Z2DA--Upgrade Electrical Systems Area 1 695-19-101 Federal contract opportunity
Solicitation number
36C25220B0022
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This pre-solicitation notice announces an upcoming solicitation for an upgrade to plumbing systems project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project scope involves infection control, plumbing, and demolition work to upgrade plumbing systems for Legionella prevention. The project value is estimated between $5 million to $10 million. The solicitation will be posted to FedBizOpps on or about May 14, 2020, with bid opening scheduled for June 16, 2020. A pre-bid conference will be held to review the site. The North American Industry Classification Code is 236220 with a size standard of $36.5 million. The period of performance is 740 calendar days from notice to proceed. The solicitation will be a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Bidders must represent SDVOSB status, qualify as a small business, and be verified in the Vendor Information Pages database at time of bid submission.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Upgrade Electrical Systems Area 1 695-19-101, newest first.
File Type Posted
S06 - Drawings 11-20.pdf PDF
S06 - Drawings 41-50.pdf PDF
S06 - Drawings 1-10.pdf PDF
36C25220B0022_1.docx DOCX document
S06 - Drawings 31-40.pdf PDF
P07 - Davis Bacon WD.pdf PDF
Previous RFIs and Answers.pdf PDF
S06 - Amended Specifications.pdf PDF
S06 - Drawings 51-66.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PNL-17

3/4"

POLE 141

TRAILER

S.L.

ON POLE

3/4"

17S

17N

XF-17

1 Ø

A-B Ø

75KVA

PNL-41

HVS-41

K

G

SOURCE "A"

G

HVP-42

G

HVP-44

G

XF-62

1 Ø

A-B Ø

75KVA

PNL-62

1/2" SL 3/4"

62N

62S

18N

18S

19N

19S

PNL-19

XF-19

1 Ø

A-B Ø

75KVA

G

PNL-27

HVP-41

POLE 108

RISER

POLE 1" PNL-16

XF-16

1 Ø

C-A Ø

50KVA

G

HVP-40

XF-12

3 Ø

75KVA

45 SOURCE "A"

SOURCE "A"

XF-27

3 Ø

75KVA

HVP-24

SOURCE "A"

SOURCE "A"

XF-14

1 Ø

B-C Ø

37.5KVA

PNL-14

SL

ON POLE

3/4"

SOURCE "B"

SOURCE "B"

SOURCE "B"

SOURCE "A"

XF-6

3 Ø

1000KVA

SOURCE "B"

HVP-27

11W 11E

PNL-11

150KVA

B-C

Ø

XF-11

1 Ø

SOURCE "A"

XF-7

3 Ø

225KVA

SOURCE "B"

XF-5

3 Ø

225KVA

HVP-30

SOURCE "A"

SOURCE "B"

SOURCE "B"

HVP-29

SOURCE "A"

SOURCE "A"

SOURCE "B"

68 SOURCE "A"

SOURCE "B"

XF-2

SOURCE "A"

SOURCE "B"

HVP-31

SOURCE "A"74

SOURCE "A"

HVP-36

SOURCE "A"

SOURCE "B"

XF-3

3 Ø

BACK FEEDS TO

EXIST. SL.CKT

3/4"

POLE

PNL-3

HVP-34

XF-1

3 Ø

FOUNTAIN

SL ON B.1

3/4"

4 3

XF-36

3 Ø

75KVA

HVS-36

K

SOURCE "A"

SOURCE "A" 81

XF-20

3 Ø

112.5KVA

XF-97

3 Ø

75KVA

20 97

XF-108

3 Ø

112.5KVA

PNL 108

BUTLER BLDG/BLUFF

PNL-K

XF-K

1 Ø

37.5KVA

B-C Ø

SOURCE "A"

SPARE

SUMP PUMPS

EXISTING TO REMAIN

XF-1301

3 Ø

112.5KVA

HVS-1301

G

HVS-A

13.2KV BUS ACB IN B-115

SEE E-25

EX

N

SL1

PNL-SL1

SOURCE "B"

3 2

SOURCE "A"

SOURCE "B"

SOURCE "A"

XF-SL1

1 Ø

37.5KVA

HVS-SL1

K

HVP-K

HVP-2

7 6

HVP-3

K

SOURCE "A"8

SOURCE "B"9

HVP-4

SOURCE "A"

11SOURCE "B"

K

HVS-4

XF-43

3 Ø

PROVIDED UNDER

SEPERATE CONTRACT

NEW

XF-112

3 Ø

K

HVS-18

SOURCE "B"

SOURCE "A"

HVP-18

SOURCE "A"

XF-49

1 Ø

C-A Ø

75 KVA

PNL-49

8450S

50H

49S

49N

3/4"

ON POLE 222

SL

SOURCE "A"

SOURCE "B"

SOURCE "B"23

SOURCE "A"24

SOURCE "B"

K

HVS-16

XF-40

1 Ø

C-A Ø

50KVA

XF-119

3 Ø

75KVA

119 40

SOURCE "A"

HVP-16

SOURCE "B" SOURCE "A"

HVP-15

SOURCE "B"34

SOURCE "A"

SOURCE "B"13

SOURCE "A"12

SOURCE "B"

SOURCE "A"

HVS-146

K

SOURCE "A"

SOURCE "B"

XF-41

3 Ø

225KVA

39 STORAGE

PNL-39

XF-39

1 Ø

B-C Ø

37.5KVA

XHVS-11

K

SOURCE "A"

SOURCE "B"

HVP-8

SOURCE "A"

HVP-11

SOURCE "B"

SOURCE "B"

XF-37

1 Ø

B-C Ø

37.5KVA

SL ON POLE 73

FEED FROM PANEL

IN

BLD 37 3/4"

SOURCE

"A"

XF-146

3 Ø

225KVA

CL1

XF-CL1

3 Ø

750KVA

XF-2 BLDG-102

3 Ø

REMOVE EX

HVP-21

HVS-20

K

SOURCE "A"

SOURCE "B"

HVP-22

HVP-20

SOURCE

"B"

HVS-22

K

PRIMARY CABLE SCHEDULE

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

44.

45.

46.

47.

48.

49.

50.

51.

52.

53.

54.

55.

56.

57.

58.

59.

60.

61.

62.

63.

64.

65.

66.

67.

68.

69.

70.

71.

72.

73.

74.

75.

76.

77.

78.

79.

80.

81.

82.

83.

84.

85.

CABLE NO. NO. OF CABLES

2 (B-C)

2 (B-C)

2 (B-C)

2 (B-C)

2 (C-A)

2 (C-A)

2 (C-A)

2 (A-B)

2 (A-B)

2 (A-B)

2 (A-B)

2 (A-B)

2 (B-C)

2 (B-C)

CONNECTED FROM CONNECTED TO LENGTH FT.

CB BLD 115

HVS A

HVS A

HVP K

HVP K

HVP 2

HVP 2

HVP 3

HVP 3

HVP 4

HVP 4

HVP 4

HVP 4

HVP 8

HVP 8

HVP 8

HVP 8

HVP 11

HVP 11

HVS 11

HVP 3

HVP 3

HVP 15

HVP 15

HVP 16

HVP 16

HVS 16

HVS 16

HVP 15

HVP 15

HVP 18

HVP 18

HVP 18

HVP 15

HVP 15

HVP 20

HVP 20

HVS 20

HVP 20

HVP 20

HVP 22

HVP 22

HVP 23

HVP 23

HVP 24

HVS 18

HVP 40

HVP 41

HVP 41

HVP 41

HVP 42

HVP 42

HVP 44

HVP 44

HVP 24

HVP 24

HVP 27

HVP 27

HVP 27

HVP 27

HVP 29

HVP 29

HVP 30

HVP 30

HVP 30

HVP 29

HVP 29

HVP 29

HVP 29

HVP 31

HVP 31

HVP 31

HVP 31

HVP 31

HVP K

HVS 4

HVP 34

HVP 34

HVP 36

HVP 36

HVP 36

HVP 27

HVP-27

HVP-36

HVS-36

HVS 17

HVP-K

HVP-K

HVP 2

HVP 2

HVP 3

HVP 3

HVP 4

HVP 4

HVS 4

HVS 4

HVP 8

HVP 8

XF 41

XF 41

HVP 11

HVP 11

HVS 11

HVS 11

XF 39

HVP 15

HVP 15

HVP 16

HVP 16

HVS 16

HVS 16

XF 119

XF 40

HVP 18

HVP 18

HVS 18

HVS 18

XF 49

HVP 20

HVP 20

HVS 20

HVS 20

XF-2 BLDG-102

HVP 22

HVP 22

HVP 23

HVP 23

HVP 24

HVP 24

HVP 40

XF 112

HVP 41

XF 12

XF 16

HVP 42

XF 17

HVP 44

XF 19

XF 62

HVP 27

HVP 27

XF 6

XF 6

HVP 29

HVP 29

HVP 30

HVP 30

XF 11

XF 7

XF 7

XF 5

XF 5

HVP 31

HVP 31

XF 3

XF 3

XF 2

XF 2

HVP 34

XFK

XF-43

XFI

HVP 36

XF 20

XF 97

XF 108

XF-27

XF-27

HVS-36

XF-36

725 +

725 +

K

BUILDING #10

CABLE #10

KIRK-KEY

LEGEND

HVS-23B

HVS-23A

HVP-23

SOURCE

"A"

SOURCE

"B"

E-601

SINGLE-LINE DIAGRAM

PRIMARY POWER DISTRIBUTION

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 SINGLE LINE DIAGRAM

SCALE: N.T.S.

A. REFER TO ES101 FOR UNDERGROUND MV

FEEDER SITE PLAN

B. REFER TO ES102 FOR BLOCK DIAGRAM, FEEDER

SCHEDULE AND PROJECT CONSTRUCTION WORK

NOTES.

1. THIS DRAWING IS FOR INFORMATIONAL

PURPOSES ONLY.

2. SEE ES-102 FOR WORK DETAILS.

1 2

INFORMATION USE ONLY

DocuSign Envelope ID: 0CBD189B-3560-4332-8952-A636DB8D6073

3/20/2020

AREA OF WORK

KEY PLAN - BUILDING 70

N

RM A12

ELEV 70-A CIRC

ELEC 70-A CONTROLLER

UL-BAS-70-4

MDP-70-A

UL-BAS-70-5 EUL-LS-BAS-70-1 P-12

PANEL 39

ELEV 70-A CIRC

ELEC 70-A CONTROLLER

UL-BAS-70-4

MDP-70-A

UL-BAS-70-5 EUL-LS-BAS-70-1 P-12

EP109

BUILDING 70 BASEMENT ENLARGED FLOOR

PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM A-12

SCALE: 1/2" = 1' 0"3 BUILDING 70 BASEMENT NEW WORK PLAN - RM A-12

SCALE: 1/2" = 1' 0"

1. RETROFIT OR REPLACE THE PANELBOARD.

REFER TO DRAWING E-613 FOR EQUIPMENT

DETAILS.

2. DEMOLISH THE PANELBOARD. REFEED THE

EXISTING LOADS FROM NEW PANELBOARD

UL-BAS-70-4.

3. SEE PHOTO ON DETAIL 2.

4. SEE PHOTO ON DETAIL 4.

5. SEE PHOTO ON DETAIL 5.

X

NORTH

TRUE

0 1 2 4 NORTH

TRUE

0 1 2 4

5 BUILDING 70 - RM A-12

SCALE: N.T.S. 4 BUILDING 70 - RM A-12

SCALE: N.T.S. 2 BUILDING 70 - RM A-12

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

DocuSign Envelope ID: 84209D4E-67F0-4C20-902C-691E17F13049

12/4/2019

LUG KIT SHALL BE INSTALLED ON TRANSFORMER LUGS IN

SUCH A CONFIGURATION THAT TRANSFORMER INSULATED

LUG SUPPORT IS NOT BENT DUE TO EXCESSIVE STRESS

FROM TIGHT CONDUCTOR BEND RADIUS

MAIN BONDING JUMPER

PRIMARY

FEEDER

BOND TO CONDUIT VIA GROUND

BUSHING WITH LAY IN LUG-TYPICAL

PRIMARY FEEDER

EQUIPMENT GROUND

GROUND BAR

BOND SECURELY TO TRANSFORMER HOUSING,

NOT TO GRATE IN BOTTOM

MOUNT TRANSFORMER ON 4" THICK, 3000 PSI CONCRETE

PAD-PAD SHALL EXTEND 4" BEYOND TRANSFORMER ON

ALL SIDES-CHAMFER EDGES 3/4", RUB SURFACE SMOOTH

XO H1 L1 H2 L2 H3 L3

SECONDARY

FEEDER

SECONDARY FEEDER

EQUIPMENT GROUND

GROUNDED CONDUCTOR

(NEUTRAL)

GROUNDING ELECTRODEGROUNDING ELECTRODE

CONDUCTOR TO BUILDING

STEEL AND INTERIOR METAL

WATER PIPING.

STRUCTURAL CEILING

SUSPENDED CEILINGLIGHT FIXTURE

WALL

ELECTRICAL

EQUIPMENT

EXCLUSIVE

DEDICATED

SPACE

FRONT EDGE PLAN

OF ELECTRICAL

EQUIPMENT

SEE TABLE 'A'

CLEARANCE SHALL BE 30" OR WIDTH OF

EQUIPMENT IF EQUIPMENT IS WIDER THAN 30".

CLEARANCE DOES NOT HAVE TO BE CENTERED

WITH EQUIPMENT BUT AT MUST BE AT LEAST

EVEN WITH ONE EDGE. EQUIPMENT DOOR SHALL

BE ABLE TO OPEN AT LEAST 90 DEGREES.

NOTE:

THIS FIGURE ILLUSTRATES THE WORKING SPACE IN FRONT OF

ELECTRICAL EQUIPMENT REQUIRED BY NEC 110.16.

NOTE:

THIS FIGURE ILLUSTRATES THE EXCLUSIVE DEDICATED SPACE

REQUIRED ABOVE AND BELOW PANELBOARDS FOR ELECTRICAL

DISTRIBUTION TO AND FROM PANELBOARDS AS REQUIRED.

ALL ELECTRICAL EQUIPMENT

TABLE 'A' - WORKING CLEARANCE

STRUCTURAL CEILING

SUSPENDED CEILING

WALL

LIGHT FIXTURE

PANELBOARD

EXCLUSIVE

DEDICATED

SPACE

EXCLUSIVE

DEDICATED

SPACE

VOLTAGE TO GROUND

(NOMINAL)

MINIMUM CLEAR DISTANCE

0 - 150

150 - 600

3' - 0"

3' - 0"

3' - 0"

3' - 6"

3' - 0"

4' - 0"

CONDITION 1 CONDITION 2 CONDITION 3

EXCLUSIVE DEDICATED

SPACE CONTINUES THROUGH

SUSPENDED CEILING TO 25'-0"

AFF OR STRUCTURAL

CEILING, WHICHEVER IS

LOWER.

1.

2.

GENERAL NOTES:

ELECTRICAL EQUIPMENT INCLUDES BUT IS NOT LIMITED TO

PANELBOARDS, SAFETY SWITCHES, MOTOR STARTERS,

JUNCTION BOXES, AND OTHER ELECTRICAL

DISTRIBUTION AND CONTROLS EQUIPMENT.

PIPING, DUCTS OR EQUIPMENT FOREIGN TO THE

ELECTRICAL EQUIPMENT OR ARCHITECTURAL

APPURTENANCES SHALL NOT BE PERMITTED TO BE INSTALLED

IN, ENTER, OR PASS THROUGH THE DEDICATED SPACES

SHOWN ABOVE.

TABLE 'A' DEFINITIONS:

CONDITION 1:

CONDITION 2:

CONDITION 3:

EXPOSED LIVE PARTS ON ONE SIDE AND NO LIVE OR

GROUNDED PARTS ON THE OTHER SIDE OF THE

WORKING SPACE.

OR

EXPOSED LIVE PARTS ON BOTH SIDES EFFECTIVELY

GUARDED BY SUITABLE WOOD OR OTHER INSULATING

MATERIALS.

EXPOSED LIVE PARTS ON ONE SIDE AND GROUNDED

PARTS ON THE OTHER SIDE.

EXPOSED LIVE PARTS ON BOTH SIDES OF THE WORKING

SPACE (NOT GUARDED AS PROVIDED IN CONDITION 1)

WITH THE OPERATOR BETWEEN.

INSULATED WIRE OR INSULATED BUSBARS OPERATING AT NOT OVER

300V SHALL NOT BE CONSIDERED LIVE PARTS.

6' -6

" M

IN

IM

U

M

6' -6

" M

IN

IM

U

M

EXISTING

PANELBOARD

NEW

PANELBOARD

NEW CONDUITS

ELECTRICAL TROUGH

NEW CONDUITS

ELECTRICAL TROUGH

E-501

ELECTRICAL DETAILS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 DRY TYPE TRANSFORMER

SCALE: N.T.S.

2 DED. WORKING SPACE REQUIREMENT FOR ELECTRICAL EQUIPMENT

SCALE: N.T.S.

3 PANELBOARD REPLACEMENT - SURFACE MOUNT (TYPICAL)

SCALE: N.T.S.

UL-31-1

VOLTAGE: 208V

CB-UL-31-1 LOAD

20A

MCB-UL-31-1

225A

CB-UL-31-1

400A

LOAD-UL-51-1

UL-61-2

VOLTAGE: 208V

CB-UL-61-2 LOAD

20A

MCB-UL-61-2

225A

CB-UL-61-2

300A

LOAD-UL-81-1

LL-31-1

VOLTAGE: 208V

CB-LL-31-1 LOAD

20A

MCB-LL-31-1

100A

CB-LL-31-1

300A

LOAD-LL-51-1

LL-61-1

VOLTAGE: 208V

CB-LL-61-1

LOAD

20A

MCB-LL-61-1

100A

CB-LL-61-1

300A

LOAD-LL-81-1

UL-91-1

VOLTAGE: 208V

CB-UL-91-1 LOAD

20A

MCB-UL-91-1

225A

CB-UL-91-1

300A

LOAD-UL-101A-1

MCB-UL-B01-5

225A

CB-UL-B01-5

300A

UL-B01-5

VOLTAGE: 208V

CB-UL-B01-5

LOAD

20A

UL-41-1

VOLTAGE: 208V

UL-51-1

VOLTAGE: 208V

UL-81-1

VOLTAGE: 208V

UL-71-1

VOLTAGE: 208V

UL-B01-6

VOLTAGE: 208V

UL-11-4

VOLTAGE: 208V

LL-41-1

VOLTAGE: 208V

LL-71-1

VOLTAGE: 208V

UL-101-1

VOLTAGE: 208V

UL-21-4

VOLTAGE: 208V

LL-101-1

VOLTAGE: 208V

LOAD-UL-B01-6

LOAD-UL-11-4

UL-11-5

VOLTAGE: 208V

LL-51-1

VOLTAGE: 208V

LL-81-1

VOLTAGE: 208V

UL-101-1A

VOLTAGE: 208V

CB-PL-B01-1

400A

UL-21-3

VOLTAGE: 208V

MCB-UL-21-3

225A

CB-UL-21-3

200A

LL-91-1

VOLTAGE: 208V

MCB-LL-91-1

100A

CB-LL-91-1

200A

CB-UL-21-3 LOAD

20A

CB-LL-91-1 LOAD

20A

LOAD-UL-21-4 LOAD-LL-101-1

DL-B01-2

VOLTAGE: 208V

XF-T-3 B0123

500KVA 300KVA

480V/208V

450A

BREAKER

DISCONNECT

600A

FUSED

DISCONNECT

2PH 500 4-1/C+G, TROUGH

(EXISTING)

1000AT

1200AF LSI

2PH 500 4-1/C+G, TROUGH

TO 800A CB-T-3-B0123-EC

DHB-B01-01

CB-PL-B01-2

100A

CB-PL-B01-2

LOAD

30A

LOAD-PL-B01-2

NEW NAME:

PL-B01-1A

PL-B01-1

208V

PL-B01-2

208V

4 4

LOAD-UL-25-2

UL-25-2

VOLTAGE: 208V

CB-UL-25-2

LOAD

20A

LOAD-UL-17-1

UL-17-1

VOLTAGE: 208V

CB-UL-17-1

LOAD

40A

UL-25-1

VOLTAGE: 208V

UL-15-1

VOLTAGE: 208V

DL-B05-1

VOLTAGE: 208V

UL-65-2 RISER

VOLTAGE: 208V

TO XF-T-7 B0504

RE: E0142

LOAD-UL-65-3

UL-65-3

VOLTAGE: 208V

CB-UL-65-3

LOAD

20A

MCB-UL-15-1

225A

CB-UL-15-1

300A

MCB-UL-65-3

100A

CB-UL-65-2

300A

MCB-UL-17-1

225A

CB-UL-17-1

400A

LOAD-EUL-Q-24-1

EUL-Q-24-1

VOLTAGE: 208V

CB-EUL-Q-24-1

LOAD

30A

MCB-EUL-Q-24-1

200A

CB-EQT-1 2474A

70A

XF-EQT-1 2474A

75KVA

480V/208V

MCB-EPH-Q-24-1

1200A

CB-EPH-Q-24-1

800A

EPH-Q-24-1

VOLTAGE: 480V

LOAD-EUL-Q-24-4

EUL-Q-24-4

VOLTAGE: 208V

CB-EUL-Q-24-4

LOAD

30A

EUL-Q-24-6

VOLTAGE: 208V

LOAD-EUL-Q-24-11

EUL-Q-24-11

VOLTAGE: 208V

CB-EUL-Q-24-11

LOAD

XF-EQT-13 2450

113KVA

480V/208V

CB-T-13

250A

EDH-307-Q-4

VOLTAGE: 480V

70-ATS-C

VOLTAGE: 208V

ATS-70-C

TO CB-ATS-EDH-307-Q4-E

RE: E0127

TO CB-ATS-EDH-307-Q-4-N

RE: E0127

E-602

BUILDING 111 PARTIAL SINGLE LINE

DIAGRAMS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 PARTIAL SINGLE LINE DIAGRAM

SCALE: N.T.S.

1. REPLACE EXISTING 600A FUSIBLE DISCONNECT

WITH NEW 450A BREAKER DISCONNECT.

2. REPLACE EXISTING 500KVA TRANSFORMER WITH

A NEW 300KVA TRANSFORMER.

3. RETROFIT EXISTING DL-B01-2.

4. REPLACE EXISTING PANELBOARD.

5. DEMOLISH EXISTING PL-B01-2. REFEED EXISTING

LOADS TO PL-B01-1.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

CB-PL-B04-1 LOAD

20A

PL-B04-1

VOLTAGE: 208V

LOAD-PL-B04-1

MCB-PL-B04-1

60A

XF-T-1 B0458

15KVA

480V/208V

TO CB-PH-B04-1

RE: E0144

CB-T-1 B0458

30A

PH-B04-1

VOLTAGE: 480V

CB-PL-B04-1 LOAD

20A

PL-B04-2

VOLTAGE: 208V

LOAD-PL-B04-2

MCB-PL-B04-2

100A

XF-T-2 B0458

25KVA

480V/208V

CB-T-2 B0458

40A

MCB-PH-B04-1

200A

LOAD-111-DH-B00-2

DH-B00-6

VOLTAGE: 480V

DH-B00-2

VOLTAGE: 480V

CB-DH-B00-2

LOAD

30A

CB-DH-B00-2

225A

DH-B00-7

VOLTAGE: 480V

DH-B00-8

VOLTAGE: 480V

DH-B00-9

VOLTAGE: 480V

DH-B00-3

VOLTAGE: 480V

DH-B00-4

VOLTAGE: 480V

DH-B00-5

VOLTAGE: 480V

DH-B00-1

VOLTAGE: 480V

DH-B00-10

VOLTAGE: 480V

LOAD-DH-B00-11

DH-B00-11

VOLTAGE: 480V

CB-DH-B00-11

LOAD

30A

CB-DH-B00-11

225A

DH-B00-17

VOLTAGE: 480V

DH-B00-12

VOLTAGE: 480V

DH-B00-18

VOLTAGE: 480V

DH-B00-13

VOLTAGE: 480V

DH-B00-19

VOLTAGE: 480V

DH-B00-14

VOLTAGE: 480V

DH-B00-20

VOLTAGE: 480V

DH-B00-15

VOLTAGE: 480V

DH-B00-16

VOLTAGE: 480V

DH-B00-21

VOLTAGE: 480V

TO CB-B00-1, 10

RE: E0144

CB-UL-34-2 LOAD 70A

UL-34-2

VOLTAGE: 208V

LOAD-UL-34-2

UL-34-1

VOLTAGE: 208V

UL-24-4

VOLTAGE: 208V

MCB-UL-34-1

100A

MCB-UL-24-4

225A

CB-PL-B04-2

150A

CB-UL-14-3 LOAD

20A

UL-14-3

VOLTAGE: 208V

LOAD-UL-14-3

CB-UL-14-4 LOAD

20A

UL-14-4

VOLTAGE: 208V

LOAD-UL-14-4

MCB-UL-14-3

70A

CB-UL-14-3

225A

MCB-UL-14-4

100A

CB-UL-14-4

225A

DL-B04-1

VOLTAGE: 208V

UL-B04-5

VOLTAGE: 208V

CB-UL-14-5 LOAD 20A

UL-14-5

VOLTAGE: 208V

LOAD-UL-14-5

MCB-UL-14-5

200A

XF-T-2 1257

75KVA

480V/208V

CB-T-UL-14-1,5

200A

DH-B02-1,2

VOLTAGE: 480V

TO CB-DH-B02-1

RE: E0127

XF-T-4 B0450

25KVA

480V/208V

CB-T-DL-B04-1

600A

LOAD-UL-105-1

UL-105-1

VOLTAGE: 208V

CB-UL-105-1 LOAD

20A

MCB-UL-105-1

100A

CB-UL-105-1

100A

LOAD-UL-25-3

UL-25-3

VOLTAGE: 208V

CB-UL-25-3 LOAD

20A

MCB-UL-25-3

100A

LOAD-UL-15-4

UL-15-4

VOLTAGE: 208V

CB-UL-15-4 LOAD

20A

MCB-UL-15-4

225A

TO XF-T-6 B0531

RE: E0142

DL-B05-2

VOLTAGE: 208V

UL-15-3

VOLTAGE: 208V

LOAD-LL-55-1 LOAD-LL-45-1

CB-LL-55-1

LOAD

20A

CB-LL-45-1

LOAD

20A

MCB-LL-45-1

100A

MCB-LL-55-1

100A

CB-LL-35-1

300A

LL-55-1

VOLTAGE: 208V

UL-45-1

VOLTAGE: 208V

LL-45-1 RISER

VOLTAGE: 208V

LL-35-1

VOLTAGE: 208V

CB-UL-35-3

300A

MCB-UL-85-3

225A

CB-UL-5536-1

60A

CB-UL-45-2 LOAD

20A

MCB-UL-45-2

225A

MCB-UL-5536-1

60A

UL-5536-1

VOLTAGE: 208V

NEW NAME:

111-UL-55-1A

UL-55-1

VOLTAGE: 208V

UL-45-2

VOLTAGE: 208V

UL-45-2 RISER

VOLTAGE: 208V

UL-35-3

VOLTAGE: 208V

LOAD-UL-5536-1

LOAD-UL-45-2

1 1

E-603

BUILDING 111 PARTIAL SINGLE LINE

DIAGRAMS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAMS

SCALE: N.T.S.

1. REPLACE EXISTING PANELBOARD.

2. DEMOLISH EXISTING LL-55-1. REFEED THE

EXISTING LOAD TO THE NEW PANEL UL-55-1A.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

CB-EUL-CR-24-3

150A CB-EUL-CR-15-1

100A

MCB-EUL-CR-15-1

100A

CB-EUL-CR-15-1 LOAD

20A

MCB-EUL-CR-24-3

225A

CB-EUL-CR-24-4 LOAD

20A

MCB-EPL-CR-B06-1

600A

XF-ECRT-8-B0602EC

225KVA

480V/208V

EPL-CR-B06-1

208V

EUL-CR-15-1

208V

EUL-CR-24-3

208V

EUL-CR-24-4

208V

LOAD-EUL-CR-24-4

LOAD-EUL-CR-15-1

TO EDH-CR-5

XF-ECRT-2 B0123A

75KVA

480V/208V

MCB-EDL-CR-B01-1

300A

CB-EUL-CR-B01-1

100A

CB-EUL-CR-11-2

100A

EUL-CR-B01-1

208V

EUL-CR-11-2

208V

LOAD-EUL-CR-B01-1

LOAD-EUL-CR-11-2

EDL-CR-B01-1

208V

TO EDH-212-CR-2

CB-EUL-CR-75-1 LOAD

20A

EUL-CR-75-1

208V

LOAD-EUL-CR-75-1

CB-EUL-CR-65-1 LOAD

20A

EUL-CR-65-1

208V

LOAD-EUL-CR-65-1

CB-EUL-CR-75-1

100A

CB-EUL-CR-65-1

100A

XF-ECRT-1 B0531EC

75KVA

480V/208V

MCB-EDL-CR-B05-1

300A

TO EDH-212-CR-2

EDL-CR-B05-1

208V

XF-ECRT-9 B0255

225KVA

480V/208V

MCB-EDL-CR-B05-1

300A

TO EDH-212-CR-2

EPL-CR-B02-1

208V

CB-EUL-CR-B02-1

225A

EUL-CR-B02-2

208V

LOAD-EUL-CR-B02-2

CB-EUL-CR-B02-2-LOAD

20A

MCB-EUL-CR-B02-2

100A

CB-EUL-CR-B02-2

100A

MCB-EUL-CR-B02-1

225A

EUL-CR-B02-1

208V

CB-EUL-CR-21-5

100A

CB-EUL-CR-21-4

LOAD

30A

CB-EUL-CR-21-4

100A

CB-EUL-CR-31-1

100A

CB-EUL-CR-41-1A

100A

CB-EUL-CR-61-1

100A

CB-EUL-CR-51-1

100A

CB-EUL-CR-71-1

100A

CB-EUL-CR-101-1

100A

CB-EUL-CR-81-1

100A

CB-EUL-CR-101-1A

100A

CB-EUL-CR-91-1

100A

EUL-CR-21-4

208V

EUL-CR-21-5

208V

EUL-CR-41-1A

208V

EUL-CR-31-1

208V

EUL-CR-91-1

208V

EUL-CR-101-1A

208V

EUL-CR-81-1

208V

EUL-CR-101-1

208V

EUL-CR-71-1

208VEUL-CR-61-1

208V

EUL-CR-51-1

208V

LOAD-EUL-CR-21-5

LOAD-EUL-CR-21-4

LOAD-EUL-CR-51-1 LOAD-EUL-CR-61-1

LOAD-EUL-CR-71-1

LOAD-EUL-CR-101-1

LOAD-EUL-CR-101-1A

LOAD-EUL-CR-81-1LOAD-EUL-CR-41-1A

LOAD-EUL-CR-31-1 LOAD-EUL-CR-91-1

XF-ECRT-1 10523E

15KVA

480V/208V

MCB-EUL-CR-105-1

50A

CB-ECRT-1 10523

30A

MCB-EUL-CR-105-1 LOAD

20A

CB-ELH-CR-105-1

90A

CB-EDCH-CR-85-2

100A

LOAD-EUL-CR-105-1

TS-TSXX

TO DH-B02-1,2 TO EDH-212-CR-2

ELH-CR-105-1

480V

EUL-CR-105-1

208V

EDCH-CR-85-2

480V

CB-BIG BERTHA

100A

LOAD-DH-B00-22

DH-B00-22

480V

CB-UL-51-2 LOAD

20A

LOAD-UL-51-2

UL-51-2

208V

CB-UL-21-2 LOAD

60A

LOAD-UL-21-2

UL-21-2

208V

CB-UL-61-1 LOAD

100A

LOAD-UL-61-1

UL-61-1

208V

MCB-UL-51-2

100A

MCB-UL-41-2

100A

MCB-UL-31-2

100A

CB-UL-31-2

150A

MCB-UL-21-1

225A

CB-UL-21-1

300A

MCB-UL-61-1

100A

CB-UL-61-1

200A

CB-DH-B00-22

225A

UL-21-1

208V

UL-41-2

208V

UL-31-2

208V

DL-B01-1

208V

MCB-DL-B01-1

1200A

CB-T-2 B0113-EC

600A

XF-T-2 B0113

300KVA

480V/208V

DH-B01-1

480V

TO SG-2N

1 1

1 1

NEW NAME:

EUL-CR-24-3A 2

CB-MTS-EUL-CR-33-1N

300A

MCB-EUL-CR-33-1

300A

NE

MTS-EUL-CR-33-1

CB-EUL-CR-33-1 LOAD

90A

EUL-CR-33-1

208V

LOAD-EUL-CR-33-1

MTS-EUL-CR-33-1

208V

TO DL-B06-1

E-604

BUILDING 111 PARTIAL SINGLE LINE

DIAGRAMS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAMS

SCALE: N.T.S.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

1. REPLACE EXISTING PANELBOARD.

2. REPLACE EXISTING TRANSFORMER.

3. DEMOLISH EXISTING EUL-CR-24-4. REFEED

EXISTING LOADS TO EUL-CR-24-3. RENAME NEW

PANEL TO EUL-CR-24-3A.

MCB-EUL-LS-24-2

100A

CB-EUL-LS-24-2 LOAD

20A

CB-EUL-LS-24-4 LOAD

30A

MCB-EUL-LS-24-9

100A

CB-ELST-12

250A

LOAD-EUL-LS-24-2LOAD-EUL-LS-24-4

XF-ELST-12-2450

113KVA

480V/208V

EUL-LS-24-2

208V

EUL-LS-24-4

208V

EUL-LS-24-9

208V

EDH-106-LS-1

480V

TO SG-1LS

CB-LH-84, 94-1 RISER

150A

MCB-LH-84-1

100A

MCB-LH-94-1

100A

CB-T-17 9407EC

50A

CB-UL-93-1

100A

CB-UL-93-1 LOAD

20A

CB-UL-94-2 LOAD

20A

XF-T-17 9407EC

45KVA

480V/208V

CB-UL-24-3 LOAD

30A

MCB-UL-24-3

225A

MCB-UL-14-6

225A

CB-UL-14-6

300A

MCB-EUL-LS-24-2

100A

MCB-EUL-LS-24-2

100A

XF-ELST-12-2450

113KVA

480V/208V

LH-84-1

480V

LH-94-1

480V

UL-94-1

208V

UL-94-2

208V

UL-93-1

208V

DH-B04-2

480V

DL-B04-2

208V

UL-14-6

208V

UL-14-7

208V

UL-24-3

208V

LOAD-UL-94-3

LOAD-UL-94-2

LOAD-UL-24-3

MCB-DH-B04-2

1200A

TO SG-1N

EDL-CR-41-1

70A

MCB-EUL-CR-41-1

100A

CB-EUL-CR-41 LOAD

20A

CB-70-PANEL 25 LOAD

30A

CB-70-PANEL 25 LOAD

30A CB-70-PANEL 25 LOAD

30A

CB-70-PANEL 25 LOAD

30A

CB-70-PANEL 25 LOAD

30A

CB-70-PANEL 25 LOAD

30A

CB-70-PANEL 25 LOAD

30A

CB-70-PANEL 25 LOAD

30A

XF-ECRT-14 4163EC

30KVA

480V/208V

EUL-CR-41-1

208V

ELH-CR-41-1

480V

EUL-CR-B00-1

208V

EUL-CR-B00-3

208V

ATS-8

480V

XF-ECRT-G-B0034

45KVA

480V/208V

LOAD-EUL-CR-41-1

LOAD-EUL-CR-B00-3

TO SG-2CR

EDH-204-CR-5

480V

ATS-ATS-8

TO EDH-108-LS-6

MCC-G

480V

DL-G

480V

NEW NAME:

UL-94-1A

(4) 1-0AWG,

(1) 6AWG EG

1-1/2"C

(3) 4AWG, (1) 8AWG EG

1"C

(3) 6AWG, 8AWG EG

150ASPLICE BOX

IN RM 9407EC

MCB-UL-94-1

150A6

CB-EUL-LS-26-2 LOAD

30A

LOAD-EUL-LS-26-2

EUL-LS-26-2

208V

MCB-EUL-LS-26-2

100A

XF-ELST-23-2611

45KVA

480V/208V

CB-ELST-23-2611

70A

EPH-LS-26-1

480V

MCB-EPH-LS-26-1

400A

CB-EPH-LS-26-1

400A

E-605

BUILDING 111 PARTIAL SINGLE LINE

DIAGRAMS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAMS

SCALE: N.T.S.

1. REPLACE EXISTING PANELBOARD.

2. REPLACE PANELBOARD MCC-G AND REFEED

EXISTING LOADS. RENAME NEW PANEL DL-G.

3. REPLACE EXISTING TRANSFORMER.

4. DEMOLISH EXISTING UL-94-2. REFEED EXISTING

LOADS TO UL-94-1. RENAME NEW PANEL UL-94-1A.

5. PROVIDE NEW 150A CIRCUIT BREAKER

DISCONNECT.

6. REFEED UL-93-1 WITH NEW CONDUCTORS TO

EXISTING TRANSFORMER SPLICE BOX IN RM

9407EC.

7. RETROFIT EXISTING PANELBOARD WITH NEW

INTERNAL COMPONENTS AND BUSSES.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

XF-ECRT-3 B0460

30KVA

480V/208V

CB-T-25 LAB PANELS

400A

CB-ET-3 BSMT B SOUTH

125A

MCB-EUL-CR-B04-3

400A

CB-EUL-CR-B04-3 LOAD

30A

LOAD-EUL-CR-B04-3

MCB-ELH-CR-B02-1

100A

CB-ELH-3-BA, 1A, 2A

250A

CB-ELH-CR-B02-1 LOAD

20A

ELH-CR-12-1

480V

ELH-CR-22-1

480V

EUL-CR-24-1

208V

EUL-CR-26-2

208V

EUL-CR-26-3

208V

EUL-CR-26-6

208V

EUL-CR-26-8

208V

EUL-CR-26-1

208V

EUL-CR-26-5

208V

MCB-EUL-CR-24-1

100A

MCB-EUL-CR-26-2

100A

MCB-EUL-CR-26-3

100A

MCB-EUL-CR-26-6

100A

MCB-EUL-CR-26-8

100A

MCB-EUL-CR-26-1

100A

MCB-EUL-CR-26-5

100A

EUL-CR-26-12

208V

EUL-CR-26-9

208V

EUL-CR-26-11

208V

EUL-CR-26-15

208V

EUL-CR-26-7

208V

EUL-CR-26-10

208V

EUL-CR-26-13

208V

MCB-EUL-CR-26-12

100A

MCB-EUL-CR-26-9

100A

MCB-EUL-CR-26-11

100A

MCB-EUL-CR-26-15

100A

MCB-EUL-CR-26-7

100A

MCB-EUL-CR-26-10

100A

MCB-EUL-CR-26-13

100A

ES-ECRT-25 2

250A

ES-ECRT-25 1

250A

TO SG-2CR

EDH-212-CR2

480V

EUL-CR-B04-3

208VLOAD-ELH-CR-22-1LOAD-ECRT-25-1

LOAD-ECRT-25-2

ECRT-25 BUS 0

208V

ECRT-25 BUS

208V

ELH-CR-B02-1

480V

CB-EQT-18 10300

100A

XF-EQT-18 10300

30KVA

480V/208V

LOAD-EUL-Q-103-1

XF-EQT-2 10300

45KVA

480V/208V

EUL-Q-103-1

208V

EUL-Q-93-2

208V

EPH-Q-103-1

480V

TO CB-EPH-Q-103-1

CB-EQT-18 10300

60A

1PH #6 3-1/C+G, 1" C

1PH 1/0 4-1/C+G, 1 1/2" C

XF-111-ECRT-25 2429EC

225 KVA

480V/208V

DELTA / WYE-GROUND

EXISTING FUSIBLE DISCONNECT

2PH 500 4-1/C+G, TROUGH

1PH 500 4-1/C+G, TROUGH

111111

1 1 1 1

E-606

BUILDING 111 PARTIAL SINGLE LINE

DIAGRAMS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAM

SCALE: N.T.S.

1. REPLACE EXISTING PANELBOARD.

2. REPLACE EXISTING 45KVA TRANSFORMER.

3. REPLACE AND RELOCATE EXISTING 225 KVA

TRANSFORMER.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

MDP-B

1 2 3 4 5 6 7

WIRE

PULL

SECTION

BRKR #10

BRKR #11

BRKR #9

BRKR #19

BRKR #20

BRKR #21

BRKR #7

BRKR #8

BRKR #12

#13 #14

#15 #16

#17 #18

BLANK BLANK

ANALOG

POWER METER

DIGITAL

POWER METER

BRKR #0 BRKR #1

BRKR #2

BRKR #4

BRKR #5

BRKR #6

BRKR #3

BRKR #00

G

CB-70-R

1600A

CB-70-AB

1600A

CB-E-70-ATS-AB

1600A CB-N-70-ATS-AB

1600A

MCB-70-MDP-70-B

1600A

MCB-70-MDP-70-A

800A

CB-70-PANEL CLOAD

40A

CB-70-PANEL BLOAD

40A

CB-70-TANK RM LOAD

30A

CB-70-RM70-A-10 LOAD

30A

CB-70-PANEL DLOAD

20A

CB-70-PANEL ALOAD

20A

CB-70-MDP-70-A

800A

MCB-70-UL/LL-B4-1

225A

MCB-70-PANEL B-22

225A

CB-70-REF SHOP PNL

100A

CB-70-PP1 LOAD

125A

CB-70-REF SHOP PANEL LOAD

20A

CB-70-PANEL B21

70A

CB-70-UL/LL-B4-1 LOAD

40A

CB-70-PANEL B-21 LOAD

20A

CB-70-A ELEV

225A

CB-70-PANEL 70A1

100A

CB-70-PANEL 39

100A

CB-70-C-PANEL 38

100A

CB-70-PANEL

100A

CB-70-A WING 2ND W

100A

CB-70-PANEL 1,2,3 W

100A

CB-70-PANEL 1

225A

CB-70-PANEL 2

225A

CB-70-LS70-A1

30A

CB-70-C-PANEL 38 LOAD

20A

MCB-70-PANEL A-5

100A

MCB-70-PANEL A-21

100A

MCB-70-PANEL A-31

100A

MCB-70-PANEL A-7

225A

CB-70-A1A

200A

CB-70-A1B

200A

CB-70-PANEL A-5

LOAD

20A

CB-70-PANEL A-21

LOAD

40A

CB-70-PANEL A-31

LOAD

40A

CB-70-PANEL A-7

LOAD

30A MCB-70-PANEL A-22

225A

MCB-70-PANEL A-32

225A

CB-70-PANEL A-32

LOAD

100A

CB-70-PANEL A-22

LOAD

30A

MCB-70-PANEL 38 (LS)

150A

MCB-70-PANEL 37

100A

CB-70-PANEL 38

LOAD (LS)

30A

CB-70-PANEL 37

LOAD

20A

70-A ELEV

40 HP

70-B ELEV

30 HP

FS-70-XF-GE EQUIPM

RM 140

400A

CB-70-ATS-SE70-B

600A

CB-70-ATS-70SE-B1

600A

CB-70-LS70-B ATS

200A

CB-70-PANEL C

200A

CB-70-B ELEV

200A

CB-70-PANEL B

200A

CB-70-TANK RM PANEL

100A

CB-70-RM 70-A-10

100A

CB-70-PANEL D

100A

CB-70-PANEL A

100A

CB-70-UL/LL-B4-1

200A

CB-70-ACREPAIR RM

100A

CB-70-PP1

400A

FS-70-GE EQUIP RM 140

200A

LOAD-70-PANEL C LOAD-70-PANEL B

LOAD-70-TANK RM LOAD-70-RM 70-A-10 LOAD-70-PANEL D LOAD-70-PANEL A

LOAD-70-UL/LL-B4-1

LOAD-70 REF SHOP

PANEL

LOAD-70-PANEL B21

LOAD-70-L-S70-A1 LOAD-70-PANEL 39 LOAD-70-PANEL 38

LOAD-70-PANEL A-5 LOAD-70-PANEL A-21 LOAD-70-PANEL A-31 LOAD-70-PANEL A-7

LOAD-70-PANEL 38 (LS) LOAD-70-PANEL 37

LOAD-70-PANEL A-22 LOAD-70-PANEL A-32

LOAD-70-GE EQMT 140

70-PANEL 38 (LS)

208V

70-PANEL 37

208V

70-LS70-A1

208V

70-PANEL 39

208V

70-C-PANEL 38

208V

70-PANEL A-5

208V

70-PANEL A-21

208V

70-PANEL A-31

208V

70-PANEL A-7

208V

70 A-2 RISER

208V

70-MDP-70-A

208V

NEW NAME:

UL-BBN-70-11

70-PANEL B-21

208V

70-REF SHOP PANEL

208V

70-PP1

208V

70-MDP-70-B

208V

GE N-70-ABE BUS

208V

NEW NAME:

UL-BBN-70-10

70-PANEL B-22

208V

70-UL/LL-B4-1

208V

70-PANEL C

208V

70-PANEL B

208V

70-TANK ROOM

208V

70-RM 70-A-10

208V

70-PANEL D

208V

70-PANEL A

208V

70-PANEL A-22

208V

70-PANEL A-32

208V

GEN-70-ABE

208V

600KW/750KVA

RL-70 GEN ABE

ATS-70-AB

70-ATS-AB

208V XF-70-GE EQUIP RM 140

225KVA

480V/208V

TO XF-70-BLDG 70

XFMR AB RE: E0102

TO CBL-E-70-MDP-70-E

RE: E0122

TO ATS-70-SE70-B

RE: E0124

TO ATS-70-SE70-B1

RE: E0124

TO ATS-70-LS70-B

RE: E0124

TO CBL-70-DL-SB-BB N-1

RE: E0123

CB-70-EDL-CR-B5-2

600A

3 4 8 2 5 6 11 17 14 16 21 18 19 20

TO 70-SE-UL-70B

RE: E0124

TO 70-SE-UL-70B1

RE: E0124

2PH #350,

4-1/C+G

MAGNETIC

CONDUIT

2PH #350,

4-1/C+G

MAGNETIC

CONDUIT

15 1

NEW NAME:

UL-BAS-70-4

100A

TVSS

CB-70-DL-SB-BBN-1

600A

E-607

BUILDING 70 A/B SINGLE LINE DIAGRAM

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 FRONT ELEVATION

SCALE: N.T.S.2 BUILDING 70 A/B SINGLE LINE DIAGRAM

SCALE: N.T.S.

1. RETROFIT THE EXISTING SWITCHBOARD MDP-70B

AS FOLLOWS:

- REPLACE EXISTING MAIN AND FUSIBLE CIRCUIT

BREAKERS AS SHOWN ON THE LOAD

SCHEDULE.

- PROVIDE A NEW TVSS WITH A DISCONNECT

BREAKER.

- PROVIDE NEW FRONT COVER FOR EACH

VERTICAL SECTION. HINGED DOOR IS

REQUIRED IF THE CIRCUIT BREAKERS ARE

ON PANELBOARD.

- KEEP POWER METERS (ANALOG AND DIGITAL).

2. DEMOLISH EXISTING CIRCUIT. SECURE AND CAP

THE EMPTY CONDUIT IN PLACE

3. PROVIDE NEW CIRCUIT AND CONDUIT.

4. DEMOLISH EXISTING PANEL 39.

5. REPLACE EXISTING PANELBOARD.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

G

GEN-70-CD

208V

600KW/750KVA

TO XF-70-BLDG 70 XFMR C

RE: E0101

TO CB-70-E

RE: E0102

TO ATS-70-LS70-C

RE: E0124

TO ATS-70-SE70-C

RE: E0124

TO CBL-70-DL-SB-BCN-1

RE: E0123

TO MCB-70-EDL-CR-B5-1

RE: E0126

CB-70-C

1600A

CB-70-D

1600A

CB-E-70-ATS-C

1600A

CB-N-70-ATS-C

1600A

MCB-70-MDP-70-C

1600A

MCB-70-PANEL V C1-3

225A

MCB-70-C-PANEL A/B

225A

MCB-70-C2-3A

200A

MCB-70-CB-7

125A

MCB-70-C1-1A

225A

MCB-70-C1-2A

225A

MCB-70-C2-1A

225A

MCB-70-C2-2A

225A

MCB-70-C2-3B

200A

MCB-70-C221-A

200A

MCB-70-C221-B

200A

CB-70-C-220 RIGAKU

100A

CB-70-10-C-2

1600A

CB-70-C221-B LOAD

50A

CB-70-C221-A

100A

CB-70-C2-3B LOAD

50A

CB-70-C2-2A LOAD

20A

CB-70-C2-1A LOAD

30A

CB-70-C1-2A LOAD

20A

CB-70-C1-1A LOAD

30A

CB-70-CB-6 LOAD

30A

CB-70-CB-7 LOAD

20A

CB-70-C1 10

100ACB-70-C-2S STAIR

SUBFEED

150A

CB-70-PANEL V C1-3

LOAD

30A

MCB-70-C-2S STAIR

225A

MCB-70-C1 10

100A

CB-70-C-2S STAIR

LOAD

50A

CB-70-C1 10 LOAD

20A

MCB-70-C2-1

100A

MCB-70-C1-1

100A

MCB-70-CB-1

100A

CB-70-CB-1, C1-1, C2-1

300A

CB-70-CB-3, C1-3, C2-3

250A

CB-70-MED RECORDS

200A

CB-70-C1-2, C2-2

200A

CB-70-CB-2

100A

CB-70-CB-4

100A

CB-70-CB-5

100A

CB-CLOTHING RM

PANEL

100A

MCB-70-CB-3

100A

MCB-70-C1-3A

200A MCB-70-UL-70-B-6

225A

MCB-70-C2-1 LOAD

30A

CB-70-C1-1 LOAD

20A

CB-70-CB-1 LOAD

30A

CB-70-CB-3 LOAD

20A

CB-70-C1-3A LOAD

20A

CB-70-UL-70-B-6

LOAD

40A

CB-70-CB-8 LOAD

30A

CB-70-CB-4 LOAD

20A

CB-70-CB-5 LOAD

30A

CB-70-C-AC

100A

CB-70-ATS-LS70-C

100A

CB-70-SE70C

600A

CB-70-WING C 1ST

CENTER

225A

CB-70-WING C 2ND

CENTER

225A

CB-70-C2-3A

200A

CB-70-CB-1A

125A

CB-70-CB-6

100A

CB-70-C1-1A

200A

CB-70-C1-2A

200A

CB-70-C2-1A

200A

CB-70-C2-2A

200A

CB-70-C2-3B

200A

CB-70-C2-4

225A

CB-70-C2-5

225A

CB-70-WEST

PANEL

400A

CB-70-DL-SB-BCN-1

600A

MCB-70-CB-5

100A

GEN-70-CD BUS

VOLTAGE: 208V

70-MDP-70-C

VOLTAGE: 208V

70-10-C-2

VOLTAGE: 208V

70-C221-B

VOLTAGE: 208V

70-C221-A

VOLTAGE: 208V

70-C2-3B

VOLTAGE: 208V

70-C2-2A

VOLTAGE: 208V

70-C2-1A

VOLTAGE: 208V

70-C1-2A

VOLTAGE: 208V

70-C1-1A

VOLTAGE: 208V

70-CB-6

VOLTAGE: 208V

70-CB-7

VOLTAGE: 208V

70-C2-3A

VOLTAGE: 208V

70-C-PANEL A/B

VOLTAGE: 208V

70-PANEL V C1-3

VOLTAGE: 208V

70-WEST PANEL

VOLTAGE: 208V

70-CB-5

VOLTAGE: 208V

70-CB-4

VOLTAGE: 208V

70-CB-8

VOLTAGE: 208V

70-UL-70-B-6

VOLTAGE: 208V

70-C1-3A

VOLTAGE: 208V

70-CB-3

VOLTAGE: 208V

70-CB-1

VOLTAGE: 208V

70-C1-1

VOLTAGE: 208V

70-C2-1

VOLTAGE: 208V

70-C110

VOLTAGE: 208V70-C-2S STAIR

VOLTAGE: 208V

MTR I-70-C-AC

POWER: 10HP

LOAD-70-PANEL VC1-3

LOAD-70-C-2S STAIR LOAD-70-C110

LOAD-70-CB7 LOAD-70-CB6 LOAD-70-C1-1A LOAD-70-C1-2A LOAD-70-C2-1A LOAD-70-C2-2A LOAD-70-C2-3B LOAD-70-C221-A LOAD-70-C221-B

LOAD-70-10-C-2

LOAD-70-C2-1 LOAD-70-C1-1 LOAD-70-CB-1

LOAD-70-CB-3 LOAD-70-C1-3A LOAD-70-UL-70-B-6

LOAD-70-CB-8 LOAD-70-CB-4

LOAD-70-CB-5

70-C-1 RISER

VOLTAGE: 208V

70-ATS-C

VOLTAGE: 208V

ATS-70-C

RL-70-GEN CD

CB-70-EDL-CR-B5-1

600A

2 3 5 9 6 7 4 119 18 11 10 13 12 14 15

TO 70-SE-UL-70-C

RE: E0124

2PH #350,

4-1/C+G

MAGNETIC

CONDUIT

NEW NAME:

DL-BCN-70-3

NEW NAME:

UL-BCN-70-4

NEW NAME:

UL-2CN-70-1

NEW NAME:

UL-2CN-70-8

NEW NAME:

UL-2CN-70-9

4 4 4

100A

TVSS

BRKR #2

BRKR #3

BRKR #4

BRKR #5

BRKR #6

BRKR #7

BRKR #8

BRKR #9

BRKR #10

BRKR #11

BRKR #12

MDP-C

1234567

BRKR #15

BRKR #16

BRKR #19

#17 #18

BRKR #13

BRKR #14

ANALOG

POWER

METER

BRKR#1 BRKR #0

DIGITAL

POWER

METER

CABLE

PULL

SECTION

BRKR #00

E-608

BUILDING 70 C SINGLE LINE DIAGRAM

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 FRONT ELEVATION

SCALE: N.T.S.2 BUILDING 70 C SINGLE LINE DIAGRAM

SCALE: N.T.S.

1. RETROFIT THE EXISTING SWITCHBOARD MDP-70B

AS FOLLOWS:

- REPLACE EXISTING MAIN AND FUSIBLE CIRCUIT

BREAKERS AS SHOWN ON THE LOAD

SCHEDULE.

- PROVIDE A NEW TVSS WITH A DISCONNECT

BREAKER.

- PROVIDE NEW FRONT COVER FOR EACH

VERTICAL SECTION. HINGED DOOR IS

REQUIRED IF THE CIRCUIT BREAKERS ARE

ON PANELBOARD.

- KEEP POWER METERS (ANALOG AND DIGITAL).

2. DEMOLISH EXISTING CIRCUIT. SECURE AND CAP

THE EMPTY CONDUIT IN PLACE

3. PROVIDE NEW CIRCUIT AND CONDUIT

4. REPLACE EXISTING PANELBOARD.

A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK

DETAILS AND DRAWING REFERENCES OF EACH

EQUIPMENT.

B. REFER TO PANEL SCHEDULES FOR THE

COMPLETE MAIN AND CIRCUIT BREAKER SIZES

AND ARRANGEMENTS.

S06 - Amended Drawings