Overhead chain-hoist crane including installation & safety verification
Solicitation number
80NSSC23841497Q
Issued by

About this file

This document outlines requirements for a federal contract to procure three chain-hoist overhead cranes. The National Aeronautics and Space Administration Goddard Space Flight Center code 551 optical thin films lab requires the cranes to lift chamber components, with a capacity of 1000 pounds, lifting height of 15 feet, and dual speed lift of 25/4.2 feet per minute. The contractor shall produce, install, verify safety, and operate the cranes at the specified NASA location within eight weeks of award. Key deliverables include delivery of the cranes within four weeks and installation and acceptance testing within eight weeks of award. The performance period is approximately eight weeks.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement of chain-hoist overhead cranes June 21, 2023

PR: _____________________

Background

The NASA GSFC code 551 optical thin films lab requires three chain-hoist overhead cranes for the lifting of chamber components. The chamber consists of a dome that is lifted to get to the inside of the chamber while the chamber is vented. The crane will be used consistently as one needs to prepare a task inside the chamber.

Scope

The contractor shall produce, install, verify safety, and operation at the NASA GSFC code 551 thin films lab of three chain hoist overhead cranes.

Requirements The contractor shall provide three chain hoist cranes, install, and verify operation with the following specifications:

½ ton rating Capacity 1000 lbs.

Lifting height 15’ – 0” Lift speed: 25/4.2 FPM (Dual Speed, VFD).

Hoist Headroom: 16.9” from bottom of monorail beam to hook saddle Corrosion resistant load chain 120 V AC/15 amps Trolley to accommodate 2.28” to 4” and 4.01” to 8” monorail beam

Deliverables or Delivery Schedule

Deliverable Projected Completion

Date

3 chain hoist overhead cranes

4 weeks ARO

Installation, acceptance testing.

8 weeks ARO

Government-Furnished Equipment and Government-Furnished Information

The vendor will not use any government furnished equipment or information to complete this project.

Place of Performance

The contractor will use its own facility to construct the chain hoist cranes. Installation will occur at NASA GSFC.

Period of Performance

The period of performance will be approximately 8 weeks after award is given.