This is a Notice to Bidders issued by Ferry Operations (NCDOT) for the Hatteras Ferry Terminal Visitor Center Building Improvements project (SCO ID No. 26-30900-01A). The work scope includes demolition of existing floor joists, subfloor, insulation, and gypsum board beneath visitor center restrooms; demolition of the existing restroom plumbing system; construction of new framing, flooring, and associated work; construction of a new plumbing system; and repair of a broken truss in the attic breakroom entry. Sealed proposals will be received at the Hatteras Ferry Terminal Visitor Center, 59063 N.C. Highway 12, South Hatteras, NC 27943 until 3:00 PM on October 1, 2026. An open Pre-Bid Meeting will be held on September 18, 2026 at 1:00 PM at the same location; attendance is not mandatory but strongly encouraged. Complete plans and specifications are available for inspection at Ferry Operations (8550 Shipyard Road, Manns Harbor, NC 27953) and Moffatt & Nichol (4700 Falls of Neuse Road, Suite 300, Raleigh, NC 27609), with electronic PDF copies available at no cost via email and hard copies available for a $100.00 refundable deposit.
All proposals shall be submitted as single prime, lump sum bids. No cash deposit or bid bond is required, and neither Performance Bonds nor Payment Bonds are required for this project. Payment will be made based on 95 percent of monthly estimates with final payment upon completion and acceptance of work. General Contractors must maintain either an Unclassified Contractor or Building Contractor license classification as required by North Carolina General Statutes Chapter 87, Article 1. Specialty contractors (plumbing, mechanical, electrical) may bid as single prime contractors provided the total value of general construction does not exceed 25 percent of total construction value. Bids may not be withdrawn after the scheduled closing time for a period of 30 days. The Owner reserves the right to reject any or all bids and waive informalities. The Designer is Moffatt & Nichol, and the Program Manager is Brian Doliber.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO BIDDERS
Sealed proposals will be received by the Ferry Operations (NCDOT) in the Conference Room of the Hatteras Ferry Terminal Visitor Center, 59063 N.C. Highway 12, South Hatteras, NC 27943 (attention Mr. Brian Doliber), up to 3:00 PM, October 1, 2026, and immediately thereafter publicly opened and read for the furnishing of labor, material and equipment entering into the construction of the following project:
Hatteras Ferry Terminal Visitor Center Building Improvements SCO ID No. 26-30900-01A
The work will include, but is not limited to, the following items:
Demolition of existing floor joists, subfloor, insulation, and gypsum board beneath visitor center restrooms.
Demolition of existing restroom plumbing system.
Construction of new framing, flooring, and associated work.
Construction of new plumbing system.
Repair of broken truss in the attic breakroom entry.
Bids will be received for a single prime construction contract. All proposals shall be lump sum.
Pre-Bid Meeting An open Pre-Bid Meeting will be held for all interested Bidders on September 18, 2026 at 1:00 PM in the Conference Room of the Hatteras Ferry Terminal Visitor Center (Phone: 252-621-6251). The meeting will address project specific questions, bidding procedures, and bid forms. Attendance at the Pre-Bid Meeting is not mandatory, but all Bidders should attend this conference and/or visit the site in order to acquaint themselves with site conditions and job requirements.
Complete plans, specifications, and contract documents will be open for inspection in the following locations:
Ferry Operations, 8550 Shipyard Road, Manns Harbor, NC 27953 (Phone: 252-621-6251) Moffatt & Nichol, 4700 Falls of Neuse Road, Suite 300, Raleigh, North Carolina 27609 (Phone: 919-781-4626)
Electronic (PDF) copies of the complete plans and specifications for this project may be obtained via email at no cost (send request to: djacobson@moffattnichol.com). Alternatively, hard copies of the complete plans, specifications, and contract documents may be obtained by those qualified as prime Bidders, upon deposit of one hundred ($100.00) in cash or certified check, from Moffatt & Nichol at 4700 Falls of Neuse Road, Suite 300, Raleigh, North Carolina 27609 (Phone: 919-781-4626). The full plan deposit will be returned to those Bidders provided all documents are returned in good, usable condition within ten (10) calendar days after the bid date.
Bidders should clearly indicate on the outside of the bid envelope "Bid Proposal for: Hatteras Ferry Terminal Visitor Center Building Improvements", their North Carolina General Contractor's license number, and that the bid is for "Single Prime Bid".
All Contractors are hereby notified that they must have a proper license as required under the North Carolina State Laws governing their respective trades.
General Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General Contractors submitting bids on this project must have license classification for either: Unclassified Contractor or Building Contractor as required by the General Contractors Licensing Board under GS 87-1.
NOTE: Under GS 87-1, a contractor that superintends or manages construction of any building, highway, public utility, grading, structure or improvement shall be deemed a “general contractor” and shall be so licensed. Therefore a single prime project that involves other trades will require the single prime contractor to hold a proper General Contractors license. Except, on public buildings being bid single prime, where the total value of the general construction does not exceed 25% of the total construction value, contractors under GS 87, Articles 2 and 4 (Plumbing, Mechanical, and Electrical) may bid and contract directly with the Owner as the single prime contractor and may subcontract to other properly licensed trades. GS 87-1.1, Rule .0210
A cash deposit or bid bond will not be required.
A Performance Bond and a Payment Bond will not be required.
Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work.
No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days.
The Owner reserves the right to reject any or all bids and to waive informalities.
Owner:
Ferry Operations (NCDOT) Brian Doliber Program Manager Ferry Operations 8550 Shipyard Road Manns Harbor, NC 27953 252-621-6251 (Phone)
Designer:
Moffatt & Nichol (M&N) 4700 Falls of Neuse Road, Suite 300 Raleigh, North Carolina 27609 919-781-4626 (Phone)
Notice to Bidders - Page 1 of 3