Amendment I

View the file

Other files

File Type Posted
Hub_Picture_2.jpg JPG image
IMG_5319.JPG JPG image
IMG_5323.JPG JPG image
IMG_5321.JPG JPG image
IMG_5322.JPG JPG image
Hub_Picture_1.jpg JPG image
Strader_Fan_Cooling_tower_relationship_to_the_service_road.docx DOCX document
Strader_Fan_Drawing_GA1_Rev_4.pdf PDF
SB1341-15-RQ-0617.docx DOCX document
Strader_Fan_Drawing_GA2_Rev_5.pdf PDF
Strader_Fan_M1_Rev_1_(1).pdf PDF
Strader_Fan_CT_2_Fan_Blades.jpg JPG image
Strader_Fan_Drawing_Images.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment I

The purpose of this amendment is to address vendor questions and answers that resulted from the site visit and to extend the due date for quotes. Also included are a few additional photos that were taken during the site visit to show more detail about the existing equipment.

Questions:

Question:

Will the service road be blocked off while work is performed?

Answer: Yes Question:

Will work need to be performed during an outage?

Answer:

Yes, awardee will be provided with the outage schedule Question:

When do we anticipate the award to be made?

Answer:

On or before September 23, 2015.

Question:

Do the replacement parts need to be the same brand/manufacturer currently used?

Answer:

The replacement parts shall be equivalent to the existing equipment, does not need to be the exact brand/manufacturer Question:

When was the tower built?

Answer:

Question:

Are all caps on the blades?

Answer:

There are caps missing from the blades (see attached pics for reference) Question:

Will the Contractor be required to attend and special NIST provided training?

Answer:

No, Contractor shall not be required to attend any NIST required training Question:

How far is it from the middle to the service road to the center of the tower?

Answer:

33 feet The due date for quotes has been extended as follows:

From: July 23, 2015 @ 12 noon ET To: July 27. 2015 @ 12 noon ET All other solicitation terms and conditions remain unchanged