S06 - Drawings 11-20.pdf

PDF 3 MB Posted

Attached to
Z2DA--Upgrade Electrical Systems Area 1 695-19-101 Federal contract opportunity
Solicitation number
36C25220B0022
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document package includes construction drawings and specifications for an electrical systems upgrade project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves replacing switchgear, transformers, and panelboards; installing portable generators; and retrofitting existing electrical closets and equipment rooms. Work will take place in various buildings and areas across multiple floors, as indicated on the drawings. Contractors should demolish outdated components and refed circuits from new equipment per the specifications. The pre-bid meeting is scheduled for June 16th, 2020, with responses due shortly after on an anticipated 100% Service-Disabled Veteran-Owned Small Business set-aside contract administered by the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Upgrade Electrical Systems Area 1 695-19-101, newest first.
File Type Posted
S06 - Drawings 1-10.pdf PDF
S06 - Drawings 41-50.pdf PDF
S06 - Drawings 21-30.pdf PDF
S06 - Amended Specifications.pdf PDF
S06 - Drawings 51-66.pdf PDF
36C25220B0022_1.docx DOCX document
S06 - Drawings 31-40.pdf PDF
P07 - Davis Bacon WD.pdf PDF
Previous RFIs and Answers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM E-34

ROOM B-43

MECH. EQUIP.

ROOM B-40

MECH. EQUIP.

ROOM A-12

ELEVATOR

EQUIP.

ROOM C-17

ELECTRICAL

CLOSET

ROOM D-9

CLASSROOM

MDP-70-E

DL-BEN-70-1

LS70-E

PULLBOX

LS-70E ZENITH ZTS

EDL-LS-BEN-70-1

UL-BEN-70-8

UL-BEN-70-7

G70-AB/E GASFLOW

SE70-E DISCONNECT

ATS-SE-70-E

DL-BEN-70-2

SECURITY & FA

ATS SE70

DL-BBN-70-1

PB-TS-SE70B1

ATS-SE70-B1

ATS-LS70B

EDL-LS-BBN-70-1

DL-BBN-70-2

DAT

EUL-LS-BBN-70-2

TRANSFORMER

UL-BBN-70-10

UL-BBN-70-11

UL-BBN-70-5

UL-BBN-70-5

ELEV 70-A CIRC

ELEC 70-A CONTROLLER

UL-BAS-70-4

MDP-70-A

PANEL 39

MDP-B

MDP-G

UL-BAS-70-5

EUL-LS-BAS-70-1

PANEL P-12

UL-BCN-70-4

ATS-SE70-C

DL-BCN-70-2

DL-BCN-70-3

UL-BCN-70-9

ATS-LS70E

EDL-LS-BCN-70-1

MDP-70-C

CABLE TROUGH

DL-BDN-70-1

ATS-SE70-D

SE70-D DISCONNECT

DL-BDN-70-2

UL-BDN-70-1

ATS-LS-BDN-70-1

EDL-LS-BDN-70-1

POWER TROUGH

MDP-70-D

EP105

EP105

EP106

EP106

EP-107

EP-107

EP108

EP108

ROOM D-4

ELECTRICAL

CLOSET

EP109

EP109

UL-BEN-70-9

AREA OF WORK

KEY PLAN - BUILDING 70

N

RM

D4

RM

C17

RM D9

RM A12RM E34

RM

B43

RM

B40

E-106

BUILDING 70 BASEMENT FLOOR PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 BASEMENT FLOOR PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. REFER TO E-613 FOR WORK DETAILS OF

EXISTING EQUIPMENT AFFECTED ON THE

PROJECT.

B. REFER TO THE ROOM ENLARGED PLANS FOR

THE NEW ELECTRICAL EQUIPMENT AND

LOCATION IF NOTED.

C. REFER TO SINGLE LINE DIAGRAMS AND PANEL

SCHEDULES FOR EQUIPMENT AND CIRCUIT

DETAILS.

D. PROVIDE PORTABLE, TEMPORARY POWER

DISTRIBUTION BOX WITH 60A PANEL BOARD AT

EACH WING. COORDINATE THE DETAILS AND

LOCATION WITH COR.

1. CONTRACTOR TO REPLACE OR RETROFIT

SWITCHBOARD OR PANELBOARD AS SHOWN ON

THIS DRAWING. SEE EQUIPMENT LIST ON DRAWING

E-613.

2. IF ANY CIRCUITS ARE SHARING A NEUTRAL

CONDUCTOR, CONTRACTOR SHALL PROVIDE A

REPLACEMENT(MUTIPLE POLE CIRCUIT BREAKER)

FOR THESE 1-POLE SINGLE BREAKERS.

3. PROVIDE (4) PORTABLE POWER DISTRIBUTION

CARTS/UNITS FOR THE HALLWAYS (NORTH, SOUTH,

1ST FLOOR, 2ND FLOOR) DURING THE SHUTDOWN

OF BUILDING SWITCHBOARD (WINGS C,B,D & E).

THE PORTABLE POWER UNIT SHALL BE, AT

MINIMUM, 70A 120/208V 3-PHASE WITH NEUTRAL

AND GROUND, WITH 6 DUPLEX AND 2 CS6369

RECEPTACLES. PROVIDE PORTABLE POWER CORD

(EST. 250FT) FROM THE ADJACENT WING

PANELBOARD TO FEED THE UNIT. COORDINATE

CIRCUITING WITH COR.

1 2

DocuSign Envelope ID: 84209D4E-67F0-4C20-902C-691E17F13049

12/4/2019

DCAE

UL-2CN-70-8

UL-2CN-70-9

UL-2CN-70-1

MDP-70-E2F

ROOM C-201

ROOM E-2048

1 2

AREA OF WORK

KEY PLAN - BUILDING 70

N

RM C-201RM E-2048

E-107

BUILDING 70 SECOND FLOOR PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 SECOND FLOOR PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. REFER TO E-613 FOR WORK DETAILS OF

EXISTING EQUIPMENT AFFECTED ON THE

PROJECT.

B. REFER TO THE ROOM ENLARGED PLANS FOR

THE NEW ELECTRICAL EQUIPMENT AND

LOCATION IF NOTED.

C. REFER TO SINGLE LINE DIAGRAMS AND PANEL

SCHEDULES FOR EQUIPMENT AND CIRCUIT

DETAILS.

D. PROVIDE PORTABLE, TEMPORARY POWER

DISTRIBUTION BOX WITH 60A PANEL BOARD AT

EACH WING. COORDINATE THE DETAILS AND

LOCATION WITH COR.

1. CONTRACTOR TO REPLACE OR RETROFIT

SWITCHBOARD OR PANELBOARD AS SHOWN ON

THIS DRAWING. SEE EQUIPMENT LIST ON DRAWING

E-613.

2. IF ANY CIRCUITS ARE SHARING A NEUTRAL

CONDUCTOR, CONTRACTOR SHALL PROVIDE A

REPLACEMENT(MUTIPLE POLE CIRCUIT BREAKER)

FOR THESE 1-POLE SINGLE BREAKERS.

3. PROVIDE (4) PORTABLE POWER DISTRIBUTION

CARTS/UNITS FOR THE HALLWAYS (NORTH, SOUTH,

1ST FLOOR, 2ND FLOOR) DURING THE SHUTDOWN

OF BUILDING SWITCHBOARD (WINGS C,B,D & E).

THE PORTABLE POWER UNIT SHALL BE, AT

MINIMUM, 70A 120/208V 3-PHASE WITH NEUTRAL

AND GROUND, WITH 6 DUPLEX AND 2 CS6369

RECEPTACLES. PROVIDE PORTABLE POWER CORD

(EST. 250FT) FROM THE ADJACENT WING

PANELBOARD TO FEED THE UNIT. COORDINATE

CIRCUITING WITH COR.

B0123EC

ELECTRICAL

CLOSET

PL-B01-2

PL-B01-1

500 KVA XFMR

DL-B01-2

UL-B01-5

UL-B01-6

ECRT-2 B0123

ELEV. DS (ETR)

600A DISCONNECT

EDL-CR-B01-1

EUL-CR-B01-1

EXISTING TROUGH

EXISTING TROUGH

B0123EC

ELECTRICAL

CLOSET

ELEV. DS (ETR)

PL-B01-1A

UL-B01-5

UL-B01-6

300KVA

TRANSFORMER

75KVA TRANSFORMER

ECRT-2

DL-B01-2

EUL-CR-B01-1

EDL-CR-B01-1

EUL-CR-B01-1EUL-CR-B01-1

450A BREAKER DISCONNECT

EXISTING TROUGH

EXISTING TROUGH

AREA OF WORK

KEY PLAN - BUILDING 111

N

RM

B0123AEC

EP101

BUILDING 111 BASEMENT FLOOR

ELECTRICAL PLAN

1.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

X SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 111 BASEMENT FLOOR DEMOLITION PLAN - RM B0123A EC

SCALE: 1/2" = 1' 0"

2 BUILDING 111 BASEMENT FLOOR NEW WORK PLAN - RM B0123A EC

SCALE: 1/2" = 1' 0"

0 1 2 4

1. DEMOLISH EXISTING PANELBOARD. REFEED THE

LOADS FROM A NEW PANELBOARD.

2. REPLACE EXISTING 500KVA TRANSFORMER WITH

A NEW 300KVA TRANSFORMER.

3. REPLACE EXISTING 75KVA TRANSFORMER WITH

A NEW UNIT.

4. REPLACE THE 600A FUSIBLE DISCONNECT

SWITCH WITH 450A BREAKER DISCONNECT.

5. REPLACE EXISTING PANELBOARD.

6. RETROFIT EXISTING PANELBOARD.

7. SEE PHOTO ON DETAIL 3.

8. SEE PHOTO ON DETAIL 4.

9. SEE PHOTO ON DETAIL 5.

N O

R

TH

TRUE

0 1 2 4

N O

R

TH

TRUE

0 1 2 4

3 BUILDING 111 - RM B0123A

SCALE: N.T.S.

4 BUILDING 111 - RM B0123A

SCALE: N.T.S.

5 BUILDING 111 - RM B0123A

SCALE: N.T.S.

2429EC

ELECTRICAL

CLOSET

(EX)

BMS

ELH-CR-24-2

EUL-CR-24-4EUL-CR-24-3

PULL BOX

BUILDING

COLUMN

(EX)

TRANSFORMER

DISCONNECT SWITCH

1 1

2(EX) ECRT-25

225KVA TRANSFORMER

APPROX. 90"AFF

EXISTING

THROUGH

2429EC

ELECTRICAL

CLOSET

(EX)

BMS

EUL-CR-24-3A

BUILDING

COLUMN

(EX)

TRANSFORMER

DISCONNECT SWITCH

ELH-CR-24-2

EXISTING

THROUGH

NEW RELOCATED

ECRT-25

225KVA TRANSFORMER

03 AREA OF WORK

KEY PLAN - BUILDING 111

N

RM

5512EC

FIFTH FLOOR

AREA OF WORK

KEY PLAN - BUILDING 111

N

RM 2429EC

SECOND FLOOR

BMS CONTROL PANEL

WALL

ELH-CR-24-2

WALL

ELECT

BOX

PULL BOX

CONDUIT STUB-UP

BMS CONTROL PANEL

WALL

ELH-CR-24-2

WALL

ELECT

BOX

PULL BOX

CONDUIT STUB-UP

225KVA

XFMR

EP102

BUILDING 111 SECOND FLOOR ELECTRICAL

PLAN

1. DEMOLISH EXISTING PANELBOARD. REFEED THE

LOADS FROM A NEW PANELBOARD.

2. REPLACE EXISTING 225KVA TRANSFORMER WITH

A NEW UNIT.

3. SHIFT THE PANELBOARD AND PULLBOX TO THE

RIGHT SIDE TO ALLOW FOR THE NEW 225KVA

TRANSFORMER.

4. SEE PHOTO ON DETAIL 2.

5. SEE PHOTO ON DETAIL 6.

6. SEE PHOTO ON DETAIL 7.

7. SEE PHOTO ON DETAIL 8.

X SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

4 BUILDING 111 SECOND FLOOR DEMOLITION PLAN - RM 2429EC

SCALE: 1/2" = 1' 0"

0 1 2 4

5 BUILDING 111 SECOND FLOOR NEW WORK PLAN - RM 2429EC

SCALE: 1/2" = 1' 0"

0 1 2 4

3 FRONTWALL ELAVATION - RM 2429EC (NEW WORK)

SCALE: N.T.S.

1 FRONTWALL ELAVATION - RM 2429EC (DEMO)

SCALE: N.T.S.

N O

R

TH

TRUE

0 1 2 4

N O

R

TH

TRUE

0 1 2 4

2 BUILDING 111 - RM 2429EC

SCALE: N.T.S.

6 BUILDING 111 - RM 2429EC

SCALE: N.T.S.

7 BUILDING 111 - RM 2429EC

SCALE: N.T.S.

8 BUILDING 111 - RM 2429EC

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

TRANSFORMER

T-17

UL-94-1

UL-94-2

STACKS

TRANSFORMER T-17

PRIMARY DISC SWITCH

DISCONNECT SWITCH

FOR PANELBOARD

RM 9410

STORAGE

9407EC

ELECTRICAL

CLOSET

TRANSFORMER

SPLICE BOX

UL-94-1A

TRANSFORMER T-17

SECONDARY BREAKER

DISCONNECT

RM 9410

STORAGE

9407EC

ELECTRICAL

CLOSET

TRANSFORMER

SPLICE BOX

AREA OF WORK

KEY PLAN - BUILDING 111

N

RM

9300 RM

9407EC

LL-55-1UL-55-1

UL-55-1A

EP103

BUILDING 111 FIFTH AND NINTH FLOOR

ELECTRICAL PLAN

1. DEMOLISH EXISTING TRANSFORMER

DISCONNECT SWITCH.

2. REPLACE EXISTING 45KVA TRANSFORMER T-17

WITH THE NEW TRANSFORMER IN ROOM 9410.

REFER TO DRAWING E-605 FOR WIRING DETAILS.

3. DEMOLISH EXISTING DISCONNECT SWITCH FOR

PANELBOARD.

4. REPLACE EXISTING PANELBOARDS WITH 1-NEW

PANELBOARD. REFEED THE CIRCUITS FROM THIS

NEW PANELBOARD.

5. RETAIN ALL EXISTING WALL RECEPTACLES.

6. SEE PHOTO ON DETAIL 3.

7. SEE PHOTO ON DETAIL 4.

X SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 111 NINTH FLOOR DEMOLITION PLAN - RM 9407 EC

SCALE: 1/4" = 1' 0"

0 2 4 8

N O

R

TH

TRUE

2 BUILDING 111 NINTH FLOOR NEW WORK PLAN - RM 9407 EC

SCALE: 1/4" = 1' 0"

0 2 4 8

N O

R

TH

TRUE

5 BUILDING 111 FIFTH FLOOR DEMOLITION PLAN - RM 5512EC

SCALE: 1/2" = 1' 0"

0 1 2

6 BUILDING 111 FIFTH FLOOR NEW WORK PLAN - RM 5512EC

SCALE: 1/2" = 1' 0"

0 1 2 N

O R

TH

TRUE

0 1 2 4

N O

R

TH

TRUE

0 1 2 4 3 BUILDING 111 - RM 9407EC

SCALE: N.T.S.

4 BUILDING 111 - RM 9407EC

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

AREA OF WORK

KEY PLAN - BUILDING 111

N

RM 10300

RM 10523EC

ELH-CR-105-1

EUL-CR-105

ECRT-1

10523EC

ELECTRICAL

CLOSET3

ELH-CR-105-1

EUL-CR-105

ECRT-1

10523EC

ELECTRICAL

CLOSET

EXISTING EPH-Q-103-1

NEW 45KVA TRANSFORMER

EQT-2 10300

EP104

BUILDING 111 TENTH FLOOR ELECTRICAL

PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

3 BUILDING 111 TENTH FLOOR DEMOLITION PLAN - RM 10523EC

SCALE: 1/2" = 1' 0"

N O

R

TH

TRUE

0 1 2 4

4 BUILDING 111 TENTH FLOOR NEW WORK PLAN - RM 10523EC

SCALE: 1/2" = 1' 0"

N O

R

TH

TRUE

0 1 2 4

X

1 BUILDING 111 TENTH FLOOR NEW WORK PLAN - RM 10300

SCALE: 1/4" = 1' 0"

0 2 4 8

N O

R

TH

TRUE

2 BUILDING 111 - RM 10523EC

SCALE: 1/4" = 1' 0"

1. DEMOLISH EXISTING PANELBOARD. REFEED THE

LOADS FROM A NEW PANELBOARD.

2. REPLACE EXISTING TRANSFORMER WITH A NEW

UNIT.

3. SEE PHOTO ON DETAIL 2.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

KEY PLAN - BUILDING 70

N

RM

D-4EC

RM

B40

ATS SE70

ATS-LS70B

(ETR)

EDL-LS-BBN-70-1

EUL-LS-BBN-70-2

(ETR)

TRANSFORMER

(ETR)

MDP-70B

DL-BBN-70-2

(ETR)

DAT

(ETR)

B-40

MECH. EQPT.

DL-BBN-70-1

GENERATOR

"TEST" SWITCHES

ATS-SE70-B1

PB-TS-SE70B1

MDP-70-G

DL-BBN-70-1

ATS-LS70B

(ETR)

EUL-LS-BBN-70-2

(ETR)

TRANSFORMER

(ETR)

DL-BBN-70-2

(ETR)

DAT

(ETR)

B-40

MECH. EQPT.

MDP-70B

EDL-LS-BBN-70-1

PB-TS-SE70B1

MDP-70-G

GENERATOR

"TEST" SWITCHES

EP105

BUILDING 70 BASEMENT ENLARGED FLOOR

PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM B-40

SCALE: 1/2" = 1' 0"

2 BUILDING 70 BASEMENT NEW WORK PLAN - RM B-40

SCALE: 1/2" = 1' 0"

1. RETROFIT OR REPLACE THE PANELBOARD.

REFER TO DRAWING E-613 FOR EQUIPMENT

DETAILS.

2. DEMOLISH THE EQUIPMENT INCLUDING POWER

AND CONTROL WIRING.

3. RETROFIT THE SWITCHBOARD. REFER TO

DRAWING E-613 FOR EQUIPMENT DETAIL.

4. RELABEL THE CIRCUITS SE-70-C, SE-70-E,

SE-70-B, AND SE-70-D AS "SPARE" ON THE

SWITCHBOARD MDP-70-G.

5. REMOVE THE CONTROL WIRING FROM

DEMOLISHED ATS'S (IN THE PROJECT). RELABEL

THE AFFECTED SWITCHES "SPARE".

6. SEE PHOTO ON DETAIL 3.

7. SEE PHOTO ON DETAIL 4.

8. SEE PHOTO ON DETAIL 5.

9. SEE PHOTO ON DETAIL 6.

X SHEET KEY NOTES:

NORTH

TRUE

0 1 2 4

NORTH

TRUE

0 1 2 4

3 BUILDING 70 - RM B-40

SCALE: N.T.S.

4 BUILDING 70 - RM B-40

SCALE: N.T.S.

5 BUILDING 70 - RM B-40

SCALE: N.T.S.

6 BUILDING 70 - RM B-40

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

DL-BDN-70-1

(ETR) ATS-SE70-D

DL-BDN-70-2

UL-BDN-70-1

ATS-LS-BDN-70-1

(ETR)

EDL-LS-BDN-70-1

POWER

TROUGH

(ETR)

MDP-70-D

D-4EC

ELECTRICAL

CLOSET

SE70-D DISCONNECT

4 5

AREA OF WORK

KEY PLAN - BUILDING 70

N

RM

D-4EC

RM

B40

DL-BDN-70-1

(ETR)

ATS-LS-BDN-70-1

(ETR)

POWER

TROUGH

(ETR)

D-4EC

ELECTRICAL

CLOSET

DL-BDN-70-2

EDL-LS-BDN-70-1

MDP-70-D

UL-BDN-70-1

EP106

BUILDING 70 BASEMENT ENLARGED FLOOR

PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM D-4EC

SCALE: 1/2" = 1' 0"

2 BUILDING 70 BASEMENT NEW WORK PLAN - RM D-4EC

SCALE: 1/2" = 1' 0"

1. RETROFIT OR REPLACE THE PANELBOARD.

REFER TO DRAWING E-613 FOR EQUIPMENT

DETAILS.

2. DEMOLISH THE EQUIPMENT INCLUDING POWER

AND CONTROL WIRING.

3. RETROFIT THE SWITCHBOARD. REFER TO

DRAWING E-613 FOR EQUIPMENT DETAIL.

4. SEE PHOTO ON DETAIL 3.

5. SEE PHOTO ON DETAIL 4.

X SHEET KEY NOTES:

NORTH

TRUE

0 1 2 4

NORTH

TRUE

0 1 2 4

3 BUILDING 70 - RM D-4EC

SCALE: N.T.S.

4 BUILDING 70 - RM D-4EC

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

N

RM

C17

UL-BCN-70-4

ATS-SE70-C

ATS-LS70C

EDL-LS-BCN-70-1

MDP-70-C

CABLE TROUGH

UL-BCN-70-9

DL-BCN-70-3

DL-BCN-70-2

C-17

ELECTRICAL

CLOSET

1 1 1 2

SE70-C

DISCONNECT

ATS-LS70C

CABLE TROUGH

C-17

ELECTRICAL

CLOSET

UL-BCN-70-4

EDL-LS-BCN-70-1

MDP-70-C

UL-BCN-70-9

DL-BCN-70-3

DL-BCN-70-2

EP107

BUILDING 70 BASEMENT ENLARGED FLOOR

PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM C-17

SCALE: 1/2" = 1' 0"

2 BUILDING 70 BASEMENT NEW WORK PLAN - RM C-17

SCALE: 1/2" = 1' 0"

1. RETROFIT OR REPLACE THE PANELBOARD.

REFER TO DRAWING E-613 FOR EQUIPMENT

DETAILS.

2. DEMOLISH THE EQUIPMENT INCLUDING POWER

AND CONTROL WIRING.

3. RETROFIT THE SWITCHBOARD. REFER TO

DRAWING E-613 FOR EQUIPMENT DETAIL.

4. SEE PHOTO ON DETAIL 3.

X

NORTH

TRUE

0 1 2 4

NORTH

TRUE

0 1 2 4

3 BUILDING 70 - RM C-17

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

N

RM E34

UL-BEN-70-9

DL-BEN-70-1

LS70-E

DISCONNECT

PULLBOX

LS-70E ZENITH ZTS

EDL-LS-BEN-70-1

UL-BEN-70-8

ATS-SE-70-EDL-BEN-70-2

SECURITY & FA

SE70-E DISCONNECT

UL-BEN-70-7

G70-AB/E GASFLOW

MDP-70-E

E-34

UL-BEN-70-9

EDL-LS-BEN-70-1

DL-BEN-70-2

MDP-70-E

1 2

UL-BEN-70-8

UL-BEN-70-7 1

DL-BEN-70-1

LS70-E

DISCONNECT

PULLBOX

LS-70E ZENITH ZTS

UL-BEN-70-8

SECURITY & FA G70-AB/E GASFLOW

E-34

UL-BEN-70-9

EDL-LS-BEN-70-1

DL-BEN-70-2

MDP-70-E

UL-BEN-70-8

UL-BEN-70-7

EP108

BUILDING 70 BASEMENT ENLARGED FLOOR

PLAN

SHEET KEY NOTES:

SHEET NOTES:

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

UPGRADE ELECTRICAL

SYSTEMS PHASE 1

695-19-101

CLEMENT J. ZABLOCKI VAMC

5000 W NATIONAL AVE, MILWAUKEE, WI

53295

19-097

100% CONSTRUCTION DOCUMENTS

Structural Engineer:

10/29/2019 CNJHT

1 BUILDING 70 BASEMENT DEMOLITION PLAN - RM E-34

SCALE: 1/2" = 1' 0"

2 BUILDING 70 BASEMENT NEW WORK PLAN - RM E-34

SCALE: 1/2" = 1' 0"

1. RETROFIT OR REPLACE THE PANELBOARD.

REFER TO DRAWING E-613 FOR EQUIPMENT

DETAILS.

2. DEMOLISH THE EQUIPMENT INCLUDING POWER

AND CONTROL WIRING.

3. RETROFIT THE SWITCHBOARD. REFER TO

DRAWING E-613 FOR EQUIPMENT DETAIL.

4. SEE PHOTO ON DETAIL 3.

5. SEE PHOTO ON DETAIL 4.

X

NORTH

TRUE

0 1 2 4

NORTH

TRUE

0 1 2 4

3 BUILDING 70 - RM E-34

SCALE: N.T.S.

4 BUILDING 70 - RM E-34

SCALE: N.T.S.

A. REFER TO E-613 FOR WORK DETAILS OF

EQUIPMENT ON THE PROJECT.

B. REFER TO SINGLE LINE DIAGRAMS FOR

EQUIPMENT AND FEEDER DETAILS.

S06 - Amended Drawings

File details come from the government source that posted it. Updated .