Amendment_I.docx
DOCX document 23 KB Posted
- Attached to
- Replacement of Cooling Tower Fan Assembly
- Solicitation number
- SB1341-15-RQ-0617
About this file
Amendment I
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hub_Picture_2.jpg | JPG image | |
| IMG_5319.JPG | JPG image | |
| IMG_5323.JPG | JPG image | |
| IMG_5321.JPG | JPG image | |
| IMG_5322.JPG | JPG image | |
| Hub_Picture_1.jpg | JPG image | |
| Strader_Fan_Cooling_tower_relationship_to_the_service_road.docx | DOCX document | |
| Strader_Fan_Drawing_GA1_Rev_4.pdf | ||
| SB1341-15-RQ-0617.docx | DOCX document | |
| Strader_Fan_Drawing_GA2_Rev_5.pdf | ||
| Strader_Fan_M1_Rev_1_(1).pdf | ||
| Strader_Fan_CT_2_Fan_Blades.jpg | JPG image | |
| Strader_Fan_Drawing_Images.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment I
The purpose of this amendment is to address vendor questions and answers that resulted from the site visit and to extend the due date for quotes. Also included are a few additional photos that were taken during the site visit to show more detail about the existing equipment.
Questions:
Question:
Will the service road be blocked off while work is performed?
Answer: Yes Question:
Will work need to be performed during an outage?
Answer:
Yes, awardee will be provided with the outage schedule Question:
When do we anticipate the award to be made?
Answer:
On or before September 23, 2015.
Question:
Do the replacement parts need to be the same brand/manufacturer currently used?
Answer:
The replacement parts shall be equivalent to the existing equipment, does not need to be the exact brand/manufacturer Question:
When was the tower built?
Answer:
Question:
Are all caps on the blades?
Answer:
There are caps missing from the blades (see attached pics for reference) Question:
Will the Contractor be required to attend and special NIST provided training?
Answer:
No, Contractor shall not be required to attend any NIST required training Question:
How far is it from the middle to the service road to the center of the tower?
Answer:
33 feet The due date for quotes has been extended as follows:
From: July 23, 2015 @ 12 noon ET To: July 27. 2015 @ 12 noon ET All other solicitation terms and conditions remain unchanged