This statement of work outlines requirements for the delivery of power supplies and rack slides to support the Molten Regolith Electrolysis project at NASA's Kennedy Space Center. The contractor shall supply one SGX20X750E-1ASAR DC programmable power supply providing 15kW at 20V and 750A, one SGX20X500C-1ASAR supply providing 10kW at 20V and 500A, and one K550212-01R rack slide unit. The hardware must be validated as meeting the technical specifications of the Molten Regolith Electrolysis team. Delivery within 10 weeks of procurement and NASA testing and verification within 30 days of receipt are required. Performance will take place at the Kennedy Space Center under the direction of the point of contact, Jaime Toro Medina.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements The Molten Regolith Electrolysis (MRE) team requires the delivery of the power supplies and rack slides with part # SGX20X750E-1ASAR (QTY 1), SGX20X500C- 1ASAR (QTY 1) and K550212-01R (QTY 1).
2. Characteristics, Scope, and Specs
The contractor shall perform the following duties:
• Supply the DC Programmable Power Supply SGX20X750E-1ASAR. It will provide the following service: 15kW, 20V, 750A, Input Voltage 440/480 (396-528Vac) IEEE-488.2 (RS232 and Ethernet comes standard), RoHS with a compliant, 5 Yr Warranty
• Supply the SGX20X500C-1ASAR SORENSEN SGX Series, 20V, 500A, Input Voltage 208/230 (187-253Vac) 10kW, IEEE-488.2 (RS232 and Ethernet comes standard on SGX) RoHs
• Supply the K550212-01R, 3U and 4U Rack Slides (for 4kW - 15kW models)
• Validate that the hardware meets the design requirements of the above supplies with the MRE team.
3. Place of Performance Jaime Toro Medina – NASA Kennedy Space Center, Granular Mechanics and Regolith Operations Laboratory.
4. Period of Performance Delivery of the supplies will take place in 10 weeks or less by date of procurement to the NASA Kennedy Space Center. POC Jaime Toro Medina. (jaime.a.toromedina@nasa.gov) NASA testing and verification shall be performed within 30 days of receival.
mailto:jaime.a.toromedina@nasa.gov