SATPC0038106 Tab 04 4 SOW Redacted.pdf
PDF 259 KB Posted
- Attached to
- Printing of Plug25 Plug Sleeve Hardware.
- Solicitation number
- 80NSSC25900510Q-R1
About this file
This Statement of Work (SOW) outlines NASA Glenn Research Center's requirements for manufacturing Plug25 Plug Sleeve Hardware using powder bed fusion manufacturing. The project involves producing five specific plug components (Sleeve Plug, Plug Base, Plug K9, Plug K7, and Plug K1B) in either 300 series Stainless Steel Alloy or Inconel 718, depending on size.
Key requirements include 100% dimensional inspection with documentation, weekly status updates with pictures, and delivery within 4-10 weeks after order receipt. The vendor must provide Mill Test Reports and Certificates of Conformance, perform powder bed fusion printing, machining, inspection/non-destructive testing, and surface treatments. Non-conforming parts will be evaluated for potential rework at the vendor's expense, and final acceptance will be confirmed via email by the NASA point of contact.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NASA Glenn Research Center Statement of Work for Plug25 Plug Sleeve Hardware
10/23/17 sdm
A. Background (couple sentences providing general overview) This statement of work outlines the requirements needed for the printing of the Plug25 Plug Sleeve Hardware. These need to be printed in a 300 series Stainless Steel Alloy or Inconel 718 depending on size via powder bed fusion manufacturing, then delivered to NASA Glenn Research Center.
B. Quality Assurance
Mill Test Reports and Certificates of Conformance are required for all materials and any Special
Processes. Documentation shall be delivered with hardware.
C. Reference Documents - See attachments for the drawings.
Drawing Number Drawing Name Quantity 240901MRA116 Sleeve Plug 1 240901MRA192 Plug Base 1 240901MRA194 Plug K9 1 240901MRA196 Plug K7 1 240901MRA198 Plug K1B 1
D. Government Furnished Equipment
NASA Glenn Research Center will NOT be providing any equipment in relation to this task.
E. Scope of Work to be Performed
Disciplines:
1) Powder Bed Fusion Printing
2) Machining
3) Inspection/Non-Destructive Testing (NDT)
4) Coating/Surface Treatments
5) Materials
F. Environmental Impacts
None
NASA Glenn Research Center Statement of Work for Plug25 Plug Sleeve Hardware
10/23/17 sdm
G. Inspections
100% Dimensional Inspection for all dimensions shown on drawings, with documentation is required for all manufactured items. Documentation shall be delivered with hardware.
H. Milestones
Weekly status updates with pictures are required.
I. Deliverables (list what NASA expects to have received at the conclusion of the task)
Upon conclusion of this task, NASA Glenn Research Center expects to receive the Plug25 Plug Sleeve Hardware. This hardware is to be delivered in 4-10 weeks after receipt of order as parts are completed.
J. Period-of-Performance
The hardware assembly being requested has a delivery date of 4-10 weeks after receipt of order as parts are completed.
K. Non-Conforming Parts
Non-Conforming parts will be evaluated by NASA Glenn Research Center for possible re-work or re-make or acceptance “as-is”. Parts determined to require re-work or re-make will be re-worked at the vendor’s expense including shipping from and to NASA Glenn Research Center.
L. Government Acceptance
NASA POC will send email (barry.l.wilson@nasa.gov) confirming receipt and acceptance.
mailto:barry.l.wilson@nasa.gov
| B. Quality Assurance |
| C. Reference Documents |
| E. Scope of Work to be Performed |
| F. Environmental Impacts |
| G. Inspections |
| H. Milestones |
| J. Period-of-Performance |
| K. Non-Conforming Parts |
| L. Government Acceptance |