Scope of Work.docx

DOCX document 20 KB Posted

Attached to
HC-144 Mountain and Canyon Flying Training Course
Solicitation number
70Z04821QPCLDY300
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

HC-144 – Mountain and Canyon Flying Training Course

1.0 GENERAL

1.1 BACKGROUND

ATC Mobile, HC-144 Training Division is working to bolster advanced training. Currently every Fixed wing Coast Guard unit, in some capacity either through their respective Area of Responsibilities or while on deployment have been exposed to mountainous terrain with no official tactics, training or procedures. The advantages of such a program will allow for a better understanding of mountain phenomenon coupled with the importance of aircraft performance planning. The need for this training is apparent when you look at several FAA, ICAO, and NTSB studies.

1.2 SCOPE

Four subject matter experts from each Coast Guard fixed-wing platform will attend this training: a course auditor, an HC-144 Standardization Instructor Pilot, a C-27J Standardization Instructor Pilot and a C130J Standardization Instructor Pilot. Training is four days and will comprise of a combination of ground and flight instruction. Upon successful completion, course participants will have an advanced level of capability and proficiency to employ mountain flying techniques and will be able to instruct fleet pilots on these methods.

1.3 OBJECTIVE

HC-144 Training Division will learn teaching techniques to be able to better train the fleet. In addition, as part of the course audit, high altitude and flight performance training may become part of a C-School listing that will subsequently allow other members to attend the course.

2.0 SPECIFIC REQUIREMENTS/TASKS

Instruction will include ground school and flight training as listed in section 2.1. Course must include instructional tools (train the trainer) so the subject matter experts can provide instructional techniques to operational pilots. In addition, recommended flight maneuvers and discussions for specific Coast Guard fixed wing aircraft will need to be part of the training. Due to country clearance and travel limitations, the course must be located in the contiguous United States of America. The performance is four days and must be completed by 4 September 2021. Reservations will be contingent upon contract award.

2.1 TASK ONE. Performance Standards and Enabling Objectives

• 12+ hours of ground instruction consisting aircraft performance, climb gradient, density altitude, confined area landings, emergency considerations, mountain phenomenon and meteorology, go or no-go decision making, and the various phases of mountain approach.

• 8 to 10 hours of dual mountain flying time with vendor providing the aircraft rental as part of the total cost.

3.0 TRAVEL

Travel will be arranged by USCG personnel through ADTRAV.

4.0 PROTECTION OF INFORMATION

Contractor access to information protected under the Privacy Act is required under this Statement of Work. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

5.0 CONTRACTOR FURNISHED PROPERTY

The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in subparagraph 5.0

6.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

6.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

File details come from the government source that posted it. Updated .