Safety Review TYP2 Diller Flatbed Wagon.pdf
PDF 201 KB Posted
- Attached to
- Flatbed Wagons
- Solicitation number
- W911N2-23-Q-0040
About this file
This memorandum from the Letterkenny Army Depot Safety Office outlines safety requirements for contractors. It notifies contractors that the Depot maintains an ISO 45001 certified Safety Management System and that all site work must comply with OSHA, DoD, Army and Depot safety regulations. Contractors must be familiar with applicable consensus standards for their industry as well as the Depot's local safety regulation. Any injuries, accidents or near misses occurring on site must be reported to the Depot Safety Office within 24 hours, regardless of other reporting. Changes to contract requirements must be submitted to the Safety Office for review. Contact information is provided for safety-related questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendent 0001_Solicitation W911N2-23-Q-0040_Revised (via KO).pdf | ||
| Solicitation_W911N2-23-Q-0040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LETTERKENNY ARMY DEPOT
1 OVERCASH AVENUE
CHAMBERSBURG, PENNSYLVANNIA 17201
MEMORANDUM FOR: Directorate of Industrial Operations
ATTN: Elijah Shipe, Commodity Manager, THAAD/TPY2
SUBJECT: Safety Office Review of Diller Standard Flatbed Wagon,18,000# Capacity, PN
FB-920CS8
1. Purpose: To document the LEAD Safety Offices review of the subject contract.
2. If there is no PWS for the contract or the PWS has already been approved, the contractor shall be notified of the following items.
a. The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is ISO 45001 certified.
b. The ‘LEAD Safety and Occupational Health Program’ (LEAD 385-1) can be found at https://www.letterkenny.army.mil/info/Visitors-Information/ .
c. It is the contractor’s responsibility to be familiar with these documents and to comply with their contents.
d. Any site work ay LEAD shall be completed in accordance with applicable OSHA, DoD, Army, LEAD 385-1. General information requirements related to safety and fire prevention included in section 1.4.5 of the PWS.
e. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to ANSI standards, NFPA standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting any work. The contractor shall make themselves familiar with LEAD’s local safety regulation LEAD-R 385-1 prior to beginning any work at LEAD.
f. Any injuries, accidents, or Near Misses that occur shall be reported to the LEAD safety office within 24 hours of the event regardless of if the event is reported to another Safety Management System (SMS).
3. If the requirements for this contract change, the proponent of the contract must submit all changes to the LEAD Safety Office for review.
4. The POC for this memo is Terrie Doom, LEAD Safety Office, AMLD-SAF, (717) 267-8678, email terrie.l.doom.civ@army.mil.
https://www.letterkenny.army.mil/info/Visitors-Information/ mailto:terrie.l.doom.civ@army.mil