S06 - Drawings 11-20.pdf
PDF 3 MB Posted
- Attached to
- Z2DA--Upgrade Electrical Systems Area 1 695-19-101 Federal contract opportunity
- Solicitation number
- 36C25220B0022
About this file
This document package includes construction drawings and specifications for an electrical systems upgrade project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves replacing switchgear, transformers, and panelboards; installing portable generators; and retrofitting existing electrical closets and equipment rooms. Work will take place in various buildings and areas across multiple floors, as indicated on the drawings. Contractors should demolish outdated components and refed circuits from new equipment per the specifications. The pre-bid meeting is scheduled for June 16th, 2020, with responses due shortly after on an anticipated 100% Service-Disabled Veteran-Owned Small Business set-aside contract administered by the Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 - Drawings 1-10.pdf | ||
| S06 - Drawings 41-50.pdf | ||
| S06 - Drawings 21-30.pdf | ||
| S06 - Amended Specifications.pdf | ||
| S06 - Drawings 51-66.pdf | ||
| 36C25220B0022_1.docx | DOCX document | |
| S06 - Drawings 31-40.pdf | ||
| P07 - Davis Bacon WD.pdf | ||
| Previous RFIs and Answers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOM E-34
ROOM B-43
MECH. EQUIP.
ROOM B-40
MECH. EQUIP.
ROOM A-12
ELEVATOR
EQUIP.
ROOM C-17
ELECTRICAL
CLOSET
ROOM D-9
CLASSROOM
MDP-70-E
DL-BEN-70-1
LS70-E
PULLBOX
LS-70E ZENITH ZTS
EDL-LS-BEN-70-1
UL-BEN-70-8
UL-BEN-70-7
G70-AB/E GASFLOW
SE70-E DISCONNECT
ATS-SE-70-E
DL-BEN-70-2
SECURITY & FA
ATS SE70
DL-BBN-70-1
PB-TS-SE70B1
ATS-SE70-B1
ATS-LS70B
EDL-LS-BBN-70-1
DL-BBN-70-2
DAT
EUL-LS-BBN-70-2
TRANSFORMER
UL-BBN-70-10
UL-BBN-70-11
UL-BBN-70-5
UL-BBN-70-5
ELEV 70-A CIRC
ELEC 70-A CONTROLLER
UL-BAS-70-4
MDP-70-A
PANEL 39
MDP-B
MDP-G
UL-BAS-70-5
EUL-LS-BAS-70-1
PANEL P-12
UL-BCN-70-4
ATS-SE70-C
DL-BCN-70-2
DL-BCN-70-3
UL-BCN-70-9
ATS-LS70E
EDL-LS-BCN-70-1
MDP-70-C
CABLE TROUGH
DL-BDN-70-1
ATS-SE70-D
SE70-D DISCONNECT
DL-BDN-70-2
UL-BDN-70-1
ATS-LS-BDN-70-1
EDL-LS-BDN-70-1
POWER TROUGH
MDP-70-D
EP105
EP105
EP106
EP106
EP-107
EP-107
EP108
EP108
ROOM D-4
ELECTRICAL
CLOSET
EP109
EP109
UL-BEN-70-9
AREA OF WORK
KEY PLAN - BUILDING 70
N
RM
D4
RM
C17
RM D9
RM A12RM E34
RM
B43
RM
B40
E-106
BUILDING 70 BASEMENT FLOOR PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 BASEMENT FLOOR PLAN
SCALE: 1/16" = 1' 0"
NORTH
TRUE
8 16 320
A. REFER TO E-613 FOR WORK DETAILS OF
EXISTING EQUIPMENT AFFECTED ON THE
PROJECT.
B. REFER TO THE ROOM ENLARGED PLANS FOR
THE NEW ELECTRICAL EQUIPMENT AND
LOCATION IF NOTED.
C. REFER TO SINGLE LINE DIAGRAMS AND PANEL
SCHEDULES FOR EQUIPMENT AND CIRCUIT
DETAILS.
D. PROVIDE PORTABLE, TEMPORARY POWER
DISTRIBUTION BOX WITH 60A PANEL BOARD AT
EACH WING. COORDINATE THE DETAILS AND
LOCATION WITH COR.
1. CONTRACTOR TO REPLACE OR RETROFIT
SWITCHBOARD OR PANELBOARD AS SHOWN ON
THIS DRAWING. SEE EQUIPMENT LIST ON DRAWING
E-613.
2. IF ANY CIRCUITS ARE SHARING A NEUTRAL
CONDUCTOR, CONTRACTOR SHALL PROVIDE A
REPLACEMENT(MUTIPLE POLE CIRCUIT BREAKER)
FOR THESE 1-POLE SINGLE BREAKERS.
3. PROVIDE (4) PORTABLE POWER DISTRIBUTION
CARTS/UNITS FOR THE HALLWAYS (NORTH, SOUTH,
1ST FLOOR, 2ND FLOOR) DURING THE SHUTDOWN
OF BUILDING SWITCHBOARD (WINGS C,B,D & E).
THE PORTABLE POWER UNIT SHALL BE, AT
MINIMUM, 70A 120/208V 3-PHASE WITH NEUTRAL
AND GROUND, WITH 6 DUPLEX AND 2 CS6369
RECEPTACLES. PROVIDE PORTABLE POWER CORD
(EST. 250FT) FROM THE ADJACENT WING
PANELBOARD TO FEED THE UNIT. COORDINATE
CIRCUITING WITH COR.
1 2
DocuSign Envelope ID: 84209D4E-67F0-4C20-902C-691E17F13049
12/4/2019
DCAE
UL-2CN-70-8
UL-2CN-70-9
UL-2CN-70-1
MDP-70-E2F
ROOM C-201
ROOM E-2048
1 2
AREA OF WORK
KEY PLAN - BUILDING 70
N
RM C-201RM E-2048
E-107
BUILDING 70 SECOND FLOOR PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 SECOND FLOOR PLAN
SCALE: 1/16" = 1' 0"
NORTH
TRUE
8 16 320
A. REFER TO E-613 FOR WORK DETAILS OF
EXISTING EQUIPMENT AFFECTED ON THE
PROJECT.
B. REFER TO THE ROOM ENLARGED PLANS FOR
THE NEW ELECTRICAL EQUIPMENT AND
LOCATION IF NOTED.
C. REFER TO SINGLE LINE DIAGRAMS AND PANEL
SCHEDULES FOR EQUIPMENT AND CIRCUIT
DETAILS.
D. PROVIDE PORTABLE, TEMPORARY POWER
DISTRIBUTION BOX WITH 60A PANEL BOARD AT
EACH WING. COORDINATE THE DETAILS AND
LOCATION WITH COR.
1. CONTRACTOR TO REPLACE OR RETROFIT
SWITCHBOARD OR PANELBOARD AS SHOWN ON
THIS DRAWING. SEE EQUIPMENT LIST ON DRAWING
E-613.
2. IF ANY CIRCUITS ARE SHARING A NEUTRAL
CONDUCTOR, CONTRACTOR SHALL PROVIDE A
REPLACEMENT(MUTIPLE POLE CIRCUIT BREAKER)
FOR THESE 1-POLE SINGLE BREAKERS.
3. PROVIDE (4) PORTABLE POWER DISTRIBUTION
CARTS/UNITS FOR THE HALLWAYS (NORTH, SOUTH,
1ST FLOOR, 2ND FLOOR) DURING THE SHUTDOWN
OF BUILDING SWITCHBOARD (WINGS C,B,D & E).
THE PORTABLE POWER UNIT SHALL BE, AT
MINIMUM, 70A 120/208V 3-PHASE WITH NEUTRAL
AND GROUND, WITH 6 DUPLEX AND 2 CS6369
RECEPTACLES. PROVIDE PORTABLE POWER CORD
(EST. 250FT) FROM THE ADJACENT WING
PANELBOARD TO FEED THE UNIT. COORDINATE
CIRCUITING WITH COR.
B0123EC
ELECTRICAL
CLOSET
PL-B01-2
PL-B01-1
500 KVA XFMR
DL-B01-2
UL-B01-5
UL-B01-6
ECRT-2 B0123
ELEV. DS (ETR)
600A DISCONNECT
EDL-CR-B01-1
EUL-CR-B01-1
EXISTING TROUGH
EXISTING TROUGH
B0123EC
ELECTRICAL
CLOSET
ELEV. DS (ETR)
PL-B01-1A
UL-B01-5
UL-B01-6
300KVA
TRANSFORMER
75KVA TRANSFORMER
ECRT-2
DL-B01-2
EUL-CR-B01-1
EDL-CR-B01-1
EUL-CR-B01-1EUL-CR-B01-1
450A BREAKER DISCONNECT
EXISTING TROUGH
EXISTING TROUGH
AREA OF WORK
KEY PLAN - BUILDING 111
N
RM
B0123AEC
EP101
BUILDING 111 BASEMENT FLOOR
ELECTRICAL PLAN
1.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
X SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 111 BASEMENT FLOOR DEMOLITION PLAN - RM B0123A EC
SCALE: 1/2" = 1' 0"
2 BUILDING 111 BASEMENT FLOOR NEW WORK PLAN - RM B0123A EC
SCALE: 1/2" = 1' 0"
0 1 2 4
1. DEMOLISH EXISTING PANELBOARD. REFEED THE
LOADS FROM A NEW PANELBOARD.
2. REPLACE EXISTING 500KVA TRANSFORMER WITH
A NEW 300KVA TRANSFORMER.
3. REPLACE EXISTING 75KVA TRANSFORMER WITH
A NEW UNIT.
4. REPLACE THE 600A FUSIBLE DISCONNECT
SWITCH WITH 450A BREAKER DISCONNECT.
5. REPLACE EXISTING PANELBOARD.
6. RETROFIT EXISTING PANELBOARD.
7. SEE PHOTO ON DETAIL 3.
8. SEE PHOTO ON DETAIL 4.
9. SEE PHOTO ON DETAIL 5.
N O
R
TH
TRUE
0 1 2 4
N O
R
TH
TRUE
0 1 2 4
3 BUILDING 111 - RM B0123A
SCALE: N.T.S.
4 BUILDING 111 - RM B0123A
SCALE: N.T.S.
5 BUILDING 111 - RM B0123A
SCALE: N.T.S.
2429EC
ELECTRICAL
CLOSET
(EX)
BMS
ELH-CR-24-2
EUL-CR-24-4EUL-CR-24-3
PULL BOX
BUILDING
COLUMN
(EX)
TRANSFORMER
DISCONNECT SWITCH
1 1
2(EX) ECRT-25
225KVA TRANSFORMER
APPROX. 90"AFF
EXISTING
THROUGH
2429EC
ELECTRICAL
CLOSET
(EX)
BMS
EUL-CR-24-3A
BUILDING
COLUMN
(EX)
TRANSFORMER
DISCONNECT SWITCH
ELH-CR-24-2
EXISTING
THROUGH
NEW RELOCATED
ECRT-25
225KVA TRANSFORMER
03 AREA OF WORK
KEY PLAN - BUILDING 111
N
RM
5512EC
FIFTH FLOOR
AREA OF WORK
KEY PLAN - BUILDING 111
N
RM 2429EC
SECOND FLOOR
BMS CONTROL PANEL
WALL
ELH-CR-24-2
WALL
ELECT
BOX
PULL BOX
CONDUIT STUB-UP
BMS CONTROL PANEL
WALL
ELH-CR-24-2
WALL
ELECT
BOX
PULL BOX
CONDUIT STUB-UP
225KVA
XFMR
EP102
BUILDING 111 SECOND FLOOR ELECTRICAL
PLAN
1. DEMOLISH EXISTING PANELBOARD. REFEED THE
LOADS FROM A NEW PANELBOARD.
2. REPLACE EXISTING 225KVA TRANSFORMER WITH
A NEW UNIT.
3. SHIFT THE PANELBOARD AND PULLBOX TO THE
RIGHT SIDE TO ALLOW FOR THE NEW 225KVA
TRANSFORMER.
4. SEE PHOTO ON DETAIL 2.
5. SEE PHOTO ON DETAIL 6.
6. SEE PHOTO ON DETAIL 7.
7. SEE PHOTO ON DETAIL 8.
X SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
4 BUILDING 111 SECOND FLOOR DEMOLITION PLAN - RM 2429EC
SCALE: 1/2" = 1' 0"
0 1 2 4
5 BUILDING 111 SECOND FLOOR NEW WORK PLAN - RM 2429EC
SCALE: 1/2" = 1' 0"
0 1 2 4
3 FRONTWALL ELAVATION - RM 2429EC (NEW WORK)
SCALE: N.T.S.
1 FRONTWALL ELAVATION - RM 2429EC (DEMO)
SCALE: N.T.S.
N O
R
TH
TRUE
0 1 2 4
N O
R
TH
TRUE
0 1 2 4
2 BUILDING 111 - RM 2429EC
SCALE: N.T.S.
6 BUILDING 111 - RM 2429EC
SCALE: N.T.S.
7 BUILDING 111 - RM 2429EC
SCALE: N.T.S.
8 BUILDING 111 - RM 2429EC
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
TRANSFORMER
T-17
UL-94-1
UL-94-2
STACKS
TRANSFORMER T-17
PRIMARY DISC SWITCH
DISCONNECT SWITCH
FOR PANELBOARD
RM 9410
STORAGE
9407EC
ELECTRICAL
CLOSET
TRANSFORMER
SPLICE BOX
UL-94-1A
TRANSFORMER T-17
SECONDARY BREAKER
DISCONNECT
RM 9410
STORAGE
9407EC
ELECTRICAL
CLOSET
TRANSFORMER
SPLICE BOX
AREA OF WORK
KEY PLAN - BUILDING 111
N
RM
9300 RM
9407EC
LL-55-1UL-55-1
UL-55-1A
EP103
BUILDING 111 FIFTH AND NINTH FLOOR
ELECTRICAL PLAN
1. DEMOLISH EXISTING TRANSFORMER
DISCONNECT SWITCH.
2. REPLACE EXISTING 45KVA TRANSFORMER T-17
WITH THE NEW TRANSFORMER IN ROOM 9410.
REFER TO DRAWING E-605 FOR WIRING DETAILS.
3. DEMOLISH EXISTING DISCONNECT SWITCH FOR
PANELBOARD.
4. REPLACE EXISTING PANELBOARDS WITH 1-NEW
PANELBOARD. REFEED THE CIRCUITS FROM THIS
NEW PANELBOARD.
5. RETAIN ALL EXISTING WALL RECEPTACLES.
6. SEE PHOTO ON DETAIL 3.
7. SEE PHOTO ON DETAIL 4.
X SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 111 NINTH FLOOR DEMOLITION PLAN - RM 9407 EC
SCALE: 1/4" = 1' 0"
0 2 4 8
N O
R
TH
TRUE
2 BUILDING 111 NINTH FLOOR NEW WORK PLAN - RM 9407 EC
SCALE: 1/4" = 1' 0"
0 2 4 8
N O
R
TH
TRUE
5 BUILDING 111 FIFTH FLOOR DEMOLITION PLAN - RM 5512EC
SCALE: 1/2" = 1' 0"
0 1 2
6 BUILDING 111 FIFTH FLOOR NEW WORK PLAN - RM 5512EC
SCALE: 1/2" = 1' 0"
0 1 2 N
O R
TH
TRUE
0 1 2 4
N O
R
TH
TRUE
0 1 2 4 3 BUILDING 111 - RM 9407EC
SCALE: N.T.S.
4 BUILDING 111 - RM 9407EC
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
AREA OF WORK
KEY PLAN - BUILDING 111
N
RM 10300
RM 10523EC
ELH-CR-105-1
EUL-CR-105
ECRT-1
10523EC
ELECTRICAL
CLOSET3
ELH-CR-105-1
EUL-CR-105
ECRT-1
10523EC
ELECTRICAL
CLOSET
EXISTING EPH-Q-103-1
NEW 45KVA TRANSFORMER
EQT-2 10300
EP104
BUILDING 111 TENTH FLOOR ELECTRICAL
PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
3 BUILDING 111 TENTH FLOOR DEMOLITION PLAN - RM 10523EC
SCALE: 1/2" = 1' 0"
N O
R
TH
TRUE
0 1 2 4
4 BUILDING 111 TENTH FLOOR NEW WORK PLAN - RM 10523EC
SCALE: 1/2" = 1' 0"
N O
R
TH
TRUE
0 1 2 4
X
1 BUILDING 111 TENTH FLOOR NEW WORK PLAN - RM 10300
SCALE: 1/4" = 1' 0"
0 2 4 8
N O
R
TH
TRUE
2 BUILDING 111 - RM 10523EC
SCALE: 1/4" = 1' 0"
1. DEMOLISH EXISTING PANELBOARD. REFEED THE
LOADS FROM A NEW PANELBOARD.
2. REPLACE EXISTING TRANSFORMER WITH A NEW
UNIT.
3. SEE PHOTO ON DETAIL 2.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
KEY PLAN - BUILDING 70
N
RM
D-4EC
RM
B40
ATS SE70
ATS-LS70B
(ETR)
EDL-LS-BBN-70-1
EUL-LS-BBN-70-2
(ETR)
TRANSFORMER
(ETR)
MDP-70B
DL-BBN-70-2
(ETR)
DAT
(ETR)
B-40
MECH. EQPT.
DL-BBN-70-1
GENERATOR
"TEST" SWITCHES
ATS-SE70-B1
PB-TS-SE70B1
MDP-70-G
DL-BBN-70-1
ATS-LS70B
(ETR)
EUL-LS-BBN-70-2
(ETR)
TRANSFORMER
(ETR)
DL-BBN-70-2
(ETR)
DAT
(ETR)
B-40
MECH. EQPT.
MDP-70B
EDL-LS-BBN-70-1
PB-TS-SE70B1
MDP-70-G
GENERATOR
"TEST" SWITCHES
EP105
BUILDING 70 BASEMENT ENLARGED FLOOR
PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM B-40
SCALE: 1/2" = 1' 0"
2 BUILDING 70 BASEMENT NEW WORK PLAN - RM B-40
SCALE: 1/2" = 1' 0"
1. RETROFIT OR REPLACE THE PANELBOARD.
REFER TO DRAWING E-613 FOR EQUIPMENT
DETAILS.
2. DEMOLISH THE EQUIPMENT INCLUDING POWER
AND CONTROL WIRING.
3. RETROFIT THE SWITCHBOARD. REFER TO
DRAWING E-613 FOR EQUIPMENT DETAIL.
4. RELABEL THE CIRCUITS SE-70-C, SE-70-E,
SE-70-B, AND SE-70-D AS "SPARE" ON THE
SWITCHBOARD MDP-70-G.
5. REMOVE THE CONTROL WIRING FROM
DEMOLISHED ATS'S (IN THE PROJECT). RELABEL
THE AFFECTED SWITCHES "SPARE".
6. SEE PHOTO ON DETAIL 3.
7. SEE PHOTO ON DETAIL 4.
8. SEE PHOTO ON DETAIL 5.
9. SEE PHOTO ON DETAIL 6.
X SHEET KEY NOTES:
NORTH
TRUE
0 1 2 4
NORTH
TRUE
0 1 2 4
3 BUILDING 70 - RM B-40
SCALE: N.T.S.
4 BUILDING 70 - RM B-40
SCALE: N.T.S.
5 BUILDING 70 - RM B-40
SCALE: N.T.S.
6 BUILDING 70 - RM B-40
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
DL-BDN-70-1
(ETR) ATS-SE70-D
DL-BDN-70-2
UL-BDN-70-1
ATS-LS-BDN-70-1
(ETR)
EDL-LS-BDN-70-1
POWER
TROUGH
(ETR)
MDP-70-D
D-4EC
ELECTRICAL
CLOSET
SE70-D DISCONNECT
4 5
AREA OF WORK
KEY PLAN - BUILDING 70
N
RM
D-4EC
RM
B40
DL-BDN-70-1
(ETR)
ATS-LS-BDN-70-1
(ETR)
POWER
TROUGH
(ETR)
D-4EC
ELECTRICAL
CLOSET
DL-BDN-70-2
EDL-LS-BDN-70-1
MDP-70-D
UL-BDN-70-1
EP106
BUILDING 70 BASEMENT ENLARGED FLOOR
PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM D-4EC
SCALE: 1/2" = 1' 0"
2 BUILDING 70 BASEMENT NEW WORK PLAN - RM D-4EC
SCALE: 1/2" = 1' 0"
1. RETROFIT OR REPLACE THE PANELBOARD.
REFER TO DRAWING E-613 FOR EQUIPMENT
DETAILS.
2. DEMOLISH THE EQUIPMENT INCLUDING POWER
AND CONTROL WIRING.
3. RETROFIT THE SWITCHBOARD. REFER TO
DRAWING E-613 FOR EQUIPMENT DETAIL.
4. SEE PHOTO ON DETAIL 3.
5. SEE PHOTO ON DETAIL 4.
X SHEET KEY NOTES:
NORTH
TRUE
0 1 2 4
NORTH
TRUE
0 1 2 4
3 BUILDING 70 - RM D-4EC
SCALE: N.T.S.
4 BUILDING 70 - RM D-4EC
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
N
RM
C17
UL-BCN-70-4
ATS-SE70-C
ATS-LS70C
EDL-LS-BCN-70-1
MDP-70-C
CABLE TROUGH
UL-BCN-70-9
DL-BCN-70-3
DL-BCN-70-2
C-17
ELECTRICAL
CLOSET
1 1 1 2
SE70-C
DISCONNECT
ATS-LS70C
CABLE TROUGH
C-17
ELECTRICAL
CLOSET
UL-BCN-70-4
EDL-LS-BCN-70-1
MDP-70-C
UL-BCN-70-9
DL-BCN-70-3
DL-BCN-70-2
EP107
BUILDING 70 BASEMENT ENLARGED FLOOR
PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM C-17
SCALE: 1/2" = 1' 0"
2 BUILDING 70 BASEMENT NEW WORK PLAN - RM C-17
SCALE: 1/2" = 1' 0"
1. RETROFIT OR REPLACE THE PANELBOARD.
REFER TO DRAWING E-613 FOR EQUIPMENT
DETAILS.
2. DEMOLISH THE EQUIPMENT INCLUDING POWER
AND CONTROL WIRING.
3. RETROFIT THE SWITCHBOARD. REFER TO
DRAWING E-613 FOR EQUIPMENT DETAIL.
4. SEE PHOTO ON DETAIL 3.
X
NORTH
TRUE
0 1 2 4
NORTH
TRUE
0 1 2 4
3 BUILDING 70 - RM C-17
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
N
RM E34
UL-BEN-70-9
DL-BEN-70-1
LS70-E
DISCONNECT
PULLBOX
LS-70E ZENITH ZTS
EDL-LS-BEN-70-1
UL-BEN-70-8
ATS-SE-70-EDL-BEN-70-2
SECURITY & FA
SE70-E DISCONNECT
UL-BEN-70-7
G70-AB/E GASFLOW
MDP-70-E
E-34
UL-BEN-70-9
EDL-LS-BEN-70-1
DL-BEN-70-2
MDP-70-E
1 2
UL-BEN-70-8
UL-BEN-70-7 1
DL-BEN-70-1
LS70-E
DISCONNECT
PULLBOX
LS-70E ZENITH ZTS
UL-BEN-70-8
SECURITY & FA G70-AB/E GASFLOW
E-34
UL-BEN-70-9
EDL-LS-BEN-70-1
DL-BEN-70-2
MDP-70-E
UL-BEN-70-8
UL-BEN-70-7
EP108
BUILDING 70 BASEMENT ENLARGED FLOOR
PLAN
SHEET KEY NOTES:
SHEET NOTES:
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 1
695-19-101
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
19-097
100% CONSTRUCTION DOCUMENTS
Structural Engineer:
10/29/2019 CNJHT
1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM E-34
SCALE: 1/2" = 1' 0"
2 BUILDING 70 BASEMENT NEW WORK PLAN - RM E-34
SCALE: 1/2" = 1' 0"
1. RETROFIT OR REPLACE THE PANELBOARD.
REFER TO DRAWING E-613 FOR EQUIPMENT
DETAILS.
2. DEMOLISH THE EQUIPMENT INCLUDING POWER
AND CONTROL WIRING.
3. RETROFIT THE SWITCHBOARD. REFER TO
DRAWING E-613 FOR EQUIPMENT DETAIL.
4. SEE PHOTO ON DETAIL 3.
5. SEE PHOTO ON DETAIL 4.
X
NORTH
TRUE
0 1 2 4
NORTH
TRUE
0 1 2 4
3 BUILDING 70 - RM E-34
SCALE: N.T.S.
4 BUILDING 70 - RM E-34
SCALE: N.T.S.
A. REFER TO E-613 FOR WORK DETAILS OF
EQUIPMENT ON THE PROJECT.
B. REFER TO SINGLE LINE DIAGRAMS FOR
EQUIPMENT AND FEEDER DETAILS.
S06 - Amended Drawings
File details come from the government source that posted it. Updated .