Scope of Work_CS CONTROL.docx
DOCX document 15 KB Posted
- Attached to
- CGC HAMILTON STEERING GEAR REPAIR
- Solicitation number
- 70Z08520NP45E1800
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated clauses up to 25K AND Services with parts exceeding Micro.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work: CGC HAMILTON
Port Aft Steering Flooding – Steering Gear
Background:
The steering system is OOC until repairs are affected and CS CONTROLS electrical control system is repaired. An OOC Steering gear forces the Cutter into a Not Mission Capable Status, restricting them to the pier.
Statement of Work:
1. Tech to Travel and provide two days of on-site assist and repairs on CGC HAMILTON. Return Steering system to operational status.
2. Tech to install required parts and groom system.
3. Provide CFR for any additional labor or parts required. No parts and additional labor permitted until approved by Contracting Officer.
4. Provide operational test of the system.
Parts:
The Coast Guard (procured by MILSTRIP) will provide the following parts.
1. Steering Actuator Rebuild Kit, NIIN: 016173938; P/N: U-1-4-49; Qty. 1
Note: tech rep needs to be wearing a mask, monitoring body temperature and reporting any Covid-19 symptoms.
| POP: | 04-05 JUNE 2020 |
| Tech will already be on site and available to work on Thursday 04 June. To depart after full workday on Friday 05 June. This is work to be conducted directly following approved PR 850P45D40 with a POP 01-03 JUNE 2020. |
Location:
1050 REGISTER ST.
NORTH CHARLESTON, SC 29405 US
OEM: CS Controls
File details come from the government source that posted it. Updated .