Amendment 3 - RFI Answers Labor Rates
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign_In.pdf | ||
| Section_L-Mechanical_IDIQ.docx | DOCX document | |
| Amendment_2.pdf | ||
| Drawings.zip | ZIP file | |
| Map_of_NIST.pdf | ||
| Amendment_1.pdf | ||
| Solicitation_-_Mechanical.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Continuation Page
PAGE 2 OF 15 SB1341-14-RP-0050/003
Continued from Block 14...
2) Update Section L - Instructions to Offerors
3) Add Labor Rates to Section J.
There is no time extension with this amendment. All other terms and conditions remain unchanged.
Table of Contents
PAGE 3 OF 15 SB1341-14-RP-0050/003
SECTION J LIST OF ATTACHMENTS
J. 1 Labor Rates
J. 2 RFI Answers
PAGE 4 OF 15 SB1341-14-RP-0050/003
SECTION J
LIST OF ATTACHMENTS
J. 1 Labor Rates
General Decision Number: MD140057 08/01/2014 MD57
Superseded General Decision Number: MD20130057
State: Maryland
Construction Type: Building
County: Montgomery County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/03/2014 1 01/24/2014 2 01/31/2014 3 04/11/2014 4 04/25/2014 5 05/09/2014 6 05/16/2014 7 05/23/2014 8 05/30/2014 9 06/27/2014 10 07/04/2014 11 07/18/2014 12 07/25/2014 13 08/01/2014
ASBE0024-007 10/01/2013
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 33.13 13.76
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-010 10/09/2013
Rates Fringes
PAGE 5 OF 15 SB1341-14-RP-0050/003
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 20.86 5.46
* BRMD0001-006 05/01/2014
Rates Fringes
TILE SETTER......................$ 26.28 10.00
BRMD0001-009 05/01/2014
Rates Fringes
TILE FINISHER....................$ 21.48 9.08
BRMD0001-011 05/04/2014
Rates Fringes
BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 29.17 8.62
BRMD0001-012 05/01/2014
Rates Fringes
MASON - STONE....................$ 34.18 15.63
CARP0132-017 05/01/2013
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 26.81 8.13
CARP1831-002 04/01/2013
PAGE 6 OF 15 SB1341-14-RP-0050/003
MILLWRIGHT.......................$ 31.59 8.58
ELEC0026-021 09/02/2013
Rates Fringes
ELECTRICIAN (Communication and Sound Equipment).............$ 26.55 8.57
ELEC0026-022 06/02/2014
Rates Fringes
ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 41.60 14.75+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.
ELEV0010-001 01/01/2014
Rates Fringes
ELEVATOR MECHANIC................$ 40.49 26.785+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0077-018 05/01/2013
Rates Fringes
OPERATOR: Bulldozer.............$ 31.65 8.45+a OPERATOR: Loader Front End Loaders 3 1/2
PAGE 7 OF 15 SB1341-14-RP-0050/003
cubic yards and above.......$ 32.40 8.45+a Front End Loaders Below 3 1/2 cubic yards.............$ 31.65 8.45+a a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.
IRON0005-005 06/01/2014
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 30.25 17.285
IRON0201-006 05/01/2014
Rates Fringes
IRONWORKER, REINFORCING..........$ 27.00 18.08
LABO0657-017 06/01/2013
Rates Fringes
LABORER: Mason Tender - Cement/Concrete..................$ 21.82 6.97 LABORER: Pipelayer..............$ 21.82 6.97
PAIN0051-014 06/01/2013
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 24.30 9.61 Glazing Contracts over $2 million.....................$ 27.64 9.61
PAIN0051-019 06/01/2013
PAINTER
PAGE 8 OF 15 SB1341-14-RP-0050/003
Brush, Roller, Spray and Drywall Finisher/Taper......$ 24.89 8.91 Industrial..................$ 29.18 8.91
PLAS0891-005 07/01/2013
Rates Fringes
PLASTERER........................$ 28.33 5.85
PLAS0891-006 02/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.61
PLAS0891-008 08/01/2013
Rates Fringes
PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 3.89 Mixer/Pump..................$ 18.50 3.89 Sprayer.....................$ 23.00 3.89
PLUM0005-010 08/01/2013
Rates Fringes
PLUMBER..........................$ 38.17 16.25+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-011 11/17/2013
Rates Fringes
PIPEFITTER (Including HVAC Pipe and System Installation)....$ 37.77 18.82+a
PAGE 9 OF 15 SB1341-14-RP-0050/003
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 09/01/2012
Rates Fringes
ROOFER...........................$ 26.90 10.18
SFMD0669-001 07/01/2013
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 31.14 17.62
SHEE0100-015 07/01/2014
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 39.73 16.08+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
SUMD2010-091 08/04/2010
Rates Fringes
LABORER
Common or General...........$ 14.15 2.30 Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 Mason Tender - Brick........$ 13.00 0.00 Mason Tender - Stone........$ 14.03 0.00 Mason Tender for Pointing, Caulking and Cleaning.......$ 13.21 Mortar Mixer................$ 16.61 9.08
POINTER, CAULKER, CLEANER,
PAGE 10 OF 15 SB1341-14-RP-0050/003
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.19 0.00
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38 Backhoe.....................$ 19.82 5.02 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 0.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 5.18 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88
TERRAZZO WORKER/SETTER...........$ 19.94 6.54
TRUCK DRIVER
Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification
PAGE 11 OF 15 SB1341-14-RP-0050/003
and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change
PAGE 12 OF 15 SB1341-14-RP-0050/003
until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage
PAGE 13 OF 15 SB1341-14-RP-0050/003
payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
J. 2 RFI Answers
PAGE 14 OF 15 SB1341-14-RP-0050/003
1. Form 1442 does not indicate how many original and copies of the bid are required to be turned in. If this is an electronic submission, the posting under FBO currently doesn't allow for it. Please advise.
All proposals shall be submitted electronically on FBO.gov. This option has been granted on FBO.gov.
No other submissions will be accepted.
2. Are all of the evaluation factors and pricing under one volume or two? There is currently no layout provided for either a business/cost proposal and/or a technical proposal. Is everything expected to just be submitted in one complete volume?
There shall be two (2) volumes included in each proposal, a technical and a price volume. Please see the update to Section L regarding what is to be included in each volume.
3. Evaluation Factor 3 - Past Performance: To clarify, any subcontractor used for the task order must provide their past performance in addition to the offerors past performance? If so, is the past experience also needed or just past performance (references) for the subcontractor(s)?
Past performance is not required for subcontractors. The contractor just needs to demonstrate that they have successfully completed projects with their subcontractors.
4. Evaluation Factor 2 - Subfactor C Project Team: Does NIST want the offeror to list the proposed project team of subcontractors soley working on the included task order, or the proposed team of all subcontractors for the duration of the entire IDIQ? Please elaborate.
Contractor shall provide a list of subcontractors they intend on using for the duration of the entire IDIQ.
5. The (8) new intake hoods and curbs shown on drawing 302-492 are rather close to the edge of the roof.
Will there be permanent safety rails required as part of the SOW?
Contractor shall follow all appropriate OSHA guidelines for this work.
6. Can you please provide guidance on how to fill out the price response on the SF1442. Will these be fixed prices based on the total IDIQ amount (i.e. $1,800,000 per year x 5 years for a total NTE $9,000,000)? If so, is there a place on the SF1442 where the price for the task order will be reflected?
As this is an ID/IQ contract, there is no pricing needed on each of the CLINs on the 1442. The general Statement of Work is located on page 8 of the solicitation. As is stated in evaluation factor 4 in Section L, the only pricing needed is the bid schedule for the initial task order. No other pricing information is required, nor will be evaluated.
PAGE 15 OF 15 SB1341-14-RP-0050/003
7. Is there a spec/manufacturer for the new “6MM (1/4”) THK. 4’x 8’ exterior panels”?
See Section 07 42 43 of the sample task order for complete specifications.
Acceptable Manufacturer: Laminators Incorporated; 3255 Penn St., Hatfield, PA 19440. ASD. Tel: (215)723-8107. Toll Free: (877) OMEGA77. Fax: (215) 721-1239.
Shawn.crouthamel@laminatorsinc.com. Web: http://www.laminatorsinc.com
8. It is assumed all work can be performed during normal business hours for this project?
Correct, work shall be performed during normal business hours.
Descript: The solicitation is amendeded as follows:
1) Add RFI Answers to Section J ...See Continuation Page
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 15 |
| DocNo: 003 |
| EffDate: AUG 14, 2014 |
| ReqNo: NB193000-14-01320 |
| ProjNo: |
| IssuedByCode: 000SB |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
| AdminByCode: |
| AdminBy: |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: SB1341-14-RP-0050 |
| SolDate: JUL 24, 2014 |
| AwdNo: |
| AwdDate: |
| NoCopies: |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |