Scope of Work Boat Bay .docx

DOCX document 25 KB Posted

Attached to
Small Boat Floor Repair
Solicitation number
84-23-Q-34263-059
Issued by

View the file

Other files

File Type Posted
SF 30 Questions and Answers Amendment A00001.pdf PDF
Pricing Sheet.docx DOCX document
duraflex-poly-crete-color-chart.pdf_safe.pdf PDF
poly-crete-brochure-1_19.pdf_safe.pdf PDF
52.212-5.docx DOCX document
Wage Determination 2015-5233 Rev 24 12.27.22.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Boat Bay Flooring removal and installation Service Address:

USCG Maritime Safety and Security Team Houston Scope of Work:

Period: 01 May 2023 to 30 May 2023 Job Summary:

1.1 Service request for the removal and disposal of existing floor panels, crews and all associated debris. Repair and patching of any holes in the concrete and renew any expansion joints as needed. Prep installed drains, columns, doors building and exterior walls to ensure the prevention of splatter and NOT sealed under the new flooring. Prep surface area including step up for application for POLY-CRETE SLB (Color-Medium Grey). Total workable surface area for boat bay and step up leading into the building is approximately 3.700 SQFT.

1.2 Contractor shall provide all necessary documentation for all employees (Valid State ID, Drivers Licenses, etc.). As well any vehicle brought on board any Coast Guard/Military Facility shall have valid state registration and insurance.

1.3 Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer.

Summary of Essential Job Functions:

Removal and disposal of existing boat bay flooring including all screws, panel and associated debris. Prior to floor installation, patch and repair of holes and expansion joints as needed. Prior to floor installation prep of drains, columns, exterior walls and building to prevent splatter and sealing prior to application of POLY-CRETE SLB (Color Medium Grey) for flooring and step up as specified in Job Summary 1.1 and enclosure (1). Cleanup disposal and removal of all used material.

Minimum Requirements:

1. Remove and dispose of existing flooring, screws and debris.

1. Patch any holes in the concrete and renew any expansion joints as needed.

1. Prep drains in boat bay area so they are NOT sealed under the new flooring.

1. Prep columns, door and building as needed to prevent splatter.

1. Prep step up surface area for the application for Poly-Crete SLB. (Color-Medium Grey)

1. Prep surface area for the application of Poly-Crete SLB. (Color-Medium Grey

1. Removal and disposal of all used material

Customer will provide:

Coordinated access between USCG Sector Houston and USCG MSST Facility for duration of work.

Dumpsters and Recycling bins for material and debris.

Contractor will provide:

All tools, equipment and material required for service referenced in Job Summary 1.1 All required personnel and vehicle credential as referenced in Job Summary 1.2 and 1.3

PRICING VALIDITY

6.1 Vendor quote must include the following statement:

"Vendor has reviewed the customer's SOW and certifies that the price covers the customer's requirement. No additional funds will be required."

Disclaimer:

Contractor will notify USCG of all changes, issues, and/or problems associated with the completion of this job. The contractor shall be liable for all damages to Government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damages or injury to persons that occur as a result of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work the workers, the public, and the property of others.