This is a Scope of Work document for the Thomas B. Finan Hospital Center in Maryland, detailing roadway repairs and critical area resurfacing at the facility. The project requires a contractor to provide comprehensive labor, materials, equipment, supervision, traffic control, and related services to repair deteriorated roadway sections and resurface designated critical areas. The scope encompasses pre-construction activities including site inspections, utility locates, and traffic control planning; damaged surface area preparation involving pavement removal and debris disposal; milling and resurfacing of critical roadway sections with asphalt overlay; drainage structure adjustments for utility covers and catch basins; pavement markings and restoration; and quality control verification. Specific site deficiencies are documented through five photographs showing critical asphalt failure at the dietary entrance, severe pavement alligatoring, road and concrete curb washout along the facility exit lane, pavement degradation and potholes between cottage areas, and large structural potholes with surface cracking.

The document does not contain information regarding pricing terms, set asides, incumbent contractors, response dates, due dates, site visit requirements, bidder meetings, award dates, contract term, renewal options, or funding sources. These details would typically be found in the related solicitation or invitation for bid documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE & SPECIF ICATION

Facility Roadway Repairs & Critical Area Resurfacing

PROJECT DESCRIPTION

Provide all labor, materials, equipment, supervision, traffic control, and incidentals necessary to repair deteriorated roadway sections and pave designated critical areas to restore safe vehicular and pedestrian access, improve drainage, and extend pavement service life.

SCOPE OF WORK

1. Pre-Construction Activities

Conduct site inspection with facility Maintenance Supervisor to verify square footage and limits of work.

Mark underground utilities through utility locate services as needed.

Develop and implement traffic control and safety plans.

Coordinate work schedules to minimize disruption to facility operations, emergency access, and deliveries.

Install temporary signage, barricades, and traffic control devices.

2. Damaged Surface Area Preparation

Saw-cut pavement edges to provide clean transition joints as needed.

Remove failed asphalt, potholes, alligator cracking, rutting, and deteriorated pavement in the critically damaged sections (see Photo Appendix).

Excavate unsuitable base materials as needed.

Haul away and properly dispose of all deteriorated pavement debris off site.

3. Milling and Resurfacing (Critical Areas)

Mill existing pavement surfaces in designated roadway sections to specified depth.

Clean milled surfaces and apply tack coat.

Install a new asphalt overlay in critical areas as verified by the facility Maintenance Supervisor.

Ensure smooth transitions at curbs, manholes, and existing pavement.

4. Drainage Structure Adjustments

Adjust manholes, valve boxes, utility covers, and catch basins to final grade as needed.

Verify positive drainage away from buildings and roadways.

Scope of Work: Facility Roadway Repairs & Resurfacing Page 1 of 7

5. Pavement Markings and Restoration

Replace all disturbed pavement markings, striping, directional arrows, crosswalks, stop bars, and parking stall markings.

Restore landscaped areas disturbed by construction.

Remove construction debris and temporary traffic control devices.

6. Quality Control

Perform compaction as needed.

Verify pavement thickness and material compliance.

Conduct final inspection with facility Maintenance Supervisor.

Correct deficiencies prior to project acceptance.

Scope of Work: Facility Roadway Repairs & Resurfacing Page 2 of 7

PHOTO APPENDIX: SITE DEFICIENCIES

FIGURE 1: CRITICAL ASPHALT FAILURE AT THE ROAD ENTRANCE TO DIETARY

Scope of Work: Facility Roadway Repairs & Resurfacing Page 3 of 7

FIGURE 2: ALTERNATE ANGLE OF SEVERE PAVEMENT ALLIGATORING AT THE DIETARY

ENTRANCE

Scope of Work: Facility Roadway Repairs & Resurfacing Page 4 of 7

FIGURE 3: SEVERE ROAD AND CONCRETE CURB WASHOUT ALONG THE FACILITY EXIT LANE

Scope of Work: Facility Roadway Repairs & Resurfacing Page 5 of 7

FIGURE 4: PAVEMENT DEGRADATION AND POTHOLES ON THE ROAD BETWEEN COTTAGE 5

AND COTTAGE 7

Scope of Work: Facility Roadway Repairs & Resurfacing Page 6 of 7

FIGURE 5: LARGE STRUCTURAL POTHOLE AND SURROUNDING SURFACE CRACKING ON THE

FACILITY EXIT LANE

Scope of Work: Facility Roadway Repairs & Resurfacing Page 7 of 7

Facility Roadway Repairs & Critical Area Resurfacing
Scope of Work
Photo Appendix: Site Deficiencies

File details come from the government source that posted it. Updated .