SATPC0041983 Tab 07 2 SOW_Redacted.pdf

PDF 421 KB Posted

Attached to
Instron 8800MT Controller & Software Upgrade for Instron 8521
Solicitation number
80NSSC26939326Q
Issued by

About this file

This is a Statement of Work (SOW) for the NASA Glenn Research Center (GRC) requiring the purchase and installation of an Instron 8800MT Controller and Software Upgrade for an existing Instron 8521 hydraulic test frame.

The SOW specifies a single OEM part (CP139256) that includes hardware, software, and services. The hardware components consist of an Instron 8800MT Territory Configuration Set, a Dell Personal Computer with US keyboard, English operating system, 22-inch wide screen flat panel monitor, and Microsoft Windows 11 Professional operating system. The software package includes WaveMatrix3 Dynamic Testing Software with calculation, advanced control, and specimen self-heating control modules; Bluehill Universal Testing Software with English language option and general/components application module; and supporting software for the 8800 controller series. Additional deliverables include system installation and introduction, standard stroke verification in both directions, standard rotary stroke verification, standard force verification (0-300 KN in both tension and compression), standard torque verification up to 226 N-m, and alignment assessment in conformance with Nadcap AC 7101 requirements for mechanical testing. The package also includes retrofit system warranty services, shipping, and an Instron Connect Agreement for software upgrades and updates. The place of performance is NASA Glenn Research Center located at 21000 Brookpark Road, Cleveland, Ohio 44135, with a period of performance of 24–26 weeks after receipt of order (ARO).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1400-050 System Installation and Introduction 1 1471-001 Standard Stroke Verification (Both Directions) 1 1471-002 Standard Rotary Stroke Verification 1 (Both Directions) 1480-001 Standard Force Verification, 0-300 KN 1 (0-67,442 lbf), BOTH DIRECTIONS (Tension and Compression).

1481-037 Standard Torque Verification up to 226 1 N-m (2,000 lbf-in) 1 1481-045 Alignment assessment of one load train in 1 conformance with Nadcap AC 7101 requirements for mechanical testing (e.g.. metals).

WARRANTY, SHIPPING & SUPPORT

Item # Description Qty 1405-505 Retrofit System Warranty Services 1 Shipping Shipping Included 1 1405-710 Instron Connect Agreement for New Systems or 1 Software Upgrades/Updates

3. Place of Performance NASA Glenn Research Center (GRC)

21000 Brookpark Road Cleveland, OH 44135

4. Period of Performance 24 – 26 Weeks ARO

File details come from the government source that posted it. Updated .