SATPC0042954 Tab 04 4 SOW..pdf
PDF 140 KB Posted
- Attached to
- MilliporeSigma Milli Water Purification System
- Solicitation number
- 80NSSC27946293Q
About this file
Statement of Work Summary
This Statement of Work documents NASA Langley Research Center's requirement to purchase a complete MilliporeSigma Milli Water Purification System for facility B1293C. The procurement includes one primary purification unit (Milli Q EQ 7008, model ZEQ7008T0C) along with 16 supporting components and accessories. Required items include a 50-liter storage tank with frame and top assembly, country box, benchtop kit, system mounting kit, 16-pack ultrapure water purification kit, 0.22 micron Millipak filter, installation pack, connector, external solenoid valve, water sensor, 24 effervescent tablets, wall mounting brackets for both the system and storage tank, installation materials, and zone 2 travel documentation.
The work location is NASA Langley Research Center's Advanced Materials & Processing Branch in Hampton, Virginia 23681, with a performance period of 30 days after receipt of order (ARO). The procurement is for a single complete system with all specified components delivered and potentially installed within the stated timeframe.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042954 Tab 10 RFQ Open Market Template.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
Langley Research Center has a requirement to purchase the MilliporeSigma Milli Water
Purification System for B1293C; the specifics are listed below.
2. Characteristics, Scope, and Specs
Qty Description
1 Milli Q EQ 7008 purification/ ZEQ7008T0C
1 TANKA050 / Storage tank frame 50 L
1 TANKT0PEQ / STORAGE TANK TOP WITHOUT ASM
1 ZFCBEQXUS /Country box Milli Q Eq 7008
1 BTEQ0DKT /Milli Q Eq 7000 Benchtop Kit
1 SMEQ00KT/ System Mounting Kit for Q Pod
1 EQ70XXPKIT Milli Q EQ 7008 16 ultrapure water purification k
1 MPGP002A1 Millipak 0.22 m filter
1 STARTPK01 StartPAK installation pack
1 ZFC0NN2ST CONNECTOR 2M SYSTEM TANK
1 EXTSV00A1 External solenoid valve
1 ZWATSENA1 WATER SENSOR
1 5874316024C EfferSan Effervescent Tablets Qty 24
1 SYSTFIXA1 Wall mounting bracket
1 TANKFIXA1 Wall Mounting Bracket for Storage tank
1 ZWMQXEQIN2 Milli-Q EQ 70XX Installation
1 ZWAAZONE2 TRAVEL ZONE 2
3. Place of Performance
NASA Langley Research Center Advanced Materials & Processing Branch Hampton, VA 23681
4. Period of Performance
30 days ARO
File details come from the government source that posted it. Updated .