Solicitation_SB1341-17-RQ-0349.pdf
PDF 5 MB Posted
- Attached to
- Potable Water Testing
- Solicitation number
- SB1341-17-RQ-0349
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| RFI_Responses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATE . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 57 SB134117RQ0349
The Contractor shall submit a firm fixed price (FFP) quotation on the SF1449 for each of the FFP Contract Line Item Numbers (CLINS). (CLINS X001, represent Option CLINS). The Contractor shall sign the SF1449, blocks 30a through 30c acknowledging quotation submission.
0001 Base Year: Potable water testing services, per the attached Performance Work Statement, all associated attachments (A&B), and the Wage Determination dated 12/30/2016, No.: 15-5415, Rev. 3.
DELIVERY DATE: 09/30/2018
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2017 to 09/30/2018
1.00 JB
OPT
1001 Option 1: Potable water testing services, per the attached Performance Work Statement, and associated attachments (A&B).
DELIVERY DATE: 09/30/2019
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2018 to 09/30/2019
1.00 JB
OPT
2001 Option 2: Potable water testing services, per the attached Performance Work Statement, and associated attachments (A&B).
DELIVERY DATE: 09/30/2020
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2019 to 09/30/2020
1.00 JB
OPT
3001 Option 3: Potable water testing services, per the attached Performance Work Statement, and associated attachments (A&B).
DELIVERY DATE: 09/30/2021
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2020 to 09/30/2021
1.00 JB
OPT
4001 Option 4: Potable water testing services, per the attached Performance Work Statement, and associated attachments (A&B).
1.00 JB
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 4 OF 57 SB134117RQ0349
DELIVERY DATE: 09/30/2022
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2021 to 09/30/2022
Table of Contents
PAGE 5 OF 57 SB134117RQ0349
SECTION
. 1 Performance Work Statement
. 2 Attachment A
. 3 Attachment B
. 4 Evaluation Criteria
. 5 General Instructions for woring at NIST
. 6 Past Performance Questionnaire
. 7 Wage Determination
. 8 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
. 9 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JAN 2017)
. 10 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (JAN 2017)
. 11 52.232-15 PROGRESS PAYMENTS NOT INCLUDED (APR 1984)
. 12 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
. 13 52.237-3 CONTINUITY OF SERVICES (JAN 1991)
. 14 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
. 15 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
. 16 1352.271-70 INSPECTION AND MANNER OF DOING WORK (APR 2010)
. 17 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV
2015)
. 18 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY
CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
. 19 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--
COMMERCIAL ITEMS (JAN 2017)
. 20 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
. 21 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
. 22 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
. 23 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
. 24 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
. 25 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
. 26 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
. 27 1352.233-70 AGENCY PROTESTS (APR 2010)
. 28 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
. 29 NIST LOCAL-36 TRAVEL NOTE
. 30 NIST LOCAL-39 MARKING/PACKING INSTRUCTIONS
PAGE 6 OF 57 SB134117RQ0349
SECTION
. 1 Performance Work Statement
Potable Water Services Testing
Performance Work Statement (PWS)
I. BACKGROUND
The National Institute of Standards and Technology (NIST) campuses in Boulder, CO, Fort
Collins, CO, and Gaithersburg, MD, are equipped with drinking water fountains and potable water sinks throughout various buildings. All campuses’ need to ensure potable water meets
Environmental Protection Agency (EPA) requirements.
Potable Water Sources
The contractor shall complete the annual testing of all potable water within the buildings of
NIST, Boulder CO, Fort Collins CO and Gaithersburg, MD. The contractor shall take the necessary water samples to adequately determine if the potable water is free of harmful levels of Aluminum, Copper, Lead, Cadmium, Zinc and Total Coliforms, in accordance with the
United States (US) EPA Primary and Secondary Drinking Water Standards for Maximum
Containment Levels (MCLs).
II. SCOPE OF WORK
Purpose/Objective
The contractor shall furnish all labor, materials, equipment, transportation, facilities, supervision, and management, unless otherwise specified herein. The contractor shall take appropriate water samples from all designated source locations. The range of test sources can fluctuate annually as current building modifications continue. The present quantities of test sources are eighty-five (85) sources in Boulder; four (4) sources in Fort Collins, and two-hundred-sixty-five (265) in Gaithersburg, MD.
Current sources are shown in Attachment A for NIST Boulder / Fort Collins, CO Campuses and Attachment B for NIST Gaithersburg, MD Campus. The Contractor shall coordinate site access with the Contracting Officer Representative (COR) or the Alternate Contracting Officer
Representative (ACOR) at least fourteen (14) days prior to any-on-site sampling is to occur.
All tests shall be scheduled and conducted on either weekends or a Federal Holiday that falls on a Monday, including Columbus Day, Veterans Day, Martin Luther King Jr. Day or
President's Day, which may require multiple mobilizations.
Specific Requirements
The contractor shall complete the following tasks:
TASK 1: Perform water testing for Aluminum, Copper, Lead, Cadmium, Zinc, and
Total Coliform in accordance with the US EPA Primary and Secondary Drinking Water
Standards for Maximum Containment Levels (MCLs).
PAGE 7 OF 57 SB134117RQ0349
TASK 2: Testing shall be conducted per the analytical methods promulgated under the authority of Section 304(h) of the Clean Water Act, specifically, EPA Test Methods:
200.8 - Metals by ICP/MS and SM9223B Enzyme Substrate Test and reported to NIST via a compiled written report within thirty (30) calendar days after taking the samples.
The contractor shall provide new laboratory identification for each sample source showing building number, area location and sample source (example: fountain / sink) for future sampling efforts. Reports shall be submitted as electronic copies. Accepted reports shall be Level II Laboratory Report translations and shall include at a minimum:
Case Narratives; Detection Summary; Method Summary; Sample Summary; Sample
Results; Surrogate Summary; QC Sample Results; QC Association; Chronicle; Receipt
Checklists; and Chain of Custody.
TASK 3: Provide three overall Water Quality Consumer Confidence Reports (CCR).
One (1) overall Report for NIST Boulder, one (1) overall for NIST Fort Collins
Campus and one (1) overall Report for NIST Gaithersburg Campus. The CCR reports are due within ninety (90) days of sampling completion for each location. Reports shall be submitted as electronic copies.
TASK 4: Provide up to three (3) emergency retests for each location, within 24 hours of the original test. (1 trip, up to 3 samples, analysis and a standard detailed report within 30 days). Reports shall be submitted as electronic copies.
TASK 5: Provide up to five (5) routine retests for each location with a standard detailed report within thirty (30) days. Reports shall be submitted as electronic copies.
III. PERIOD OF PERFORMANCE:
IV. PLACE OF PERFORMANCE:
All work shall be conducted at the NIST/Boulder (site-wide) 325 Broadway, Boulder, Colorado, 80305, NIST Fort Collins at Radio Station WWV 2000 E. County Rd. 58 Fort
Collins, CO 80524 and NIST/Gaithersburg, MD (site-wide) 100 Bureau Drive
Gaithersburg, MD 20899
The day-to-day supervision and direct control over the work performed by the on-site contractor will be the responsibility of the selected COR/ACOR.
V. GOVERNMENT FURNISHED PROPERTY:
There shall be no government furnished property for this contract.
PAGE 8 OF 57 SB134117RQ0349
VI. DELIVERABLE SCHEDULE:
Number/
Reference Description Format Quantity Due Date
Task 1 Perform water testing for Aluminum, Copper, Lead, Cadmium, Zinc, and Total
Coliform in accordance with the US EPA
Primary and Secondary Drinking Water
Standards for Maximum Containment
Levels (MCLs).
Sample team(s) using the
Standards of the
US EPA
Primary and
Secondary
Drinking Water
Standards for
Maximum
Containment
Levels (MCLs).
Sample personnel as needed
October 1st to
September
30th of each fiscal year.
Task 2 Testing shall be conducted per the analytical methods promulgated under the authority of Section 304(h) of the Clean
Water Act, specifically, EPA Test
Methods: 200.8 - Metals by ICP/MS and
SM9223B Enzyme Substrate Test and reported to NIST via a compiled electronic report.
Electronic copies.
One (1) report for each source per
NIST
location.
Within 30 days of sampling.
Task 3 Provide three overall Water Quality
Consumer Confidence Reports (CCR).
One (1) overall Report for NIST Boulder, one (1) overall for NIST Fort Collins
Campus and one (1) overall Report for
NIST Gaithersburg Campus. The CCR reports are due within 90 days of sampling completion for each location.
Reports shall be submitted as electronic copies.
One (1) per requested location
Within 90 days of sampling completion.
Task 4 Provide up to 3 emergency retests for each location, within 24 hour of the original test.
Reports shall be submitted as electronic copies.
One (1) per source, per NIST location.
Tests within
24 hours of request.
Reports within 30 days of sampling completion
Task 5 Provide up to 5 routine retests for each
NIST location.
Reports shall be submitted as electronic copies.
One (1) per source, per location.
Within 30 days of sampling.
LIST OF DELIVERABLES (Deliverables shall be submitted electronically, hard copies of deliverables (when applicable) shall be delivered to the Contracting Officer, located in Building
111, Room 113.)
PAGE 9 OF 57 SB134117RQ0349
STANDARDS FOR ACCEPTANCE OF DELIVERABLES:
The COR will provide comments on each deliverable within fourteen (14) calendar days from receipt of a given deliverable provided by the contractor. The contractor shall make any needed changes to the report(s) within five (5) calendar days from receipt of electronic or written comments from the COR. The COR will provide written notification when a deliverable is accepted.
VII. SPECIAL REQUIREMENTS:
Invoicing for this contract is to be provided upon project completion. Project completion to include the submittal and acceptance of all contract deliverables.
VIII. TRAVEL:
Travel is to include the following:
1. Travel necessary to service the NIST/Fort Collins and NIST/Gaithersburg campuses from the NIST/Boulder campus.
2. Travel necessary to be responsive to the all three (3) NIST locations within 24 business-hours of being called to do so.
3. All travel shall be in accordance with the Federal Travel Regulations (FTR).
(Website reference: https://www.gsa.gov/portal/content/104790)
4. Reference NIST Local-36 Travel Note.
In Accordance with the Federal Acquisition Regulation (FAR) 31.205-46 (a)(1), Costs for transportation may be based on mileage rates, actual costs incurred, or on a combination thereof, provided the method used results in a reasonable charge. Costs for lodging, meals, and incidental expenses may be based on per diem, actual expenses, or a combination thereof, provided the method used results in a reasonable charge.
IX. CONTRACTOR SUPPLIED MATERIALS
All equipment and tools to perform the work herein.
X. CONTRACTORS MINIMUM QUALIFICATIONS:
The contractor shall perform water quality sampling under the US EPA Primary and
Secondary Drinking Water Standards for Maximum Containment Levels (MCLs), including Section 304(h) of the Clean Water Act and specifically, EPA Test Methods:
200.8 - Metals by ICP/MS and SM9223B Enzyme Substrate Testing.
State of Colorado:
Certified as an “Environmental Laboratory” by the Department of Public Health and
Environment, with successful participation in the on-site inspections for evaluation for compliance with the U.S. Environmental Protection Agency's (EPA) Manual for the
Certification of Laboratories Analyzing Drinking Water.
PAGE 10 OF 57 SB134117RQ0349
State of Maryland:
Certified as a “Drinking Water Laboratory” under Code of Maryland Regulations:
26.08.05, Certification of State Water Quality Laboratories.
- End of PWS –
PAGE 11 OF 57 SB134117RQ0349
. 2 Attachment A
ATTACHMENT A
Source of Sample Building Source Location Location in Building
Sink 2 1 Cafeteria
Fountain 1000 Area
Fountain 01-CO-1-2 Floor 2 Spine
Fountain 01-CO-5-2 Middle of W1
Sink 01-2010 1-2010 Break Rm
Fountain 01-CO-5-2 Wing 2
Fountain 1 01-CO-1-3 Floor 3 Spine CENTER
Fountain 2 01-CO-1-3 Floor 3 Spine EAST
Fountain 3 01-CO-1-3 Floor 3 Spine WEST
Penthouse Room 5003 Penthouse
Fountain 01-CO-2-3 Wing 4 (NEAR 3441)
Sink 01-CO-2-3 Inside Rm 3442
Fountain 1 01-CO-1-4 Floor 4 Spine WEST
Fountain 2 01-CO-1-4 Floor 4 Spine CENTER WEST
Fountain 3 01-CO-1-4 Floor 4 Spine CENTER EAST
Fountain 4 01-CO-1-4 Floor 4 Spine EAST
Sink 01-4075 1-4075 Kitchen
Fountain 1 01-CO-3-4 Floor 4 Wing 5
Fountain 2 01-CO-3-4 Floor 4 Wing 5
Fountain 01-CO-2-2 NEAR 2555 / WEIGHT ROOM
Fountain 01-CO-2-5 Wing 5 Mezzanine
Sink 01-5548 5548
Fountain 1 01-CO-6-3 Floor 3 Wing 5
Fountain 2 01-3545 Floor 3 Wing 5
Fountain North Near 3301 Wing 3
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST BOULDER
PAGE 12 OF 57 SB134117RQ0349
Source of Sample Building Source Location Location in Building
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST BOULDER
Fountain North - 2 Near 3301 Wing 3
Fountain South Near Room 3330 Wing 3
Sink Room 3330 Wing 3
Refrigerator Room 3330 Wing 3
Fountain North Across from 4601 Wing 6
Fountain South Outside Room 4634 Wing 6
Sink Room 4634 Wing 6
Refrigerator Room 4634 Wing 6
Sink 2 1100 Hall
Fountain 02-CO-2-1 1200 Hall
Fountain 1600 Hall
Fountain 2600 Hall
Sink 0100 Hall
Sink 4 Kitchen Sink
Fridge Kitchen Refridgerator
Fountain 04-1300 1300 Area
Fountain 3 Annex Hallway
Sink 4A / 111 KITCHEN
Sink 5 Break Area
Sink 21 1004
PAGE 13 OF 57 SB134117RQ0349
Source of Sample Building Source Location Location in Building
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST BOULDERFountain 22 1200 Area EAST
Fountain 24 24-LO-2-1 1st floor
Fountain 24-CO-1-2 2nd floor
Refrigerator 1 25 Kitchen
Refrigerator 2 Kitchen
Sink Kitchen
Fountain Room 1100
Sink 1 26 Kitchen West
Sink 2 Kitchen South
Sink 3 Kitchen East
Sink Room 109
Fountain Room 109
Sink Room 113
Fountain Room 113
Sink Room 122
Sink Room 122
Sink Room 118
Sink Room 118
Sink Room 129
Sink Room 132
Sink Room 133
Sink Room 139
Fountain Room 139
Fountain 1 42 Room 101
Fountain 2 Room 001
Fountain 200 Hallway
PAGE 14 OF 57 SB134117RQ0349
Source of Sample Building Source Location Location in Building
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST BOULDERSink Room 202
Fountain 51 By back door
Fountain PML 81-1A101
Fountain 81-1A141
Fountain 81-1A-197
Sink 81-1A-108
Sink 81-2A-141
Sink 81-2A-201
Fountain
Fountain
Sink
Sink
NIST FORT COLLINS
PAGE 15 OF 57 SB134117RQ0349
. 3 Attachment B
ATTACHMENT B
Building # Location Fountain Kitchen Sink
301 A137 1 1
A147 1
A153 1
A100 1
A116 1
A132 1
C118 1
B131 1
B188 1
B185-3 1
302 110 1
103 1
100 1
114 1
303 116 1
304 125 1
155 3
309 103 1
215 C103 2
216 A245 2 1
A215 2 1
A115 2 1
A143 2 1
B115 2 1
B143 2 1
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURG
PAGE 16 OF 57 SB134117RQ0349
Building # Location Fountain Kitchen Sink
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURG217 A041 2
A149 2 1
B149 2 1
A121 2 1
B121 2 1
A249 2 1
B249 2 1
B221 2 1
A221
218 E001 1
C001 1
B007 1
B019 2
B037 1
219 A001 1
B002 1
A017-1 2
A0037 1
E001 1
225 1st floor front entrance 1
1st floor middle hall 1
1st floor back hall 1
2nd floor front entrance 1
2nd floor middle hall 1
2nd floor back hall 1
3rd floor front hall 1
3rd floor middle hall 1
3rd floor back hall 1
B305 1
PAGE 17 OF 57 SB134117RQ0349
Building # Location Fountain Kitchen Sink
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURG227 A105 1
a135 1
1st floor middle hall 1
A207 1
A202 1
2nd floor middle hall 1
A302 1
A311 1
3rd floor middle hall 1
A335 1
207 MAIN ENTRANCE 1
411 A181 1
B103 1
A183 1
230 129 1
229 1
223 W Front 1st Floor 1
Middle 1st Floor 1
E Back 1st Floor 1
W Front 2nd Floor 1
Middle 2nd Floor 1
B261 1
E Back 2nd Floor 1
A258 1
A254 1
W Front 3rd 1
B309 1
B311 1
Middle 3rd 1
E Back 3rd 1
PAGE 18 OF 57 SB134117RQ0349
Building # Location Fountain Kitchen Sink
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURG222 E Back 3rd 1
Middle 3rd 1
E Front 1
W Back 3rd 1
B263 1
Middle 2nd Floor 1
B221 1
E Front 2nd 1
W Back 1st 1
A158 1
Middle 1st Floor 1 1
A114-A112 1 1
W Front 1st 1
221 Back 1st 1
B151 1
B145 1
Middle 1st Floor 1
W Front 2nd Floor 1
A205 1
W Back 3rd 1
Middle 3rd 1
E 3rd Front 1
B367 1
245 C124 1
C222 1
C311 1
C320 1
B130 1
B105 1
D03 1
B19 1
233 A129 1
B153 1
318 B103 1
B107 2
C101 1
224 1st Front entrance 1
A119 1
1ST Middle 1
1ST Back (B173) 1
2nd Front entrance 1
2nd Middle 1
2nd Back (B273) 1
3rd Front entrance 1
A314 1
3rd Middle 1
3rd Back (B373) 1
PAGE 19 OF 57 SB134117RQ0349
Building # Location Fountain Kitchen Sink
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURG
226 1ST Floor Front Entrance 1
1st floor middle 1
1st floor Back 1
B163 1
2nd floor front 1
2nd floor middle 1
2nd floor back (B271) 1
3rd floor front 1
3rd floor middle 1
3rd floor back (B371)
B351 1
231 B106 1
A142 1
A111 1
A240 1
A2598 1
103 MAIN ENTRANCE 2
OFF THE MAIN ENTRANCE 1
205 107 1
208 1
210 1
237 107
202 117 1
215 1
203 112 1
110 1
236 112 1
116 1
320 008E 1
008W 1
18 1
27 1
38 1
101 A04 1
A1008 1
A1032 1
A106 1
A1108 1
A1132 1
A208 1
A232 1
A308 1
A31 1
A332 1
A408 1
A432 1
A508 1
PAGE 20 OF 57 SB134117RQ0349
Building # Location Fountain Kitchen Sink
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURGA532 1
A608 1
A632 1
A708 1
A732 1
A808 1
A832 1
A908 1
A932 1
B117 1
B29 1
C101 1
C120 1
C29 1
C41 1
D100 1
E08 1
E102 1
E116 1
E208 1
220 1st Floor East Hallway 1
1st Floor Middle Hallway 1
1st Floor West Hallway 1
2nd Floor East Hallway 1
2nd Floor Middle Hallway 1
2nd Floor West Hallway 1
3rd Floor East Hallway 1
3rd Floor Middle Hallway 1
3rd Floor West Hallway 1
Basement East Hallway 1
Basement Middle Hallway 1
Basement West Hallway 1
1st Floor East Hallway 1
235 A129 1
A156 1
B104 1
B191 2
C203 1
E08 2
E108 2
PAGE 21 OF 57 SB134117RQ0349
Building # Location Fountain Kitchen Sink
FY 17 NIST Campus Type and Location of Current Potable Water Test Points
NIST GAITHERSBURGE137 1
K04 1
K06 2
K12.2 1
K144 1
K192 1
PAGE 22 OF 57 SB134117RQ0349
. 4 Evaluation Criteria
EVALUATION CRITERIA AND BASIS FOR AWARD
The Government will award a purchase order resulting from this solicitation to the responsible contractor whose quotation conforming to the solicitation will be most advantageous and represents the best value to the Government, price and technical factors will be considered, utilizing simplified acquisition procedures of FAR Part 13. The Government will not use the formal source selection procedures described in FAR part 15. The Government will evaluate quotations utilizing the procedures of FAR 13.106-2 Evaluation of quotations or offers. The Government will consider price and technical non-price factors described in this solicitation to determine the quotation that is most advantageous and represents the Lowest Priced
Technically Acceptable (LPTA) quote.
The Government intends to evaluate quotations and issue a contract based on the initial quotations received. Therefore, the quoter’ s initial quotation should contain the quoter’ s best terms from a price and technical standpoint. The Government reserves the right to request revised quotations from, or negotiate final purchase order terms with, one or more, but not all, quoter if later determined by the Contracting
Officer to be necessary. However, the Contracting Officer will not establish a competitive range, conduct discussions, or otherwise use the formal source selection procedures described in FAR part 15. The
Government may reject any or all quotations if such action is in the public interest; and issue a contract/ purchase order to other than the quoter with the lowest priced quotation.
Award shall be made to the Lowest Priced / Technically Acceptable (LPTA) quoter. Technical acceptability shall be determined based upon the technical requirements as detailed within the associated
Performance Work Statement (PWS). The lowest price is based on the aggregate total price of the
Contract Line Item Numbers (CLINS).
If the lowest priced evaluated offer is judged technically acceptable, that offer represents the best value for the government, and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers. If the lowest priced offeror's quotation is rated to be technically unacceptable, the next lowest priced offeror's proposal will be evaluated, and the process will continue (in order by price) until an offeror's proposal is judged technically acceptable or until all offers are evaluated. The factors identified below shall be used to evaluate offers:
Factor I: Price.
Factor II: Technical Capability.
Factor III: Past Performance.
Factor I, Price
Submittal Requirements
Contractor's shall submit a firm fixed price (FFP) quotation on the SF1449 for each of the FFP CLINS.
(CLINS X001, represent Option CLINS). The contractor shall sign the SF1449, blocks 30a – 30c acknowledging quotation submission.
Basis of Evaluation
Price evaluation consists of the evaluation of the offeror's aggregate total of all the FFP CLINs. The
Government will evaluate the price quotation using price analysis techniques to determine fairness, reasonableness and realism in relation to the technical solution. Price analysis will be conducted in
PAGE 23 OF 57 SB134117RQ0349
accordance with the FAR, Commerce Acquisition Manual and any other provision within this RFQ. The analysis may include information from a Government auditing agency, Government technical personnel, or other sources. If a price is disproportionally lower than other competitive prices or significantly unbalanced, the price may be deemed unrealistic. A determination will be made by the Contracting
Officer based upon the information provided. The Government reserves the right to ask for any additional price related information from the Contractor to determine a price fair and reasonable.
Factor II, Technical Capability
Contractors shall submit Technical Capability documentation which may include a narrative, charts, graphs, tables and drawings. Technical Capability is defined as the contractor's demonstration of resources and capability to successfully conduct the requirements of the contract. The technical capability documentation should clearly describe, in sufficient detail, the contractor's resources which will be used to successfully fulfill the technical requirements identified in this RFQ. The documents may include product/ service literature.
If the prime Offeror is proposing a subcontractor or consultant(s) to perform any part of this work, the submittals shall provide documentation of a written agreement between the prime Offeror and the proposed subcontractor which identifies the agreement and the proposed work types.
Basis of Evaluation
Evaluation of this factor is a subjective evaluation of the contractor's demonstrated resources and capability to meet the requirements of the PWS. This factor will be rated on a Pass or Fail basis. The
Government will evaluate the technical approach submittals to determine whether the offeror demonstrates a clear understanding of the requirement and demonstrates the necessary plan, resources and capability to meet the requirements of the PWS via the proposed personnel and equipment. The evaluation will also assess any proposed business arrangements with subcontractors or consultants to perform the required work to confirm that the subcontractor(s) roles and responsibilities are clearly identified. A service call plan with direct calls to subcontractor representatives is not acceptable and will result in an unacceptable rating for this factor.
Factor III, Past Performance
Contractors shall submit no more than 3 Past Performance Questionnaires (PPQ). The Contractor should provide completed PPQs with the quotation. Contractors should follow-up with clients to help ensure timely submittal of the completed questionnaires with the RFQ. If the Contractor is unable to obtain a completed PPQ from a client for a project(s) before the RFQ closing date, the Contractor should complete and submit with the quotation the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. If requested by the client, questionnaires may be submitted directly to the Government's primary point of contact, Marc Zurasky at marc.zurasky@nist.gov, with courtesy copy to the alternate point of contact Kenneth Helgeson at kenneth.helgeson@nist.gov.
PAGE 24 OF 57 SB134117RQ0349
Contractor's may provide any information on problems encountered and the corrective actions taken on projects. Contractor's may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total. The Government reserves the right to contact references for verification or additional information.
Basis of Evaluation
The assessment of the contractor's past performance will be used as a means of evaluating the contractor's probability of successfully meeting the requirements of the RFQ. This past performance evaluation considers each contractor demonstrated recent and relevant record of performance in regards to the RFQ requirement. In addition to the maximum of three (3) relevant past performance reports, the Government reserves the right to obtain more information for use in the Evaluation of the past performance factor.
Evaluation of past performance is a subjective evaluation of how relevant a recent contract effort was in regards to the RFQ requirements and how well the contractor performed on relevant contracts.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) Federal Awardee Performance and
Integrity Information System (FAPIIS) using all CAGE/ DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/ subsidiary/ affiliate) identified in the contractor's quotation, inquiries of owner representative(s), and any other known sources not provided by the contractor. The Government reserves the right to contact any other source of information that may have knowledge or information on a contractor's relevant past performance history.
The Government will consider the currency and relevancy of the information, the source of the information, context of the data, and general trends in the Contractor's performance. This evaluation is separate and distinct from the Contracting Officer's responsibility determination. A relevant project is defined as a project that is similar in size, scope and complexity to that of the RFQ performed within the past 3 years. Contractor's lacking relevant past performance history will not be evaluated favorably nor unfavorably in past performance, and will receive a Neutral rating. This factor will be evaluated on a Pass or Fail basis. Contractor’s demonstrating an overall Satisfactory or better rating on relevant Past
Performance will receive a rating of Pass for this factor.
PAGE 25 OF 57 SB134117RQ0349
. 5 General Instructions for woring at NIST
GENERAL INSTRUCTIONS
CONDUCTING WORK AT THE NIST BOULDER CAMPUS
PART 1: GENERAL
1.1 INTRODUCTION
This document is intended to provide the necessary information/requirements for all contractors performing work at the Department of Commerce (DOC) facilities. It is understood all information in this document may not apply for the specific project described in the Performance Work Statement (PWS); however, it is the responsibility of the contractor to ensure the requirements are met when applicable.
Specifics of the activities are described in the attached PWS and supporting documentation.
Questions about the requirements can be addressed to the Contracting Officer (CO) and Contracting Officers
Representative (COR)/Project Manager designated for the specific project.
1.2 BACKGROUND
The mission of the Office of Facilities and Property Management (OFPM) is to advance NIST’S mission success by planning, building, operating, maintaining and servicing facilities that provides a safe, secure, and sustainable environment.
Additionally, OFPM manages and provides services to the DOC staff in support of their research, technical, and administrative programs. DOC agencies serviced by OFPM include, but may not be limited to: The National
Oceanic and Atmospheric Administration (NOAA), The National Telecommunications and Information
Administration (NTIA), and The National Institute of Standards and Technology (NIST).
1.3 HOURS OF OPERATION
A. DOC hours of operations are from 7:00 AM to 5:00 PM, Monday through Friday, on normal Federal workdays. Should the contractor desire to work at times other than those specified above, the dates and hours must be scheduled at least 7 working days in advance and approved in writing by the Contracting
Officer’s Representative (COR).
B. Use the Main Entrance at the DOC site for materials supply and entry for:
1. Special arrangements may be made through the COR for delivery of material/supplies, and/or overtime beyond these hours or on holidays.
2. Check-in required at DOC Visitor’s Center located at the site main entrance.
C. Employee identification shall include the name, country of citizenship, and employer for each Contractor and Subcontractor's employee working on the DOC site. These shall be submitted to the COR for review
3 days prior to the work date. After hours, work will require a hard badge or a COR or a hard badged contract supervisor escort 100 percent of time if accessing DOC buildings (see section 3.3). Follow the specific procedures pertaining to security and work hours prescribed by the COR/Security.
D. Department of Homeland Security (DHS) Advisory System:
Note: The following paragraphs describe the threat levels that may be changes at any time due to national security issues. If a change is issued by the DHS all changes in procedures/directions for entering and performing work at the site will be communicated to the contractor through the COR.
1. Contractor’s access to the DOC campus grounds may occasionally be restricted as a result of a change in the Nation’s Threat Level when publicly announced by DHS.
E. National Terrorism Advisory System (NTAS)
1. The National Terrorism Advisory System, or NTAS, replaces the color-coded Homeland Security
Advisory System (HSAS). This new system will more effectively communicate information about terrorist threats by providing timely, detailed information to the public, government agencies, first responders, airports and other transportation hubs, and the private sector.
PAGE 26 OF 57 SB134117RQ0349
2. It recognizes that Americans all share responsibility for the nation’s security, and should always be aware of the heightened risk of terrorist attack in the United States and what they should do.
F. NTAS Alerts
1. After reviewing the available information, the Secretary of Homeland Security will decide, in coordination with other Federal entities, whether an NTAS Alert should be issued.
2. NTAS Alerts will only be issued when credible information is available.
3. These alerts will include a clear statement that there is an imminent threat or elevated threat. Using available information, the alerts will provide a concise summary of the potential threat, information about actions being taken to ensure public safety, and recommended steps that individuals, communities, businesses and governments can take to help prevent, mitigate or respond to the threat.
4. The NTAS Alerts will be based on the nature of the threat: in some cases, alerts will be sent directly to law enforcement or affected areas of the private sector, while in others, alerts will be issued more broadly to the American people through both official and media channels.
5. NTAS Alerts contain a sunset provision indicating a specific date when the alert expires - there will not be a constant NTAS Alert or blanket warning that there is an overarching threat. If threat information changes for an alert, the Secretary of Homeland Security may announce an updated
NTAS Alert. All changes, including the announcement that cancels an NTAS Alert, will be distributed the same way as the original alert.
6. Contractor coordinates procedures with COR.
7. Threat Levels:
a. Low Condition (Green): A Low Condition is declared when there is a low risk of terrorist attacks.
(1) Federal departments and agencies will implement general and agency-specific
Protective Measures to assure that all facilities and regulated sectors take reasonable measures to mitigate vulnerabilities to terrorist attack.
(2) Contractor coordinates procedures with COR.
b. Guarded Condition (Blue): A Guarded Condition is declared when there is a general risk of terrorist attacks.
(1) In addition to Protective Measures taken in previous Threat Condition, Federal departments and agencies will implement general measures in addition to agency-specific Protective Measures to check communications with designated emergency response or command locations, update emergency response measures, and provide public with information.
(2) Contractor coordinates procedures with COR.
c. Elevated Condition (Yellow). An Elevated Condition is declared when there is a significant risk of terrorist attacks.
(1) In addition to Protective Measures taken in previous Threat Conditions, Federal departments and agencies may develop protective measures for the DOC campus grounds such as increased surveillance, coordinating emergency plans as appropriate with nearby jurisdictions, and implementing contingency and emergency response plans.
(2) Contractor coordinates procedures with COR.
d. High Condition (Orange): A High Condition is declared when there is a high risk of terrorist attacks.
(1) In addition to Protective Measures taken in previous Threat Conditions, Federal departments and agencies will implement general and agency-specific Protective
Measures for the DOC campus grounds.
(2) At this Threat Level the Government may restrict access to site and facility to essential personnel only.
(3) Contractor coordinates procedures with COR.
e. Severe Condition (Red). A Severe Condition reflects a severe risk of terrorist attacks.
(1) Under most circumstances, the Protective Measures for a Severe Condition are not intended to be sustained for substantial periods of time. In addition to
Protective Measures for previous Threat Conditions, Federal departments and agencies may close Public and Government sites and facilities as a protective
PAGE 27 OF 57 SB134117RQ0349
measure.
(2) Contractor coordinates procedures with COR.
1.4 UNFORESEEN FACILITY CLOSURES
When an unforeseen facility closure occurs, the Contractor will either reschedule the work or perform the work on the next regularly scheduled workday. Contractor personnel may be required by the COR to remain on site to handle problems as a result of a closure, e.g., severe weather, national emergency, changes in national security levels.
Information about the status of the site may be obtained by calling the switch board at 303-497-3000. Usually the day’s site status is available by 5 AM MST.
1.5 SANITARY FACILITIES
Toilet rooms in existing buildings may be used by the Contractor when performing work inside DOC owned buildings. When work is being conducted outside the Contractor shall:
A. Provide temporary toilet facilities for use of all workmen.
B. Provide the COR with keys to all temporary structures.
C. Maintain toilet facilities in a clean, sanitary condition.
D. Provide adequate supplies of toilet paper, cleaning and other required items.
1. Holding tanks for the collection of sanitary waste will not be permitted.
2. Contractor shall install all pipes serving these trailers underground with appropriate cleanouts and provide measures to prevent them from freezing.
3. Piping shall be run in an organized and pre-planned fashion and all piping shall be removed from the DOC campus upon demobilization of the Construction trailer(s) and the sewer main piping shall be restored to its original condition.
4.
1.6 EQUIPMENT AND MATERIAL STORAGE
The contractor shall provide and store, in an area designated by the COR, all equipment and materials required to complete the project. The materials are required to be kept undamaged, clean and dry throughout the duration of the project.
A. Prior to the start of work, Contractor shall meet with all Subcontractors to arrange and prepare a plot plan defining staging, storage, field office and traffic areas within lay-down/staging and trailer/parking areas designated.
1. Obtain COR's approval of plan not less than 3 calendar days prior to the installation of temporary facilities.
2. Except as specifically provided, working and storing outside these areas will not be permitted.
3. Arrange and locate temporary structures and storage to avoid interfering with construction.
B. Within the area designated for its use, provide suitable and sufficient enclosed and covered spaces with raised flooring, to protect materials and equipment from damage by weather, construction work, or other hazards.
1. Maintain storage and working areas in clean and orderly condition.
2. Tie down canvas and other coverings sufficiently to be maintained in conditions of high winds.
3. At completion of contract, contractor shall remove all storage areas and return any disturbed areas to original condition or better.
1.7 ELECTRICITY AND WATER
DOC will pay for electricity and water during the course of this project. The contractor is responsible for making connections to the existing systems.
A. Electricity: Temporary electrical work shall meet the requirements of NFPA 70-1996 (NEC), Article 305.
1. Temporary electrical service shall be provided from existing campus power distribution system.
a. If the contractor chooses to use Governments electrical service, then the Contractor is
PAGE 28 OF 57 SB134117RQ0349
responsible for connection, installation, and maintenance of all portions of the temporary electrical service, and connected equipment.
b. Verify connection location with COR.
2. Make arrangements for all equipment, poles, meter, wiring, switches, outlets, etc., for all lighting and power requirements for construction purposes.
a. Permanent existing campus power distribution system may be used.
b. Remove all temporary electrical equipment, when no longer needed.
c. Immediately preceding completion, remove and replace all damaged parts of permanent systems.
3. Temporary electrical power derived from existing site distribution system will be paid for by the
Government. Any other power generation shall be paid for by Contractor.
a. The use of resistive heating devices is prohibited.
b. Turn off all lighting and/or equipment not in use.
4. Extend warranty or guarantee period on permanent systems used during construction period so they commence on date of Acceptance.
5. Provide UL approved extension cords where necessary.
6. Contractor to submit after hours lighting plan to COR for approval at least 14 calendar days prior to work.
7. Provide temporary electrical systems which meet Government approval.
8. Contractor shall remove same from the DOC campus at such time as temporary lighting is no longer required.
B. Water:
1. During construction/renovation/and maintenance projects the contractor, with the consent/approval of the COR, shall:
a. Make all arrangements; install equipment, backflow preventer, piping, and outlets for an adequate supply of clean water for construction purposes.
b. Existing water lines may be used for temporary service.
(1) Government will pay for all domestic system water used by Contractor.
(2) Furnish drinking water and cups for all those connected with the work.
(3) Contractor shall tie into existing domestic water line at a location designated and approved by COR, and shall provide all materials, labor and equipment necessary for the connection of all trailers requiring a domestic water connection.
c. Contractor shall install all pipes serving these trailers underground with appropriate shut-off valves for isolation of each branch connection and shall provide measures to prevent them from freezing.
d. Piping shall be run in an organized and pre-planned fashion and all piping shall be removed from the DOC campus upon demobilization, and the domestic water main piping shall be restored to its original condition.
1.8 TELEPHONE
Telephone service is not normally available on-site for the Contractor’s use.
A. If Service is requested the following shall apply:
1. Provide all temporary telephone services to perform the work adjacent to Contractor's Office on
Project site. Pay for temporary telephone installation, equipment, local and long distance service, disconnection, removal and any incidental fees or charges.
2. Contractor shall be responsible for the entirety of the costs for providing telephone service to
Contractors trailer complex.
a. Contractor should not assume utilization of existing DOC underground telephone duct system to distribute cabling without DOC approval.
1.9 ROADS
A. Do not block access to existing facilities.
B. Under no circumstances will egresses be blocked. Any changes in egress shall be approved by COR.
PAGE 29 OF 57 SB134117RQ0349
1.10 PARKING
A. Personnel performing the work shall not park in any Government parking lot without prior express consent of COR.
1. Contractor acknowledges that any personnel violating this requirement do so at their own risk.
a. Make personnel aware that their vehicles may be towed at their own expense.
2. Parking in residential and other areas in immediate vicinity of Project site is prohibited.
3. Contractor to keep all personnel, vehicles and operations on Project site within designated limits.
4. If authorized by the COR, temporary parking areas shall be surfaced with crushed stone and maintained by the Contractor to prevent deterioration (ruts, mud, etc.) as approved by the COR.
a. Direct personnel performing the work to use access to site designated by COR.
b. The Contractor shall provide parking and transportation for Contractor personnel off the
Project site if designated onsite parking areas are inadequate for Contractor needs.
1.11 CONTRACTOR’S USE OF PREMISES
A. Leave undisturbed as much of the site as practical.
1. Land disturbed but not designated for disturbance on the drawings or by the Government shall be restored to its original condition at Contractor's cost.
2. Leave root zones of trees undisturbed.
B. Provide warranty and/or guarantee on permanent items and systems used during construction, commencing on date of acceptance, for specified duration(s).
C. Contractor acknowledges that there is wildlife on the Project site. Take all necessary measures to ensure that all such wildlife is protected from execution of the work. Prohibit hunting of any sort.
D. Investigation Equipment: Site investigations and field work may require the use of a stepladder and/or other investigative equipment (measuring tapes, flashlights, screwdrivers, etc.). Contractors shall provide their own stepladders and/or investigative equipment. The stepladders shall be Type 1 (industrial) or Type
II (commercial).
E. Operating Equipment: Do not turn off, or adjust any equipment without prior authorization from the
COR. Work carefully around rotating equipment. Loosely fitting clothes (neckties, dangling jewelry, etc.)
shall not be worn when near rotating equipment. Long hair shall be secured. Some equipment may start automatically. Take care when working around this equipment. (NOTE: It may become necessary to implement appropriate lock-out, tag-out procedures to control hazardous energy sources to ensure that personnel do not activate equipment during investigation, servicing, or maintenance).
F. Mechanical/Electrical Rooms: Obtain authorization from the COR prior to working in electrical and/or mechanical rooms. Lock rooms after use. Do not operate any valves, switches, or breakers without prior approval from the COR. Adhere to all OSHA Lock-Out, Tag-Out Regulations (29 CFR 1910.147).
G. Transmitters: Do not use transmitters without prior written approval by the COR.
H. It is the prime contractor’s responsibility to ensure Contractor employees and Subcontractors become familiar with and obey all DOC site regulations, including fire, traffic, and security regulations. All personnel employed on the site shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry.
The Contractor's vehicles and equipment shall be conspicuously marked for identification.
PART 2: SAFETY
2.1 OCCUPATIONAL HEALTH AND SAFETY
A. Contractor(s) acknowledges that by working at the National Institute of Standards and Technology
(NIST), a Federal Government facility located in Boulder, Colorado, they are subject to the jurisdiction of the U.S. Department of Labor's Occupational Safety and Health Administration (OSHA). The Regional
Office has authority to assign a Compliance Safety and Health Officer (CSHO) to conduct safety and health inspections regarding the Contractors operations at the NIST Boulder site. In addition to OSHA oversight, the Contractor is required to follow NIST health and safety instructions and the Office of
PAGE 30 OF 57 SB134117RQ0349
Facilities and Property Management (OFPM) safety policies and procedures applicable to their operations.
CITATIONS AND NOTICE OF PENALTY FOR NONCOMPLIANCE WITH OSHA
STANDARDS
1. To protect NIST’s interests, the Contractor acknowledges that NIST may conduct periodic safety, health and environmental inspections to assure that staff and property are not at risk of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .