SAM.GOV 70LGLY22QGLB00085 - Sewer Jetter.pdf

PDF 104 KB Posted

Attached to
SEWER CLEANER/JETTER
Solicitation number
70LGLY22QGLB00085
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70LGLY22QGLB00085

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

08/09/2022 22FMD0453

1 2

FEDERAL LAW ENFORCEMENT TRAINING CENTERS

1131 CHAPEL CROSSING RD

GLYNCO GA 31524

DEPARTMENT OF HOMELAND SECURITY

30 Days After Award

DEPARTMENT OF HOMELAND SECURITY

FEDERAL LAW ENFORCEMENT TRNG CTR

1131 CHAPEL CROSSING RD

ATTN: BLDG:

GLYNCO

GA 31524

912 267-2330Sheila Henley

08/15/2022 1400 ET

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Offerors shall provide a statement of compliance with FAR 52.222-50, Combating Trafficking in Persons, requirements and confirm subcontractors will accomplish a statement of compliance upon award.

UEI:____________________

DELIVERY DATE: _______________________

0001 NEW MONGOOSE JETTER MODEL 254 TRAILER MOUNTED

HIGH PRESSURE SEWER CLEANER

Jetter Specs:

TRAILER MOUNTED

Continued ...

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

70LGLY22QGLB00085

Engine: 74 HP

Pump:UDOR 25 GPM @ 4000 PSI w/30 Min Run Dry Capability

Water On/Off Control

Recirculation System W/ Bypass / Flow Control Valve

Pulsation System

Air Purge System

Tank: 600 Gal. Black Super-Poly Water Tank

Fill: 2.5" Fill System

Hose Reel & Hose: Rotating Safety Hose Reel w/500' Capacity of 5/8" Hose

Industrial Swivel Bearing.

Electrical: NEMA 4 Control Panel, Auto Shutdown (High Eng. Temp/Low Oil Pres.

Precision Pressure Control; Wireless Pendant

(Water On/Off, Precision Pressure Control, Hose Reel Payout/ Retrieve, and Emergency Stop)

12V DC Power Outlet; Led Amber Strobe Light.

Trailer:

Double Torsion Axle, 7,000 GVWR

Electric Brakes w/2-5/16" Ball Hitch

(1) Aluminum Toolbox - Fender Mounted D.O.T. Approved LED Lighting

Fill Hose Storage Rack

Accessories:

10' Leader Hose

BB Hose Guide

Cleaning Nozzle

Penetrator Nozzle

Warthog WS Nozzle

Finned Nozzle Extension

Nozzle Rack

USB Operator / Owner Manual

Fill Hose

STANDARD OPTIONS TO INCLUDE:

FOOTAGE METER (MOUNTED ON JET HOSE REEL)

500FT SEWER HOSE (1/2" I.D. 4000 P.S.I. OPERATING

PRESSURE)

WASHDOWN SYSTEM W/GUN AND 25' OF HOSE

SPARE TIRE AND RIM

SPARE TIRE MOUNTING BRACKET

NOTE: SUBMIT PICTURE AND SPECIFICATION WITH YOUR

QUOTE.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

File details come from the government source that posted it. Updated .