This Statement of Work issued by LA Metro (Los Angeles County Metropolitan Transportation Authority) pertains to the procurement of forty (40) stainless steel metal panels for J Line Transitway stations to support wayfinding information and station equipment. The panels are required in seven different size configurations ranging from 19.75" x 89.75" to 19.75" x 104.75", with quantities varying by size. All panels must be fabricated from 304 stainless steel alloy at 16 gauge thickness with a finish-4 specification and include a lifetime structural warranty. Fabrication must be performed using hi-def plasma, waterjet, flatbed laser, or tube laser cutting with a tolerance of 0.063 inches and standard shear cutting capabilities. Quotes must be submitted by email to ortizdelgadoj@metro.net no later than 4:00 PM PDT on August 4, 2026, with delivery to LA Metro Headquarters in Los Angeles, California required within four weeks of purchase order execution. Installation will be performed by Metro staff using manufacturer-provided instructions only.

Award will be based on best value to Metro considering price, tax, freight, lead time, and past performance. All taxes, delivery charges, freight, tariffs, and applicable fees must be included in submitted quotes, or the quote will be deemed non-responsive. Delivery must be scheduled between 8:00 AM and 4:00 PM, Monday through Friday, in a single shipment. Questions or requests for approved equals must be submitted at least three business days prior to the solicitation close date. This solicitation is open to all vendors with no stated set-asides or incumbent restrictions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

RQ143460(3)

40 METAL PANELS PURCHASE FOR J LINE STATIONS

1.0 Project Overview

Metro is looking to acquire new metal for several stations along the J Line Transitway to improve patron wayfinding information and durable station equipment.

2.0 Parts Requirements

Metro has existing metal columns at multiple stations and is seeking to match the design of the current columns to install J Line wayfinding information. Metro needs forty

(40) metal panels. All panels shall have a lifetime structural warranty.

All structural steel shall be fabricated through hi-def plasma, waterjet, flatbed laser, or tube laser cutting. Manufacturer should be able to fabricate metal panels in different sizes ranging from 19.75” x 104.75” (maximum) to 19.75” x 89.75” with standard sheer cutting capabilities. Tolerance for metal cutting should be 0.063. All fabrication of units shall be completed at the manufacturer’s facility prior to delivery to Metro. Below are the sizes panels and quantity.

Measurements Qty.

19.75” x 100.75” 4 pieces

19.75” x 104.75” 4 pieces

19.75” x 89.75” 4 pieces

19.75” x 93.75” 8 pieces

19.75” x 94.75” 8 pieces

19.75” x 95.75” 4 pieces

19.75” x 96.75” 4 pieces

19.75” x 97.75” 4 pieces

Total Qty. 40

The following specifications are required:

Type: Sheet & Plate

Metal: Stainless

Alloy: 304

Thickness: 16 ga

Length: 120"

Weight of Each Panel: 100.80

Width: 48"

Finish: 4

3.0 Delivery

Units are to be delivered to Metro’s Headquarters at the following address:

LA Metro Headquarters Attn: Blanca Buenrostro (7th Floor) 1 Gateway Plaza, Los Angeles, CA 90012 Phone No. (213)922-2969

Delivery is to be scheduled between the hours of 8:00AM – 4:00PM, Monday through Friday. Delivery is expected to occur in one shipment no later than 4 weeks after the signed purchase order/Contract.

All Taxes, Delivery charges, Freight, Tariffs, and any applicable Fees shall be included in the quote, or the quote will be deemed non-responsive.

4.0 Installation

Installation of the metal panels will be completed by Metro staff. The manufacturer will only provide installation instructions and requirements.