This is a roofing inspection report for Battle Creek Public Schools' Admin/Willard Building located at 7 West Van Buren Street in Battle Creek, Michigan. The report documents existing roofing conditions and establishes the scope of work for a roofing project identified as 21-002. The building has a total roof area of 16,280 square feet comprised of five sections: Section #1 contains 2,700 square feet of TPO membrane; Section #2 contains 6,100 square feet of TPO membrane; Section #3 contains 100 square feet of TPO membrane; Section #4 contains 100 square feet of TPO membrane; and Section #5 contains 7,280 square feet of shingles. The inspection included a visual assessment and thermal moisture scan to evaluate the existing roofing systems.

The inspection revealed significant maintenance issues requiring corrective action. The proposed scope of work includes restoration of 200 square feet and replacement of 16,080 square feet of roofing material. Section #1 exhibits ponding with clogged roof drains and fair condition parapet walls and edge metal. Section #2 shingles are in fair condition but show mineral loss, with a failing previous restoration coating. Section #3 has standing water with drainage issues and fair condition counterflashing and edge metal. The project specifications require contractors to verify actual square footage, account for varying roof deck types, and apply appropriate details including modified base sheets, recovery boards, and 2-inch polyiso insulation with new TPO membrane and shingle systems as applicable.

View the file

Other files for this state and local contract opportunity

Other files attached to BATTLE CREEK PUBLIC SCHOOLS ROOFING PROJECT, newest first.
File Type Posted
21-002 Specifications 2021 BCPS District Roofing-1.pdf PDF
Roofing 21-002 Miller Stone Compiled.pdf PDF
Project Manual - 21-002 BCPS District Roofing 2021-2.pdf PDF
Roofing 21-002 Clarification 01-4.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B A

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O O

LS

C

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

COVER

SHEET

A1

BATTLE CREEK PUBLIC SCHOOLS

ADMIN/WILLARD BUILDING

7 W VAN BUREN STREET

BATTLE CREEK, MI 49017

NOTES

DRAWING INDEX

LOCATION MAPWORK PERFORMED

SITE MAP

A1 - COVER SHEET

A2 – ROOF PLAN

A2 – ROOF PLAN

D1 – DETAILS

D2 – DETAILS

C1-C3 - CONDITIONS

S1 - SCOPE

EXISTING ROOFING SYSTEMS:

- VISUAL ASSESSMENT

- THERMAL MOSITURE SCAN

- PRIORITY SUMMARY

- BUDGET PLANNING

TPA Membrane

Shingle

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

SYSTEM OVERVIEW:

SECTION: SYSTEM TYPE: AREA:

SECTION #1: TPA 2,700 SF

SECTION #2: TPA 6,100 SF

SECTION #3: TPA 100 SF

SECTION #4: TPA 100 SF

SECTION #5: SINGLES 7,280 SF

TOTAL: 16,280 SF

ROOF

PLAN

A2

Shingles

TPA Membrane

1 2

TPA Membrane/NOT

INCLUDED

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

ROOF

PLAN

A3

RTU

HATCH

DRAIN

UNIT

EXHAUST

EXPANSION JOINT

DETAIL LEGEND

** CONTRACTOR IS RESPONSIBLE FOR VARIFYING SQUARE

FOOTAGE

SYSTEM OVERVIEW:

SECTION: SYSTEM TYPE: AREA:

SECTION #1: TPA 2,700 SF

SECTION #2: TPA 6,100 SF

SECTION #3: TPA 100 SF

SECTION #4: TPA 100 SF

SECTION #5: SINGLES 7,280 SF

TOTAL: 16,280 SF

RTU

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

DETAILS

D1

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

Detail Requirements

2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

Detail Requirements

2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.

N.T.S.D1

1 TYPICAL FIELD OF ROOF DETAIL

N.T.S.D1

2 TYPICAL PENETRATION

N.T.S.D1

4 DRAIN - TYPICAL

N.T.S.D1

5 TYPICAL CURB DETAIL

N.T.S.D1

3 TYPICAL WALL DETAIL

Modif ied Base Sheet

½” Recover Board

(2x) 2" Poly Iso

Modif ied Base Sheet

½” Recover Board

(2x) 2" Poly Iso Modif ied Base Sheet

½” Recover Board

(2x) 2" Poly Iso

Modif ied Base Sheet

½” Recover Board

(2x) 2" Poly Iso

Modif ied Base Sheet

½” Recover Board

(2x) 2" Poly Iso

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

DETAILS

D2

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

Detail Requirements

2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

Detail Requirements

2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.

N.T.S.D2

1 TYPICAL FIELD OF ROOF DETAIL

N.T.S.D2

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

CONDITIONS

C1

SECTION #1

Roof Section Overview

The parapet walls and edge metal are in fair condition.

Ponding is present on the membrane and water no longer flows to the roof drains.

The roof drain is clogged and water completely covers the drain.

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

CONDITIONS

C2

SECTION #2

The shingles are in fair condition but starting to show signs of mineral loss.

Roof Area Overview

The singles are in fair condition

A previous restoration coating on this section is failing.

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

CONDITIONS

C3

SECTION #3

Water no longer flows to the roof drain which sits higher than the field of the roof.

Another view of standing water and the failing coating. The counterflahsing and edge metal is in fair condition.

TT

LE

C R

EE

K

P U

B

LI

C S

C H

O

A P

IT

A

L A

V E

N E

B A

TT

LE

C R

EE

K

, M I 4

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

SCOPE

S1

RESTORATION: 200 SF

REPLACEMENT: 16,080 SF

1 2

** CONTRACTOR IS RESPONSIBLE FOR VARIFYING SQUARE

FOOTAGE

Admin-Willard Roof Report.vsdx
A1
Adult Ed
Page-3
D1
D2
#1
#2
#3
P1

File details come from the government source that posted it. Updated .