This is a Statement of Work (SOW) for a USDA Security Camera and Access Control System Upgrade at the Western Human Nutrition Research Center in Davis, CA. The project involves providing and installing a new Lenel Access Control headend system, including a server, power supply, control modules, and licensing. Key requirements include terminating existing field devices, bringing new devices online to meet USDA standards, replacing the exterior buzzer notification system, and ensuring compatibility with Windows 11.

The solicitation (RFQ 1232SA25Q0052) is an unrestricted commercial item acquisition with a NAICS code of 561621 and a small business size standard of $25 million. Quotes are due by May 30, 2025, at 3 PM EDT, to be submitted to Shelley.Steen@usda.gov. The project requires full system replacement with delivery and acceptance to be completed within 60 days of award at the USDA facility. The contractor will be responsible for installation, permits, quality control, safety, and providing a one-year warranty on materials.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment #01 - USDA Security Access Control System Upgrade for the USDA, ARS, WHNRC in Davis, CA, newest first.
File Type Posted
WHNRC First Floor.pdf PDF
WHNRC Second Floor.pdf PDF
QUESTIONS REGARDING SOLICITATION 1232SA25Q0052.docx DOCX document
WD 2015-5631 RV23 Eff 12232024.pdf PDF
Terms and Conditions with Provisions and Clauses.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

USDA Security Access Control System Upgrade

Western Health Nutrition Research Center (WHNRC)

Davis, CA

STATEMENT OF WORK

1.0 CONTRACT PROJECT:

a. Project Number: TBD

b. Project Title: USDA Security Camera and Access Control System Upgrade

c. Project Location:Western Human Nutrition Research Center
430 West Health Science Dr., Davis, CA 95616

2.0 PROJECT CONTACT PERSONS:

0. CONTRACTING OFFICER (CO):

0. Ted Blume Email: theodore.blume@usda.gov Tel. No.: 510-559-6016

0. ADMINISTRATIVE OFFICER (AO):

TBD

0. LOCATION MONITOR:

Todd Leverett 430 West Health Science Dr., Davis, CA 95616 Email: todd.leverett@usda.gov Tel. No.: 530-574-4129

0. AREA SAFETY AND HEALTH MANAGER

Ken Cushman 800 Buchanan Street Albany, CA 94710 Email: ken.cushman@usda.gov Tel. No.: 510-529-5921

3.0 SCOPE OF SERVICES:

The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.

1. The Contractor shall provide services for the following tasks marked by an “X”:

[X] Provide a cost proposal to complete the project as per project requirements.

[X] Provide and install all material to complete the project as per project requirements.

4.0 SCOPE OF WORK:

The Contractor will complete the following tasks:

Access Control

1. Contractor will provide and install one (1) New Lenel Access Control headend which includes: Server, Power Supply, Enclosure, Control Modules, Batteries and Licensing.

One (1) LSP-16DRN-E6M1WPA, Four (4) 2UKH4 12V DC, 12 Ah, One (1) LNL-X2220, Nine (9) LNL-1320-S3 and One (1) SWS-32ES

2. Contractor will terminate existing field device to the controller: Readers, REX, Door Contacts.

3. Contractor will bring the newly proposed devices online to meet USDA standards.

4. Contractor will provide current computer capable of operating Windows 11 and the updated program operating system.

5. Replace existing backdoor loading dock exterior buzzer notification system. Need system to notify the administration area in rooms 123 and Building Manager location in 152 when deliveries or tradesmen need access unto the facility.

Inclusions

1. Provision or installation of fiber, electrical distribution components, conduit and boxes.

2. Installation of system control cabinets, panels and field devices for all related equipment.

3. Cutting, painting and patching, if required.

4. Dedicated Telephone lines, network connectivity or monitoring services for systems listed above as needed.

5. Fire Alarm system interface, if required.

6. All lock hardware, to be provided by others.

7. 120 VAC connections and supply to be done by others as required.

8. Costs associated with schedule acceleration or unplanned phases.

9. Gates, motors and ground loop devices, to be provided by others

Clarifications

1. Pricing includes project management for the duration of the tentative project schedule.

2. Pricing includes one (1) year warranty on materials only.

3. Materials pricing is for the extent of the tentative project schedule.

4. Work is assumed to be completed during normal business hours Monday – Friday (7am-5pm).

5. Pricing includes standard ground shipping, FOB destination.

5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Government prior to starting demolition operations. Contractor shall legally dispose all any materials removed that will not be retained.

5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.

5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.

5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.

5.6 Protection of Work and Property/Safety Requirements:

1. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.

1. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.

1. Contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.

5.8 Materials and Equipment:

1. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.

1. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/Location Monitor.

1. Government will not furnish any labor or equipment to unload or move materials or supplies.

5.9 Cleanup: The site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.

5.10 Warranty:

1. Submit data concerning the standard one-year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.

1. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.