Schedule of items.doc

DOC document 52 KB Posted

Attached to
Hand thinning and hand piling Federal contract opportunity
Solicitation number
1204GRFQ-DW-14
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Hand thinning and hand piling, newest first.
File Type Posted
WhiteBarkPine Unit Map 23MAR2021.pdf PDF
WhiteBarkPine Sheep Vicinity Map_23MAR2021.pdf PDF
DUIS for Sheep Mountain WBP Thin_Pile.doc DOC document
Statement of Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER NO.

IF THIS ORDER IS GREATER THAN $2,500.00, IT IS

NOT VALID UNTIL SIGNED BY THE CONTRACTING OFFICER

Contract No.

Project Name:
White Bark Pine

Thin & Pile Issue:

Contractor:

Issuing and Billing Office:

Wallowa-Whitman National Forest

1550 Dewey Ave, Suite A

Baker City, OR 97814 County: Baker/Grant

Item No.

Subitem No.

Description
Quantity to Date
Quantity

Order

Unit
Unit

Price Amount

1.1
WB #1
Hand Thin

ac

1.2
WB #1
Hand piling of thinning material

ac

Required Delivery Date: All work shall be completed within 180 days after the effective date of the Notice to Proceed.

Total Price: $

Contractor: (Name and Signature)

Requested By: (Name and Signature) Teresa Corning-Sevey /s/ Teresa L Corning-Sevey

Fund Authorization: (Name and Signature)

District Ranger

Line Officer:

Ordered By: (Name and Signature) Contracting Officer:

Order:
Job Code: RTRT

Original to CO, CC to Contractor, B&F and COR Please provide the following information:

MSPA Number:

CREW SIZE:

PROPOSED SCHEDULE:

PRODUCTION RATE, ACRES PER DAY PCT AND HANDPILING:

*Note: Government anticipates 10 ac/day PCT and 4 ac/day Piling*

DESCRIPTION/STATEMENT OF WORK

This is a task order requesting work of completing hand thinning and hand piling in the Sheep Mountain Area on the Prairie City Ranger District in accordance with all the specifications in the Malheur National Forest 2017 Fuels Reduction and Slash Treatment IDIQ and the attached Detailed Unit Information Sheet (DUIS).This work will require use of chainsaws. Work is estimated to begin upon issuance of a notice to proceed. The contractor will be issued a notice to proceed at the post award meeting. All awarded work is intended to be completed within 180 days after the effective date of the Notice to Proceed.

LOCATION

The requested work to be completed is located in the Sheep Mountain Area of the Prairie City Ranger District. This location is North and East of Summit Prairie, south of Lookout Mountain

COMPLETION

All work must be completed within 180 days after the effective date of the Notice to Proceed.

Access: High Clearance 4 wheel drive will be necessary to access the unit.

To access the White Bark Pine thin & pile unit, From Prairie City, OR. Take Bridge Street heading South for approximately 20.2 miles. Bridge Street will turn into Grant County Road 62. At road junctions 62 and Forest Road 1665, Turn left (east) onto rd 1665 and travel approximately 2.5 miles to the road jcts with Rd 1660. Turn left (north) onto Road # 1660 and travel approximately 1 mile to the road jct with Rd 1660 and Rd # 548. Turn left (north) onto Road # 548 and travel approximately 3 miles to the unit. The unit will be on the right side (east) of rd # 548. Round trip 53.4 miles.

Identifying Skips/Gaps: Skips and gaps have been designated by unit layout, and none are necessary within unit boundaries.

Special Concerns/ Time Restrictions: Refer to the DUIS and Contract (IDIQ) for more specific information on restrictions and units effected.

· Seeps/ Springs/ Elk wallows.

· Areas to protect- no hand piles shall occur within these areas.

· Aspen stands and other hardwoods – Hardwood stands may be present within units.

· Calving/fawning restriction and mitigation.

File details come from the government source that posted it. Updated .