And Temporary Controls

8.12.1. The contractor is responsible for security of his own property and security of government property when construction activities affect existing security measures.

8.12.2. The contractor shall provide and maintain portable toilet facilities at the site for the use of contractor and subcontractor personnel, as required by the EM 385-1-1. The units shall be emptied and cleaned at least once a week, or more often if required by the COR. The doors to the unit shall be self-closing. Additionally, the toilet units shall be located out of public view as the site allows.

9. ANTI-TERRORISM (AT) and Operational Security (OPSEC)

9.1. AT Level I Training. All contractors and its subcontractors required to work on JBLM shall complete AT Level 1 awareness training prior to commencing work on JBLM. The contractor shall submit a signed company letter stating the annual AT Level 1 training has been or will be completed by all employees and subcontractors prior to commencing any work on JBLM. Training certificates shall be maintained and be available for inspection. Compliance may be verified by Government QA. AT Level 1 awareness training is available at the following website: https://jkodirect.jten.mil

9.2. Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The contractor shall comply with Joint Base Lewis-McChord security regulations: JBLM Regulation 210-1, JBLM Post Regulations, Chapter 7, section XVII; JBLM Regulation 190-13, Access to and Conduct While on the Joint Base Lewis-McChord; and JBLM Regulation 190-5, Installation Traffic Code. Contractor employees shall display either contractor-provided identification badges or the AIE Long Term Badge issued by JBLM. If the contractor does not have an AIE Long Term Badge, the contractor shall develop a contractor-provided identification badge made of nonmetallic material, easily readable and include the employee's name, the contractor's name, and a recent color photograph of the employee. The first step to obtain an AIE Long Term Badge (12 months) is to ensure the contractor’s corporation is on the DES Contractor Access List (CAL) with the correct dates for the contract/task order, the contractor will request through the PM/COR to be placed on the CAL. Both USACE and PW has POCs for the PM/COR to process CAL additions. The second step is a copy of the company’s personnel roster of those requiring badges (showing full name, date of birth, company name, position in company, how often do you come on post, what hours do you access post, what days of the week, and email address) needs to be sent through the PM/COR who will process the list through the USACE or PW POC to DES. If the individuals on the list require access outside of 0700-1700 Monday to Friday this needs to be annotated on the list. The third step is to request AIE Long Term Badge using the AIE LONG TERM BADGE REQUEST FORM, the form will require a Government employee signature, the completed form is taken to either the JBLM Lewis Main or the JBLM McChord Field Visitor Centers for the background check, then the person who needs the badge goes to Waller Hall Vehicle Registration with the form where the badge is issued. Contractor personnel shall wear the identification badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Each contractor employee shall wear the identification badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

9.2.1. Real ID Act. Joint Base Lewis-McChord is in compliance with the REAL ID Act of 2005. This means visitors presenting drivers licenses and Identification cards stating “Not Valid For Federal Purposes" or "Federal Limits May Apply” will need to provide supplemental documentation to prove identity (see link below) in order to be issued a temporary installation pass or a AIE long term pass. If a visitor requesting access does not have REAL ID Act compliant form of identification and cannot provide supplemental identity proofing documents, they must be escorted at all times while on the installation. Each time the pass or AIE long term pass is renewed the supplemental documentation will need to be provided again. For the most current information concerning state-by-state compliance with the REAL ID Act, visit:

HTTPS://WWW.DHS.GOV/CURRENT-STATUS-STATES-TERRITORIES.

9.3. iWATCH. All contractor employees and their subcontractor employees required to work on JBLM or have access to contract documents shall complete Level I OPSEC training prior to commencing work on JBLM. The contractor shall submit a signed company letter stating the annual Level I OPSEC training has been or will be completed by all employees and subcontractor employees prior to commencing any work on JBLM. Training certificates shall be maintained and be available for inspection. Compliance may be verified by the Government QAR. Level I OPSEC training is available at the following website: http:/www.cdse.edu/catalog/operations-security.html.

9.4. OPSEC

9.4.1. Operations security (OPSEC) denies adversaries sensitive information, critical information or essential elements of friendly information. This information requires special protection from disclosure that could compromise or cause a threat to our National Security, an Army organization, activity, family member, DA civilian, or DOD contractor. OPSEC is everyone’s responsibility that comes in contact with the information. Information that is described below must be controlled, and if the information is in digital or hardcopy format, it needs to be destroyed at contract completion. Control includes not disclosing the information to personnel who do not have the need to have this information; if digital, do not post in a manner open to the public (on cloud storage or publicly available site) and if hard copy secure in a locked area (office, trailer, vehicle, etc…) Examples which may be deemed sensitive include but are not limited to information related to:

· Unit structuring

· manning

· equipment

· Training and readiness

· vulnerabilities

· administration and personnel

· Military Operations Planning

· intelligence, counterintelligence

· security

· logistics

· deploying

· acquisition plans

· capabilities

· morale

· financial data and funding

· Drawings, blue prints, as-builts and designs

· utility systems information (electrical, water, waste water, storm water, gas, communications)

9.4.2. Handle any attempt by unauthorized personnel to solicit sensitive information (for example computer breach or questioning employees on or off JBLM) as a Threat Awareness and Reporting. Program (TARP) incident. Report all facts immediately by calling 253-912-4442 or 911 (see iWatch paragraph above) and inform the COR.

9.4.3. OPSEC Level I Training. All contractor employees and their subcontractor employees required to work on JBLM or have access to contract documents shall complete Level I OPSEC training prior to commencing work on JBLM. The contractor shall submit a signed company letter stating the annual Level I OPSEC training has been or will be completed by all employees prior to commencing any work on JBLM. Training certificates shall be maintained and be available for inspection. Compliance may be verified by Government QA. Level I OPSEC training is available at the following website: http:/www.cdse.edu/catalog/operations-security.html.

9.5. The contractor and subcontractors shall pre-screen all employees required to work on JBLM using the E-Verify website (https://www.e-verify.gov/) to meet the established employment eligibility requirements. The contractor shall ensure that the employee has two valid forms of Government-issued identification to ensure the correct information is entered into the E-verify system. The contractor shall submit a signed company letter stating all employees have or will be screened in E-Verify prior to commencing any work on JBLM.