This is a Bid Proposal Form and Schedule for the Saddletree Court Drainage Improvements project issued by the County of Greenville in South Carolina, dated 7/15/2025. The project involves comprehensive drainage infrastructure improvements, with the bidder required to complete all work within 120 consecutive calendar days after receiving the Notice to Proceed. The bid schedule includes 22 line items covering various construction activities such as mobilization, clearing and grubbing, excavation, pipe installation, catch basin and drop inlet construction, fencing, seeding, and landscape restoration.

The bid schedule details specific quantities for each work item, including 220 linear feet of 15" HPP (High-Performance Pipe), 520 linear feet of 18" HPP, 3 catch basins with manholes, riprap installation, and landscaping elements like permanent seeding and hardwood mulch. The bidder will be subject to liquidated damages of $150 per consecutive calendar day for work not completed within the specified timeframe. The project requires a detailed bid submission with comprehensive documentation, including contractor licensing information, and emphasizes that failure to complete and return the proposal signature page will result in the bid being deemed non-responsive and ineligible for award consideration.

View the file

Other files

File Type Posted
Saddle_Tree_Court_Drainage_Improvements.pdf PDF
Saddletree-FOR-BIDS.pdf PDF
County-Standard-Specifications-JULY-2025.pdf PDF
Saddletree-NDIP-Project-Description.pdf PDF
Sample_Construction_Agreement.pdf PDF
Saddletree-NDIP-Project-Description.doc DOC document
COG_Sub_W9_.pdf PDF
Saddletree-NDIP-Bid-Tab.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 7/15/2025 Page 1 of 3 Saddletree Court Drainage Improvements BID PROPOSAL FORM & SCHEDULE

BID PROPOSAL FORM

SADDLETREE COURT DRAINAGE IMPROVEMENTS

Proposal of _______________________________________________(hereinafter called “BIDDER”), organized and existing under laws of the State of South Carolina.

To: County of Greenville (hereinafter called “OWNER”). In compliance with your invitation for Bids, BIDDER hereby proposes to perform all WORK for the construction of Saddletree Court Drainage Improvement Project.

in strict accordance with the CONTRACT DOCUMENTS within the time set forth therein, and at the prices stated below.

By submission of the BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.

BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the

NOTICE TO PROCEED and to substantially complete project within One Hundred Twenty (120) consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of One Hundred Fifty

($150.00) Dollars for each consecutive calendar day thereafter as provided in the General Conditions.

BIDDER acknowledges receipt of the following ADDENDUM:

Date: 7/15/2025 Page 2 of 3

BID SCHEDULE

SADDLETREE COURT DRAINAGE IMPROVEMENTS

All work performed as essential to the completion of the intent of the Contract Documents shall be paid for in accordance with the Bid Schedule. No direct payment shall be made for work performed which is not shown as a separate Bid Item. All costs shall be included in the various pay items in the Bid Schedule.

Item # Item QTY Unit Unit Price Total Price 1 Mobilization & De-Mobilization 1 LS

Clearing & Grubbing Tree Removal and Stump Grinding within Construction Limits 1 LS

3 Unclassified Excavation 100 CY 4 Rock Excavation 0 CY 5 Borrow Excavation 100 CY 6 Maintenance Stone/CR14 or Washed Stone 200 Ton

7 15” HPP 220 LF

8 18" HPP 520 LF

9 24" HPP 60 LF

10 4X4 CB, Type 9 w/ manhole (*0>4 deep) 3 EA 11 4X4 CB, Type 9 w/ manhole (*4>6 deep) 1 EA 12 4x4 JB, Type 9 w/ manhole (0>4 deep) 2 EA 13 2x3 Drop Inlet 2 EA 14 18" Marmac Coupling 2 EA 15 Riprap, Class B incl. Geotextile Fabric 75 Ton

Perm. Seeding (straw mulched) to match each yard type of Grass 3.0 MSY

17 Top soil (top 4" of trench backfill) 100 CY 18 Silt Fence 100.0 LF 19 6'H PT Wood Privacy Fence 80 LF 20 4'H PT Wood Rail & Galv. Chicken Wire Fence 100 LF 21 Remove & Re-Install Sprinkle System 1 LS 22 Hardwood Mulch to match Existing 30 CY

----------------------- Total Bid --------------------- ----------- -------- -------------- ----

* For pricing, catch basin depth is measured from invert to throat and does not include the pedestals or top slab.

Note: Construction staking, lines and grades shall be provided by the County therefore a Staking Line Item is not shown.

Project Total Bid to include all required work described in this document and/or on the project plans

Date: 7/15/2025 Page 3 of 3

BIDDER ACKNOWLEDGES READING THE “INSTRUCTIONS TO BIDDERS”, “BID SCHEDULE”, AND

“AGREEMENT”, AND IS IN AGREEMENT WITH THE CONDITIONS OF EACH.

Failure to complete, sign and return this page will cause the bid to be non-responsive and ineligible for award consideration.

PROPOSAL SIGNATURE (All persons submitting proposals for this project shall sign below)

Legal Entity

Signature

Printed Name

SEAL - If Corporation

P.O. Box

Street Address

City, State, Zip Code

Telephone # Fax #

S.C. Contractors License # SCDOT Prequalified Bidder #

Federal ID# S.C. Sales Tax #

FAILURE TO COMPLETE AND RETURN THIS PAGE WILL RESULT IN