Summary
This is a Sustainable Transportation Planning Grant Application and supporting documentation from Sacramento County Department of Transportation (SacDOT) for the Wilton Area Roadway Resiliency Project, a Climate Adaptation Planning initiative in partnership with the California Department of Transportation (Caltrans). The project seeks to develop a Resilience Improvement Plan to enhance surface transportation assets' ability to withstand flooding and wildfires in Wilton, an unincorporated rural community in Sacramento County located along the Cosumnes River. Primary deliverables include an Adaptation Strategies Summary Report, Existing Conditions Summary Report, Stakeholder & Public Engagement Plan, Project Framework memorandum, Priority Transportation Projects list, 30% conceptual design drawings and cost estimates for up to five projects, Advisory Committee meeting documentation, and Draft and Final Resilience Improvement Plan documents. The project timeframe spans October 2025 through December 2026 (18 months). SacDOT will procure a consultant to provide transportation planning, stakeholder engagement, preliminary engineering, alternatives analysis, and cost estimating services. Key stakeholder coordination includes Caltrans District 3, Sacramento Area Council of Governments, Federal Emergency Management Agency, Wilton Rancheria (federally recognized Tribe), Sacramento County Water Resources, and local community representatives. The project includes evaluation of bicycle lane additions, nature-based stormwater solutions, drainage improvements, and culvert upgrades to maintain evacuation routes during climate-related emergencies.
The grant requests $650,000 in Caltrans funding with a local cash match of $84,214 (11.47%), totaling a $734,214 project cost. Funding sources for local match include Local Transportation Funds. The project is included in Caltrans' State Climate Resilience Improvement Plan for Transportation (SCRIPT) and aligns with the California Climate Action Plan for Transportation Infrastructure, California Adaptation Strategy, and regional plans including SACOG's 2015 Sacramento Regional Transportation Climate Adaptation Plan. The project targets an under-resourced rural community with populations under 50,000 located outside urbanized areas, meeting grant eligibility criteria for disadvantaged communities. Consultant proposals were due February 19, 2026, with evaluation based on quality of proposed services (30%), experience and qualifications (50%), and proposal compliance (20%). The prime consultant must be a California-registered civil engineer with recent relevant experience, capable of delivering materials in AutoCAD 2025, Microsoft Word 365, and Excel 365. Consultant insurance requirements include $2,000,000 general liability aggregate, $2,000,000 professional liability per claim and aggregate, and workers' compensation at statutory limits. Federal funding requirements, prevailing wage compliance, nondiscrimination provisions, and Title VI assurances apply. Letters of support were submitted by State Senator Roger Niello, US Representative Doris Matsui, US Senator Adam Schiff, Minority Floor Leader Heath Flora, and Sacramento County Supervisor Pat Hume.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 81785_Wilton_Area_Roadway_Resiliency_Project_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sustainable Transportation Planning Grant Program
GRANT APPLICATION COVER SHEET
Project Title and Location
Project Title Wilton Area Roadway Resiliency Project
Project Location (City)
Wilton, a census designated place
Project Location (County) Sacramento County
Funding Information
1. Is the applicant proposing to meet the minimum local match requirement or an over-match? Use the Match Calculator to determine the appropriate match. Match Calculator (Posted on STPG Website)
☒ Minimum Local Match ☐ Over-Match
2. What is the source of Local Match funds being used?
(MPOs – Federal Toll Credits, PL, and FTA 5303 cannot be used to match Sustainable Communities Competitive or Adaptation Planning grants)
☒ Local Transportation Funds ☐ Local Sales Tax ☐ Special Bond Measures ☐ Other, specify:
Grant Funds Requested
Local Match (Cash)
Local Match (In-Kind)
Total Local Match
Local Match
Total Project Cost
$650,000 $84,214 $0 $84,214 11.47% $734,214
Grant Category (select only one)
Climate Adaptation (MPOs, RTPAs, Transit Agencies, Cities, Counties, Tribes, other Public Transportation Planning Entities) x 11.47% Local Match requirement (Not Applicable to Native American Tribal Governments)
Sustainable Communities (MPOs with sub-applicant, RTPAs, Transit Agencies, Cities, Counties, Tribes, other Public Transportation Planning Entities)
Strategic Partnerships (MPOs & RTPAs only) Strategic Partnerships Transit (MPOs, RTPAs & Transit Agencies only)
Sustainable Communities Competitive (11.47% Local Match requirement) **Not applicable to Native American Tribal Governments**
Strategic Partnerships (FHWA SPR Part I) (20% Local Match requirement)
Sustainable Communities Competitive Technical (11.47% Local Match requirement) **Not applicable to Native American Tribal Governments**
Strategic Partnerships Transit (FTA 5304) (11.47% Local Match requirement)
Application Submittal Type (more than one may be selected)
New Prior Phases Re-Submittal x New Application
Continuation of a prior project.
If so, list the Grant FY and project title below.
Re-submittal from a prior grant cycle.
How many times has an application been submitted for this project, including this one?
PART A. APPLICATION INFORMATION
PART B. PROJECT INFORMATION
FY 2025-26
https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants
Project Description (3-5 Sentences Max.)
Insert Application Narrative:
1. Project Description
The Wilton Area Roadway Resiliency Project (Project) entails the development of a Resilience Improvement Plan to enhance the ability of existing surface transportation assets to withstand flooding and wildfires associated with extreme climate events. Located along the Cosumnes River, the Wilton Community has history of severe flooding events and wildfires that have damaged the community, closed roadways within the region’s evacuation network, and have resulted in fatalities. Sacramento County Department of Transportation will work closely with Caltrans and multiple stakeholders to analyze climate impacts, understand community needs and concerns, identify and prioritize potential improvements, and prepare 30% design plans and estimates for improvements identified by the plan. The Project is included in Caltrans' Resiliency Improvement Plan, and is consistent with and will coordinate with other state, regional, and local plans.
Project Type
Choose the Project Type that best represents the focus of the proposed project. See Grant Application Guide for examples. Select a maximum of two project types.
☐ Active Transportation (Bicycle and Pedestrian)
☒ Climate Change (Infrastructure Adaptation, Vulnerability and Resiliency)
☐ Complete Streets (Multimodal specific type)
☐ Corridor (Local Streets or Highways)
☐ Freight/Goods Movement
☐ General Plan-Related (Circulation Element, Land Use Element, Specific Plan)
☒ Multimodal (Motorized and Active Transportation)
☐ Safety (Vision Zero, Safe Routes to Schools)
☐ Technical (Modeling, VMT Mitigation, ZEV Infrastructure, ZEB Transition, etc.)
☐ Transit (Bus, Light Rail, and Commuter Rail Service)
☐ Other, specify:
Under-Resourced Community Definitions
If applicable to the project, what tools were used to identify the under-resourced communities in the project area? Choose all that apply.
☒ Rural Communities of 50,000 or less and outside of urbanized areas
☐ Native American Tribal Governments
☐ Regionally/Locally Defined Under-Resourced Communities
☐ At/Below 80% Assembly Bill 1550 (Gomez, Statutes of 2016)
☐ At/Above 75% California Department of Education, Free or Reduced Priced Meals Data
☐ At/Above 75% CalEnviroScreen Version 4.0
☐ At/Below 25% California Healthy Places Index
PART B. PROJECT INFORMATION (CONTINUED)
Primary Applicant Sub-Applicant Sub-Applicant
Organization (Legal name) Sacramento County
Dept./Division Department of Transportation
Street Address 4111 Branch Center Road
City Sacramento
Zip Code 95827-3811
Phone Number (916) 874-5164
Executive Director Name Ron E. Vicari
Title Director
Executive Director E-mail vicarir@saccounty.gov
Financial Manager Name Alice Dodge
Title Accounting Manager
Financial Manager E-mail dodgea@saccounty.gov
Contact Person Name Tim Stevens
Title Senior Civil Engineer
Contact Phone Number (916) 874-7281
Contact E-mail stevensti@saccounty.gov
*Use additional pages if necessary.
PART C. CONTACT INFORMATON*
City/County Primary/Sub-Applicants for Sustainable Communities Grants Yes No
Does the City/County have a compliant Housing Element? If No, explain the current status:
X
Has the City/County submitted Annual Progress Report to the California Department of Housing and Community Development for calendar years 2022 and 2023?
X
Applicants may leverage other program funds for this planning grant, as long as the activities are eligible.
Yes No N/A
Is the applicant applying for the Governor’s Office of Planning and Research (OPR) Climate Adaptation Planning Grant Program? Applicants should not submit the same project application to both funding programs. However, applicants may propose to leverage funds from one funding program to another. For instance, an applicant with a large project may propose to fund one component with Caltrans funds, and another with OPR funds. Applicants may also propose two entirely different projects to each funding program.
If yes, identify the differences between each proposal, and briefly summarize the leverage opportunity if awarded both Caltrans and OPR funding:
X
Is the applicant applying for any other funding programs to complete this project? If yes, list them here:
FHWA PROTECT
x
PART D. COMPLIANT HOUSING ELEMENT
PART E. OTHER FUNDING PROGRAMS
Use the following link to determine the appropriate legislative members in the Project area.
Search by address: http://findyourrep.legislature.ca.gov/
State Senator(s) Assembly Member(s)
District Name District Name
6 Roger W. Niello 9 Heath Flora
List all letters of support received for the proposed project. Letters should be addressed to the applicant.
Letters received after the final application filing date will not be considered.
Name/Agency Name/Agency
Senator Roger Niello, Sixth Senatorial District
Representative Doris Matsui, US House of Representatives
Minority Floor Leader Heath Flora, Ninth Assembly District
Senator Adam B. Schiff, United States Senate
Supervisor Pat Hume, Sacramento County Board of Supervisors
PART F. LEGISLATIVE INFORMATION
PART G. LETTERS OF SUPPORT
http://findyourrep.legislature.ca.gov/
CLIMATE ADAPTATION PLANNING - GRANT APPLICATION
NARRATIVE
Project Information
Organization (legal name)
Project Title
Project Area Boundaries Project Timeframe (Start and End Dates):
Application Narrative
1. Project Description (5 points) - Do not exceed the space provided (5 sentences maximum) Briefly summarize project in a clear and concise manner, including why the project is necessary, major deliverables, desired outcomes, parties involved, and alignment with relevant local, regional, and/or State planning efforts.
FY 2025-26 PART G. APPLICATION NARRATIVE
NARRATIVE
2A. Project Justification (10 points) - Do not exceed the space provided
• Describe the problem or deficiencies the project is attempting to address, including the climate adaptation need and any other priority needs, as well as how the project will address the identified problems or deficiencies
• Describe the impact of not funding the project
• Describe the public benefits
NARRATIVE
2A. Project Justification (continued)
NARRATIVE
2B. Under-Resourced Communities Justification (7.5 points) - Do not exceed the space provided The tools in the Grant Application Guide, Appendix A, are intended to help applicants define an under-resourced community.
• Explain how the project area or portions of the project area benefit under-resourced communities, including Tribal, local, regional, and rural communities as applicable
• Explain how the proposed project addresses the needs of the communities and how they will benefit from the proposed project, including if the communities informed the scope of the project
• Cite data sources, the tools used, and include a comparison to the statewide thresholds that are established in each tool
NARRATIVE
2C. Under-Resourced Communities Engagement (7.5 points) - Do not exceed the space provided See Grant Application Guide, Appendix A. for best practices in community engagement
• Describe how the proposed project will engage under-resourced communities and how the effort was informed by engagement with under-resourced communities, including Tribal, local, regional, and rural communities as applicable o Include specific outreach methods for involving under-resourced communities
• Describe how under-resourced communities will continue to be engages during the next phases after the proposed planning project is complete, including implementation
3. Grant Specific Objectives (Total 40 points) Integrate the following Grant Program Considerations (Grant Application Guide, Chapter 1.2) in the responses for 3A-D below, as applicable:
• Caltrans Strategic Plan
• California Transportation Plan (CTP)
• Modal Plans that Support the CTP
• Strategic Highway Safety Plan
• Title VI and Environmental Justice
• Climate Action Plan for Transportation Infrastructure
• California Adaptation Strategy
• Master Plan for Aging
NARRATIVE
3A. Grant Specific Objectives; climate risk and adaptation (10 points) - Do not exceed the space provided
• Explain how the project identifies and assesses climate change impact risks to multimodal transportation infrastructure vulnerabilities to climate change impacts in the project area
• Explain how the project will identify adaptation strategies and specific actions to remedy identified climate related vulnerabilities. Projects and plans should describe short-, medium-, and long-term strategies that will address the overall risk for the entire service life of the asset or capital project using the best available science and guidance.
• Articulate how the project will advance the planning of specific climate adaptation projects, such as developing a cost estimate, pursuing a technical feasibility study for adaptation options, or developing a conceptual design (up to 30%)
• When applicable, explain how the project includes economic analysis and/or cost-benefit analysis of identified adaptation strategy or strategies
NARRATIVE
3A. Grant Specific Objectives; climate risk and adaptation (continued)
NARRATIVE
3B. Grant Specific Objectives; co-benefits (10 points) - Do not exceed the space provided
• Identify co-benefits of the adaptation work, such as benefits to public health, natural ecosystems, air quality, social equity, the economy, or reductions in greenhouse gas (GHG) emissions.
o If reductions in GHG emissions are identified as a co-benefit, explain how the project advances transportation related GHG emission reductions specifically through different project types/strategies (e.g., mode shift, demand management, accessibility, etc.)
• Describe if and how nature-based solutions will be integrated into the proposed project
• Describe how adaptation needs of environmental resources in proximity to the transportation system such as coastal resources like tidal marsh or beaches, wildlife connectivity, wetlands, or fish passage needs are considered in the proposed project (if applicable)
NARRATIVE
3C. Grant Specific Objectives; partnerships and stakeholder process (10 points) - Do not exceed the space provided
• Explain how the project demonstrates on-going collaboration and partnerships between sectors and jurisdictions, and across levels of government at a regional scale
• Explain if the project also includes collaboration and partnerships with diverse external stakeholders such as businesses, non-governmental agencies, federal, state, or local agencies, community-based organizations, and community residents
• Explain how the project includes a multistakeholder process that provides an opportunity for meaningful community engagement from communities potentially impacted by any project identified or developed as part of the planning grant
NARRATIVE
3D. Grant Specific Objectives; alignment with other plans and State Goals (10 points) - Do not exceed the space provided
• Explain how the project is consistent with priorities, goals, and actions of the California State Adaptation Strategy, follows State guidance on adaptation planning, and is consistent with any applicable local/regional resilience planning.
• Articulate if the project will identify ways to incorporate transportation-related climate adaptation needs into existing transportation plans, specifically how the project will lead to the identification and development of capital projects that can be programmed as part of local or regional plans
• Explain how the project is in alignment with or augments existing plans, including climate action/adaptation plans, hazard mitigation plans, safety elements of general plans, resilience improvement plans, and/or Coastal Act/Certified Local Coastal Program plans
• Explain how the proposed project addresses public access and Complete Streets needs
NARRATIVE
4. Project Management (Total 30 points) See Scope of Work and Cost and Schedule samples and checklists for requirements (Grant Application Guide, Appendix B), also available on the Caltrans grants website:
https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/ regional-and-community-planning/sustainable-transportation-planning-grants
4A. Scope of Work (15 points)
4B. Cost and Schedule (15 points) https://dot.ca.gov/programs/transportation-planning/regional-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/regional-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants
WILTON AREA ROADWAY RESILIENCY PROJECT
FY 2025-26 SUSTAINABLE TRANSPORTATION PLANNING GRANT PROGRAM – CLIMATE ADAPTION PLANNING
Page | 1
PROJECT MAP
Figure 1 – Project Location Map
Page | 2
Figure 2 – Train Derailment from 2017 Storms
Page | 3
Figure 3 – Cosumnes River Floodplain Map
Page | 4
Figure 4 – Wilton Flooding from 2023 Storms
Page | 5
Figure 5 – Historical Fire Perimeters Map
Source: https://www.arcgis.com/apps/mapviewer/index.html?layers=c3c10388e3b24cec8a954ba10458039d https://www.arcgis.com/apps/mapviewer/index.html?layers=c3c10388e3b24cec8a954ba10458039d
Page | 6
Figure 6 – Wilton Evacuation Routes
Page | 7
REFERENCED DOCUMENTS AND DATASETS
Sacramento Region Extreme Heat Dataset The extreme heat dataset (Link) is a collection of data points that represent land surface temperatures measured across the region.
Caltrans’ State Climate Resilience Improvement Plan for Transportation (SCRIPT) Caltrans developed a State Climate Resilience Improvement Plan for Transportation (SCRIPT) (Link), consistent with 23 U.S.C. § .
Resiliency Design and Data Tools Cal-Adapt (Link): Cal-Adapt provides data and tools for climate adaptation planning and resiliency improvements. The website includes historical baseline (1961-1990), mid-century (2035-2064), and end-century (2070 – 2099) temperature, precipitation, and wildfire data for observed, medium emissions (RCP 4.5), and high emissions (RCP 8.5).
SACOG Climate Adaptation (Link): SACOG has developed a GIS-base repository for climate adaptation tools and datasets extreme heat, stream flow, storms, and changes.
SACOG 2015 Sacramento Regional Transportation Climate Adaptation Plan (Link): The plan identifies how climate risks can impact transportation facilities and adaption planning strategies.
California Governor’s Office of Planning and Research (OPR) Integrated Climate Adaptation and Resiliency Program (ICARP) (Link):
ICARP provides climate threat analysis tools, data, and research to inform the resiliency planning efforts.
Sacramento County Charter Sacramento County Charter Article XVI Personnel Administration Section 71J Contracting for Services states that when in-house knowledge exists, work shall be performed by agency staff that does not cause displacement of staff (Link).
https://adaptation-sacog.hub.arcgis.com/pages/extremeheat https://dot.ca.gov/-/media/dot-media/programs/transportation-planning/documents/office-of-smart-mobility-and-climate-change/2023-script-amendment-1-with-letters-a11y.pdf https://cal-adapt.org/ https://adaptation-sacog.hub.arcgis.com/#data https://www.sacog.org/sites/main/files/file-attachments/2015_sacramento_region_transportation_climate_adaptation_plan_1.pdf?1601491789 https://opr.ca.gov/climate/icarp/ https://library.qcode.us/lib/sacramento_county_ca/pub/county_code/item/sacramento_county_charter-article_xvi-sec_71j
SCOPE OF WORK
Project Information
Grant Category Sustainable Transportation Planning Grant
Grant Fiscal Year FY 2025-26
Project Title Wilton Area Roadway Resiliency Project
Organization
(Legal name) Sacramento County Department of Transportation (SacDOT)
Introduction
The Wilton Area Roadway Resiliency Project (Project) will consist of a Resilience Improvement
Plan to enhance the ability of existing surface transportation assets to withstand flooding and wildfires associated with extreme climate events. Located along the Cosumnes River, the Wilton community has a history of severe flooding events and wildfires that have damaged the community, closed roadways within the region’s evacuation network, and have resulted in fatalities. Sacramento County Department of Transportation (SacDOT) will work closely with
Caltrans and multiple other stakeholders to analyze the climate impacts, understand community needs and concerns, identify and prioritize potential improvements, and prepare 30% design plans and estimates. The project is included in Caltrans' Resiliency Improvement Plan and is consistent with and will coordinate with other State, regional, and local plans.
The Project planning process will also evaluate the addition of bicycle lanes to increase mobility and active transportation options in the area where none currently exist. This will enhance safety for bicyclists and pedestrians utilizing the roadways and provide mode shift opportunities for area residents.
The Project is located completely in an under-resourced, rural, community and will benefit the residents and businesses that have been impacted by severe storms and wildfire. The Project goals are to provide this community with reliable evacuation routes and a multimodal transportation network that supports low-cost active transportation. Further, the information developed through the Project will be made available to other agencies that may be planning resiliency improvements. Best practices will be documented and shared on the Project’s website.
Project Stakeholders
Sacramento County will administer the project in coordination with Caltrans and multiple other stakeholder agencies and the public, including:
• Sacramento Area Council of Governments (SACOG) Regional Planners Committee
• SACOG Regional Planning Partnership
• Capital Regional Climate Readiness Collaborative
• Federal Emergency Management Agency (FEMA)
• Reclamation District 800
• California Rural Legal Assistance
• Sacramento Area Flood Control Agency (SAFCA)
• Sacramento County Bicycle Advocacy Committee
• Sacramento County Water Resources
• Sacramento County Office of Emergency Services (OES)
• Sacramento County Farm Bureau
• Cosumnes Community Planning Advisory Council
• Wilton Rancheria (federally recognized Tribe)
• Wilton History Group
• Wilton Cosumnes Park District
• Cosumnes Community Services District
• City of Elk Grove
• Elk Grove Unified School District
• El Grove Historical Society
• City of Galt
• Galt Historical Society
• Isleton Chamber of Commerce
• Rancho Murieta Homeowners Association
• California Future Farmers of America Center
• Area residents and businesses
SacDOT will procure a consultant to assist in delivering the project. Anticipated consultant tasks include transportation planning, stakeholder and community outreach and engagement, preliminary engineering and alternatives analysis, cost estimating, and the preparation of draft and final planning documents.
Overall Project Objectives
The overall objective of this Project is to deliver a plan to improve Wilton Area roadways, making them safer, more reliable, and resilient to future climate risks for all users.
The Project will result in a detailed analysis and review of alternatives to improve the resiliency of the transportation network in the Project area. The analysis will review floodplain, hydrology, and stormwater data as well as historic evacuations to understand the short-term and long-term implications on the Project area’s roads. Natural hazards and risks will be identified in the Project area and a priority ranking system for improvements will be developed. The Project aims to implement proven, nature-based, and cost-effective solutions that address localized flooding, including construction of bioswales, increasing drainage ditch depths, and/or armoring slopes.
Solutions will be considered and evaluated for eliminating flooding of the transportation network, keeping evacuation routes open, and/or shoring roadways in a manner that minimizes flood damage, returning them to service immediately once flood waters have receded. The goal for the Project is to better protect the public from the dangers of flooded roadways and maintain the integrity of the area's evacuation network for all emergencies, including wildfires, which are common in the region.
Active transportation facilities will also be considered and evaluated to increase mobility and transportation options in the area where none currently exist. This will enhance safety for bicyclists and pedestrians utilizing the roadways and encourage mode shift for this under-resourced community.
Summary of Project Tasks
Task 01: Project Administration
SacDOT will manage and administer the grant project according to the Grant Application
Guidelines, Regional Planning Handbook, and the executed grant agreement between Caltrans and SacDOT. These tasks include:
• Kick-Off meeting with Caltrans to discuss grant procedures and project expectations
• Tracking all grant expenditures for recipient and sub-recipients
• Submit complete invoice packages to Caltrans District staff based on completion of deliverables, at least semi-annually, but not more frequently than monthly
• Submit timely, quarterly work program reports which include a summary of project progress and grant/local match expenditures to Caltrans District staff.
• After completion of the project, grant closeout will proceed with final invoicing
Task Deliverables
Project Kick-off Meeting with Caltrans Agenda and Summary
Invoices & Progress Reports
Task 02: Consultant Procurement
The County will prepare and issue a Request for Proposals (RFP) to procure a consultant consistent with County, state and federal requirements, including the Local Assistance Procedures Manual
(LAPM), and select a planning consultant to complete the project. SacDOT will execute a contract with the selected firm consistent with the required contract guidelines and procedures.
SacDOT will share the final executed contract with Caltrans. SacDOT will conduct a kick-off meeting with the selected consultant.
Task Deliverables
Request for Proposals
Consultant Contract
Consultant Contract Amendments (as applicable)
Kick-off Meeting Agenda and Summary
Task 03: Existing Conditions
Consultant shall review and summarize all available previous studies, literature and data sources, including but not limited to:
• California State Transportation Agency 2021 Climate Action Plan for Transportation
Infrastructure
• California Governor’s Office of Planning and Research 2020 ICARP
• California Governor’s Office of Land Use and Climate Innovation 2019 California’s Fourth
Climate Change Assessment
• Caltrans 2024 State Climate Resilience Improvement Plan for Transportation (SCRIPT)
• Caltrans District 3 2020 Adaptation Priorities
• Caltrans 2019 Climate Change Vulnerability Assessments
• SACOG 2015 Sacramento Regional Transportation Climate Adaptation Plan
• SACOG 2020 Vulnerability and Criticality Assessment
• SACOG 2020 Project-Level Adaptation Strategies Guidance Document
• Sacramento County 2021 Climate Action Plan
• Sacramento County 2021 Multi-Jurisdictional Local Hazardous Mitigation Plan
• City of Elk Grove 2019 Climate Action Plan
Available floodplain, hydrology, and stormwater data will be reviewed and analyzed to identify the short-term and long-term implications on the Project’s roads.
The review will focus on infrastructure resilience to climate impacts, especially projects that integrate natural infrastructure or provide multiple environmental and social benefits.
Based on the above review, Consultant shall prepare an Adaptation Strategies Summary Report documenting potential transportation adaptation planning strategies and projects. The summary may include adaptation strategies related to raising, protecting, and/or armoring transportation infrastructure impacted by flooding and other related strategies, especially as they impact the existing evacuation network
Consultant’s project management activities to facilitate the gathering of the existing conditions data and preparing the Summary of Existing Conditions Report are included in this task.
Adaptation Strategies Summary Report
Existing Conditions Summary Report
Task 04: Stakeholder and Public Engagement
SacDOT is committed to an active engagement process to seek input from all sectors of the population with emphasis on disadvantaged communities and communities vulnerable to climate change.
This task involves developing a stakeholder outreach and engagement strategy that identifies and documents project stakeholders, the engagement timeline, and specific methods of involvement. The strategy will consider activities that will best identify community needs and desired outcomes with a focus on disadvantaged communities. The engagement strategy will identify and engage a stakeholder working group, and consider engagement strategies such as workshops, pop ups, surveys, social media, interviews, and a combination of in-person and virtual activities. At a minimum, stakeholders will include local and regional agencies, community-based organizations, advocacy groups, neighborhood associations, and the community at large.
The Consultant will coordinate and facilitate stakeholder and public engagement efforts identified in the public engagement strategy and will document the implemented activities and the results of each engagement. Examples of engagement activities that will be implemented for the project include:
• Conducting virtual and in-person surveys
• Printing of materials and distribution at community events and workshops
• Hosting of in-person workshops at locations and times that are suitable for residents
• Community tabling at local events to engage a wide audience
Printed materials will be provided in English and Spanish, and interpreter services will be provided as requested.
Task Deliverables
Stakeholder & Public Engagement Plan
Stakeholder List
Outreach Marketing Materials
Meeting Agendas
Engagement After Action Reports and Summaries
Task 5: Develop Project Framework
Consultant will develop a ranking that considers impacts to the evacuation network, relative cost, environmental impacts, and adjacent population to prioritize mitigation strategies or projects to advance to 30% conceptual design.
Consultant will work with SacDOT to develop and refine project evaluation criteria and determine the weighting for use in the prioritization of projects. The criteria and weighting should consider public input and reflect and balance regional planning goals, state and federal requirements, and local regulations.
Consultant will prepare an analysis that identifies and ranks short- and long-term adaptation mitigation measures. Consultant will draft a memorandum and will incorporate the following:
• Identify and rank climate change mitigation measures
• Prioritization of adaptation needs and strategies in the project area
Memorandum outlining the detailed methodology to identify and rank projects.
Task 6: Prioritize Transportation Projects for Implementation
Based on the findings from the previous tasks, Consultant will identify applicable projects that mitigate climate impacts and promote transportation infrastructure resilience for the Wilton Area.
Roadways impacted by flooding will be prioritized for implementation to enhance resilience in the Wilton Area. Based on the stakeholder engagement plan, input will be solicited from stakeholders on the projects evaluated, criteria used, and final scoring and project prioritization.
Consultant will compile the data/mapping analysis needed to determine the scoring for the criteria used and evaluate priority projects using the metrics that have been approved by
SacDOT. Consultant will provide the final list of 15 priority transportation projects, including preliminary cost estimates, to advance to Task 7 Expedite Implementation.
Memorandum of identified projects/project alternatives and rankings
List of Priority Transportation Projects Recommended for Implementation
Task 7: Expedite Implementation with 30% Conceptual Design
After discussion with SacDOT, and further engagement with stakeholders and the public, projects will be identified to move forward into conceptual design. The Consultant will develop 30% pre-environmental, conceptual design drawings and cost estimates for up to five projects identified in Task 6 and approved by SacDOT. Preliminary design drawings will define the footprint of the improvements to identify potential right of way and utility impacts. The conceptual design will consider feasibility and include cost estimates. These will incorporate strategies that best position the project for future grant pursuits and capitalize on public sources of funding.
Conceptual level designs and cost estimates for up to five (5) projects
Task 8: Advisory Committee Meetings
Consultant will facilitate the development of an Advisory Committee to guide the project planning process, public outreach efforts, and project deliverables.
Consultant shall schedule, organize, and lead the Advisory Committee meetings at least quarterly.
The consultant shall prepare the agendas, meeting notes, list of attendees, and list of action items for each meeting and provide to the members one (1) week before the scheduled meeting date.
Consultant shall create and maintain an updated action item list of deliverables with the project schedule for the duration of the project and distribute it to the Advisory Committee monthly.
Consultant shall present to, and receive approval from, the Advisory Committee all project materials before distribution to the stakeholder groups and to the public.
The Advisory Committee members will review the agenda materials prior to the meetings and provide comments on the materials at least one day before the meeting. When needed, the members will return to the groups they represent to request feedback regarding advisory committee agenda topics at every phase of the project development. The Committee will review all draft deliverables for all tasks and will attend the meetings.
Consultant’s project management activities performed during the Advisory Committee efforts are included in this task.
Task Deliverables
Advisory Committee Meeting Agendas
Advisory Committee Meeting Notes
List of Attendees
Action Items list
Project Schedule
Task 9: Draft and Final Resilience Improvement Plan
Consultant will prepare the draft and final Resilience Improvement Plan detailing the methodology and findings of existing conditions, stakeholder and public engagement activities, the project criteria and prioritization, and conceptual designs. The draft report will be shared with
Caltrans, the Advisory Committee, and other project stakeholders, including the public, to solicit input on recommended projects. Feedback received will be incorporated into the Project’s final plan.
Caltrans involvement will include reviewing the draft report and providing feedback on the contents and alignment with regional and State transportation planning initiatives.
Draft Resilience Improvement Plan
Final Resilience Improvement Plan
Task 10: Board Review/Approval
SacDOT will bring forth the Final Plan before the Board of Supervisors for review/adoption.
Consultant will present Final Draft Plan to the Board of Supervisors at a public meeting for final review and action.
Final Plan Presentations
If yes, what is the estimated indirect cost rate? ______
J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J
01 $0 $30,000 $0 $32,500
02 $5,000 $5,746 $0 $10,746
03 $30,000 $5,746 $0 $35,746
04 $130,000 $6,746 $0 $136,746
05 $100,000 $6,746 $0 $106,746
06 $100,000 $5,946 $0 $105,946
07 $150,000 $5,946 $0 $155,946
08 $30,000 $5,796 $0 $35,796
09 $95,000 $5,796 $0 $100,796
10 $10,000 $5,746 $0 $15,746
$650,000 $84,214 $0 $736,714
FY 2026/27 FY 2027/28
Task
Grant Amount*
Estimated
Local Cash
Match*
Estimated
Local
In-Kind
Match*
Estimated Total
Project Cost*
FY 2025/26
Draft and Final Plan
Board Review/Approval
Totals
Does your agency plan to request reimburesement for indirect costs?
Expedite Implementation with 30% Conceptual Design
Project Administration (no more than 5% of total grant funds)
Consultant Procurement
Existing Conditions
Stakeholder and Public Engagement
Develop Project Framework
Prioritize Transportation Projects for Implementation
Advisory Committee Meetings
Task Title
Does your agency plan to use the Tapered Match approach for invoicing purposes?
Local Match Calculator (posted on-line)Use the Local Match Calculator to ensure that grant and local match amounts are correct:
Reimbursements/
Invoicing
Disclaimers Agency commits to the Cost and Schedule below. Any changes will need to be approved by Caltrans prior to initiating any Cost and Schedule change or amendment.
Use only whole dollars in the financial information fields. No rounding up or down and no cents.
California Department of Transportation
Sustainable Transportation Planning Grant Program
COST AND SCHEDULE
Grant Category Sustainable Transportation Planning Grant
Wilton Area Roadway Resiliency Project
FY 2025-26Grant Fiscal Year
Sacramento County Department of Transportation (SacDOT)
Project Title
Organization (Legal name)
Yes No
Yes No https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants https://dot.ca.gov/programs/transportation-planning/division-of-transportation-planning/regional-and-community-planning/sustainable-transportation-planning-grants
December 20, 2024
The Honorable Tony Tavares, Director
California Department of Transportation
1120 N Street
Sacramento, CA 95814
RE: Support Letter for the Wilton Area Roadway Resiliency Project Grant Application
I am writing to express my support for the Sacramento County Department of Transportation
Wilton Area Roadway Resiliency Project (Project) application to the California Department of
Transportation’s (CalTrans) FY 2025-26 Sustainable Transportation Planning Grant Program.
The Project involves developing a Resilience Improvement Plan to address significant challenges posed by seasonal flooding and wildfires in Wilton and the surrounding area of this rural community that I represent in the Sixth District in the California State Senate. This Project will include analysis of environmental issues related to flooding and wildfires and conceptual designs for roadway and bridge improvements, ensuring that the local evacuation network can withstand severe weather events and preserving emergency evacuation routes.
Severe weather in 2022 and 2023 caused devastating flooding in the Wilton area, resulting in submerged roadways, disrupted evacuation routes, and tragic loss of life. This Project will incorporate critical improvements, including enhanced drainage systems and nature-based solutions, to prevent such outcomes in the future. Sacramento County is taking proactive steps to protect its residents by preserving infrastructure and making improvements that will bolster the effectiveness of local streets and evacuation routes.
I strongly support the $4 million funding request for the Wilton Area Roadway Resiliency Project through the California Department of Transportation Sustainable Transportation Planning Grant
Program. Thank you for your consideration and your continued commitment to supporting projects with provide critical infrastructure improvements that contribute to the quality of life and potentially lifesaving needs of this rural community in Sacramento County. If you need further information, please contact my Roseville District Office at (916) 772-0571.
Sincerely, ROGER NIELLO
Senator, Sixth District
December 18, 2024
The Honorable Tony Tavares
Director
California Department of Transportation
1120 N Street
Sacramento, CA 95814
Dear Director Tavares, I am writing to express my support for the Sacramento County Department of Transportation’s application to the California Department of Transportation’s FY 2025-26 Sustainable Transportation
Planning Grant Program for the Wilton Area Roadway Resiliency Project. This is a vital project for my constituents that will enhance the safety, resiliency, and accessibility of Wilton, California, and the surrounding region.
The Wilton Area Roadway Resiliency Project will develop a Resilience Improvement Plan to address the significant challenges posed by seasonal flooding and wildfires in this rural unincorporated community.
This Plan will include climate impact analysis, environmental screening, and conceptual design for roadway and bridge improvements, ensuring that the local evacuation network can withstand severe weather events and preserve emergency evacuation routes.
Severe weather patterns in 2022 and 2023 caused devastating flooding in the Wilton area, resulting in submerged roadways, disrupted evacuation routes, and tragic loss of life. This Project will incorporate critical improvements, including enhanced drainage systems and nature-based solutions, to prevent such outcomes in the future. Sacramento County is taking proactive steps to protect its residents, preserve infrastructure, and enhance climate adaptation strategies by bolstering the resiliency of local streets and evacuation routes.
The Project also supports sustainability and transportation equity, incorporating bicycle lanes that will reduce greenhouse gas emissions while providing transportation options for community members without access to personal vehicles. These enhancements align with state and regional climate goals and ensure equitable access to safe and reliable transportation for all residents while also reducing vehicle miles traveled.
I support Sacramento County’s Wilton Area Roadway Resiliency Project, and I urge you to give this project your full and fair consideration, consistent with applicable law, rules, and regulations. The Wilton
Area Roadway Resiliency Project is a model for forward-thinking infrastructure planning, addressing immediate needs while preparing for long-term climate resilience.
DORIS MATSUI
Member of Congress
January 7, 2025
The Honorable Tony Taveres Director, California Department of Transportation (CalTrans) 1120 N Street Sacramento, CA 95814
Dear Director Taveres:
I would like to express my support for the Sacramento County Department of Transportation’s (DOT) Wilton Area Roadway Resiliency Project application to the California Department of Transportation’s FY 2025-26 Sustainable Transportation Planning Grant Program. This project represents a critical step in enhancing the safety and accessibility for the City of Wilton’s roadways.
Severe weather patterns in 2022 and 2023 caused devastating flooding in the Wilton area, resulting in submerged roads, disrupted evacuation routes, and tragic loss of life. This project would develop a “Resilience Improvement Plan” to address the significant challenges posed by climate change and includes climate impact analysis, environmental screening, and conceptual design for roadway and bridge improvements. In doing so, the local evacuation network could be ensured to withstand future severe weather events and preserve emergency evacuation routes.
Furthermore, this project prioritizes sustainability efforts and transportation equity. It seeks to incorporate bicycle lanes to reduce greenhouse gas emissions while providing transportation options for community members without access to personal automobiles. These enhancements align with state and regional climate goals and ensure equitable access to safe and reliable transportation for all residents and lowering vehicle miles traveled.
As Senator for California, this project would offer great progress in protecting my constituents from on-going climate incidents not only in the City of Wilton, but the county-at-large. I urge that you give the Sacramento Department of Transportation’s application full and fair consideration.
ADAM B. SCHIFF
United States Senator
| 3-application-signature-page-v2-a11y_EXECUTED |
| 5.a-capg-app-narrative-form-10242024-a11y_FINAL |
| Explain how the project area or portions of the project area benefit underserved communities, including Tribal, local, regional, and rural communities as applicable |
| Explain how the proposed project addresses the needs of the communities and how they will benefit from the proposed project, including if the communities informed the scope of the project |
| Cite data sources, the tools used, and include a comparison to the statewide thresholds that are established in each tool |
| Do not exceed the space provided |
| 5.b Project Location Map_FINAL |
| 7-fy-25-26-scope-of-work-checklist-template_FINAL |
| 8FY 2526 Cost and Schedule Checklist Templatea11y_FINAL |
| LETTERS OF SUPPORT_WILTON |
| 01. Niello Support Letter for the Wilton Area |
| 02. Representative Matsui Wilton Area LOS |
| 03. Flora Ninth District LOS_FINAL |
| 04. 1.7.25 Sacramento County DOT Wilton Area Roadway Resiliency Project LOS |
| 05. Hume Wilton Area Roadway Resiliency Project |
| Organization Legal Name: Sacramento County Department of Transportation (SacDOT) |
| Project Title: Wilton Area Roadway Resiliency Project |
| Project Area Boundaries: SR 99 to the west, Grant Line Road to the north, Tavernor Road to the east, and Valesin Road to the south |
| Project Timeframe (Start and End Dates): Start Date: October, 2025 |
End Date: December 2026 - UPDATE WHEN SCHEDULE IS COMPLETE