S-10-26_PLANS.pdf
PDF 5 MB Posted
- Solicitation number
- S-10-26
- Issued by
- Niobrara County, Wyoming
About this file
This is an Engineering Plan Review approval letter from the City of Cheyenne Engineering Department for the North Cheyenne Community Park Drainage Improvement project. The City of Cheyenne approved drainage impact study plans dated October 3, 2025, for Lot 2, Block 1 of the North Cheyenne Community Park, 2nd Filing, located at the northeast corner of Storey Boulevard and Chief Washakie Avenue. The project involves removal and replacement of existing storm drain pipe and manholes, installation of riprap pads, grading, and resodding of disturbed areas to address standing water issues in the park. The plans were prepared by Y2 Consultants (Adrienne Lemmers, 1725 Carey Ave, Cheyenne, WY 82001) and underwent Engineering Plan Review by the City Engineer's Office, with approval granted on October 7, 2025. The approval includes review by the Board of Public Utilities and Fire Department, with all approvals dated October 7, 2025. The plan set consists of multiple sheets including cover sheets, existing and finished conditions, plan and profile drawings, and construction details for storm drainage components.
The Engineering Plan Review approval is issued on a scope-only basis, with the City explicitly stating that the design's character, sufficiency, and completeness remain the sole responsibility of the Wyoming Registered Engineer(s) who sealed and signed the plans. The City holds no responsibility regarding the design and detail of the information contained in the plans and does not verify plan accuracy or completeness. The approved plan set was finalized following a second Engineering Plan Review Update with the EPR set dated August 8, 2025, and updated to October 3, 2025. Contact information for questions regarding the approval is provided as the City Engineer's Office at 307-637-6268.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 7, 2025
Y2 Consultants
Attn: Adrienne Lemmers
1725 Carey Ave, Cheyenne
WY 82001
RE: EPR Approval Letter for North Cheyenne Community Park
ENPR-25-49
Dear Ms. Lemmers, The Engineering Plan Review, for plans dated October 3rd, 2025, is complete for the above referenced project.
The plans are approved in scope only. The City Engineering Department’s approval and review shall be understood to be a cursory review of the plans only. The character, sufficiency, and completeness of the design and plans are the sole responsibility of the Wyoming Registered
Engineer(s) who have sealed and signed them. This review does not constitute verification of plan accuracy or completeness, and the City holds no responsibility regarding the design and detail of the information contained therein.
Please contact the City Engineer’s Office at 307-637-6268 if you have any questions.
Respectfully, Thomas D. Cobb, P.E.
City Engineer
A COMMUNITY OF CHOICE
ENGINEERING
2101 O’Neil Avenue Room 206 Cheyenne, Wyoming 82001 Phone (307)637-6268 Fax (307)637-6256
APPROVED
Oct. 07 2025
12:26:59 PM
Docusign Envelope ID: 2795E8A2-FCFB-43FC-BFDC-0B853E4A4F7E
Set Title:
F:
\2
5\
3_ N.
C he ye nn e Co m m un ity
P ar k\ Ci vi l\A
CA
D\
3_
TI
TL
E-
PA
GE
.d w g
LA
ST
S
AV
ED
: 9 /2
3/
:0
AM
B
Y:
A
DR
IE
NN
EL
P
LO
T
BY
: A
DR
IE
NN
E
LE
M M
ER
S
Desc.
Plot Date:
Date
Job No.
Drafter:
Reviewer:
N
CH
EY
EN
NE
C
OM
M
UN
IT
Y
PA
RK
D
RA
IN
AG
E
IM
PA
CT
S
TU
DY
LO
T
2, B
LO
CK
N
OR
TH
C
HE
YE
NN
E
CO
M M
UN
IT
Y
PA
RK
, 2
ND
F
IL
IN
G
CH
EY
EN
NE
, W
Y
2nd EPR Update Updated EPR Set
EPR SET 8/08/25
10/03/25
C0.1
COVER SHEET
CI
TY
O F
CH
EY
EN
NE
DRAINAGE IMPACT
STUDY
8/08/25
8/29/25
25033
AN/RM
AL
DRAINAGE IMPROVEMENT PLANS
LOT 2, BLOCK 1 NORTH CHEYENNE COMMUNITY PARK, 2ND FILING,
CHEYENNE, WY
VICINITY MAP PROJECT MAP
CITY OF CHEYENNE
North
DATE APPROVED
REVIEWED AND APPROVED PER
CITY STANDARD ORDINANCES
AND CITY CODES
CITY ENGINEER
BOARD OF PUBLIC UTILITIES
FIRE DEPARTMENT
DATE APPROVED
DATE APPROVED
DATE APPROVED
10-03-25
APPROVED
Oct. 07 2025
12:26:54 PM
Docusign Envelope ID: 2795E8A2-FCFB-43FC-BFDC-0B853E4A4F7E
October 7, 2025
LEGEND
(E) - EXISTING (P) - PROPOSED
S
FINISHED CONDITIONS
LEGEND
(E) - EXISTING (P) - PROPOSED
EXISTING CONDITIONS
Set Title:
F:
\2
5\
3_ N.
C he ye nn e Co m m un ity
P ar k\ Ci vi l\A
CA
D\
3_
TI
TL
E-
PA
GE
.d w g
LA
ST
S
AV
ED
: 9 /2
3/
:0
AM
B
Y:
A
DR
IE
NN
EL
P
LO
T
BY
: A
DR
IE
NN
E
LE
M M
ER
S
Desc.
Plot Date:
Date
Job No.
Drafter:
Reviewer:
N
CH
EY
EN
NE
C
OM
M
UN
IT
Y
PA
RK
D
RA
IN
AG
E
IM
PA
CT
S
TU
DY
LO
T
2, B
LO
CK
N
OR
TH
C
HE
YE
NN
E
CO
M M
UN
IT
Y
PA
RK
, 2
ND
F
IL
IN
G
CH
EY
EN
NE
C0.2
NOTES
CI
TY
O F
CH
EY
EN
NE
DRAINAGE IMPACT
STUDY
8/08/25
8/29/25
25033
AN/RM
AL
10-03-25
APPROVED
Oct. 07 2025
12:26:59 PM
Set Title:
F:
\2
5\
3_ N.
C he ye nn e Co m m un ity
P ar k\ Ci vi l\A
CA
D\
3_
BA
SE
-C
IV
IL
-P .d w g
LA
ST
S
AV
ED
: 1
0/ 1/
:2
PM
B Y:
A
DR
IE
NN
EL
P
LO
T
BY
: A
DR
IE
NN
E
LE
M
M
ER
S
Desc.
Plot Date:
Date
Job No.
Drafter:
Reviewer:
CH
EY
EN
NE
C
OM
M
UN
IT
Y
PA
RK
D
RA
IN
AG
E
2N D
FI
LI
NG
, L
OT
, B
LO
CK
CH
EY
EN
NE
, W Y
C1.1
EXISTING CONDITIONS
CI
TY
O F
CH
EY
EN
NE
DRAINAGE IMPACT
STUDY
8/08/25
8/29/25
25033
AL
North
10-03-25
APPROVED
Oct. 07 2025
12:27:00 PM
S
6089.74' 6089.69'
6087.00'
6089.30'
Set Title:
F:
\2
5\
3_ N.
C he ye nn e Co m m un ity
P ar k\ Ci vi l\A
CA
D\
3_
DE
SI
GN
-P .d w g
LA
ST
S
AV
ED
: 1
0/ 2/
0:
A
M B
Y:
A
DR
IE
NN
EL
P
LO
T
BY
: A
DR
IE
NN
E
LE
M M
ER
S
Desc.
Plot Date:
Date
Job No.
Drafter:
Reviewer:
N
CH
EY
EN
NE
C
OM
M
UN
IT
Y
PA
RK
D
RA
IN
AG
E
IM
PA
CT
S
TU
DY
LO
T
2, B
LO
CK
N
OR
TH
C
HE
YE
NN
E
CO
M M
UN
IT
Y
PA
RK
, 2
ND
F
IL
IN
G
CH
EY
EN
NE
C2.1
FINISHED CONDITIONS
CI
TY
O F
CH
EY
EN
NE
DRAINAGE IMPACT
STUDY
8/08/25
25033
AN/RM
AL
North
10-03-25
APPROVED
Oct. 07 2025
S
STORM DRAIN PROFILE
HORIZ. SCALE" 1" = 20' VERT. SCALE" 1" = 2'
START STA: -0+10.00, END STA: 5+10.00
North
Set Title:
F:
\2
5\
3_ N.
C he ye nn e Co m m un ity
P ar k\ Ci vi l\A
CA
D\
3_
DE
SI
GN
-P &P
.d w g
LA
ST
S
AV
ED
: 8 /2
9/
:1
AM
B
Y:
A
DR
IE
NN
EL
P
LO
T
BY
: A
DR
IE
NN
E
LE
M M
ER
S
Desc.
Plot Date:
Date
Job No.
Drafter:
Reviewer:
N
CH
EY
EN
NE
C
OM
M
UN
IT
Y
PA
RK
D
RA
IN
AG
E
IM
PA
CT
S
TU
DY
LO
T
2, B
LO
CK
N
OR
TH
C
HE
YE
NN
E
CO
M M
UN
IT
Y
PA
RK
, 2
ND
F
IL
IN
G
CH
EY
EN
NE
Updtaed EPR Set
C3.1
PLAN AND PROFILE
CI
TY
O F
CH
EY
EN
NE
DRAINAGE IMPACT
STUDY
8/08/25
8/29/25
25033
AN/RM
AL
10-03-25
APPROVED
Oct. 07 2025
STORM MANHOLE COVER DETAIL
NOT TO SCALE
STORM MANHOLE DETAIL
NOT TO SCALE
STORM MANHOLE DETAIL
NOT TO SCALE
PROFILE
ELEVATION VIEW
CONCRETE TOE WALL FOR OUTLET FLARED END
NOT TO SCALE
PLAN VIEW
PROFILE VIEW
TRASH GUARD
NOT TO SCALE
ELEVATION
PLAN
SIDE VIEW
Set Title:
F:
\2
5\
3_ N.
C he ye nn e Co m m un ity
P ar k\ Ci vi l\A
CA
D\
3_
DE
TA
IL
S.
dw g
LA
ST
S
AV
ED
: 8 /2
8/
0:
A M
B Y:
A
DR
IE
NN
EL
P
LO
T
BY
: A
DR
IE
NN
E
LE
M
M
ER
S
Desc.
Plot Date:
Date
Job No.
Drafter:
Reviewer:
N
CH
EY
EN
NE
C
OM
M
UN
IT
Y
PA
RK
D
RA
IN
AG
E
IM
PA
CT
S
TU
DY
LO
T
2, B
LO
CK
N
OR
TH
C
HE
YE
NN
E
CO
M M
UN
IT
Y
PA
RK
, 2
ND
F
IL
IN
G
CH
EY
EN
NE
C4.1
DETAILS
CI
TY
O F
CH
EY
EN
NE
DRAINAGE IMPACT
STUDY
8/08/25
8/29/25
25033
AN/RM
AL
10-03-25
APPROVED
Oct. 07 2025
| 2025-10-07T13:38:41-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .