Rockwood-_114-25_Pricing_2024-08-27.xlsx

XLSX spreadsheet 90 KB Posted

Attached to
Competitive Selection OH|DOT11425-8
Contract number
DOT11425-8
Issued by
Ohio

About this file

This document is a state and local contract indefinite delivery vehicle for general maintenance services, specifically Contract 114-25, covering Districts 1, 2, 6, 7, and 8 in Ohio. The contract is awarded to Rockwood Builders, Ltd., with key references from the Ohio Department of Transportation and the Ohio Department of Public Safety. The vendor contacts include Brandon Pho (General Manager), Kevin Lei (Project Manager), and Chris Park (Field Superintendent), all based in Columbus, Ohio.

The contract provides labor rates, equipment rates, and markup pricing for various construction disciplines across multiple Ohio counties, though Rockwood Builders did not submit bids for Districts 1, 2, 7, and 8. For District 6, the company provided detailed hourly, daily, and weekly rates for equipment including pickup trucks, scissor lifts, skid steers, air compressors, and excavators. The pricing includes a 65% overhead rate and a 15% parts markup for projects. Labor rates are specified for different construction trades, with variations based on county and project cost (under or over $75,000), and the contract allows for prevailing wage adjustments. The document includes a general maintenance worksheet for cost calculations, though no specific project details are populated in the sample.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

References

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
Vendor References
Vendor Name:Rockwood Builders, Ltd.
Submit below the the name, email address, organization name, address, telephone numbers of at least three (3) references with whom they have provided public improvement and emergency maintenance and/or repairs to in the last five (5) years (see Section 11 of the Specifications).
NameEmail AddressOrganizationAddressTelephone Number
Charles StewartCharles.Stewart@dot.ohio.govOhio Dept of Transportation1980 W. Broad St. Columbus, OH 43223614-466-1519
Julian MooreJulian.Moore@dot.ohio.govOhio Dept of Transportation1980 W. Broad St. Columbus, OH 43223614-307-7150
Eric SmihERSmith@dps.ohio.govDept of Public Safety1970 W. Broad Street
Columbus OH 43222614-674-2558
Chris Leecclee@dps.ohio.govDept of Public Safety1970 W. Broad Street
Columbus OH 43222614-995-3713

mailto:Charles.Stewart@dot.ohio.govmailto:ERSmith@dps.ohio.govmailto:Julian.Moore@dot.ohio.govmailto:cclee@dps.ohio.gov Vendor Contacts

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
Vendor Contacts
Vendor Name:Rockwood Builders, Ltd.
Position/FunctionNameEmail AddressTelephone NumberAlternate/Other Telephone Number
GMBrandon Phobrandon@rockwoodbuilders.com614-901-8610614-286-2871
Project MgrKevin Leikevin@rockwoodbuilders.com614-901-8610614-767-9888
Field SuperintendentChris Parkpark4670@gmail.com614-901-8610614-286-2450

D1 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 1 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Rockwood Builders, Ltd.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Allen County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Defiance County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Hancock County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Hardin County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Paulding County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Putnam County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Van Wert County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Wyandot County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for OverheadNO BID
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)NO BID

D1 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 1 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Rockwood Builders, Ltd.
County Where Equipment Will Be UtilizedALLENDEFIANCEHANCOCKHARDINPAULDINGPUTNAMVAN WERTWYANDOT
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
NO BID
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

D2 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 2 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Rockwood Builders, Ltd.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Fulton County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Henry County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Lucas County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Ottawa County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Sandusky County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Seneca County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Williams County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Wood County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for OverheadNO BID
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)NO BID

D2 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 2 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Rockwood Builders, Ltd.
County Where Equipment Will Be UtilizedFULTONHENRYLUCASOTTAWASANDUSKYSENECAWILLIAMSWOOD
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
NO BID
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

D6 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 6 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Rockwood Builders, Ltd.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Delaware County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Fayette County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Franklin County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Madison County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Marion County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Morrow County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Pickaway County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
Union County Standard Wage Rate$ 68.88$ 88.88$ 78.88$ 88.88$ 64.88$ 65.88$ 68.88$ 68.88$ 56.88$ 68.88$ 75.88$ 75.88$ 98.88
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for Overhead65.00%
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)15.00%

D6 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 6 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Rockwood Builders, Ltd.
County Where Equipment Will Be UtilizedDELAWAREFAYETTEFRANKLINMADISONMARIONMORROWPICKAWAYUNION
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
Pickup TruckHourly$ 55.00$ 55.00$ 55.00$ 55.00$ 55.00$ 55.00$ 55.00$ 55.00
Daily$ 255.00$ 255.00$ 255.00$ 255.00$ 255.00$ 255.00$ 255.00$ 255.00
Weekly$ 1,250.00$ 1,250.00$ 1,250.00$ 1,250.00$ 1,250.00$ 1,250.00$ 1,250.00$ 1,250.00
Elec scissor lift narrowHourly$ 125.00$ 125.00$ 125.00$ 125.00$ 125.00$ 125.00$ 125.00$ 125.00
Daily$ 950.00$ 950.00$ 950.00$ 950.00$ 950.00$ 950.00$ 950.00$ 950.00
Weekly$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00
SkidsteerHourly$ 150.00$ 150.00$ 150.00$ 150.00$ 150.00$ 150.00$ 150.00$ 150.00
Daily$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00
Weekly$ 4,650.00$ 4,650.00$ 4,650.00$ 4,650.00$ 4,650.00$ 4,650.00$ 4,650.00$ 4,650.00
Diesel air compressorHourly$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00
Daily$ 650.00$ 650.00$ 650.00$ 650.00$ 650.00$ 650.00$ 650.00$ 650.00
Weekly$ 2,625.00$ 2,625.00$ 2,625.00$ 2,625.00$ 2,625.00$ 2,625.00$ 2,625.00$ 2,625.00
Floor stripperHourly$ 90.00$ 90.00$ 90.00$ 90.00$ 90.00$ 90.00$ 90.00$ 90.00
Daily$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00
Weekly$ 2,350.00$ 2,350.00$ 2,350.00$ 2,350.00$ 2,350.00$ 2,350.00$ 2,350.00$ 2,350.00
Lighty Duty Box TruckHourly$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00
Daily$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00
Weekly$ 2,250.00$ 2,250.00$ 2,250.00$ 2,250.00$ 2,250.00$ 2,250.00$ 2,250.00$ 2,250.00
ExcavatorHourly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Daily$ 1,200.00$ 1,200.00$ 1,200.00$ 1,200.00$ 1,200.00$ 1,200.00$ 1,200.00$ 1,200.00
Weekly$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00
Cut-Off SawHourly$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00
Daily$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Weekly$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00
Power washerHourly$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00
Daily$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00
Weekly$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00
Dump TruckHourly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Daily$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00
Weekly$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00
ForkliftHourly$ 75.00$ 75.00$ 75.00$ 75.00$ 75.00$ 75.00$ 75.00$ 75.00
Daily$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00
Weekly$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

D7 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 7 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Rockwood Builders, Ltd.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Auglaize County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Champaign County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Clark County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Darke County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Logan County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Mercer County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Miami County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Montgomery County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Shelby County Standard Wage Rate
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for OverheadNO BID
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)NO BID

D7 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 7 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Rockwood Builders, Ltd.
County Where Equipment Will Be UtilizedAUGLAIZECHAMPAIGNCLARKDARKELOGANMERCERMIAMIMONTGOMERYSHELBY
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
NO BID
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

D8 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 8 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Rockwood Builders, Ltd.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Butler County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Clermont County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Clinton County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Greene County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Hamilton County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Montgomery County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Preble County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
Warren County Standard Wage RateNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BIDNO BID
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for OverheadNO BID
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)NO BID

D8 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 8 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Rockwood Builders, Ltd.
County Where Equipment Will Be UtilizedBUTLERCLERMONTCLINTONGREENEHAMILTONMONTGOMERYPREBLEWARREN
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
NO BID
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

General Maintenance Worksheet

Labor
HoursRateTotal
Total Labor0$0.00
Rented Equipment
Total CostTotal

Total Rented Equipment $0.00

Owned Equipment
QtyRateTotal

Total Owned Equipment $0.00

MaterialsMarkup %10.00%
QtyCostExt. CostMarkup $Total
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Total Materials$0.00$0.00
Subcontractors
WorkVendorTotal
Total Subcontractors$0.00
Trip Charge
QtyCostTotal
$0.00
$0.00
Total Trip Charges$0.00
TOTAL PROJECT AMOUNT$0.00

File details come from the government source that posted it. Updated .