This document outlines the qualification requirements for a relocatable tower unit between 110 to 120 feet in height to be used by the Federal Aviation Administration and Customs and Border Protection. Key requirements for the tower include withstanding winds up to 120 mph when retracted and 90 mph when extended; extending and retracting within 1 hour and 15 minutes; housing up to 2,000 pounds of payload including cameras, antennas, and equipment; generating at least 900 watts of continuous power with a minimum 30 day refueling period; and withstanding transportation on rugged terrain. Vendors must submit responses under solicitation number 6973GH-20-Q-00075 by the specified date with supporting price and capability documentation for evaluation. Selection will result in further first article testing at the vendor's facility. Repair and operation documentation must also be provided if selected for an award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RVSS-RT Requirements Eval Table 07NOV2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work 110 ft. To 120 ft. Relocatable Towers (RTs)
AML-4000 / CBP
10/21/2019
1.0 Introduction
This document defines the qualification requirements (QR) to support qualified vendors for a Firm Fixed Price (FFP) contract to produce a RT that will be utilized for Remote Video Surveillance System (RVSS- RT). The requirements are defined for the RT that will be utilized in various climates, terrains. The RT, RT site, trailer(s), RT power generation, environmental, and selective criteria are defined in the qualification requirements section and the performance should meet or exceed that listed.
2.0 Qualification Requirements
2.1 RT Site Requirements
1. When retracted, the RT payload equipment will be accessible for maintenance by a 10th to
90th percentile male. The “retracted” position is defined as the position where the tower is fully lowered but the system is still deployed, i.e., it is not configured for transport (compare to “stowed” position).
2. The RT will protect mounted equipment against lightning strikes.
3. The RT will provide grounding protection, and grounding interface for the mounted equipment.
4. When set-up, the RT site footprint will be no greater than 40 ft. by 40 ft. If larger footprint is required, the Federal Aviation Administration (FAA) will provide those details.
5. When retracted, the RT payload equipment will be accessible for maintenance without removing antennas (item 2.2.7) or cameras (item 2.2.5) that are mounted below the payload.
2.2 RT Requirements
1. The RT local controls will have an emergency stop capability at any position between retracted and extended.
2. The RT will accommodate two (2) standard RVSS-U sensor suites, and supporting equipment on top of the RT. Each sensor suite is about 200 lbs. A sensor suite consists of one (1) electro-optical (EO) camera and one (1) infrared (IR) camera. The supporting equipment may include any or all of the following: pan-tilt unit, laser illuminator, spotlight, wide angle camera, and loud hailer. Separation between the two sensor suites is a minimum of six (6) feet.
3. The RT will accommodate each sensor suite, which has 8 square ft. of average sail area.
4. The RT will not obstruct the sensor suite view.
5. The RT will accommodate two (2) wide angle cameras one ft. below the sensor suites on top of the RT. The wide angle camera is about 12.50 lbs.
6. The RT will accommodate the wide-angle camera 0.9 square ft. of sail area.
7. The RT will accommodate three (3) 6 ft. microwave dishes 10 ft. below the top of the tower.
Total possible sail area 102.7 square ft. (2 sensors, 3 antennas, and 2 wide-angle cameras).
The standard installation kits and feed lines are to be used for microwave dishes installations.
Microwave dishes are paraboloid with radome. The RT will accommodate a minimum of 2,000 lbs. of payload mounted on the tower. This payload includes (is not in addition to) the cameras, supporting equipment, and microwave dishes described in 2.2.2 – 2.2.7.
8. The RT trailer will be able to accommodate an equipment cabinet measuring a minimum of 50 inch height x 34 inch depth x 25 inch width.
9. The RT equipment cabinet will be enclosed in a lockable drip proof enclosure.
10. If guy wires are necessary to support the RT, the guy wires will attach to the RT trailer outrigger infrastructure, without ground penetration.
11. When extended, the RT will survive sustained wind conditions up to 90 mile per hour (mph).
12. When retracted, the RT will survive sustained wind conditions up to 120 mph.
13. The RT will retract, upon local command.
14. The RT will extend, upon local command.
15. The time to fully extend the RT from the retracted position will be less than one (1) hour (T), and fifteen (15) minutes (O).
16. The time to retract the RT from the fully extended position will be less than one (1) hour (T), and fifteen (15) minutes (O).
17. The RT will have a backup manual crank to retract the tower.
18. The RT will have a backup manual crank to extend the tower.
19. To retract and stow the RT trailer will take no more than two (2) people of 50 percentile female size. The “stowed” position is defined as the tower being fully retracted and the entire system is configured for transport.
20. The RT controls will be on the trailer.
21. The RT controls will be inside a lockable compartment.
22. The RT trailer will be non-ground penetrating.
23. The RT outriggers will be non-ground penetrating.
24. The RT trailer will be level when deployed up to a 10 degree slope
25. The RT will have a visual indicator that shows if the trailer is level.
2.3 Trailer(s) Requirements
1. The RT trailer(s) will be towable by a pick-up truck using a standard commercially available hitch. All payload equipment will be removed from the RT prior to transport.
2. The stowed RT will be transported per DOT limitations in accordance with applicable State
Department of Motor Vehicles, State Size and Weight Limits. Example:
http://txdmv.gov/motor-carriers/oversizeoverweightpermits/texas-size-weight-limits.
3. The stowed RT will be transportable on rugged (uneven, sloped, non-graded), and remote roads.
4. The stowed RT will survive transportation on rugged (uneven, sloped, non-graded, and remote roads.
2.4 RT Power Generation Requirements
1. The RT power generation will be capable of interfacing with grid power.
2. The RT will have self-contained power generation.
3. The RT power will be selectable between grid power, alternative power sources and the self-contained power source.
4. Upon unexpected loss of grid power, the RT will be capable of automatically switching to self-contained power without loss of power to the RT.
5. Upon unexpected loss of self-contained power, the RT will be capable of automatically switching to self-contained backup power without loss of power to the RT.
6. The RT power will have power connections on the top of the RT.
7. The RT power will have 120 VAC on the top of the RT.
8. The RT power will have 120 VAC at ground level (min. three feet AGL) on the trailer.
9. The RT self-contained power generation system will deliver a minimum of 900w continuous and 2000w peak power continuous runtime capacity operating 24-hr/day, and 7-days/week.
10. The RT self-contained backup power generation will produce a minimum of 900w power with
72 hours of continuous runtime capacity.
11. Mean time between refueling is greater than 30 days.
2.5 Environmental Requirements
1. If liquid fuels (e.g. diesel) are used, the generator and any fuel storage containers (tanks, drums, bladders, etc.) will have a secondary spill containment system compliant with local, state, and federal requirements.
2. Secondary spill containment systems compliant with local, state, and federal requirements will be provided for any liquid lubricants, hydraulic fluids, or any other oil based liquids used in the tower system.
3. Air emissions from the generators will not exceed the EPA de minimis levels for any criteria pollutants.
4. The decibel (dBA) output at 7 meters with generator operating at maximum load.
In addition to these environmental requirements for the system, upon award, the applicable vendor will provide the following: 1) a Spill Prevention, Control, and Countermeasure Plan; and 2) greenhouse gas emissions and energy reduction and conservation plans.
2.6 Selective RT Requirements
For the required 110 ft. to 120 ft. RT height, there will be a RT unit manufactured. The deflection, tilt, and twist of the RT will be provided for the 110ft. to 120ft. height of the tower proposed following all of the ANSI/TIA-222 Standard topographical categories and exposures with the above payload package at a wind speed of 60 mph fully extended. The analysis shall be run with 0.25 and 2.20 inches of ice loading. The deflection, tilt, and twist of a 110 ft. to 120 ft. RT under tower governing load combination at a basic 3 sec wind speed of 60 MPH will not be considered if the proposed solution includes any of the following:
Deflection > 3.50 inches Tilt > 0.25 degrees Twist > 0.25 degrees
2.6.1 110 FT. to 120 FT. RT Requirements
1. The RT tower height will be at least 110 ft. (T) and be able to extend to 120 ft. (T) above ground level when fully extended.
2. The RT Power Generation minimum time between refueling when using only self-contained power. Note: section 2.4 item 11
2.6.2 Options
1. Capability for remote monitoring of generator status including voltage, fuel level, and run hours. (Service to be provided by FAA)
2. Capability for remote tower lowering capability via cellular service. (Service to be provided by FAA)
3. Capability for remote power system monitoring: battery storage levels, charge rate, and output voltage to tower sensor suites. (Service to be provided by FAA)
4. Alternative power sources including solar, hydrogen, wind, etc. Proposed power sources may be standalone or integrated to the relocatable tower.
5. FAA obstruction lighting
6. Infrared lighting
3.0 RT Testing Method
The initial testing conditions performed by the Federal Aviation Administration Logistics Center (FAALC) in Oklahoma City, OK will consist of a paper evaluation based on vendor(s) submitted documents. The maximum time required for the FAALC to perform a paper evaluation is 7 consecutive days for each vendor(s).
After vendor/RT selection is made, a First Article Test (FAT) will be conducted based on the RT requirements. The selected vendor will perform a FAT at the vendor’s location with FAALC/CBP representative(s) present.
4.0 RT Repair Documentation
If selected, the vendor must provide RT repair documentation. The vendor must provide information for the replacement of the RT power generation or any electronics built-in and necessary for the RT’s performance. The documentation must include the procedure to repair or replace damaged or out of warranty components as provided by the manufacturer. Training for repair is a requirement either at the manufacturer site or as defined by FAALC. A bill of material must be provided with repair documentation.
Note: RT repair documentation is not required during the testing of the QR, but must be readily available if selected.
5.0 RT Operation and Maintenance (O&M) Documentation
If selected, the vendor must provide a RT operation and maintenance manual. The vendor must provide information for the O&M of the RT including power generation or any electronics built-in and necessary for the RT’s performance. The documentation must include the procedure to operate the RT including setting up, raising, lowering, and preparing the RT for transport. Training for O&M is a requirement either at the manufacturer site or as defined by FAALC. A bill of material must be provided with repair documentation.
Note: RT O&M documentation is not required during the testing of the QR, but must be readily available if selected.
6.0 Communication of Results
The evaluation results will be communicated by the FAALC’s contracting office. Evaluation results will be communicated as either pass or fail based on the above requirements or for any other reason the FAALC deems as an unsafe condition relating to the operation of the RT.
| 1.0 Introduction |
| 2.0 Qualification Requirements |
| 2.1 RT Site Requirements |
| 2.2 RT Requirements |
| 2.3 Trailer(s) Requirements |
| 2.4 RT Power Generation Requirements |
| 2.5 Environmental Requirements |
| 2.6 Selective RT Requirements |
| 2.6.1 110 FT. to 120 FT. RT Requirements |
| 2.6.2 Options |
| 3.0 RT Testing Method |
| 4.0 RT Repair Documentation |
| 5.0 RT Operation and Maintenance (O&M) Documentation |
| 6.0 Communication of Results |