This presolicitation notice announces an upcoming invitation for bid for project 534-18-103 to expand and replace direct digital controls at the Ralph H Johnson VA Medical Center in Charleston, South Carolina. The project scope includes replacing the existing building automation system with a new state-of-the-art system supported locally, providing a new building lighting control system monitored through the new BAS, installing a new generator monitoring system with the central panel located in the boiler plant control room, supplying new digital VAV boxes to replace existing pneumatic units controlled and monitored through the new BAS, and installing a new fuel oil pump set and controls connected to the new BAS via the Cleaver Brooks control panel. The performance period is 240 calendar days from notice to proceed issuance between May and October. The solicitation will be issued on or around July 31, 2020 as a total SDVOSB set-aside following FAR part 14 sealed bidding procedures. The estimated value is between $5-10 million. The NAICS code is 238220 and small business size standard is $16.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24720B0037 0002.docx | DOCX document | |
| 36C24720B0037 Amendment A0001.pdf | ||
| 230800-Commissioning of HVAC Systems.pdf | ||
| Answers for 36C24720B0037 - 534-18-103 Expand Replace Direct Digital Controls.pdf | ||
| S02 Fully Sprinklered Drawing May 2020.pdf | ||
| P01 2018 Life Safety Plans - 1st thru 5th Floors.pdf | ||
| 36C24720B0037_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ralph H. Johnson VA Medical Center Engineering Services (138) 109 Bee Street Charleston, SC 29401-5799
Project: Expand/Replace Direct Digital Controls System VA Medical Center, Charleston, SC
VA Project No. 534-18-103
CAN Project No. 100435
May 2020
SPECIFICATIONS
Fully Sprinklered
Submitted by CAN Engineering/Willow – Joint Venture
PO Box 17551 Greenville, SC 29606
(864)271-3873
Expand/Replace Direct Digital Controls System VA Medical Center, Charleston, SC
VA Project No. 534-18-103 CAN Project No. 100435
May 2020
SPECIFICATIONS
Fully Sprinklered
Submitted by CAN Engineering/Willow – Joint Venture
PO Box 17551 Greenville, SC 29606
(864)271-3873
List of Specifications
Expand/Replace Direct Digital Controls System VA Medical Center, Charleston, SC
VA Project No. 534-18-103 CAN Project No. 100435
DIVISION 01 – GENERAL REQUIREMENTS
01 00 00 General Requirements
01 32 16.15 Project Schedules
01 33 23 Shop Drawing, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 00 Quality Control
01 45 29 Testing Laboratory Services
01 57 19 Temporary Environmental Controls
01 74 19 Construction Waste Management
01 81 13 Sustainable Construction Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition and Deconstruction
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping
07 92 00 Joint Sealants
DIVISION 09 – FINISHES
09 51 00 Acoustical Ceiling
09 91 00 Painting
DIVISION 13 – SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
Division 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 11 HVAC, Plumbing & Boiler Plant Insulation
23 09 23 Direct-Digital Control System for HVAC
23 10 00 Facilities Fuel Oil System
23 21 13 Hydronic Piping
23 31 00 HVAC Ducts and Casings
23 36 00 Air Terminal Units
23 82 16 Air Coils
Division 26 - ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 09 23 Lighting Controls
26 36 23 Automatic Transfer Switches
Division 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm
534-18-103
List of Drawings 00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
DRAWING SHEET
NUMBER NUMBER DRAWING TITLE
GC001 1 of 51 COVER SHEET
RS101 4 of 51 SITE PLAN
GN001 3 of 51 GENERAL NOTES
XP101 4 OF 51 KEY PLAN – FIRST FLOOR
XP102 5 OF 51 KEY PLAN – SECOND FLOOR
XP103 6 OF 51 KEY PLAN – THIRD FLOOR
XP104 7 OF 51 KEY PLAN – FOURTH FLOOR
XP105 8 OF 51 KEY PLAN – FIFTH FLOOR
ME401 9 of 51 1st FLOOR - C SECTION - EQUIPMENT PLAN ME402 10 of 51 1st FLOOR - C SECTION – COOLING TOWERS & CONDENSER PUMPS
MH401 11 of 51 1st FLOOR - BB SECTION – VAV BOX REPLACEMENT MH402 12 of 51 1st FLOOR - D SECTION – VAV BOX REPLACEMENT MH403 13 of 51 2nd FLOOR – B & C SECTION - VAV BOX REPLACEMENT MH404 14 of 51 2nd FLOOR - BB SECTION – VAV BOX REPLACEMENT MH405 15 of 51 3rd FLOOR - C SECTION - VAV BOX REPLACEMENT MH406 16 of 51 4th & 5th FLOOR - C SECTION - VAV BOX REPLACEMENT
MC401 17 of 51 MECHANICAL CONTROLS - FIRST FLOOR MC402 18 of 51 MECHANICAL CONTROLS - SECOND FLOOR MC403 19 of 51 MECHANICAL CONTROLS - THIRD FLOOR MC404 20 of 51 MECHANICAL CONTROLS – PENTHOUSE & ROOF MC405 21 of 51 FIBER OPTIC NETWORK SCHEMATIC MC406 22 of 51 SYSTEM PROFILE & NETWORK ARCHITECTURE SCHEDULE
MJ501 23 of 51 MECHANICAL DETAILS
MS601 24 of 51 MECHANICAL SCHEDULES & LEGEND MS602 25 of 51 TYPICAL CONTROLS SCHEMATIC – SINGLE ZONE BLOWER COIL MS603 26 of 51 TYPICAL CONTROLS SCHEMATIC – DUAL DUCT AIR HANDLING UNITS MS604 27 of 51 TYPICAL CONTROLS SCHEMATIC – AHU & VAV (ECONOMIZER) MS605 28 of 51 AIR HANDLING UNITS SCHEDULE - EXISTING MS606 29 of 51 TYPICAL CONTROLS SCHEMATIC – AHU & VAV (NO ECONOMIZER) MS607 30 of 51 TYPICAL CONTROLS SCHEMATIC – 100% OUTSIDE AIR MS608 31 of 51 CHILLED WATER FLOW DIAGRAM MS609 32 of 51 COOLING TOWER & CONDENSER PUMPS – SEQUENCE OF OPERATION (CEP) MS610 33 of 51 EXISTING HVAC & VAV UNIT SCHEDULE MS611 34 of 51 EXISTING HVAC & VAV UNIT SCHEDULE MS612 35 of 51 EXISTING HVAC & VAV UNIT SCHEDULE MS613 36 of 51 EXISTING HVAC & VAV UNIT SCHEDULE MS614 37 of 51 EXISTING HVAC & VAV UNIT SCHEDULE
∗ Life Safety dwgs included to show fire walls
534-18-103
List of Drawings 00 01 15 - 2
DRAWING SHEET
NUMBER NUMBER DRAWING TITLE
E001 38 of 51 ELECTRICAL FRONT SHEET E401A 39 of 51 ELECTRICAL - FIRST FLOOR NORTH E401B 40 of 51 ELECTRICAL - FIRST FLOOR SOUTH E402A 41 of 51 ELECTRICAL - SECOND FLOOR NORTH E402B 42 of 51 ELECTRICAL - SECOND FLOOR SOUTH E403 43 of 51 ELECTRICAL - THIRD FLOOR E404 44 of 51 ELECTRICAL - FOURTH FLOOR E405 45 of 51 ELECTRICAL - FIFTH FLOOR
E601 46 of 51 POWER SYSTEM – PARTIAL ONE LINE DIAGRAM - ELECTRICAL E602 47 of 51 POWER CONTROLS - ONE LINE DIAGRAM - ELECTRICAL
E701 48 of 51 LIGHTING CONTROL PANEL SCHEDULES - ELECTRICAL
E801 49 of 51 ATS / GENERATOR CONTROLS DIAGRAMS E802 50 of 51 ATS / GENERATOR CONTROLS DIAGRAMS E803 51 of 51 ATS / GENERATOR CONTROLS DIAGRAMS
VAMC 534-18-103 (CAN #100435) General Requirements DDC Controls 01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.16 RESIDENT ENGINEER'S FIELD OFFICE
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.18 TEMPORARY USE OF EXISTING ELEVATORS
1.19 TEMPORARY USE OF NEW ELEVATORS
1.20 TEMPORARY TOILETS
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
1.22 NEW TELEPHONE EQUIPMENT
1.23 TESTS
1.24 INSTRUCTIONS
DDC Controls 01 00 00 - 2
1.25 GOVERNMENT-FURNISHED PROPERTY
1.26 RELOCATED EQUIPMENT ITEMS
1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.28 CONSTRUCTION SIGN
1.29 SAFETY SIGN
1.30 PHOTOGRAPHIC DOCUMENTATION
1.31 FINAL ELEVATION Digital Images
1.32 HISTORIC PRESERVATION
DDC Controls 01 00 00 - 3
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for expand/upgrade DDC controls install lighting controls, generator monitoring, replace pneumatic controls and install new fuel oil pumps as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
COR.
C. Offices of Willow/CAN JV, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I Electrical Work:_______: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including lighting controls and generator monitoring.
ITEM II Mechanical Work:_______: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including upgrade / expand DDC controls, replace pneumatic controls, install new fuel pumps.
DDC Controls 01 00 00 - 4
B. ALTERNATE NO.1: Deduct replacement of 500 new digital T stats.
C. ALTERNATE NO. 2: Delete 5 work stations.
D. Alternate No. 3: Upgrade to fiber optic system.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
E. Alternate No. 4: Delete Upgrade of lighting system.
DDC Controls 01 00 00 - 5
C. Guards:
1. The General Contractor shall provide unarmed guards at the project only if required by COR.
2. The Contractor shall provide the guards and VA police with communication devices as directed.
3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
DDC Controls 01 00 00 - 6
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
Coordinate with COR.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work.
With the written consent of the COR, the buildings and utilities may be abandoned and need not be removed.
DDC Controls 01 00 00 - 7
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they
DDC Controls 01 00 00 - 8 shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Resident Engineer COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to
COR and Contractor, as follows: COR and contractor to establish schedule for each item of project.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm
DDC Controls 01 00 00 - 9 equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days n advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
DDC Controls 01 00 00 - 10
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks ways, and entrances must be approved by the
COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1. The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.
DDC Controls 01 00 00 - 11
2. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR
852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on
DDC Controls 01 00 00 - 12 conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications // as items to be stored.
Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse.
Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
DDC Controls 01 00 00 - 13
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261........Identification and Listing of Hazardous Waste
40 CFR 262........Standards Applicable to Generators of Hazardous
Waste
40 CFR 263........Standards Applicable to Transporters of
Hazardous Waste
49 CFR 172........Hazardous Material tables and Hazardous
Material Communications Regulations
49 CFR 173........Shippers - General Requirements for Shipments and Packaging
49 CRR 173........Subpart A General
49 CFR 173........Subpart B Preparation of Hazardous Material for
Transportation
49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall
DDC Controls 01 00 00 - 14 conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.11 PHYSICAL DATA: NA
1.12 PROFESSIONAL SURVEYING SERVICES: NA
1.13 LAYOUT OF WORK: NA
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
DDC Controls 01 00 00 - 15
1.15 USE OF ROADWAYS
1.16 RESIDENT ENGINEER'S FIELD OFFICE: NA
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the
COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.
Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014
Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned.
Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used
DDC Controls 01 00 00 - 16 in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
Boilers, fuel oil pumps must be operated as a complete system and be fully maintained by operating personnel.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.18 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevators for handling building materials and
Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators.
The COR will ascertain that elevators are in proper condition.
Contractor may use elevators Nos. S1 & S2 in Building. Personnel for operating elevators will not be provided by the Department of
Veterans Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
a. Entrance jambs, heads soffits and threshold plates.
b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c. Finish flooring.
3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be
DDC Controls 01 00 00 - 17 removed and replaced by new hoisting ropes at the contractor’s expense.
1.19 TEMPORARY USE OF NEW ELEVATORS: NA
1.20 TEMPORARY TOILETS
A. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by Medical Center.
Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workmen. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
1. Obtain heat by connecting to Medical Center heating distribution system.
DDC Controls 01 00 00 - 18
E. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
F. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the
Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.
G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the
Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the
Contractor at Contractor's expense.
1.22 NEW TELEPHONE EQUIPMENT: NA
1.23 TESTS
A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
DDC Controls 01 00 00 - 19
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.
Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonable period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.24 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of
DDC Controls 01 00 00 - 20 equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned
Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.
This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in
DDC Controls 01 00 00 - 21 the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.25 GOVERNMENT-FURNISHED PROPERTY: NA
1.26 RELOCATED EQUIPMENT: NA
1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT: NA
1.28 CONSTRUCTION SIGN: NA
1.29 SAFETY SIGN: NA
1.30 PHOTOGRAPHIC DOCUMENTATION: NA
1.31 FINAL ELEVATION DIGITAL IMAGES: NA
1.32 HISTORIC PRESERVATION: NA
Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.
- - - E N D - - -
Controls Upgrade Project Sequencing (Proposed)
July 2019/OM
Scope of Work:
A. Fuel Oil Pump Relocations (2):
1. Installation and Commissioning
2. Monitoring Operations in the DDC
B. Emergency Generator System Controls:
1. Installation and Commissioning (Stand Alone System)
2. Monitoring Operations in the DDC
C. Lighting Control System Up-grade:
1. Replacement and integration of 3 old Honeywell panels.(Stand Alone System)
2. Monitoring Operations in the DDC
D. VAV Upgrade to Digital Controls:
1. Equipment and Controls Installation and Commissioning
E. New DDC System:
1. Field Investigation and Retro Commissioning
2. New DDC Configuration
3. New DDC Installation
4. New DDC Commissioning and Start Up
5. New DDC Documentation
6. New DDC Training for Operations and Maintenance
7. New DDC Local Support by successful I&C Contractor
Project Sequencing Rationale:
Present Project Bid Documents open the potential for VA to select a New Technology for the proposed New DDC system or to stay with the present technology. Also, the bid documents allow the selected General Contractor (GC) to execute the scopes of work (A,B,C and D) above separately from the proposed New DDC system upgrade effort. To avoid potential duplications of cost and effort to Commission and Start Up the control systems twice (A2, B2,C2 and C above), it is therefore recommended that ALL control related work be implemented after the New DDC system is operational.
General Contractor may decide to implement the scopes (A1,B1, C1 above) as Self Standing efforts thru Commissioning but without their controls interface. During the New DDC system Configuration ALL Control interfaces, including (D) above, will be integrated and commissioned as such one time only (A2, B2, C2, D and E) above.
VAMC 534-18-103 (CAN #100435)
DDC Controls
General Requirements 01 00 00 - 22
The installations of equipment and related controls for the VAV Upgrade to Digital controls (D above) and any other system are critical to avoid potential disruptions of services to the Medical Center during implementation.
Proposed Project Sequencing:
See attached page 2 of 2.
VAMC 534-18-103 (CAN #100435)
DDC Controls
General Requirements 01 00 00 - 23
C o n tr o ls
U p gr ad e P ro je ct S e q u e n ci n g
(P o ro p o se d o f
/2
/2
O M
Sc o p e
Fi e ld R e tr
N e w D
D C
Fi e ld C o m m is si o n in g
In ve st ig at io n C o m m is si o n in g C o n fi gu ra ti n
In st al la ti o n a n d S ta rt
U p
D o cu m e n ta ti o n
N o te s
N e w D
D C
S ys te m
E
Fu e l O il
P u m p
R e lo ca ti o n s
(2
A
. I n st al la ti o n a n d
C o m m is si o n in g
A -1
. M o n it o ri n g O p er at io n s in t h e
D D
C A
-2
Em e rg e n cy
G e n e ra to r Sy st e m C o n tr o ls
B
. I n st al la ti o n a n d
C o m m is si o n in g
B -1
. M o n it o ri n g O p er at io n s in t h e
D D
C B
-2
Li gh ti n g C o n tr o ls S ys te m U p gr ad e
C
. R ep la ce m en t an d
In te gr at io n o f o ld H o n ey w el l p an el s C
-1
. M o n it o ri n g O p er at io n s in t h e
D D
C C
-2
V A
V U p gr ad e t o
D ig it al c o n tr o ls
D
. E q u ip m en t an d
C o n tr o ls
In st al la ti o n a n d
C o m m is si o n in g
D -1
V A M C
C A N
D D C
C o n t r o l s
G e n e r a l
R e q u i r e m e n t s
VAMC 534-18-103 (CAN #100435) Shop Drawings, Product Data, and Samples DDC Controls 01 33 23 - 1
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
1-1. Refer to Articles titled SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(FAR 52.236-21) and, SPECIAL NOTES (VAAR 852.236-91), in GENERAL
CONDITIONS.
1-2. For the purposes of this contract, samples, test reports, certificates, and manufacturers' literature and data shall also be subject to the previously referenced requirements. The following text refers to all items collectively as SUBMITTALS. Submit a compiled submittal register listing all project required submittal for approval prior to mobilization onsite and prior to any material and sample submittals for review. Use submittal exchange.
1-3. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. See required submittal table at the end of this section. Materials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless:
A. Satisfactory written evidence is presented to, and approved by
Contracting Officer, that manufacturer cannot make scheduled delivery of approved item or;
B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or;
C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government.
1-4. Forward submittals in sufficient time (30 days) to permit proper consideration and approval action by Government. Time submission to assure adequate lead time for procurement of contract - required items.
Delays attributable to untimely and rejected submittals will not serve as a basis for extending contract time for completion.
1-5. Submittals will be reviewed for compliance with contract requirements by
Architect-Engineer, and action thereon will be taken by the COR on behalf of the Contracting Officer.
1-6. Upon receipt of submittals, Architect-Engineer will assign a file number thereto. Contractor, in any subsequent correspondence, shall refer to this file and identification number to expedite replies relative to previously approved or disapproved submittals.
DDC Controls 01 33 23 - 2
1-7. The Government reserves the right to require additional submittals, whether or not particularly mentioned in this contract. If additional submittals beyond those required by the contract are furnished pursuant to request therefor by Contracting Officer, adjustment in contract price and time will be made in accordance with Articles titled CHANGES (FAR
52.243-4) and CHANGES - SUPPLEMENT (VAAR 852.236-88) of the GENERAL
CONDITIONS.
1-8. Schedules called for in specifications and shown on shop drawings shall be submitted for use and information of Department of Veterans Affairs and Architect-Engineer. However, the Contractor shall assume responsibility for coordinating and verifying schedules. The Contracting
Officer and Architect- Engineer assumes no responsibility for checking schedules or layout drawings for exact sizes, exact numbers and detailed positioning of items.
1-9. Submittals must be submitted by Contractor only. Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals. Electronic submittals to A/E and COR simultaneously.
A. Submit samples in single units unless otherwise specified. Submit shop drawings, schedules, manufacturers' literature and data, and certificates in quadruplicate, except where a greater number is specified.
B. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Letter shall be sent via first class mail and shall contain the list of items, name of the Medical Center, name of
Contractor, contract number, applicable specification paragraph numbers, applicable drawing numbers (and other information required for exact identification of location for each item), manufacturer and brand, ASTM or Federal Specification Number (if any) and such additional information as may be required by specifications for particular item being furnished. In addition, catalogs shall be marked to indicate specific items submitted for approval.
1. A copy of letter must be enclosed with items, and any items received without identification letter will be considered "unclaimed goods" and held for a limited time only.
2. Each sample, certificate, manufacturers' literature and data shall be labeled to indicate the name and location of the Medical, name of
Contractor, manufacturer, brand, contract number and ASTM or Federal
Specification Number as applicable and location(s) on project.
DDC Controls 01 33 23 - 3
3. Required certificates shall be signed by an authorized representative of manufacturer or supplier of material, and by…