FA857118R00120002.pdf
PDF 199 KB Posted
- Attached to
- Robotic Sanding System Federal contract opportunity
- Solicitation number
- Not on record
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_15_MAY_2018.pdf | ||
| Purchase_Description__12_MAY_2018.pdf | ||
| RFP_Amend_01.pdf | ||
| RFP.pdf | ||
| CDRLs_A004-_Chart.pdf | ||
| Purchase_Description-Robotic_Sanding_System_B169_(L8WC10)_4-9-18.pdf | ||
| CDRLs_A006-_Acceptance_Test_Plan.pdf | ||
| CDRLs_A001-_Contractor's_Standard_Operating_Procedures.pdf | ||
| CDRLs_A007-_Acceptance_Test_Plan.pdf | ||
| CDRLs_A005-_Training.pdf | ||
| CDRLs_A003-_COTS.PDF | ||
| CDRLs_A002-_Mishap.pdf | ||
| Questions_&_Answers.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3QCCM8047A002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A) Revise the CLIN structure B) Update the Option language C) Revise the authorities for CDRLs A002-A007 D) Incorporate a revision to the Purchase Description E) Extend the date for receipt of proposals to: 12:00 PM on 25 May 2018
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA857118R0012
X 9B. DATED (SEE ITEM 11)
03-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-May-2018
CODE
AFSC/PZIMA *FA8571
CP 478 222 7588
375 PERRY ST BLDG 255
ROBINS AFB GA 31098-1672
FA8571 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA857118R0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-May-2018 12:00 PM to 25-May-
2018 12:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from Material to Automated Sanding System.
The CLIN extended description has changed from:
Automated Robotic Sander SystemBldg. 169, South BoothIAW Product Description dated, 9 April 2018Govt POC:
Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with Shane Groves**
To:
Automated Robotic Sander SystemSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with Shane Groves**
CLIN 0002
This CLIN has been renumbered to CLIN 0003.
The CLIN extended description has changed from:
System Enhancement (A)South Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with Shane Groves**
System Enhancement South Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be
CLIN 0003
This CLIN has been renumbered to CLIN 0004.
The CLIN extended description has changed from:
System Enhancement (B)South Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with
System EnhancementSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be
CLIN 0004
This CLIN has been renumbered to CLIN 0005.
The CLIN extended description has changed from:
System Enhancement (C)South Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with
System EnhancementSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be
CLIN 0005
This CLIN has been renumbered to CLIN 0006.
The CLIN extended description has changed from:
System Enhancement (D)South Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with
System EnhancementSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be
CLIN 0006
This CLIN has been renumbered to CLIN 0002.
The CLIN extended description has changed from:
Automated Robotic Sander SystemSouth Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC:
Automated Robotic Sander SystemSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation
CLIN 0007
The CLIN extended description has changed from:
ELIN A001 - Standard Operating ProceduresAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery instructions
ELIN A001 - Contractor's Standard Operating ProceduresAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery instructions The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
The NAICS code 811219 has been added.
The MDAP/MAIS Code 000 has been added.
CLIN 0008
ELIN A002 - Accident/Incident ReportAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery instructions
ELIN A002 - Accident/Incident ReportAuthority DI-SAFT-81563/T NOT 1See Block 16 of CDRL A002 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 0009
ELIN A003 - Comm. Off-The-Shelf Equip. Man. ReqAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery instructions
ELIN A003 - Commercial Off-The-Shelf (COTS) Equipment ManualRequirementsAuthority DI-TMSS-80527CSee Block 16 of CDRL A003 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 0010
ELIN A004 - Project Planning ChartAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery
ELIN A004 - Project Planning ChartAuthroity DI-MGMT-80507CSee Block 16 of CDRL A004 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 0011
ELIN A005 - Training MaterialsAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery
ELIN A005 - Training MaterialsAuthority DI-ILSS-80872See Block 16 of CDRL A005 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 0012
ELIN A006 - Acceptance Test Plan - SiteAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery
ELIN A006 - Acceptance Test Plan - FactoryAuthority DI-QCIC-80553See Block 16 of CDRL A006 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 0013
ELIN A007 - Acceptance Test Plan - FactoryAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for
ELIN A007 - Acceptance Test Plan - SiteAuthority DI-QCIC-80553See Block 16 of CDRL A007 for delivery
The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 1001
The CLIN extended description has changed from:
Automated Robotic Sander SystemBldg. 169, South BoothIAW Product Description dated, 9 April 2018Govt POC:
Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with Shane Groves**Option I may be exercised at any time within 24 months after effective date of award.
Automated Robotic Sander SystemSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018. Option may be exercised at any time within 36 months after effective date of award.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with Shane Groves**
CLIN 1002
Automated Robotic Sander SystemSouth Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC:
Automated Robotic Sander SystemSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation
CLIN 1003
This CLIN has been renumbered to CLIN 1007.
The CLIN extended description has changed from:
A001 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 1004
This CLIN has been renumbered to CLIN 1008.
The CLIN extended description has changed from:
delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 1005
This CLIN has been renumbered to CLIN 1009.
The CLIN extended description has changed from:
Block 16 of CDRL A003 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 1006
This CLIN has been renumbered to CLIN 1010.
The CLIN extended description has changed from:
instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 1007
This CLIN has been renumbered to CLIN 1011.
The CLIN extended description has changed from:
ELIN A005 - Training MaterialsAuthority DI-ILSS-80872See Block 16 of CDRL A005 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
CLIN 1008
This CLIN has been renumbered to CLIN 1012.
The CLIN extended description has changed from:
ELIN A006 - Acceptance Test Plan - SiteAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery
ELIN A006 - Acceptance Test Plan - FactoryAuthority DI-QCIC-80553See Block 16 of CDRL A006 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 1009
This CLIN has been renumbered to CLIN 1013.
The CLIN extended description has changed from:
instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 2001
Automated Robotic Sander SystemWest Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC:
coordinated with Shane Groves**Option II may be exercised at any time within 36 months after effective date of award.
Automated Robotic Sander SystemSouth Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018. Option may be exercised at any time within 36 months after effective date of award.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation shall be coordinated with Shane Groves**
CLIN 2002
Automated Robotic Sander SystemWest Booth, Bldg 169IAW Product Description dated, 9 April 2018Govt POC:
Automated Robotic Sander SystemWest Booth, Bldg 169Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation. The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil**Delivery and installation
CLIN 2003
This CLIN has been renumbered to CLIN 2007.
The CLIN extended description has changed from:
A001 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
CLIN 2004
This CLIN has been renumbered to CLIN 2008.
The CLIN extended description has changed from:
delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 2005
This CLIN has been renumbered to CLIN 2009.
The CLIN extended description has changed from:
Block 16 of CDRL A003 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 2006
This CLIN has been renumbered to CLIN 2010.
instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 2007
This CLIN has been renumbered to CLIN 2011.
The CLIN extended description has changed from:
ELIN A005 - Training MaterialsAuthority DI-ILSS-80872See Block 16 of CDRL A005 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 2008
This CLIN has been renumbered to CLIN 2012.
The CLIN extended description has changed from:
ELIN A006 - Acceptance Test Plan - SiteAuthority DI-MGMT-81580-ITSee Block 16 of CDRL A001 for delivery
ELIN A006 - Acceptance Test Plan - FactoryAuthority DI-QCIC-80553See Block 16 of CDRL A006 for delivery instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
CLIN 2009
This CLIN has been renumbered to CLIN 2013.
The CLIN extended description has changed from:
instructions The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
The unit of issue Each has been added.
The FSC code J016 has been added.
The PROG code A1C has been added.
The WSC Equipment code 000 has been added.
The NAICS code 811219 has been added.
CLIN 1003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1003 1 Each Three Pad Automatic Changer
FFP
Automated Robotic Sander System South Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves** FOB: Destination
SIGNAL CODE: A
NET AMT
CLIN 1004 is added as follows:
1004 1 Each Multiple Grit Support
FFP
Automated Robotic Sander System South Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
CLIN 1005 is added as follows:
1005 1 Each Path Planning Software
FFP
Automated Robotic Sander System South Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
CLIN 1006 is added as follows:
1006 1 Each Camera Tracking System
FFP
Automated Robotic Sander System South Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
CLIN 2003 is added as follows:
2003 1 Each Three Pad Automatic Changer
FFP
Automated Robotic Sander System West Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
CLIN 2004 is added as follows:
2004 1 Each Multiple Grit Support
FFP
Automated Robotic Sander System West Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
CLIN 2005 is added as follows:
2005 1 Each Path Planning Software
FFP
Automated Robotic Sander System West Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
CLIN 2006 is added as follows:
2006 1 Each Camera Tracking System
FFP
Automated Robotic Sander System West Booth, Bldg 169
Each system shall be installed no later than 18 months after contract award and training and production support shall not exceed 3 months following installation.
The total Period of Performance (PoP) for each system shall not exceed 21 months IAW Product Description dated, 12 May 2018.
Govt POC: Shane Groves, Phone: 478-335-6482 e-mail: shane.groves@us.af.mil
**Delivery and installation shall be coordinated with Shane Groves**
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0007 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
F3QCCM
The following Delivery Schedule for CLIN 0008 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 0009 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
FOB: N/A
The following Delivery Schedule for CLIN 0010 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 0011 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 0012 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 0013 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1003 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1004 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1005 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1006 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1007 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1008 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1009 has been added:
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1010 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1011 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1012 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 1013 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2003 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2004 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2005 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2006 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2007 has been added:
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2008 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2009 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2010 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2011 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2012 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
The following Delivery Schedule for CLIN 2013 has been added:
CAGE
21 mths. ADC 1 402 MXW *F3QCCM
AF BPN NO MILSBILLS PROCESSES
420 RICHARD RAY BLVD STE 100
ROBINS AFB GA 31098-0000
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0007 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The Acceptance/Inspection Schedule for CLIN 0008 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0009 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 0010 has been changed from:
N/A N/A N/A N/A
The Acceptance/Inspection Schedule for CLIN 0011 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 0012 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 0013 has been changed from:
N/A N/A N/A N/A
To:
The following Acceptance/Inspection Schedule was added for CLIN 1003:
The following Acceptance/Inspection Schedule was added for CLIN 1004:
The following Acceptance/Inspection Schedule was added for CLIN 1005:
The following Acceptance/Inspection Schedule was added for CLIN 1006:
The Acceptance/Inspection Schedule for CLIN 1007 has been changed from:
To:
The Acceptance/Inspection Schedule for CLIN 1008 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 1009 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 1010 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 1011 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 1012 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 1013 has been changed from:
The following Acceptance/Inspection Schedule was added for CLIN 2003:
The following Acceptance/Inspection Schedule was added for CLIN 2004:
The following Acceptance/Inspection Schedule was added for CLIN 2005:
The following Acceptance/Inspection Schedule was added for CLIN 2006:
The Acceptance/Inspection Schedule for CLIN 2007 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 2008 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 2009 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 2010 has been changed from:
To:
The Acceptance/Inspection Schedule for CLIN 2011 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 2012 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 2013 has been changed from:
N/A N/A N/A N/A
To:
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRL A001- Contractor's
Standard Operating Procedures
01-MAY-2018
Exhibit B CDRL A002- Mishap 01-MAY-2018 Exhibit C CDRL A003- COTS 01-MAY-2018 Exhibit D CDRL A004- Chart 01-MAY-2018 Exhibit E CDRL A005- Training 01-MAY-2018 Exhibit F CDRL A006 -
Acceptance Test Plan - Factory
01-MAY-2018
Exhibit G CDRL A007- Acceptance Test Plan - Site
01-MAY-2018
Attachment 1 Purchase Description 25 09-APR-2018 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Purchase Description_12
MAY 2018
25 12-MAY-2018
(End of Summary of Changes)
File details come from the government source that posted it.