SATPC0039293 Tab 04 4 SOW.pdf

PDF 68 KB Posted

Attached to
PSIM/ALTAIR SOFTWARE RENEWAL
Solicitation number
80NSSC25910941Q
Issued by

About this file

This Statement of Work (SOW) details NASA's requirement to purchase 35 Altair Units software licenses for PSIM/Altair. The software is critical for power electronics and simulation capabilities, specifically used for developing complex missions, designing satellite power systems, and creating wire harnesses. The contractor's primary duty is to submit a license file, with performance to be conducted at NASA/Goddard Space Flight Center (GSFC) over a 1-year (12-month) period. The SOW emphasizes the importance of timely license delivery, noting that delays could potentially extend project schedules, reduce designers' capabilities, or result in project cancellations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

• To purchase software licenses for PSIM/Altair

ITEM:

• 35 Altair Units

Justification:

Required for power electronics and simulation capabilities which are crucial for developing complex missions. The robust simulation engine helps to ensure reliable simulations and efficient design processes. This software is also used to design satellite power systems and develop wire harnesses.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

• Submit a license file

• Delays in development of time-critical projects could extend their schedules beyond their current fiscal year funding dates, and hence reduce designers’ abilities to produce the expected product, or cancel the projects

3. Place of Performance

• NASA/GSFC

4. Period of Performance

• 1 year period of performance (12 months)

File details come from the government source that posted it. Updated .