S06 - Drawings 21-30.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--Upgrade Electrical Systems Area 1 695-19-101 Federal contract opportunity
- Solicitation number
- 36C25220B0022
About this file
This pre-solicitation notice announces an upcoming solicitation for an upgrade to plumbing systems project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project scope involves infection control, plumbing, and demolition work to upgrade plumbing systems for Legionella prevention. The project value is estimated between $5 million to $10 million. The solicitation will be posted to FedBizOpps on or about May 14, 2020, with bid opening scheduled for June 16, 2020. A pre-bid conference will be held to review the site. The North American Industry Classification Code is 236220 with a size standard of $36.5 million. The period of performance is 740 calendar days from notice to proceed. The solicitation will be a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Bidders must represent SDVOSB status, qualify as a small business, and be verified in the Vendor Information Pages database at time of bid submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 - Drawings 11-20.pdf | ||
| S06 - Drawings 41-50.pdf | ||
| S06 - Drawings 1-10.pdf | ||
| 36C25220B0022_1.docx | DOCX document | |
| S06 - Drawings 31-40.pdf | ||
| P07 - Davis Bacon WD.pdf | ||
| Previous RFIs and Answers.pdf | ||
| S06 - Amended Specifications.pdf | ||
| S06 - Drawings 51-66.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PNL-17
3/4"
POLE 141
TRAILER
S.L.
ON POLE
3/4"
17S
17N
XF-17
1 Ø
A-B Ø
75KVA
PNL-41
HVS-41
K
G
SOURCE "A"
G
HVP-42
G
HVP-44
G
XF-62
1 Ø
A-B Ø
75KVA
PNL-62
1/2" SL 3/4"
62N
62S
18N
18S
19N
19S
PNL-19
XF-19
1 Ø
A-B Ø
75KVA
G
PNL-27
HVP-41
POLE 108
RISER
POLE 1" PNL-16
XF-16
1 Ø
C-A Ø
50KVA
G
HVP-40
XF-12
3 Ø
75KVA
45 SOURCE "A"
SOURCE "A"
XF-27
3 Ø
75KVA
HVP-24
SOURCE "A"
SOURCE "A"
XF-14
1 Ø
B-C Ø
37.5KVA
PNL-14
SL
ON POLE
3/4"
SOURCE "B"
SOURCE "B"
SOURCE "B"
SOURCE "A"
XF-6
3 Ø
1000KVA
SOURCE "B"
HVP-27
11W 11E
PNL-11
150KVA
B-C
Ø
XF-11
1 Ø
SOURCE "A"
XF-7
3 Ø
225KVA
SOURCE "B"
XF-5
3 Ø
225KVA
HVP-30
SOURCE "A"
SOURCE "B"
SOURCE "B"
HVP-29
SOURCE "A"
SOURCE "A"
SOURCE "B"
68 SOURCE "A"
SOURCE "B"
XF-2
SOURCE "A"
SOURCE "B"
HVP-31
SOURCE "A"74
SOURCE "A"
HVP-36
SOURCE "A"
SOURCE "B"
XF-3
3 Ø
BACK FEEDS TO
EXIST. SL.CKT
3/4"
POLE
PNL-3
HVP-34
XF-1
3 Ø
FOUNTAIN
SL ON B.1
3/4"
4 3
XF-36
3 Ø
75KVA
HVS-36
K
SOURCE "A"
SOURCE "A" 81
XF-20
3 Ø
112.5KVA
XF-97
3 Ø
75KVA
20 97
XF-108
3 Ø
112.5KVA
PNL 108
BUTLER BLDG/BLUFF
PNL-K
XF-K
1 Ø
37.5KVA
B-C Ø
SOURCE "A"
SPARE
SUMP PUMPS
EXISTING TO REMAIN
XF-1301
3 Ø
112.5KVA
HVS-1301
G
HVS-A
13.2KV BUS ACB IN B-115
SEE E-25
EX
N
SL1
PNL-SL1
SOURCE "B"
3 2
SOURCE "A"
SOURCE "B"
SOURCE "A"
XF-SL1
1 Ø
37.5KVA
HVS-SL1
K
HVP-K
HVP-2
7 6
HVP-3
K
SOURCE "A"8
SOURCE "B"9
HVP-4
SOURCE "A"
11SOURCE "B"
K
HVS-4
XF-43
3 Ø
PROVIDED UNDER
SEPERATE CONTRACT
NEW
XF-112
3 Ø
K
HVS-18
SOURCE "B"
SOURCE "A"
HVP-18
SOURCE "A"
XF-49
1 Ø
C-A Ø
75 KVA
PNL-49
8450S
50H
49S
49N
3/4"
ON POLE 222
SL
SOURCE "A"
SOURCE "B"
SOURCE "B"23
SOURCE "A"24
SOURCE "B"
K
HVS-16
XF-40
1 Ø
C-A Ø
50KVA
XF-119
3 Ø
75KVA
119 40
SOURCE "A"
HVP-16
SOURCE "B" SOURCE "A"
HVP-15
SOURCE "B"34
SOURCE "A"
SOURCE "B"13
SOURCE "A"12
SOURCE "B"
SOURCE "A"
HVS-146
K
SOURCE "A"
SOURCE "B"
XF-41
3 Ø
225KVA
39 STORAGE
PNL-39
XF-39
1 Ø
B-C Ø
37.5KVA
XHVS-11
K
SOURCE "A"
SOURCE "B"
HVP-8
SOURCE "A"
HVP-11
SOURCE "B"
SOURCE "B"
XF-37
1 Ø
B-C Ø
37.5KVA
SL ON POLE 73
FEED FROM PANEL
IN
BLD 37 3/4"
SOURCE
"A"
XF-146
3 Ø
225KVA
CL1
XF-CL1
3 Ø
750KVA
XF-2 BLDG-102
3 Ø
REMOVE EX
HVP-21
HVS-20
K
SOURCE "A"
SOURCE "B"
HVP-22
HVP-20
SOURCE
"B"
HVS-22
K
PRIMARY CABLE SCHEDULE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
CABLE NO. NO. OF CABLES
2 (B-C)
2 (B-C)
2 (B-C)
2 (B-C)
2 (C-A)
2 (C-A)
2 (C-A)
2 (A-B)
2 (A-B)
2 (A-B)
2 (A-B)
2 (A-B)
2 (B-C)
2 (B-C)
CONNECTED FROM CONNECTED TO LENGTH FT.
CB BLD 115
HVS A
HVS A
HVP K
HVP K
HVP 2
HVP 2
HVP 3
HVP 3
HVP 4
HVP 4
HVP 4
HVP 4
HVP 8
HVP 8
HVP 8
HVP 8
HVP 11
HVP 11
HVS 11
HVP 3
HVP 3
HVP 15
HVP 15
HVP 16
HVP 16
HVS 16
HVS 16
HVP 15
HVP 15
HVP 18
HVP 18
HVP 18
HVP 15
HVP 15
HVP 20
HVP 20
HVS 20
HVP 20
HVP 20
HVP 22
HVP 22
HVP 23
HVP 23
HVP 24
HVS 18
HVP 40
HVP 41
HVP 41
HVP 41
HVP 42
HVP 42
HVP 44
HVP 44
HVP 24
HVP 24
HVP 27
HVP 27
HVP 27
HVP 27
HVP 29
HVP 29
HVP 30
HVP 30
HVP 30
HVP 29
HVP 29
HVP 29
HVP 29
HVP 31
HVP 31
HVP 31
HVP 31
HVP 31
HVP K
HVS 4
HVP 34
HVP 34
HVP 36
HVP 36
HVP 36
HVP 27
HVP-27
HVP-36
HVS-36
HVS 17
HVP-K
HVP-K
HVP 2
HVP 2
HVP 3
HVP 3
HVP 4
HVP 4
HVS 4
HVS 4
HVP 8
HVP 8
XF 41
XF 41
HVP 11
HVP 11
HVS 11
HVS 11
XF 39
HVP 15
HVP 15
HVP 16
HVP 16
HVS 16
HVS 16
XF 119
XF 40
HVP 18
HVP 18
HVS 18
HVS 18
XF 49
HVP 20
HVP 20
HVS 20
HVS 20
XF-2 BLDG-102
HVP 22
HVP 22
HVP 23
HVP 23
HVP 24
HVP 24
HVP 40
XF 112
HVP 41
XF 12
XF 16
HVP 42
XF 17
HVP 44
XF 19
XF 62
HVP 27
HVP 27
XF 6
XF 6
HVP 29
HVP 29
HVP 30
HVP 30
XF 11
XF 7
XF 7
XF 5
XF 5
HVP 31
HVP 31
XF 3
XF 3
XF 2
XF 2
HVP 34
XFK
XF-43
XFI
HVP 36
XF 20
XF 97
XF 108
XF-27
XF-27
HVS-36
XF-36
725 +
725 +
K
BUILDING #10
CABLE #10
KIRK-KEY
LEGEND
HVS-23B
HVS-23A
HVP-23
SOURCE
"A"
SOURCE
"B"
E-601
SINGLE-LINE DIAGRAM
PRIMARY POWER DISTRIBUTION
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 SINGLE LINE DIAGRAM
SCALE: N.T.S.
A. REFER TO ES101 FOR UNDERGROUND MV
FEEDER SITE PLAN
B. REFER TO ES102 FOR BLOCK DIAGRAM, FEEDER
SCHEDULE AND PROJECT CONSTRUCTION WORK
NOTES.
1. THIS DRAWING IS FOR INFORMATIONAL
PURPOSES ONLY.
2. SEE ES-102 FOR WORK DETAILS.
1 2
INFORMATION USE ONLY
DocuSign Envelope ID: 0CBD189B-3560-4332-8952-A636DB8D6073
3/20/2020
AREA OF WORK
KEY PLAN - BUILDING 70
N
RM A12
ELEV 70-A CIRC
ELEC 70-A CONTROLLER
UL-BAS-70-4
MDP-70-A
UL-BAS-70-5 EUL-LS-BAS-70-1 P-12
PANEL 39
ELEV 70-A CIRC
ELEC 70-A CONTROLLER
UL-BAS-70-4
MDP-70-A
UL-BAS-70-5 EUL-LS-BAS-70-1 P-12
EP109
BUILDING 70 BASEMENT ENLARGED FLOOR
PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM A-12
SCALE: 1/2" = 1' 0"3 BUILDING 70 BASEMENT NEW WORK PLAN - RM A-12
SCALE: 1/2" = 1' 0"
1. RETROFIT OR REPLACE THE PANELBOARD.
REFER TO DRAWING E-613 FOR EQUIPMENT
DETAILS.
2. DEMOLISH THE PANELBOARD. REFEED THE
EXISTING LOADS FROM NEW PANELBOARD
UL-BAS-70-4.
3. SEE PHOTO ON DETAIL 2.
4. SEE PHOTO ON DETAIL 4.
5. SEE PHOTO ON DETAIL 5.
X
NORTH
TRUE
0 1 2 4 NORTH
TRUE
0 1 2 4
5 BUILDING 70 - RM A-12
SCALE: N.T.S. 4 BUILDING 70 - RM A-12
SCALE: N.T.S. 2 BUILDING 70 - RM A-12
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
DocuSign Envelope ID: 84209D4E-67F0-4C20-902C-691E17F13049
12/4/2019
LUG KIT SHALL BE INSTALLED ON TRANSFORMER LUGS IN
SUCH A CONFIGURATION THAT TRANSFORMER INSULATED
LUG SUPPORT IS NOT BENT DUE TO EXCESSIVE STRESS
FROM TIGHT CONDUCTOR BEND RADIUS
MAIN BONDING JUMPER
PRIMARY
FEEDER
BOND TO CONDUIT VIA GROUND
BUSHING WITH LAY IN LUG-TYPICAL
PRIMARY FEEDER
EQUIPMENT GROUND
GROUND BAR
BOND SECURELY TO TRANSFORMER HOUSING,
NOT TO GRATE IN BOTTOM
MOUNT TRANSFORMER ON 4" THICK, 3000 PSI CONCRETE
PAD-PAD SHALL EXTEND 4" BEYOND TRANSFORMER ON
ALL SIDES-CHAMFER EDGES 3/4", RUB SURFACE SMOOTH
XO H1 L1 H2 L2 H3 L3
SECONDARY
FEEDER
SECONDARY FEEDER
EQUIPMENT GROUND
GROUNDED CONDUCTOR
(NEUTRAL)
GROUNDING ELECTRODEGROUNDING ELECTRODE
CONDUCTOR TO BUILDING
STEEL AND INTERIOR METAL
WATER PIPING.
STRUCTURAL CEILING
SUSPENDED CEILINGLIGHT FIXTURE
WALL
ELECTRICAL
EQUIPMENT
EXCLUSIVE
DEDICATED
SPACE
FRONT EDGE PLAN
OF ELECTRICAL
EQUIPMENT
SEE TABLE 'A'
CLEARANCE SHALL BE 30" OR WIDTH OF
EQUIPMENT IF EQUIPMENT IS WIDER THAN 30".
CLEARANCE DOES NOT HAVE TO BE CENTERED
WITH EQUIPMENT BUT AT MUST BE AT LEAST
EVEN WITH ONE EDGE. EQUIPMENT DOOR SHALL
BE ABLE TO OPEN AT LEAST 90 DEGREES.
NOTE:
THIS FIGURE ILLUSTRATES THE WORKING SPACE IN FRONT OF
ELECTRICAL EQUIPMENT REQUIRED BY NEC 110.16.
NOTE:
THIS FIGURE ILLUSTRATES THE EXCLUSIVE DEDICATED SPACE
REQUIRED ABOVE AND BELOW PANELBOARDS FOR ELECTRICAL
DISTRIBUTION TO AND FROM PANELBOARDS AS REQUIRED.
ALL ELECTRICAL EQUIPMENT
TABLE 'A' - WORKING CLEARANCE
STRUCTURAL CEILING
SUSPENDED CEILING
WALL
LIGHT FIXTURE
PANELBOARD
EXCLUSIVE
DEDICATED
SPACE
EXCLUSIVE
DEDICATED
SPACE
VOLTAGE TO GROUND
(NOMINAL)
MINIMUM CLEAR DISTANCE
0 - 150
150 - 600
3' - 0"
3' - 0"
3' - 0"
3' - 6"
3' - 0"
4' - 0"
CONDITION 1 CONDITION 2 CONDITION 3
EXCLUSIVE DEDICATED
SPACE CONTINUES THROUGH
SUSPENDED CEILING TO 25'-0"
AFF OR STRUCTURAL
CEILING, WHICHEVER IS
LOWER.
1.
2.
GENERAL NOTES:
ELECTRICAL EQUIPMENT INCLUDES BUT IS NOT LIMITED TO
PANELBOARDS, SAFETY SWITCHES, MOTOR STARTERS,
JUNCTION BOXES, AND OTHER ELECTRICAL
DISTRIBUTION AND CONTROLS EQUIPMENT.
PIPING, DUCTS OR EQUIPMENT FOREIGN TO THE
ELECTRICAL EQUIPMENT OR ARCHITECTURAL
APPURTENANCES SHALL NOT BE PERMITTED TO BE INSTALLED
IN, ENTER, OR PASS THROUGH THE DEDICATED SPACES
SHOWN ABOVE.
TABLE 'A' DEFINITIONS:
CONDITION 1:
CONDITION 2:
CONDITION 3:
EXPOSED LIVE PARTS ON ONE SIDE AND NO LIVE OR
GROUNDED PARTS ON THE OTHER SIDE OF THE
WORKING SPACE.
OR
EXPOSED LIVE PARTS ON BOTH SIDES EFFECTIVELY
GUARDED BY SUITABLE WOOD OR OTHER INSULATING
MATERIALS.
EXPOSED LIVE PARTS ON ONE SIDE AND GROUNDED
PARTS ON THE OTHER SIDE.
EXPOSED LIVE PARTS ON BOTH SIDES OF THE WORKING
SPACE (NOT GUARDED AS PROVIDED IN CONDITION 1)
WITH THE OPERATOR BETWEEN.
INSULATED WIRE OR INSULATED BUSBARS OPERATING AT NOT OVER
300V SHALL NOT BE CONSIDERED LIVE PARTS.
6' -6
" M
IN
IM
U
M
6' -6
" M
IN
IM
U
M
EXISTING
PANELBOARD
NEW
PANELBOARD
NEW CONDUITS
ELECTRICAL TROUGH
NEW CONDUITS
ELECTRICAL TROUGH
E-501
ELECTRICAL DETAILS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 DRY TYPE TRANSFORMER
SCALE: N.T.S.
2 DED. WORKING SPACE REQUIREMENT FOR ELECTRICAL EQUIPMENT
SCALE: N.T.S.
3 PANELBOARD REPLACEMENT - SURFACE MOUNT (TYPICAL)
SCALE: N.T.S.
UL-31-1
VOLTAGE: 208V
CB-UL-31-1 LOAD
20A
MCB-UL-31-1
225A
CB-UL-31-1
400A
LOAD-UL-51-1
UL-61-2
VOLTAGE: 208V
CB-UL-61-2 LOAD
20A
MCB-UL-61-2
225A
CB-UL-61-2
300A
LOAD-UL-81-1
LL-31-1
VOLTAGE: 208V
CB-LL-31-1 LOAD
20A
MCB-LL-31-1
100A
CB-LL-31-1
300A
LOAD-LL-51-1
LL-61-1
VOLTAGE: 208V
CB-LL-61-1
LOAD
20A
MCB-LL-61-1
100A
CB-LL-61-1
300A
LOAD-LL-81-1
UL-91-1
VOLTAGE: 208V
CB-UL-91-1 LOAD
20A
MCB-UL-91-1
225A
CB-UL-91-1
300A
LOAD-UL-101A-1
MCB-UL-B01-5
225A
CB-UL-B01-5
300A
UL-B01-5
VOLTAGE: 208V
CB-UL-B01-5
LOAD
20A
UL-41-1
VOLTAGE: 208V
UL-51-1
VOLTAGE: 208V
UL-81-1
VOLTAGE: 208V
UL-71-1
VOLTAGE: 208V
UL-B01-6
VOLTAGE: 208V
UL-11-4
VOLTAGE: 208V
LL-41-1
VOLTAGE: 208V
LL-71-1
VOLTAGE: 208V
UL-101-1
VOLTAGE: 208V
UL-21-4
VOLTAGE: 208V
LL-101-1
VOLTAGE: 208V
LOAD-UL-B01-6
LOAD-UL-11-4
UL-11-5
VOLTAGE: 208V
LL-51-1
VOLTAGE: 208V
LL-81-1
VOLTAGE: 208V
UL-101-1A
VOLTAGE: 208V
CB-PL-B01-1
400A
UL-21-3
VOLTAGE: 208V
MCB-UL-21-3
225A
CB-UL-21-3
200A
LL-91-1
VOLTAGE: 208V
MCB-LL-91-1
100A
CB-LL-91-1
200A
CB-UL-21-3 LOAD
20A
CB-LL-91-1 LOAD
20A
LOAD-UL-21-4 LOAD-LL-101-1
DL-B01-2
VOLTAGE: 208V
XF-T-3 B0123
500KVA 300KVA
480V/208V
450A
BREAKER
DISCONNECT
600A
FUSED
DISCONNECT
2PH 500 4-1/C+G, TROUGH
(EXISTING)
1000AT
1200AF LSI
2PH 500 4-1/C+G, TROUGH
TO 800A CB-T-3-B0123-EC
DHB-B01-01
CB-PL-B01-2
100A
CB-PL-B01-2
LOAD
30A
LOAD-PL-B01-2
NEW NAME:
PL-B01-1A
PL-B01-1
208V
PL-B01-2
208V
4 4
LOAD-UL-25-2
UL-25-2
VOLTAGE: 208V
CB-UL-25-2
LOAD
20A
LOAD-UL-17-1
UL-17-1
VOLTAGE: 208V
CB-UL-17-1
LOAD
40A
UL-25-1
VOLTAGE: 208V
UL-15-1
VOLTAGE: 208V
DL-B05-1
VOLTAGE: 208V
UL-65-2 RISER
VOLTAGE: 208V
TO XF-T-7 B0504
RE: E0142
LOAD-UL-65-3
UL-65-3
VOLTAGE: 208V
CB-UL-65-3
LOAD
20A
MCB-UL-15-1
225A
CB-UL-15-1
300A
MCB-UL-65-3
100A
CB-UL-65-2
300A
MCB-UL-17-1
225A
CB-UL-17-1
400A
LOAD-EUL-Q-24-1
EUL-Q-24-1
VOLTAGE: 208V
CB-EUL-Q-24-1
LOAD
30A
MCB-EUL-Q-24-1
200A
CB-EQT-1 2474A
70A
XF-EQT-1 2474A
75KVA
480V/208V
MCB-EPH-Q-24-1
1200A
CB-EPH-Q-24-1
800A
EPH-Q-24-1
VOLTAGE: 480V
LOAD-EUL-Q-24-4
EUL-Q-24-4
VOLTAGE: 208V
CB-EUL-Q-24-4
LOAD
30A
EUL-Q-24-6
VOLTAGE: 208V
LOAD-EUL-Q-24-11
EUL-Q-24-11
VOLTAGE: 208V
CB-EUL-Q-24-11
LOAD
XF-EQT-13 2450
113KVA
480V/208V
CB-T-13
250A
EDH-307-Q-4
VOLTAGE: 480V
70-ATS-C
VOLTAGE: 208V
ATS-70-C
TO CB-ATS-EDH-307-Q4-E
RE: E0127
TO CB-ATS-EDH-307-Q-4-N
RE: E0127
E-602
BUILDING 111 PARTIAL SINGLE LINE
DIAGRAMS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 PARTIAL SINGLE LINE DIAGRAM
SCALE: N.T.S.
1. REPLACE EXISTING 600A FUSIBLE DISCONNECT
WITH NEW 450A BREAKER DISCONNECT.
2. REPLACE EXISTING 500KVA TRANSFORMER WITH
A NEW 300KVA TRANSFORMER.
3. RETROFIT EXISTING DL-B01-2.
4. REPLACE EXISTING PANELBOARD.
5. DEMOLISH EXISTING PL-B01-2. REFEED EXISTING
LOADS TO PL-B01-1.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
CB-PL-B04-1 LOAD
20A
PL-B04-1
VOLTAGE: 208V
LOAD-PL-B04-1
MCB-PL-B04-1
60A
XF-T-1 B0458
15KVA
480V/208V
TO CB-PH-B04-1
RE: E0144
CB-T-1 B0458
30A
PH-B04-1
VOLTAGE: 480V
CB-PL-B04-1 LOAD
20A
PL-B04-2
VOLTAGE: 208V
LOAD-PL-B04-2
MCB-PL-B04-2
100A
XF-T-2 B0458
25KVA
480V/208V
CB-T-2 B0458
40A
MCB-PH-B04-1
200A
LOAD-111-DH-B00-2
DH-B00-6
VOLTAGE: 480V
DH-B00-2
VOLTAGE: 480V
CB-DH-B00-2
LOAD
30A
CB-DH-B00-2
225A
DH-B00-7
VOLTAGE: 480V
DH-B00-8
VOLTAGE: 480V
DH-B00-9
VOLTAGE: 480V
DH-B00-3
VOLTAGE: 480V
DH-B00-4
VOLTAGE: 480V
DH-B00-5
VOLTAGE: 480V
DH-B00-1
VOLTAGE: 480V
DH-B00-10
VOLTAGE: 480V
LOAD-DH-B00-11
DH-B00-11
VOLTAGE: 480V
CB-DH-B00-11
LOAD
30A
CB-DH-B00-11
225A
DH-B00-17
VOLTAGE: 480V
DH-B00-12
VOLTAGE: 480V
DH-B00-18
VOLTAGE: 480V
DH-B00-13
VOLTAGE: 480V
DH-B00-19
VOLTAGE: 480V
DH-B00-14
VOLTAGE: 480V
DH-B00-20
VOLTAGE: 480V
DH-B00-15
VOLTAGE: 480V
DH-B00-16
VOLTAGE: 480V
DH-B00-21
VOLTAGE: 480V
TO CB-B00-1, 10
RE: E0144
CB-UL-34-2 LOAD 70A
UL-34-2
VOLTAGE: 208V
LOAD-UL-34-2
UL-34-1
VOLTAGE: 208V
UL-24-4
VOLTAGE: 208V
MCB-UL-34-1
100A
MCB-UL-24-4
225A
CB-PL-B04-2
150A
CB-UL-14-3 LOAD
20A
UL-14-3
VOLTAGE: 208V
LOAD-UL-14-3
CB-UL-14-4 LOAD
20A
UL-14-4
VOLTAGE: 208V
LOAD-UL-14-4
MCB-UL-14-3
70A
CB-UL-14-3
225A
MCB-UL-14-4
100A
CB-UL-14-4
225A
DL-B04-1
VOLTAGE: 208V
UL-B04-5
VOLTAGE: 208V
CB-UL-14-5 LOAD 20A
UL-14-5
VOLTAGE: 208V
LOAD-UL-14-5
MCB-UL-14-5
200A
XF-T-2 1257
75KVA
480V/208V
CB-T-UL-14-1,5
200A
DH-B02-1,2
VOLTAGE: 480V
TO CB-DH-B02-1
RE: E0127
XF-T-4 B0450
25KVA
480V/208V
CB-T-DL-B04-1
600A
LOAD-UL-105-1
UL-105-1
VOLTAGE: 208V
CB-UL-105-1 LOAD
20A
MCB-UL-105-1
100A
CB-UL-105-1
100A
LOAD-UL-25-3
UL-25-3
VOLTAGE: 208V
CB-UL-25-3 LOAD
20A
MCB-UL-25-3
100A
LOAD-UL-15-4
UL-15-4
VOLTAGE: 208V
CB-UL-15-4 LOAD
20A
MCB-UL-15-4
225A
TO XF-T-6 B0531
RE: E0142
DL-B05-2
VOLTAGE: 208V
UL-15-3
VOLTAGE: 208V
LOAD-LL-55-1 LOAD-LL-45-1
CB-LL-55-1
LOAD
20A
CB-LL-45-1
LOAD
20A
MCB-LL-45-1
100A
MCB-LL-55-1
100A
CB-LL-35-1
300A
LL-55-1
VOLTAGE: 208V
UL-45-1
VOLTAGE: 208V
LL-45-1 RISER
VOLTAGE: 208V
LL-35-1
VOLTAGE: 208V
CB-UL-35-3
300A
MCB-UL-85-3
225A
CB-UL-5536-1
60A
CB-UL-45-2 LOAD
20A
MCB-UL-45-2
225A
MCB-UL-5536-1
60A
UL-5536-1
VOLTAGE: 208V
NEW NAME:
111-UL-55-1A
UL-55-1
VOLTAGE: 208V
UL-45-2
VOLTAGE: 208V
UL-45-2 RISER
VOLTAGE: 208V
UL-35-3
VOLTAGE: 208V
LOAD-UL-5536-1
LOAD-UL-45-2
1 1
E-603
BUILDING 111 PARTIAL SINGLE LINE
DIAGRAMS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAMS
SCALE: N.T.S.
1. REPLACE EXISTING PANELBOARD.
2. DEMOLISH EXISTING LL-55-1. REFEED THE
EXISTING LOAD TO THE NEW PANEL UL-55-1A.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
CB-EUL-CR-24-3
150A CB-EUL-CR-15-1
100A
MCB-EUL-CR-15-1
100A
CB-EUL-CR-15-1 LOAD
20A
MCB-EUL-CR-24-3
225A
CB-EUL-CR-24-4 LOAD
20A
MCB-EPL-CR-B06-1
600A
XF-ECRT-8-B0602EC
225KVA
480V/208V
EPL-CR-B06-1
208V
EUL-CR-15-1
208V
EUL-CR-24-3
208V
EUL-CR-24-4
208V
LOAD-EUL-CR-24-4
LOAD-EUL-CR-15-1
TO EDH-CR-5
XF-ECRT-2 B0123A
75KVA
480V/208V
MCB-EDL-CR-B01-1
300A
CB-EUL-CR-B01-1
100A
CB-EUL-CR-11-2
100A
EUL-CR-B01-1
208V
EUL-CR-11-2
208V
LOAD-EUL-CR-B01-1
LOAD-EUL-CR-11-2
EDL-CR-B01-1
208V
TO EDH-212-CR-2
CB-EUL-CR-75-1 LOAD
20A
EUL-CR-75-1
208V
LOAD-EUL-CR-75-1
CB-EUL-CR-65-1 LOAD
20A
EUL-CR-65-1
208V
LOAD-EUL-CR-65-1
CB-EUL-CR-75-1
100A
CB-EUL-CR-65-1
100A
XF-ECRT-1 B0531EC
75KVA
480V/208V
MCB-EDL-CR-B05-1
300A
TO EDH-212-CR-2
EDL-CR-B05-1
208V
XF-ECRT-9 B0255
225KVA
480V/208V
MCB-EDL-CR-B05-1
300A
TO EDH-212-CR-2
EPL-CR-B02-1
208V
CB-EUL-CR-B02-1
225A
EUL-CR-B02-2
208V
LOAD-EUL-CR-B02-2
CB-EUL-CR-B02-2-LOAD
20A
MCB-EUL-CR-B02-2
100A
CB-EUL-CR-B02-2
100A
MCB-EUL-CR-B02-1
225A
EUL-CR-B02-1
208V
CB-EUL-CR-21-5
100A
CB-EUL-CR-21-4
LOAD
30A
CB-EUL-CR-21-4
100A
CB-EUL-CR-31-1
100A
CB-EUL-CR-41-1A
100A
CB-EUL-CR-61-1
100A
CB-EUL-CR-51-1
100A
CB-EUL-CR-71-1
100A
CB-EUL-CR-101-1
100A
CB-EUL-CR-81-1
100A
CB-EUL-CR-101-1A
100A
CB-EUL-CR-91-1
100A
EUL-CR-21-4
208V
EUL-CR-21-5
208V
EUL-CR-41-1A
208V
EUL-CR-31-1
208V
EUL-CR-91-1
208V
EUL-CR-101-1A
208V
EUL-CR-81-1
208V
EUL-CR-101-1
208V
EUL-CR-71-1
208VEUL-CR-61-1
208V
EUL-CR-51-1
208V
LOAD-EUL-CR-21-5
LOAD-EUL-CR-21-4
LOAD-EUL-CR-51-1 LOAD-EUL-CR-61-1
LOAD-EUL-CR-71-1
LOAD-EUL-CR-101-1
LOAD-EUL-CR-101-1A
LOAD-EUL-CR-81-1LOAD-EUL-CR-41-1A
LOAD-EUL-CR-31-1 LOAD-EUL-CR-91-1
XF-ECRT-1 10523E
15KVA
480V/208V
MCB-EUL-CR-105-1
50A
CB-ECRT-1 10523
30A
MCB-EUL-CR-105-1 LOAD
20A
CB-ELH-CR-105-1
90A
CB-EDCH-CR-85-2
100A
LOAD-EUL-CR-105-1
TS-TSXX
TO DH-B02-1,2 TO EDH-212-CR-2
ELH-CR-105-1
480V
EUL-CR-105-1
208V
EDCH-CR-85-2
480V
CB-BIG BERTHA
100A
LOAD-DH-B00-22
DH-B00-22
480V
CB-UL-51-2 LOAD
20A
LOAD-UL-51-2
UL-51-2
208V
CB-UL-21-2 LOAD
60A
LOAD-UL-21-2
UL-21-2
208V
CB-UL-61-1 LOAD
100A
LOAD-UL-61-1
UL-61-1
208V
MCB-UL-51-2
100A
MCB-UL-41-2
100A
MCB-UL-31-2
100A
CB-UL-31-2
150A
MCB-UL-21-1
225A
CB-UL-21-1
300A
MCB-UL-61-1
100A
CB-UL-61-1
200A
CB-DH-B00-22
225A
UL-21-1
208V
UL-41-2
208V
UL-31-2
208V
DL-B01-1
208V
MCB-DL-B01-1
1200A
CB-T-2 B0113-EC
600A
XF-T-2 B0113
300KVA
480V/208V
DH-B01-1
480V
TO SG-2N
1 1
1 1
NEW NAME:
EUL-CR-24-3A 2
CB-MTS-EUL-CR-33-1N
300A
MCB-EUL-CR-33-1
300A
NE
MTS-EUL-CR-33-1
CB-EUL-CR-33-1 LOAD
90A
EUL-CR-33-1
208V
LOAD-EUL-CR-33-1
MTS-EUL-CR-33-1
208V
TO DL-B06-1
E-604
BUILDING 111 PARTIAL SINGLE LINE
DIAGRAMS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAMS
SCALE: N.T.S.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
1. REPLACE EXISTING PANELBOARD.
2. REPLACE EXISTING TRANSFORMER.
3. DEMOLISH EXISTING EUL-CR-24-4. REFEED
EXISTING LOADS TO EUL-CR-24-3. RENAME NEW
PANEL TO EUL-CR-24-3A.
MCB-EUL-LS-24-2
100A
CB-EUL-LS-24-2 LOAD
20A
CB-EUL-LS-24-4 LOAD
30A
MCB-EUL-LS-24-9
100A
CB-ELST-12
250A
LOAD-EUL-LS-24-2LOAD-EUL-LS-24-4
XF-ELST-12-2450
113KVA
480V/208V
EUL-LS-24-2
208V
EUL-LS-24-4
208V
EUL-LS-24-9
208V
EDH-106-LS-1
480V
TO SG-1LS
CB-LH-84, 94-1 RISER
150A
MCB-LH-84-1
100A
MCB-LH-94-1
100A
CB-T-17 9407EC
50A
CB-UL-93-1
100A
CB-UL-93-1 LOAD
20A
CB-UL-94-2 LOAD
20A
XF-T-17 9407EC
45KVA
480V/208V
CB-UL-24-3 LOAD
30A
MCB-UL-24-3
225A
MCB-UL-14-6
225A
CB-UL-14-6
300A
MCB-EUL-LS-24-2
100A
MCB-EUL-LS-24-2
100A
XF-ELST-12-2450
113KVA
480V/208V
LH-84-1
480V
LH-94-1
480V
UL-94-1
208V
UL-94-2
208V
UL-93-1
208V
DH-B04-2
480V
DL-B04-2
208V
UL-14-6
208V
UL-14-7
208V
UL-24-3
208V
LOAD-UL-94-3
LOAD-UL-94-2
LOAD-UL-24-3
MCB-DH-B04-2
1200A
TO SG-1N
EDL-CR-41-1
70A
MCB-EUL-CR-41-1
100A
CB-EUL-CR-41 LOAD
20A
CB-70-PANEL 25 LOAD
30A
CB-70-PANEL 25 LOAD
30A CB-70-PANEL 25 LOAD
30A
CB-70-PANEL 25 LOAD
30A
CB-70-PANEL 25 LOAD
30A
CB-70-PANEL 25 LOAD
30A
CB-70-PANEL 25 LOAD
30A
CB-70-PANEL 25 LOAD
30A
XF-ECRT-14 4163EC
30KVA
480V/208V
EUL-CR-41-1
208V
ELH-CR-41-1
480V
EUL-CR-B00-1
208V
EUL-CR-B00-3
208V
ATS-8
480V
XF-ECRT-G-B0034
45KVA
480V/208V
LOAD-EUL-CR-41-1
LOAD-EUL-CR-B00-3
TO SG-2CR
EDH-204-CR-5
480V
ATS-ATS-8
TO EDH-108-LS-6
MCC-G
480V
DL-G
480V
NEW NAME:
UL-94-1A
(4) 1-0AWG,
(1) 6AWG EG
1-1/2"C
(3) 4AWG, (1) 8AWG EG
1"C
(3) 6AWG, 8AWG EG
150ASPLICE BOX
IN RM 9407EC
MCB-UL-94-1
150A6
CB-EUL-LS-26-2 LOAD
30A
LOAD-EUL-LS-26-2
EUL-LS-26-2
208V
MCB-EUL-LS-26-2
100A
XF-ELST-23-2611
45KVA
480V/208V
CB-ELST-23-2611
70A
EPH-LS-26-1
480V
MCB-EPH-LS-26-1
400A
CB-EPH-LS-26-1
400A
E-605
BUILDING 111 PARTIAL SINGLE LINE
DIAGRAMS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAMS
SCALE: N.T.S.
1. REPLACE EXISTING PANELBOARD.
2. REPLACE PANELBOARD MCC-G AND REFEED
EXISTING LOADS. RENAME NEW PANEL DL-G.
3. REPLACE EXISTING TRANSFORMER.
4. DEMOLISH EXISTING UL-94-2. REFEED EXISTING
LOADS TO UL-94-1. RENAME NEW PANEL UL-94-1A.
5. PROVIDE NEW 150A CIRCUIT BREAKER
DISCONNECT.
6. REFEED UL-93-1 WITH NEW CONDUCTORS TO
EXISTING TRANSFORMER SPLICE BOX IN RM
9407EC.
7. RETROFIT EXISTING PANELBOARD WITH NEW
INTERNAL COMPONENTS AND BUSSES.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
XF-ECRT-3 B0460
30KVA
480V/208V
CB-T-25 LAB PANELS
400A
CB-ET-3 BSMT B SOUTH
125A
MCB-EUL-CR-B04-3
400A
CB-EUL-CR-B04-3 LOAD
30A
LOAD-EUL-CR-B04-3
MCB-ELH-CR-B02-1
100A
CB-ELH-3-BA, 1A, 2A
250A
CB-ELH-CR-B02-1 LOAD
20A
ELH-CR-12-1
480V
ELH-CR-22-1
480V
EUL-CR-24-1
208V
EUL-CR-26-2
208V
EUL-CR-26-3
208V
EUL-CR-26-6
208V
EUL-CR-26-8
208V
EUL-CR-26-1
208V
EUL-CR-26-5
208V
MCB-EUL-CR-24-1
100A
MCB-EUL-CR-26-2
100A
MCB-EUL-CR-26-3
100A
MCB-EUL-CR-26-6
100A
MCB-EUL-CR-26-8
100A
MCB-EUL-CR-26-1
100A
MCB-EUL-CR-26-5
100A
EUL-CR-26-12
208V
EUL-CR-26-9
208V
EUL-CR-26-11
208V
EUL-CR-26-15
208V
EUL-CR-26-7
208V
EUL-CR-26-10
208V
EUL-CR-26-13
208V
MCB-EUL-CR-26-12
100A
MCB-EUL-CR-26-9
100A
MCB-EUL-CR-26-11
100A
MCB-EUL-CR-26-15
100A
MCB-EUL-CR-26-7
100A
MCB-EUL-CR-26-10
100A
MCB-EUL-CR-26-13
100A
ES-ECRT-25 2
250A
ES-ECRT-25 1
250A
TO SG-2CR
EDH-212-CR2
480V
EUL-CR-B04-3
208VLOAD-ELH-CR-22-1LOAD-ECRT-25-1
LOAD-ECRT-25-2
ECRT-25 BUS 0
208V
ECRT-25 BUS
208V
ELH-CR-B02-1
480V
CB-EQT-18 10300
100A
XF-EQT-18 10300
30KVA
480V/208V
LOAD-EUL-Q-103-1
XF-EQT-2 10300
45KVA
480V/208V
EUL-Q-103-1
208V
EUL-Q-93-2
208V
EPH-Q-103-1
480V
TO CB-EPH-Q-103-1
CB-EQT-18 10300
60A
1PH #6 3-1/C+G, 1" C
1PH 1/0 4-1/C+G, 1 1/2" C
XF-111-ECRT-25 2429EC
225 KVA
480V/208V
DELTA / WYE-GROUND
EXISTING FUSIBLE DISCONNECT
2PH 500 4-1/C+G, TROUGH
1PH 500 4-1/C+G, TROUGH
111111
1 1 1 1
E-606
BUILDING 111 PARTIAL SINGLE LINE
DIAGRAMS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 111 PARTIAL SINGLE LINE DIAGRAM
SCALE: N.T.S.
1. REPLACE EXISTING PANELBOARD.
2. REPLACE EXISTING 45KVA TRANSFORMER.
3. REPLACE AND RELOCATE EXISTING 225 KVA
TRANSFORMER.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
MDP-B
1 2 3 4 5 6 7
WIRE
PULL
SECTION
BRKR #10
BRKR #11
BRKR #9
BRKR #19
BRKR #20
BRKR #21
BRKR #7
BRKR #8
BRKR #12
#13 #14
#15 #16
#17 #18
BLANK BLANK
ANALOG
POWER METER
DIGITAL
POWER METER
BRKR #0 BRKR #1
BRKR #2
BRKR #4
BRKR #5
BRKR #6
BRKR #3
BRKR #00
G
CB-70-R
1600A
CB-70-AB
1600A
CB-E-70-ATS-AB
1600A CB-N-70-ATS-AB
1600A
MCB-70-MDP-70-B
1600A
MCB-70-MDP-70-A
800A
CB-70-PANEL CLOAD
40A
CB-70-PANEL BLOAD
40A
CB-70-TANK RM LOAD
30A
CB-70-RM70-A-10 LOAD
30A
CB-70-PANEL DLOAD
20A
CB-70-PANEL ALOAD
20A
CB-70-MDP-70-A
800A
MCB-70-UL/LL-B4-1
225A
MCB-70-PANEL B-22
225A
CB-70-REF SHOP PNL
100A
CB-70-PP1 LOAD
125A
CB-70-REF SHOP PANEL LOAD
20A
CB-70-PANEL B21
70A
CB-70-UL/LL-B4-1 LOAD
40A
CB-70-PANEL B-21 LOAD
20A
CB-70-A ELEV
225A
CB-70-PANEL 70A1
100A
CB-70-PANEL 39
100A
CB-70-C-PANEL 38
100A
CB-70-PANEL
100A
CB-70-A WING 2ND W
100A
CB-70-PANEL 1,2,3 W
100A
CB-70-PANEL 1
225A
CB-70-PANEL 2
225A
CB-70-LS70-A1
30A
CB-70-C-PANEL 38 LOAD
20A
MCB-70-PANEL A-5
100A
MCB-70-PANEL A-21
100A
MCB-70-PANEL A-31
100A
MCB-70-PANEL A-7
225A
CB-70-A1A
200A
CB-70-A1B
200A
CB-70-PANEL A-5
LOAD
20A
CB-70-PANEL A-21
LOAD
40A
CB-70-PANEL A-31
LOAD
40A
CB-70-PANEL A-7
LOAD
30A MCB-70-PANEL A-22
225A
MCB-70-PANEL A-32
225A
CB-70-PANEL A-32
LOAD
100A
CB-70-PANEL A-22
LOAD
30A
MCB-70-PANEL 38 (LS)
150A
MCB-70-PANEL 37
100A
CB-70-PANEL 38
LOAD (LS)
30A
CB-70-PANEL 37
LOAD
20A
70-A ELEV
40 HP
70-B ELEV
30 HP
FS-70-XF-GE EQUIPM
RM 140
400A
CB-70-ATS-SE70-B
600A
CB-70-ATS-70SE-B1
600A
CB-70-LS70-B ATS
200A
CB-70-PANEL C
200A
CB-70-B ELEV
200A
CB-70-PANEL B
200A
CB-70-TANK RM PANEL
100A
CB-70-RM 70-A-10
100A
CB-70-PANEL D
100A
CB-70-PANEL A
100A
CB-70-UL/LL-B4-1
200A
CB-70-ACREPAIR RM
100A
CB-70-PP1
400A
FS-70-GE EQUIP RM 140
200A
LOAD-70-PANEL C LOAD-70-PANEL B
LOAD-70-TANK RM LOAD-70-RM 70-A-10 LOAD-70-PANEL D LOAD-70-PANEL A
LOAD-70-UL/LL-B4-1
LOAD-70 REF SHOP
PANEL
LOAD-70-PANEL B21
LOAD-70-L-S70-A1 LOAD-70-PANEL 39 LOAD-70-PANEL 38
LOAD-70-PANEL A-5 LOAD-70-PANEL A-21 LOAD-70-PANEL A-31 LOAD-70-PANEL A-7
LOAD-70-PANEL 38 (LS) LOAD-70-PANEL 37
LOAD-70-PANEL A-22 LOAD-70-PANEL A-32
LOAD-70-GE EQMT 140
70-PANEL 38 (LS)
208V
70-PANEL 37
208V
70-LS70-A1
208V
70-PANEL 39
208V
70-C-PANEL 38
208V
70-PANEL A-5
208V
70-PANEL A-21
208V
70-PANEL A-31
208V
70-PANEL A-7
208V
70 A-2 RISER
208V
70-MDP-70-A
208V
NEW NAME:
UL-BBN-70-11
70-PANEL B-21
208V
70-REF SHOP PANEL
208V
70-PP1
208V
70-MDP-70-B
208V
GE N-70-ABE BUS
208V
NEW NAME:
UL-BBN-70-10
70-PANEL B-22
208V
70-UL/LL-B4-1
208V
70-PANEL C
208V
70-PANEL B
208V
70-TANK ROOM
208V
70-RM 70-A-10
208V
70-PANEL D
208V
70-PANEL A
208V
70-PANEL A-22
208V
70-PANEL A-32
208V
GEN-70-ABE
208V
600KW/750KVA
RL-70 GEN ABE
ATS-70-AB
70-ATS-AB
208V XF-70-GE EQUIP RM 140
225KVA
480V/208V
TO XF-70-BLDG 70
XFMR AB RE: E0102
TO CBL-E-70-MDP-70-E
RE: E0122
TO ATS-70-SE70-B
RE: E0124
TO ATS-70-SE70-B1
RE: E0124
TO ATS-70-LS70-B
RE: E0124
TO CBL-70-DL-SB-BB N-1
RE: E0123
CB-70-EDL-CR-B5-2
600A
3 4 8 2 5 6 11 17 14 16 21 18 19 20
TO 70-SE-UL-70B
RE: E0124
TO 70-SE-UL-70B1
RE: E0124
2PH #350,
4-1/C+G
MAGNETIC
CONDUIT
2PH #350,
4-1/C+G
MAGNETIC
CONDUIT
15 1
NEW NAME:
UL-BAS-70-4
100A
TVSS
CB-70-DL-SB-BBN-1
600A
E-607
BUILDING 70 A/B SINGLE LINE DIAGRAM
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 FRONT ELEVATION
SCALE: N.T.S.2 BUILDING 70 A/B SINGLE LINE DIAGRAM
SCALE: N.T.S.
1. RETROFIT THE EXISTING SWITCHBOARD MDP-70B
AS FOLLOWS:
- REPLACE EXISTING MAIN AND FUSIBLE CIRCUIT
BREAKERS AS SHOWN ON THE LOAD
SCHEDULE.
- PROVIDE A NEW TVSS WITH A DISCONNECT
BREAKER.
- PROVIDE NEW FRONT COVER FOR EACH
VERTICAL SECTION. HINGED DOOR IS
REQUIRED IF THE CIRCUIT BREAKERS ARE
ON PANELBOARD.
- KEEP POWER METERS (ANALOG AND DIGITAL).
2. DEMOLISH EXISTING CIRCUIT. SECURE AND CAP
THE EMPTY CONDUIT IN PLACE
3. PROVIDE NEW CIRCUIT AND CONDUIT.
4. DEMOLISH EXISTING PANEL 39.
5. REPLACE EXISTING PANELBOARD.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
G
GEN-70-CD
208V
600KW/750KVA
TO XF-70-BLDG 70 XFMR C
RE: E0101
TO CB-70-E
RE: E0102
TO ATS-70-LS70-C
RE: E0124
TO ATS-70-SE70-C
RE: E0124
TO CBL-70-DL-SB-BCN-1
RE: E0123
TO MCB-70-EDL-CR-B5-1
RE: E0126
CB-70-C
1600A
CB-70-D
1600A
CB-E-70-ATS-C
1600A
CB-N-70-ATS-C
1600A
MCB-70-MDP-70-C
1600A
MCB-70-PANEL V C1-3
225A
MCB-70-C-PANEL A/B
225A
MCB-70-C2-3A
200A
MCB-70-CB-7
125A
MCB-70-C1-1A
225A
MCB-70-C1-2A
225A
MCB-70-C2-1A
225A
MCB-70-C2-2A
225A
MCB-70-C2-3B
200A
MCB-70-C221-A
200A
MCB-70-C221-B
200A
CB-70-C-220 RIGAKU
100A
CB-70-10-C-2
1600A
CB-70-C221-B LOAD
50A
CB-70-C221-A
100A
CB-70-C2-3B LOAD
50A
CB-70-C2-2A LOAD
20A
CB-70-C2-1A LOAD
30A
CB-70-C1-2A LOAD
20A
CB-70-C1-1A LOAD
30A
CB-70-CB-6 LOAD
30A
CB-70-CB-7 LOAD
20A
CB-70-C1 10
100ACB-70-C-2S STAIR
SUBFEED
150A
CB-70-PANEL V C1-3
LOAD
30A
MCB-70-C-2S STAIR
225A
MCB-70-C1 10
100A
CB-70-C-2S STAIR
LOAD
50A
CB-70-C1 10 LOAD
20A
MCB-70-C2-1
100A
MCB-70-C1-1
100A
MCB-70-CB-1
100A
CB-70-CB-1, C1-1, C2-1
300A
CB-70-CB-3, C1-3, C2-3
250A
CB-70-MED RECORDS
200A
CB-70-C1-2, C2-2
200A
CB-70-CB-2
100A
CB-70-CB-4
100A
CB-70-CB-5
100A
CB-CLOTHING RM
PANEL
100A
MCB-70-CB-3
100A
MCB-70-C1-3A
200A MCB-70-UL-70-B-6
225A
MCB-70-C2-1 LOAD
30A
CB-70-C1-1 LOAD
20A
CB-70-CB-1 LOAD
30A
CB-70-CB-3 LOAD
20A
CB-70-C1-3A LOAD
20A
CB-70-UL-70-B-6
LOAD
40A
CB-70-CB-8 LOAD
30A
CB-70-CB-4 LOAD
20A
CB-70-CB-5 LOAD
30A
CB-70-C-AC
100A
CB-70-ATS-LS70-C
100A
CB-70-SE70C
600A
CB-70-WING C 1ST
CENTER
225A
CB-70-WING C 2ND
CENTER
225A
CB-70-C2-3A
200A
CB-70-CB-1A
125A
CB-70-CB-6
100A
CB-70-C1-1A
200A
CB-70-C1-2A
200A
CB-70-C2-1A
200A
CB-70-C2-2A
200A
CB-70-C2-3B
200A
CB-70-C2-4
225A
CB-70-C2-5
225A
CB-70-WEST
PANEL
400A
CB-70-DL-SB-BCN-1
600A
MCB-70-CB-5
100A
GEN-70-CD BUS
VOLTAGE: 208V
70-MDP-70-C
VOLTAGE: 208V
70-10-C-2
VOLTAGE: 208V
70-C221-B
VOLTAGE: 208V
70-C221-A
VOLTAGE: 208V
70-C2-3B
VOLTAGE: 208V
70-C2-2A
VOLTAGE: 208V
70-C2-1A
VOLTAGE: 208V
70-C1-2A
VOLTAGE: 208V
70-C1-1A
VOLTAGE: 208V
70-CB-6
VOLTAGE: 208V
70-CB-7
VOLTAGE: 208V
70-C2-3A
VOLTAGE: 208V
70-C-PANEL A/B
VOLTAGE: 208V
70-PANEL V C1-3
VOLTAGE: 208V
70-WEST PANEL
VOLTAGE: 208V
70-CB-5
VOLTAGE: 208V
70-CB-4
VOLTAGE: 208V
70-CB-8
VOLTAGE: 208V
70-UL-70-B-6
VOLTAGE: 208V
70-C1-3A
VOLTAGE: 208V
70-CB-3
VOLTAGE: 208V
70-CB-1
VOLTAGE: 208V
70-C1-1
VOLTAGE: 208V
70-C2-1
VOLTAGE: 208V
70-C110
VOLTAGE: 208V70-C-2S STAIR
VOLTAGE: 208V
MTR I-70-C-AC
POWER: 10HP
LOAD-70-PANEL VC1-3
LOAD-70-C-2S STAIR LOAD-70-C110
LOAD-70-CB7 LOAD-70-CB6 LOAD-70-C1-1A LOAD-70-C1-2A LOAD-70-C2-1A LOAD-70-C2-2A LOAD-70-C2-3B LOAD-70-C221-A LOAD-70-C221-B
LOAD-70-10-C-2
LOAD-70-C2-1 LOAD-70-C1-1 LOAD-70-CB-1
LOAD-70-CB-3 LOAD-70-C1-3A LOAD-70-UL-70-B-6
LOAD-70-CB-8 LOAD-70-CB-4
LOAD-70-CB-5
70-C-1 RISER
VOLTAGE: 208V
70-ATS-C
VOLTAGE: 208V
ATS-70-C
RL-70-GEN CD
CB-70-EDL-CR-B5-1
600A
2 3 5 9 6 7 4 119 18 11 10 13 12 14 15
TO 70-SE-UL-70-C
RE: E0124
2PH #350,
4-1/C+G
MAGNETIC
CONDUIT
NEW NAME:
DL-BCN-70-3
NEW NAME:
UL-BCN-70-4
NEW NAME:
UL-2CN-70-1
NEW NAME:
UL-2CN-70-8
NEW NAME:
UL-2CN-70-9
4 4 4
100A
TVSS
BRKR #2
BRKR #3
BRKR #4
BRKR #5
BRKR #6
BRKR #7
BRKR #8
BRKR #9
BRKR #10
BRKR #11
BRKR #12
MDP-C
1234567
BRKR #15
BRKR #16
BRKR #19
#17 #18
BRKR #13
BRKR #14
ANALOG
POWER
METER
BRKR#1 BRKR #0
DIGITAL
POWER
METER
CABLE
PULL
SECTION
BRKR #00
E-608
BUILDING 70 C SINGLE LINE DIAGRAM
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 FRONT ELEVATION
SCALE: N.T.S.2 BUILDING 70 C SINGLE LINE DIAGRAM
SCALE: N.T.S.
1. RETROFIT THE EXISTING SWITCHBOARD MDP-70B
AS FOLLOWS:
- REPLACE EXISTING MAIN AND FUSIBLE CIRCUIT
BREAKERS AS SHOWN ON THE LOAD
SCHEDULE.
- PROVIDE A NEW TVSS WITH A DISCONNECT
BREAKER.
- PROVIDE NEW FRONT COVER FOR EACH
VERTICAL SECTION. HINGED DOOR IS
REQUIRED IF THE CIRCUIT BREAKERS ARE
ON PANELBOARD.
- KEEP POWER METERS (ANALOG AND DIGITAL).
2. DEMOLISH EXISTING CIRCUIT. SECURE AND CAP
THE EMPTY CONDUIT IN PLACE
3. PROVIDE NEW CIRCUIT AND CONDUIT
4. REPLACE EXISTING PANELBOARD.
A. REFER TO EQUIPMENT LIST ON E-613 FOR WORK
DETAILS AND DRAWING REFERENCES OF EACH
EQUIPMENT.
B. REFER TO PANEL SCHEDULES FOR THE
COMPLETE MAIN AND CIRCUIT BREAKER SIZES
AND ARRANGEMENTS.
S06 - Amended Drawings
File details come from the government source that posted it. Updated .