Schedule of items.doc
DOC document 52 KB Posted
- Attached to
- Hand thinning and hand piling Federal contract opportunity
- Solicitation number
- 1204GRFQ-DW-14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WhiteBarkPine Unit Map 23MAR2021.pdf | ||
| WhiteBarkPine Sheep Vicinity Map_23MAR2021.pdf | ||
| DUIS for Sheep Mountain WBP Thin_Pile.doc | DOC document | |
| Statement of Work.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK ORDER NO.
IF THIS ORDER IS GREATER THAN $2,500.00, IT IS
NOT VALID UNTIL SIGNED BY THE CONTRACTING OFFICER
Contract No.
| Project Name: |
| White Bark Pine |
Thin & Pile Issue:
Contractor:
Issuing and Billing Office:
Wallowa-Whitman National Forest
1550 Dewey Ave, Suite A
Baker City, OR 97814 County: Baker/Grant
Item No.
Subitem No.
| Description |
| Quantity to Date |
| Quantity |
Order
| Unit |
| Unit |
Price Amount
| 1.1 |
| WB #1 |
| Hand Thin |
ac
| 1.2 |
| WB #1 |
| Hand piling of thinning material |
ac
Required Delivery Date: All work shall be completed within 180 days after the effective date of the Notice to Proceed.
Total Price: $
Contractor: (Name and Signature)
Requested By: (Name and Signature) Teresa Corning-Sevey /s/ Teresa L Corning-Sevey
Fund Authorization: (Name and Signature)
District Ranger
Line Officer:
Ordered By: (Name and Signature) Contracting Officer:
| Order: |
| Job Code: RTRT |
Original to CO, CC to Contractor, B&F and COR Please provide the following information:
MSPA Number:
CREW SIZE:
PROPOSED SCHEDULE:
PRODUCTION RATE, ACRES PER DAY PCT AND HANDPILING:
*Note: Government anticipates 10 ac/day PCT and 4 ac/day Piling*
DESCRIPTION/STATEMENT OF WORK
This is a task order requesting work of completing hand thinning and hand piling in the Sheep Mountain Area on the Prairie City Ranger District in accordance with all the specifications in the Malheur National Forest 2017 Fuels Reduction and Slash Treatment IDIQ and the attached Detailed Unit Information Sheet (DUIS).This work will require use of chainsaws. Work is estimated to begin upon issuance of a notice to proceed. The contractor will be issued a notice to proceed at the post award meeting. All awarded work is intended to be completed within 180 days after the effective date of the Notice to Proceed.
LOCATION
The requested work to be completed is located in the Sheep Mountain Area of the Prairie City Ranger District. This location is North and East of Summit Prairie, south of Lookout Mountain
COMPLETION
All work must be completed within 180 days after the effective date of the Notice to Proceed.
Access: High Clearance 4 wheel drive will be necessary to access the unit.
To access the White Bark Pine thin & pile unit, From Prairie City, OR. Take Bridge Street heading South for approximately 20.2 miles. Bridge Street will turn into Grant County Road 62. At road junctions 62 and Forest Road 1665, Turn left (east) onto rd 1665 and travel approximately 2.5 miles to the road jcts with Rd 1660. Turn left (north) onto Road # 1660 and travel approximately 1 mile to the road jct with Rd 1660 and Rd # 548. Turn left (north) onto Road # 548 and travel approximately 3 miles to the unit. The unit will be on the right side (east) of rd # 548. Round trip 53.4 miles.
Identifying Skips/Gaps: Skips and gaps have been designated by unit layout, and none are necessary within unit boundaries.
Special Concerns/ Time Restrictions: Refer to the DUIS and Contract (IDIQ) for more specific information on restrictions and units effected.
· Seeps/ Springs/ Elk wallows.
· Areas to protect- no hand piles shall occur within these areas.
· Aspen stands and other hardwoods – Hardwood stands may be present within units.
· Calving/fawning restriction and mitigation.