SATPC0036598 Tab 07 SOW_Redacted.pdf
PDF 160 KB Posted
- Solicitation number
- 80NSSC24882772Q
About this file
This document is a Statement of Work (SOW) for an Extended Short-Wave Infrared (SWIR) Camera and Lens. The SOW lists the specific technical requirements for the SWIR camera and lens, including the part numbers, product descriptions, quantities, and delivery lead time.
The related federal contract opportunity is a sole source acquisition by the National Aeronautics and Space Administration Shared Services Center (NASA NSSC) to procure the SWIR camera and lens from Axiom Optics, Inc. under the authority of FAR 13.106-1(b)(1)(i). The procurement will be for commercial items and services using FAR Part 12 and FAR Part 13 procedures. The place of performance is at the NASA Langley Research Center. Interested organizations may submit their capabilities and qualifications in writing by 9:00 a.m. Central Standard Time on 9/12/2024 for the government to determine whether to conduct a competitive procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0036598 Tab 07 RDSS_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 AX-1SR2401.2 Goldeye G-008 XSWIR 2.2 TEC2
• InGaAs FPA-320x256
• 30μm pixel pitch
• C-Mount
• 344fps max full frame
• 14-bit ADC
• TEC1 cooling: up to -60K relative
• GigE interface
2 AX-1AC2001.1 Power supply for Goldeye Cool camera
• Desktop Power Supply 100-240V AC to 12V 2A DC
• Hirose 4p
• without AC power cord
3 AX-1AC2002 Cable AC Power 1.8m US to C13
• Power cable
4 AX-19SR2150 1" VIS-SWIR C-Mount Lens 50mm
• Format: 1". Focal Length: 50mm. Iris range: F2.5 - 16. Iris Type: Manual Iris.
VIS+SWIR Type: 400-2000nm.
3. Place of Performance
NASA Langley Research Center
Hampton, VA23681
4. Period of Performance
Estimated delivery lead-time is 4 weeks ARO.
File details come from the government source that posted it. Updated .